SlideShare a Scribd company logo
1 of 3
RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                             MEASURES IN PLACE


        Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.


                                                                          Principal of College

Accommodation Assessed . Buisness Ventures. Classroom S1 . 10
desks in various arrangements, approx 10 chairs. Benching to 3                                             Assessment Date:
                                                                          Assessor. Peter Hart
walls, 18 P.C.s and chairs. 2 Stationary Cupboards. Shelving at 3
levels.

                                                                                                              RISK (with controls)    Additional
                              Who might be
         HAZARD                                                 PRECAUTIONS/CONTROLS                                                  Controls
                              harmed and
     potential for harm                             already in place to remove hazard, reduce risk level       L     S        R       Needed.
                              how?
                                                                                                                                     Details Over
Hygiene And Comfort           The actors,           •   Toilets and sinks provided within Corridor
                              camera person,            accommodation. Hot and Cold water, soap supplied.      1     1        1
                              director and          •   By making sure drinks are available.
                              everyone              •   Make sure that all the areas are clean.
                              involved in the
                              production and
                              people passing
                              by for when we
                              are filming
                              outdoors.
Who might be                                                                                    RISK (with controls)    Additional
          HAZARD                                                                   PRECAUTIONS/CONTROLS
                                       harmed and                                                                                                              Controls
      potential for harm                                               already in place to remove hazard, reduce risk level             L       S         R
                                       how?                                                                                                                    Needed.
Trips, Slips and Falls                 The actors,                     •    Make sure the location where we are filming is kept         3       2         3
                                       camera person,                       clear of anything that we don’t need, so it doesn’t
                                       director and                         become cluttered and so we can move around
                                       everyone                             easily.
                                       involved in the                 •    Make sure there are no wires trailing on the floor off
                                       production and                       any of the equipment for people to trip over.
                                       people passing
                                       by for when we
                                       are filming
                                       outdoors, if
                                       there were for
                                       example wires
                                       trailing across
                                       the floor and
                                       someone was
                                       to trip over it.
Accident                               The actors,                     •    There are 3 actors and one person that will be doing
                                       camera person,                       the camera work but there will always be at least           2       2         3
                                       director and                         one actor that won’t be being filmed so there will be
                                       everyone                             a first aid box available for them to use if someone
                                       involved in the                      needs it.
                                       production

Electrical                             Everyone                        •    Make sure that there are no drinks around when
                                       involved in the                      filming.                                                    1       2         2
                                       production, if
                                       drinks were to
                                       get knocked
                                       over and spill
                                       on any
                                       electrical
                                       appliances.

The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)   LIKELIHOOD                                                 (S)       SEVERITY OF HAZARD                         (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                           (LxS).
1. Hazard    exists   very   infrequently;   limited   numbers    1.       Could cause minor injury only
exposed                                                           2.       Could cause major injury/3 day or more          Very high risks score 6 or 9
2.   Likely to occur; hazard exists intermittently or occurs           absence                           Moderate risks score 3 or 4
     occasionally                                              3.   Could cause fatality/severe injury   Low priority risks score      1 or 2
3.   Likely to occur soon; permanent hazard or occurs
     daily / repeatedly; many may be exposed                                                             VERY HIGH RISKS NEED IMMEDIATE ACTION

More Related Content

What's hot

Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templatetamz486
 
Location Recce
Location RecceLocation Recce
Location RecceEllicia
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSam Benzie
 
more evidence to include in blogger
more evidence to include in bloggermore evidence to include in blogger
more evidence to include in bloggerkatiemcquillanmedia
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template mediaLewisHodson1412
 
Jacob strachotta videographer
Jacob strachotta videographerJacob strachotta videographer
Jacob strachotta videographerStrachotta_Jacob
 

What's hot (8)

Pitch
PitchPitch
Pitch
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Location Recce
Location RecceLocation Recce
Location Recce
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
more evidence to include in blogger
more evidence to include in bloggermore evidence to include in blogger
more evidence to include in blogger
 
Risk assessment template media
Risk assessment template mediaRisk assessment template media
Risk assessment template media
 
Jacob strachotta videographer
Jacob strachotta videographerJacob strachotta videographer
Jacob strachotta videographer
 
Floor plan
Floor planFloor plan
Floor plan
 

Viewers also liked

Viewers also liked (10)

Session 18 Power Point
Session 18   Power PointSession 18   Power Point
Session 18 Power Point
 
Validation boot camp 1
Validation boot camp 1Validation boot camp 1
Validation boot camp 1
 
Risk assessment for Quality-by-Design and why FMEA fails
Risk assessment for Quality-by-Design and why FMEA failsRisk assessment for Quality-by-Design and why FMEA fails
Risk assessment for Quality-by-Design and why FMEA fails
 
Quality Risk Management
Quality Risk ManagementQuality Risk Management
Quality Risk Management
 
Quality risk management
Quality risk managementQuality risk management
Quality risk management
 
ICH Q9 Quality Risk Management
ICH Q9 Quality Risk ManagementICH Q9 Quality Risk Management
ICH Q9 Quality Risk Management
 
NIST SP 800 30 Flow Chart
NIST SP 800 30 Flow ChartNIST SP 800 30 Flow Chart
NIST SP 800 30 Flow Chart
 
