RISK ASSESSMENT RECORD - WITH ALL CONTROL
                                            MEASURES IN PLACE


         Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete.


                                                                            Production Safety Manager        Richard O’Connor

                                                                            Assessor. Richard                Assessment Date: 30/03/12
Accommodation Assessed . Eccles sixth form centre room C19
                                                                            O’Connor


                                                                                                                RISK (with controls)    Additional
                               Who might be
          HAZARD                                                 PRECAUTIONS/CONTROLS                                                   Controls
                               harmed and
      potential for harm                             already in place to remove hazard, reduce risk level        L     S        R       Needed.
                               how ?
                                                                                                                                       Details Over
Hygiene And Comfort                                  •   Toilets and sinks provided outside of classrooms.
                               Production                Hot and Cold water, available in canteen.               1     1        1
                               team                  •   Drinking water provided in Toilets.
                                                     •   Inadequate natural Ventilation for students, 0
                                                         openable windows, although air conditioning in
                                                         place
                                                     •   Adequate space in classroom for students.

Trips, Slips and Falls         Production            •   Good Housekeeping [ cleaned daily ]                     1     1        1
[ Workplace Regs ]             team
                                                     •   Minimal trailing Cables.
                                                     •   Artificial Ceiling Lighting provided.
                                                     •   Carpet slightly stained but in average condition.
RISK (with controls)    Additional
                                    Who might be
          HAZARD                                                               PRECAUTIONS/CONTROLS                                                         Controls
                                    harmed and
      potential for harm                                           already in place to remove hazard, reduce risk level              L       S         R    Needed.
                                    how ?
                                                                                                                                                           Details Over
Hygiene And Comfort                                                •    Toilets and sinks provided outside of classrooms.
                                    Production                          Hot and Cold water, available in canteen.                    1       1         1
                                    team                           •    Drinking water provided in Toilets.
                                                                   •    Inadequate natural Ventilation for students, 0
                                                                        openable windows, although air conditioning in
                                                                        place
                                                                   •    Adequate space in classroom for students.

Fire Hazards                        Production                     •    Fire Alarm call points located on exit routes
                                    team
                                                                   •    Fire Audibility tests carried out each term.
                                                                   •    Full Fire evacuation carried out each term.                  1       3         3
                                                                   •    Fire Extinguishers located in corridors.
                                                                   •    Co2 Extinguisher adjacent to door.
                                                                   •    Automatic Smoke Detector
Accident                            Production                     •    1 First Aider in classroom
                                    team
                                                                   •    First Aid box available in reception                         1       2         2
                                                                   •    Local First Aider
                                                                   •    Contact Reception, 2400 if in any doubt.
Electrical                          Production                     •    visual checks carried out.
                                    team
                                                                   •    24 P.C. / Keyboard.                                          1       2         2
                                                                   •    P.A.T. Testing carried out
                                                                   •    Data Projector, Whiteboard.
                                                                   •    1 Printer.
                                                                   •    1 Extension Lead [7/08]


The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for
the severity of the hazard, both based on the following:-

(L)   LIKELIHOOD                                             (S)       SEVERITY OF HAZARD                          (R) RISK LEVEL is product of Likelihood and Severity
                                                                                                                        (LxS).
1. Hazard exists very infrequently; limited numbers           1.       Could cause minor injury only
exposed                                                       2.          Could cause major injury/3 day or more        Very high risks score 6 or 9
2. Likely to occur; hazard exists intermittently or occurs                absence                                       Moderate risks score 3 or 4
occasionally                                                 3.          Could cause fatality/severe injury   Low priority risks score    1 or 2
3.   Likely to occur soon; permanent hazard or occurs
     daily / repeatedly; many may be exposed                                                                       VERY HIGH RISKS NEED IMMEDIATE ACTION


Signature of Health & Safety Officer                    Richard O’Connor                                            Date                      30/03/12
Signature of Senior member of management with           Harrison Reed Delve                                         Date                      30/03/12
Health and Safety Responsibility.
RISK CONTROL PLAN [ Used For Risk Level 6 or 9 ]

Activity/Workplace Assessed:                                 Assessor:           Assessment Date:


                 ADDITIONAL CONTROLS NEEDED [Mandatory For Risk Level 6 or 9 ]        To be actioned by:   Date Completed:
GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK.




