RISK ASSESSMENT RECORD - WITH ALL CONTROL                                                           MEASURES IN PLACE     ...
2.   Likely to occur; hazard exists intermittently or occurs           absence                           Moderate risks sc...
RISK CONTROL PLAN [ Used For Risk Level 6 or 9 ]Activity/Workplace Assessed:                                   Assessor:  ...
Upcoming SlideShare
Loading in …5
×

Risk assessment

355 views

Published on

  • Be the first to comment

  • Be the first to like this

Risk assessment

  1. 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Director – Adam Foster Assessor – Richard Assessment Date:Accommodation Assessed House O’Connor RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details OverTrips, Slips and Falls • Keep wires away and tidy 2 2 4 • When filming party scene make sure everyone stays in an allocated area • Make sure that we keep all of the scenes with the public sensible and keep the public out of it.Fire Hazards • Make sure we don’t have too many electronics running at the same time • Keep the exits clear 1 3 3Accident • If people are drinking in the film don’t use real alcohol. 1 2 2Electrical • If we use props such as DJ decks, lights and music systems we have to make sure we take relevant 1 2 2 precautions such as volume of music, don’t make the lights either too dim or flash too muchThe three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) forthe severity of the hazard, both based on the following:-(L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS).1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury onlyexposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9
  2. 2. 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4 occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 23. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTIONSignature of Health & Safety Officer DateSignature of Senior member of management with DateHealth and Safety Responsibility.Review of Risk Assessment DateAnnual Review, Re-Visit or changes in IdentifiedHazards
  3. 3. RISK CONTROL PLAN [ Used For Risk Level 6 or 9 ]Activity/Workplace Assessed: Assessor: Assessment Date: ADDITIONAL CONTROLS NEEDED [ Mandatory For Risk Level 6 or 9 ] To be actioned by: Date Completed:GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK.TRAINING NEEDED:COMMUNICATION:

×