Quality Risk Management
Quality Risk ManagementQuality Risk Management
Quality Risk Management
 
Quality Risk Management-ICH Q9-2014
Quality Risk Management-ICH Q9-2014Quality Risk Management-ICH Q9-2014
Quality Risk Management-ICH Q9-2014
 
Presentation on QRM_NS
Presentation on QRM_NSPresentation on QRM_NS
Presentation on QRM_NS
 

Similar to Risk assessment

Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment FormBrett Tinnion
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formcembitmead
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formcembitmead
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment FormGraveney School
 
Risk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalRisk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalDmeeThriller
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1BigCheese1
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment formGraveney School
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessmentLuke Finlay
 
Risk assessment south bank
Risk assessment south bankRisk assessment south bank
Risk assessment south bankDmeeThriller
 

Similar to Risk assessment (17)

Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment townhall
Risk assessment townhallRisk assessment townhall
Risk assessment townhall
 
Risk Assessment Form
Risk Assessment FormRisk Assessment Form
Risk Assessment Form
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Film Production Risk Assessment Form
Film Production Risk Assessment FormFilm Production Risk Assessment Form
Film Production Risk Assessment Form
 
Risk assessmentjosh
Risk assessmentjoshRisk assessmentjosh
Risk assessmentjosh
 
Risk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene finalRisk assessment the loved up and vase scene final
Risk assessment the loved up and vase scene final
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Film production risk assessment form
Film production risk assessment formFilm production risk assessment form
Film production risk assessment form
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessment
 
Film production risk assessment
Film production risk assessmentFilm production risk assessment
Film production risk assessment
 
Risk assessment south bank
Risk assessment south bankRisk assessment south bank
Risk assessment south bank
 

More from snailguinproductions (20)

Ashleigh darlington cv
Ashleigh darlington cvAshleigh darlington cv
Ashleigh darlington cv
 
Evaluation
EvaluationEvaluation
Evaluation
 
Questionnaire results
Questionnaire resultsQuestionnaire results
Questionnaire results
 
Screen ratios, frame rate, video forats, compression
Screen ratios, frame rate, video forats, compressionScreen ratios, frame rate, video forats, compression
Screen ratios, frame rate, video forats, compression
 
Ansel adams
Ansel adamsAnsel adams
Ansel adams
 
Photography research annie
Photography research anniePhotography research annie
Photography research annie
 
Photography research eve arnold
Photography research eve arnoldPhotography research eve arnold
Photography research eve arnold
 
Editing portrait
Editing portraitEditing portrait
Editing portrait
 
Portrait review
Portrait reviewPortrait review
Portrait review
 
Evaluation
EvaluationEvaluation
Evaluation
 
Glossary resolution
Glossary resolutionGlossary resolution
Glossary resolution
 
Glossary pixels
Glossary pixelsGlossary pixels
Glossary pixels
 
Photos and editing effects
Photos and editing effectsPhotos and editing effects
Photos and editing effects
 
Photos and editing effects
Photos and editing effectsPhotos and editing effects
Photos and editing effects
 
Iron man 3
Iron man 3Iron man 3
Iron man 3
 
Iron man 3
Iron man 3Iron man 3
Iron man 3
 
Spiderman 2 opening credits
Spiderman 2 opening creditsSpiderman 2 opening credits
Spiderman 2 opening credits
 
Breaking dawn credits
Breaking dawn creditsBreaking dawn credits
Breaking dawn credits
 
Credits
CreditsCredits
Credits
 
Cv
CvCv
Cv
 

Risk assessment

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Principal of College Accommodation Assessed . Buisness Ventures. Classroom S1 . 10 desks in various arrangements, approx 10 chairs. Benching to 3 Assessment Date: Assessor. Peter Hart walls, 18 P.C.s and chairs. 2 Stationary Cupboards. Shelving at 3 levels. RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how? Details Over Hygiene And Comfort The actors, • Toilets and sinks provided within Corridor camera person, accommodation. Hot and Cold water, soap supplied. 1 1 1 director and • By making sure drinks are available. everyone • Make sure that all the areas are clean. involved in the production and people passing by for when we are filming outdoors.
  • 2. Who might be RISK (with controls)  Additional HAZARD PRECAUTIONS/CONTROLS harmed and Controls potential for harm already in place to remove hazard, reduce risk level L S R how? Needed. Trips, Slips and Falls The actors, • Make sure the location where we are filming is kept 3 2 3 camera person, clear of anything that we don’t need, so it doesn’t director and become cluttered and so we can move around everyone easily. involved in the • Make sure there are no wires trailing on the floor off production and any of the equipment for people to trip over. people passing by for when we are filming outdoors, if there were for example wires trailing across the floor and someone was to trip over it. Accident The actors, • There are 3 actors and one person that will be doing camera person, the camera work but there will always be at least 2 2 3 director and one actor that won’t be being filmed so there will be everyone a first aid box available for them to use if someone involved in the needs it. production Electrical Everyone • Make sure that there are no drinks around when involved in the filming. 1 2 2 production, if drinks were to get knocked over and spill on any electrical appliances. The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9
  • 3. 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION