2. PRODUCT ENGINEERING (FOSSIL BOILERS)
IMPROVEMENTS DONE IN BOILER LAYOUTS
• REDUCTIONOF BOILERCOLUMNS IN 500 MW CONTRACTS. 53 COLUMNS PROVIDEDIN
RAMAGUNDAMUNIT7, REDUCED TO 43 Nos IN KAHALGOAN & TO 39 Nos IN BELLARY.
• INTEGRATION OF LIFT STRUCTUREWITH BOILER STRUCTUREAS AGAINST STAND-ALONE
STRUCTUREEARLIER.
• WIDER SPACING OF BOILER MAINCOLUMNS (From Boiler centre line ) FOR BETTER ACCESS
SPACE.
• FIRST 250 MW DESIGNED WITH 7 BOWL MILLS WITH REARMILL ARRANGEMENT & WITH
UNSYMMETRIC ARRANGEMENT OFMILLS{ 4 NOS ONLEFT SIDE & 3 NOS ONRIGHT SIDE
WITH A CENTREGAP} FOR KORBA 2x 250 MW
10/4/2017 boben2005@gmail.com
3. PRODUCT ENGINEERING (FOSSIL BOILERS IMPROVEMENTS
DONE IN BOILER LAYOUTS
• RETROFIT OF ECONOMISER COIL HANDLING
• IMPROVEMENT OF BRACING PATTERN ON THE REAR SIDE OF THE BOILER
FOR ECONOMISER COIL HANDLING.
• RELOCATION OF GATES IN THE ECONOMISER BYPASS DUCTS FOR
ECONOMISER COIL HANDLING .
• OPTIMIZATION OF DAMPERS IN THE AIR DUCTS TO AIR PREHEATERS.
• LAYOUT FOR THE TWIN REHEATER HEADERS FOR 500 MW NEW CONTRACTS.
10/4/2017 boben2005@gmail.com
4. REGULAR ARRANGEMENT OF BOILER COLUMNS FOR
RAMAGUNDAM 500 MW UNIT 7 (53 NO OF COLUMNS)
10/4/2017 boben2005@gmail.com
5. OPTIMIZED BOILER COLUMN LOCATION FOR KAHALGAON 500 MW
(43 NOS OF COLUMNS)
10/4/2017 boben2005@gmail.com
6. OPTIMIZED ARRANGEMENT OF BOILER COLUMNS FOR
BELLARY 500 MW UNIT (39 NO OF COLUMNS)
10/4/2017 boben2005@gmail.com
9. SUMMARY OF BOILER COLUMN SPACING IN CURRENT 500
MW UNITS
CONTRACT NAME NO OF
COLUMNS
SPACING OF BOILER MAIN
COLUMNS FROM BOILER CENTRE
LINE
RAMAGUNDAM 500
MW UNIT 7
53 NOS 13 M
KAHALGOAN 500 MW 43 NOS 15.5 M
BELLARY 500 MW 39 NOS 14.5 M
10/4/2017 boben2005@gmail.com
10. BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
• SIDE MILL LAYOUT.
• 7 NUMBERS OF XRP 1003 BOWL MILLS
• WIDER MAIN BOILER COLUMN PITCHING AT 29 MTRS.
• TRISECTOR REGEN AIRHEATER 31.5 VIM(T) 2000 - USED IN THIS
CONTRACT
10/4/2017 boben2005@gmail.com
11. • LARGE MAN HOLE DOOR(1.8 x 0.9 Mt) ENVISAGED IN PENT HOUSE
FOR MAINTANECE.
• CL ELEVATION OF RING HEADER = 10.25 Mtrs.
• CL ELEVATION OF DRUM = 70.608 Mtrs.
• BOTTOM OF THE CEILING GIRDER = 78.550 Mts.
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
10/4/2017 boben2005@gmail.com
15. BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
KEY PLAN OF BOILER AND ID SYSTEM
10/4/2017 boben2005@gmail.com
16. BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
LAYOUT OF ID SYSTEM - ELEVATION
10/4/2017 boben2005@gmail.com
17. BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
LAYOUT OF ID SYSTEM - PLAN
10/4/2017 boben2005@gmail.com
18. SALIENT FEATURES OF KORBA 2 x 250 MW UNITS
1. FIRST 250 MW UNIT WITH SEVEN BOWL MILLS WITH
REAR MILL LAYOUT.
1. MILLS LOCATED UNSYMMETRICALLY ABOUT THE
BOILER AXIS : 4 NOS ON THE LEFT SIDE & 3 NOS ON THE
RIGHT SIDE WITH AN EMPTY BAY AT THE CENTRE
10/4/2017 boben2005@gmail.com