TRAINING NEEDED:




COMMUNICATION:

More Related Content

Viewers also liked

методич по праву
методич по правуметодич по праву
методич по праву
Demanessa
 
In what ways does your media product use, develop or challenge forms and conv...
In what ways does your media product use, develop or challenge forms and conv...In what ways does your media product use, develop or challenge forms and conv...
In what ways does your media product use, develop or challenge forms and conv...
jess-media-xox
 
статья шевнин киров
статья шевнин кировстатья шевнин киров
статья шевнин киров
Demanessa
 
Comic evaluacion presentacion
Comic evaluacion presentacionComic evaluacion presentacion
Comic evaluacion presentacion
Theresa San
 
Apresentacao janeiro11
Apresentacao janeiro11Apresentacao janeiro11
Apresentacao janeiro11
Fernandaconde
 
El club de los poetas muertos: carpe diem
El club de los poetas muertos: carpe diemEl club de los poetas muertos: carpe diem
El club de los poetas muertos: carpe diem
Eneko Olabarria
 

Viewers also liked (20)

методич по праву
методич по правуметодич по праву
методич по праву
 
In what ways does your media product use, develop or challenge forms and conv...
In what ways does your media product use, develop or challenge forms and conv...In what ways does your media product use, develop or challenge forms and conv...
In what ways does your media product use, develop or challenge forms and conv...
 
Eve arnold
Eve arnoldEve arnold
Eve arnold
 
Light painting
Light paintingLight painting
Light painting
 
57proposal
57proposal57proposal
57proposal
 
Adam burton
Adam burtonAdam burton
Adam burton
 
статья шевнин киров
статья шевнин кировстатья шевнин киров
статья шевнин киров
 
Vivien Maier
Vivien MaierVivien Maier
Vivien Maier
 
Faculdade integrada avm teoria da alfabetizacao
Faculdade integrada avm  teoria da alfabetizacaoFaculdade integrada avm  teoria da alfabetizacao
Faculdade integrada avm teoria da alfabetizacao
 
Antic règim
Antic règimAntic règim
Antic règim
 
GBI
GBIGBI
GBI
 
Comic evaluacion presentacion
Comic evaluacion presentacionComic evaluacion presentacion
Comic evaluacion presentacion
 
Oportunitats en infraestructures a Amèrica Llatina
 Oportunitats en infraestructures a Amèrica Llatina Oportunitats en infraestructures a Amèrica Llatina
Oportunitats en infraestructures a Amèrica Llatina
 
Catalan wines USA 2013-2014
Catalan wines USA 2013-2014Catalan wines USA 2013-2014
Catalan wines USA 2013-2014
 
Apresentacao janeiro11
Apresentacao janeiro11Apresentacao janeiro11
Apresentacao janeiro11
 
Introdução DP
Introdução DPIntrodução DP
Introdução DP
 
PáJaros P..
PáJaros P..PáJaros P..
PáJaros P..
 
El club de los poetas muertos: carpe diem
El club de los poetas muertos: carpe diemEl club de los poetas muertos: carpe diem
El club de los poetas muertos: carpe diem
 
Projectes col·laboratius de recerca i projectes publicoprivats
Projectes col·laboratius de recerca i projectes publicoprivatsProjectes col·laboratius de recerca i projectes publicoprivats
Projectes col·laboratius de recerca i projectes publicoprivats
 
AiR-drum
AiR-drumAiR-drum
AiR-drum
 

More from Taikusproductions (20)

57review
57review 57review
57review
 
Iron man 3
Iron man 3   Iron man 3
Iron man 3
 
Iron man 3
Iron man 3   Iron man 3
Iron man 3
 
Iron man 3
Iron man 3Iron man 3
Iron man 3
 
Questionnair for magazine tables
Questionnair for magazine tablesQuestionnair for magazine tables
Questionnair for magazine tables
 
Magazine design evaluation
Magazine design evaluationMagazine design evaluation
Magazine design evaluation
 
Magazine design evaluation
Magazine design evaluationMagazine design evaluation
Magazine design evaluation
 
Final major project evidence
Final major project evidenceFinal major project evidence
Final major project evidence
 
Me And My Movies
Me And My MoviesMe And My Movies
Me And My Movies
 
Genre analysis sheet - taken
Genre analysis sheet - takenGenre analysis sheet - taken
Genre analysis sheet - taken
 
Genre analysis sheet - wolverine
Genre analysis sheet - wolverineGenre analysis sheet - wolverine
Genre analysis sheet - wolverine
 
Me And My Movies
Me And My MoviesMe And My Movies
Me And My Movies
 
Intro
IntroIntro
Intro
 
Genre analysis sheet - Avengers
Genre analysis sheet - AvengersGenre analysis sheet - Avengers
Genre analysis sheet - Avengers
 
Questionnair for magazine
Questionnair for magazineQuestionnair for magazine
Questionnair for magazine
 
Nemo
NemoNemo
Nemo
 
Toy story
Toy storyToy story
Toy story
 
Shrek
ShrekShrek
Shrek
 
Johnny's work
Johnny's workJohnny's work
Johnny's work
 
Questionnair for magazine
Questionnair for magazineQuestionnair for magazine
Questionnair for magazine
 

Recently uploaded

Recently uploaded (20)

Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Risk assessment

  • 1. RISK ASSESSMENT RECORD - WITH ALL CONTROL MEASURES IN PLACE Each assessment must take into account and record any specific hazards arising from the activity, before the assessment is complete. Production Safety Manager Richard O’Connor Assessor. Richard Assessment Date: 30/03/12 Accommodation Assessed . Eccles sixth form centre room C19 O’Connor RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort • Toilets and sinks provided outside of classrooms. Production Hot and Cold water, available in canteen. 1 1 1 team • Drinking water provided in Toilets. • Inadequate natural Ventilation for students, 0 openable windows, although air conditioning in place • Adequate space in classroom for students. Trips, Slips and Falls Production • Good Housekeeping [ cleaned daily ] 1 1 1 [ Workplace Regs ] team • Minimal trailing Cables. • Artificial Ceiling Lighting provided. • Carpet slightly stained but in average condition.
  • 2. RISK (with controls)  Additional Who might be HAZARD PRECAUTIONS/CONTROLS Controls harmed and potential for harm already in place to remove hazard, reduce risk level L S R Needed. how ? Details Over Hygiene And Comfort • Toilets and sinks provided outside of classrooms. Production Hot and Cold water, available in canteen. 1 1 1 team • Drinking water provided in Toilets. • Inadequate natural Ventilation for students, 0 openable windows, although air conditioning in place • Adequate space in classroom for students. Fire Hazards Production • Fire Alarm call points located on exit routes team • Fire Audibility tests carried out each term. • Full Fire evacuation carried out each term. 1 3 3 • Fire Extinguishers located in corridors. • Co2 Extinguisher adjacent to door. • Automatic Smoke Detector Accident Production • 1 First Aider in classroom team • First Aid box available in reception 1 2 2 • Local First Aider • Contact Reception, 2400 if in any doubt. Electrical Production • visual checks carried out. team • 24 P.C. / Keyboard. 1 2 2 • P.A.T. Testing carried out • Data Projector, Whiteboard. • 1 Printer. • 1 Extension Lead [7/08] The three columns (L,S,R) are for assessing the level or degree of risk. The first (L) is for an assessment of the likelihood of the hazard taking place, the second (S) for the severity of the hazard, both based on the following:- (L) LIKELIHOOD (S) SEVERITY OF HAZARD (R) RISK LEVEL is product of Likelihood and Severity (LxS). 1. Hazard exists very infrequently; limited numbers 1. Could cause minor injury only exposed 2. Could cause major injury/3 day or more Very high risks score 6 or 9 2. Likely to occur; hazard exists intermittently or occurs absence Moderate risks score 3 or 4
  • 3. occasionally 3. Could cause fatality/severe injury Low priority risks score 1 or 2 3. Likely to occur soon; permanent hazard or occurs daily / repeatedly; many may be exposed VERY HIGH RISKS NEED IMMEDIATE ACTION Signature of Health & Safety Officer Richard O’Connor Date 30/03/12 Signature of Senior member of management with Harrison Reed Delve Date 30/03/12 Health and Safety Responsibility.
  • 4. RISK CONTROL PLAN [ Used For Risk Level 6 or 9 ] Activity/Workplace Assessed: Assessor: Assessment Date: ADDITIONAL CONTROLS NEEDED [Mandatory For Risk Level 6 or 9 ] To be actioned by: Date Completed: GENERAL RESTRICTIONS. TO REDUCE / ELIMINATE RISK. TRAINING NEEDED: COMMUNICATION: