SlideShare a Scribd company logo
1 of 4
RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                            MEASURES IN PLACE


         Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.

                                                                            Production safety
                                                                                                            Charlotte Bracken
                                                                            manager:

                                                                            Assessor. Ashleigh              Assessment Date: 30/03/12
Accommodation Assessed . Eccles sixth form centre room C19
                                                                            Darlington


                                                                                                                RISK (with controls)    Additional
                               Who might be
          HAZARD                                                 PRECAUTIONS/CONTROLS                                                   Controls
                               harmed and
      potential for harm                             already in place to remove hazard, reduce risk level       L      S        R       Needed.
                               how ?
                                                                                                                                       Details Over
Hygiene And Comfort             Production           •   Toilets and sinks provided within Corridor
                               team/ crew.               accommodation. Hot and Cold water, soap supplied.      1      1        1
                                                     •   Drinking water provided in canteens, vending
                                                         machines and a shop.
                                                     •   Inadequate Ventilation for students, no openable
                                                         windows, but there is air conditioning and air vents
                                                         to provide ventilation.
                                                     •   Adequate space in classroom for students.

Trips, Slips and Falls                               •   Good Housekeeping, disinfected and vacuumed            1      2        2
[ Workplace Regs ]                                       [ cleaned daily ]
                                                     •   Minimal trailing Cables.
                                                     •   Artificial Ceiling Lighting provided. /Emergency
                                                         Lighting luminaries adjacent to door.
                                                     •   Carpet stained but in average condition.
RISK (with controls)     Additional
                                         Who might be
           HAZARD                                                                    PRECAUTIONS/CONTROLS                                                        Controls
                                         harmed and
       potential for harm                                                already in place to remove hazard, reduce risk level            L      S       R        Needed.
                                         how ?
                                                                                                                                                                Details Over
Hygiene And Comfort                       Production                     •    Toilets and sinks provided within Corridor
                                         team/ crew.                          accommodation. Hot and Cold water, soap supplied.         1       1       1
                                                                         •    Drinking water provided in canteens, vending
                                                                              machines and a shop.
                                                                         •    Inadequate Ventilation for students, no openable
                                                                              windows, but there is air conditioning and air vents
                                                                              to provide ventilation.
                                                                         •    Adequate space in classroom for students.

Fire Hazards                                                             •    Fire Alarm call points located on exit routes
                                                                         •    Fire Audability tests carried out each term.
                                                                         •    Full Fire evacuation carried out each term.               1       3       3
                                                                         •    Fire Extinguishers located in corridors.
                                                                         •    Co2 Extinguisher adjacent to door.
                                                                         •    Automatic Smoke Detector [ device 73 ]
Accident                                                                 •    24 First Aiders on site
                                                                         •    First Aid box available in reception                      1       2       2
                                                                         •    Local First Aider
                                                                         •    Contact Reception, 2400 if in any doubt.
Electrical                                                               •    visual checks carried out.
                                                                         •    19 P.C. / Keyboard.                                       1       2       2
                                                                         •    Portable unit with T.V. and D.V.D. player. [7/08]
                                                                         •    P.A.T. Testing carried out
                                                                         •    Data Projector, Whiteboard.
                                                                         •    O.H.P. [7/07]. 1 Printer.
                                                                         •    1 Extension Lead [7/08]


The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)    LIKELIHOOD                                                  (S)       SEVERITY OF HAZARD                          (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                              (LxS).
1.    Hazard   exists   very   infrequently;   limited   numbers    1.       Could cause minor injury only
exposed                                                         2.     Could cause major injury/3 day or more   Very high risks score 6 or 9
2. Likely to occur; hazard exists intermittently or occurs             absence                                  Moderate risks score 3 or 4
    occasionally                                                3.     Could cause fatality/severe injury       Low priority risks score       1 or 2
3. Likely to occur soon; permanent hazard or occurs
    daily / repeatedly; many may be exposed                                                                     VERY HIGH RISKS NEED IMMEDIATE ACTION


Signature of Health & Safety Officer                    A.darlington                                             Date 30/03/12

Signature of Senior member of management with           C.Bracken                                                Date
Health and Safety Responsibility.
RISK CONTROL PLAN [Used For Risk Level 6 or 9]

Activity/Workplace Assessed:                                  Assessor:           Assessment Date:


                 ADDITIONAL CONTROLS NEEDED [ Mandatory For Risk Level 6 or 9 ]        To be actioned by:   Date Completed:
GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK.




TRAINING NEEDED:




COMMUNICATION:

More Related Content

Similar to Risk assessment record with all controls in place

Similar to Risk assessment record with all controls in place (6)

Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Honeywell 5821 Brochure
Honeywell 5821 BrochureHoneywell 5821 Brochure
Honeywell 5821 Brochure
 
Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
 

More from BigCheese1

Producer and audience
Producer and audienceProducer and audience
Producer and audienceBigCheese1
 
Producer and audience
Producer and audienceProducer and audience
Producer and audienceBigCheese1
 
Motion graphics glossary
Motion graphics glossaryMotion graphics glossary
Motion graphics glossaryBigCheese1
 
In a film analysis
In a film analysisIn a film analysis
In a film analysisBigCheese1
 
Random photography
Random photographyRandom photography
Random photographyBigCheese1
 
Nature photography
Nature photographyNature photography
Nature photographyBigCheese1
 
Animal photography
Animal photographyAnimal photography
Animal photographyBigCheese1
 
Andy warhol style images
Andy warhol style imagesAndy warhol style images
Andy warhol style imagesBigCheese1
 
Magazine design evaluation
Magazine design evaluationMagazine design evaluation
Magazine design evaluationBigCheese1
 
Final major project_production_diary_
Final major project_production_diary_Final major project_production_diary_
Final major project_production_diary_BigCheese1
 
Production schedule update wb 22.04.13
Production schedule update wb 22.04.13Production schedule update wb 22.04.13
Production schedule update wb 22.04.13BigCheese1
 
Production schedule update wb 15.04.13
Production schedule update wb 15.04.13Production schedule update wb 15.04.13
Production schedule update wb 15.04.13BigCheese1
 
Production schedule update wb 08.04.13
Production schedule update wb 08.04.13Production schedule update wb 08.04.13
Production schedule update wb 08.04.13BigCheese1
 
Production schedule update wb 01.04.13
Production schedule update wb 01.04.13Production schedule update wb 01.04.13
Production schedule update wb 01.04.13BigCheese1
 
Production schedule update wb 25.03.13
Production schedule update wb 25.03.13Production schedule update wb 25.03.13
Production schedule update wb 25.03.13BigCheese1
 
Production schedule update wb 25.03.13
Production schedule update wb 25.03.13Production schedule update wb 25.03.13
Production schedule update wb 25.03.13BigCheese1
 

More from BigCheese1 (20)

57review
57review57review
57review
 
Producer and audience
Producer and audienceProducer and audience
Producer and audience
 
Producer and audience
Producer and audienceProducer and audience
Producer and audience
 
Motion graphics glossary
Motion graphics glossaryMotion graphics glossary
Motion graphics glossary
 
In a film analysis
In a film analysisIn a film analysis
In a film analysis
 
Movies
MoviesMovies
Movies
 
Random photography
Random photographyRandom photography
Random photography
 
Nature photography
Nature photographyNature photography
Nature photography
 
Animal photography
Animal photographyAnimal photography
Animal photography
 
Andy warhol style images
Andy warhol style imagesAndy warhol style images
Andy warhol style images
 
Magazine design evaluation
Magazine design evaluationMagazine design evaluation
Magazine design evaluation
 
Final major project_production_diary_
Final major project_production_diary_Final major project_production_diary_
Final major project_production_diary_
 
Production schedule update wb 22.04.13
Production schedule update wb 22.04.13Production schedule update wb 22.04.13
Production schedule update wb 22.04.13
 
Production schedule update wb 15.04.13
Production schedule update wb 15.04.13Production schedule update wb 15.04.13
Production schedule update wb 15.04.13
 
Production schedule update wb 08.04.13
Production schedule update wb 08.04.13Production schedule update wb 08.04.13
Production schedule update wb 08.04.13
 
Production schedule update wb 01.04.13
Production schedule update wb 01.04.13Production schedule update wb 01.04.13
Production schedule update wb 01.04.13
 
Movies
MoviesMovies
Movies
 
Production schedule update wb 25.03.13
Production schedule update wb 25.03.13Production schedule update wb 25.03.13
Production schedule update wb 25.03.13
 
Production schedule update wb 25.03.13
Production schedule update wb 25.03.13Production schedule update wb 25.03.13
Production schedule update wb 25.03.13
 
Presentation1
Presentation1Presentation1
Presentation1
 

Recently uploaded

Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 

Recently uploaded (20)

Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

Risk assessment record with all controls in place

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Production safety Charlotte Bracken manager: Assessor. Ashleigh Assessment Date: 30/03/12 Accommodation Assessed . Eccles sixth form centre room C19 Darlington RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort Production • Toilets and sinks provided within Corridor team/ crew. accommodation. Hot and Cold water, soap supplied. 1 1 1 • Drinking water provided in canteens, vending machines and a shop. • Inadequate Ventilation for students, no openable windows, but there is air conditioning and air vents to provide ventilation. • Adequate space in classroom for students. Trips, Slips and Falls • Good Housekeeping, disinfected and vacuumed 1 2 2 [ Workplace Regs ] [ cleaned daily ] • Minimal trailing Cables. • Artificial Ceiling Lighting provided. /Emergency Lighting luminaries adjacent to door. • Carpet stained but in average condition.
  • 2. RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort Production • Toilets and sinks provided within Corridor team/ crew. accommodation. Hot and Cold water, soap supplied. 1 1 1 • Drinking water provided in canteens, vending machines and a shop. • Inadequate Ventilation for students, no openable windows, but there is air conditioning and air vents to provide ventilation. • Adequate space in classroom for students. Fire Hazards • Fire Alarm call points located on exit routes • Fire Audability tests carried out each term. • Full Fire evacuation carried out each term. 1 3 3 • Fire Extinguishers located in corridors. • Co2 Extinguisher adjacent to door. • Automatic Smoke Detector [ device 73 ] Accident • 24 First Aiders on site • First Aid box available in reception 1 2 2 • Local First Aider • Contact Reception, 2400 if in any doubt. Electrical • visual checks carried out. • 19 P.C. / Keyboard. 1 2 2 • Portable unit with T.V. and D.V.D. player. [7/08] • P.A.T. Testing carried out • Data Projector, Whiteboard. • O.H.P. [7/07]. 1 Printer. • 1 Extension Lead [7/08] The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only
  • 3. exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION Signature of Health & Safety Officer A.darlington Date 30/03/12 Signature of Senior member of management with C.Bracken Date Health and Safety Responsibility.
  • 4. RISK CONTROL PLAN [Used For Risk Level 6 or 9] Activity/Workplace Assessed: Assessor: Assessment Date: ADDITIONAL CONTROLS NEEDED [ Mandatory For Risk Level 6 or 9 ] To be actioned by: Date Completed: GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK. TRAINING NEEDED: COMMUNICATION: