SlideShare a Scribd company logo
1 of 2
BAHATTIN YANAR
E-mail: bahattinyanar@hotmail.com
Tel: +90 508 208 63 23
. RESPONSIBILITIES & QUALIFICATIONS
- Participate during the preparation phase of EPC projects; technical evaluations and cost
estimation of equipment, manpower, plant installation /commissioning activities planning)
- Preparation of inquiry specification, technical bid evaluation, post order follow up, witness of
workshop & site acceptance test for various types of rotating and package equipment.
- Preparation of procedure for installation, pre-commissioning & commissioning assistance on
various types of rotating equipment.
- Participate in planning and implementation of changes in plant or projects as required.
- Experience on complete life cycle of various type of rotating equipment used in power plants,
oil / gas petrochemical plants starting from feed thru major overhauling.
- Capable to handle different role on need basis like, representative of client, part of PMC team,
representing the EPC company .Strong customer relationship and coordination skills.
- Package and rotating mechanical equipment, construction, installation, commissioning, start-
up, handover, operations and maintenance support and machine troubleshooting.
- Supervision and execution of mechanical installation/commissioning and handing over.
- Manage the claims of end user during the warranty period of EPC projects. Create, coordinate,
implement action plan with the project management team, vendors and end user.
- Project close out activities at the end of an EPC project.
. SUMMARY OF EXPERIENCE
Experienced mechanical engineer, over 19 years of diverse engineering experience. Includes
field supervision during installation and commissioning projects. Project engineering role while
working as a mechanical lead for power plant (EPC) projects. Over 10 years of experience in
maintenance, turnarounds, troubleshooting, installation / commissioning of plant equipment and
piping systems including the supervision of min.20 trade people and engineers. I had worked on
a number of field durability issues for OG& C, power EPC projects.
Equipment Detail Experiences for installation, commissioning and maintenance are:
• 25 MW GT10-B Siemens(ABB-Alstom) Gas Turbine LTSA Contract Management and it’s Inspections
including A, B, C, D, E
• 2x10 MW EK-1100 Siemens Steam Turbine Overhaul – Year 2007
• 2x12 MW DEKX 525 De Pretto Escherr Wyss (Man Turbo)Steam Turbine Overhaul – Year 2008
• 61 MW CCPP Power Plant Project Procurement, Construction, Commissioning and Performance
Tests Completed on year 2005
• 50 MW Siemens Westinghouse Gas Turbine LTSA Contract Management and it’s Inspections
including CCI, HGPI, MI
• 48 MW G.E. LM-6000 Gas Turbine LTSA Contract Management and it’s Inspections
• 75 MW CCPP Unit-1 Power Plant Maintenance Responsibility
• 61 MW CCPP Unit-1 Power Plant Maintenance Responsibility
• 25 MW Mitsubishi Steam Turbine Overhaul – Year 2005
• All types of process pumps.
• Balance of plant equipment.
. EXPERIENCE
Bosen CCPP Power Plant - 146 MW 2 Unit CCPP Power Plant (2000 – 2007)
I was having a coordinator role during the installation and commissioning stages of the
investment project. Following up the construction and commissioning activities, reporting to the
project management was the part of my role. Also implementing action plans (material and
manpower) with the project management team at each phase of the project. Implementing the
changes of plant in order to meet the estimates and to keep the activities within the budget was
one of my roles. Besides I was providing a link between project management team and the end
user management during the execution phase.
Initial startup and operation coordination was under my responsibility for the combine cycle
power plant formed by General Electric LM6000, Aalborg HRSG, Siemens ST3–C steam turbine
and related BOP equipment.
TUPRAS -Turkish Petroleum Refineries Corp. (2007 – ...)
Maintenance Chief Engineer
Power plant investment technical coordination for the refinery with 10 Million Ton Crude/Year
capacity formed by Siemens SGT-600 gas türbine, Aalborg SF HRSG with the related BOP
equipment.
Responsible from construction to initial startup and continuous operation of the plants with the
below activities included:
• 10 Million Ton Crude/Year Capacity Refinery’s Utilities Static Equipment + Rotating Equipment
Maintenance Responsibility
• 10 Million Ton Crude/Year Capacity Refinery’s Petrol Movement Unit and Tank Farm Static Equipment
+ Rotating Equipment Maintenance Responsibility
• 300.000 Ton Oil /Year Capacity Oil Refinery’s Static Equipment + Rotating Equipment Maintenance
Responsibility
· EDUCATION
-BSc ITU (Istanbul Technical University / Istanbul - Turkey)- Mechanical Eng. (1992-1996)
· LANGUAGE / COMPUTER
Turkish : Native
English : Fluent, MS Office Applications (word, excel, power point...etc)

More Related Content

What's hot (19)

WaltJohnson
WaltJohnsonWaltJohnson
WaltJohnson
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
waseem cv
waseem cvwaseem cv
waseem cv
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016
 
CV_Ing_Civil _LEMKEDDEM_Eng
CV_Ing_Civil _LEMKEDDEM_EngCV_Ing_Civil _LEMKEDDEM_Eng
CV_Ing_Civil _LEMKEDDEM_Eng
 
DnD Presentation SEPT2014
DnD Presentation SEPT2014DnD Presentation SEPT2014
DnD Presentation SEPT2014
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S
 
Rajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_VitaeRajnish_Yadav_-_Curriculum_Vitae
Rajnish_Yadav_-_Curriculum_Vitae
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
amit resume - Copy
amit resume - Copyamit resume - Copy
amit resume - Copy
 
Murali-Resume
Murali-ResumeMurali-Resume
Murali-Resume
 
Ali update CV-18-05-2016
Ali update CV-18-05-2016Ali update CV-18-05-2016
Ali update CV-18-05-2016
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
Steven Lync1
Steven Lync1Steven Lync1
Steven Lync1
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 

Similar to ++++byanar cv (20)

Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Mohamed abdulazeem_C V.
Mohamed abdulazeem_C V.Mohamed abdulazeem_C V.
Mohamed abdulazeem_C V.
 
Resume_kalika
Resume_kalikaResume_kalika
Resume_kalika
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
MOHAN_Final
MOHAN_FinalMOHAN_Final
MOHAN_Final
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
Khalil Awwad
Khalil AwwadKhalil Awwad
Khalil Awwad
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
MOHANNAD CV
MOHANNAD  CVMOHANNAD  CV
MOHANNAD CV
 
Muhammad Awais mechanical
Muhammad Awais mechanicalMuhammad Awais mechanical
Muhammad Awais mechanical
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
Mohamed Ahmed Abdel Rahman
Mohamed Ahmed Abdel RahmanMohamed Ahmed Abdel Rahman
Mohamed Ahmed Abdel Rahman
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 

++++byanar cv

  • 1. BAHATTIN YANAR E-mail: bahattinyanar@hotmail.com Tel: +90 508 208 63 23 . RESPONSIBILITIES & QUALIFICATIONS - Participate during the preparation phase of EPC projects; technical evaluations and cost estimation of equipment, manpower, plant installation /commissioning activities planning) - Preparation of inquiry specification, technical bid evaluation, post order follow up, witness of workshop & site acceptance test for various types of rotating and package equipment. - Preparation of procedure for installation, pre-commissioning & commissioning assistance on various types of rotating equipment. - Participate in planning and implementation of changes in plant or projects as required. - Experience on complete life cycle of various type of rotating equipment used in power plants, oil / gas petrochemical plants starting from feed thru major overhauling. - Capable to handle different role on need basis like, representative of client, part of PMC team, representing the EPC company .Strong customer relationship and coordination skills. - Package and rotating mechanical equipment, construction, installation, commissioning, start- up, handover, operations and maintenance support and machine troubleshooting. - Supervision and execution of mechanical installation/commissioning and handing over. - Manage the claims of end user during the warranty period of EPC projects. Create, coordinate, implement action plan with the project management team, vendors and end user. - Project close out activities at the end of an EPC project. . SUMMARY OF EXPERIENCE Experienced mechanical engineer, over 19 years of diverse engineering experience. Includes field supervision during installation and commissioning projects. Project engineering role while working as a mechanical lead for power plant (EPC) projects. Over 10 years of experience in maintenance, turnarounds, troubleshooting, installation / commissioning of plant equipment and piping systems including the supervision of min.20 trade people and engineers. I had worked on a number of field durability issues for OG& C, power EPC projects. Equipment Detail Experiences for installation, commissioning and maintenance are: • 25 MW GT10-B Siemens(ABB-Alstom) Gas Turbine LTSA Contract Management and it’s Inspections including A, B, C, D, E • 2x10 MW EK-1100 Siemens Steam Turbine Overhaul – Year 2007 • 2x12 MW DEKX 525 De Pretto Escherr Wyss (Man Turbo)Steam Turbine Overhaul – Year 2008
  • 2. • 61 MW CCPP Power Plant Project Procurement, Construction, Commissioning and Performance Tests Completed on year 2005 • 50 MW Siemens Westinghouse Gas Turbine LTSA Contract Management and it’s Inspections including CCI, HGPI, MI • 48 MW G.E. LM-6000 Gas Turbine LTSA Contract Management and it’s Inspections • 75 MW CCPP Unit-1 Power Plant Maintenance Responsibility • 61 MW CCPP Unit-1 Power Plant Maintenance Responsibility • 25 MW Mitsubishi Steam Turbine Overhaul – Year 2005 • All types of process pumps. • Balance of plant equipment. . EXPERIENCE Bosen CCPP Power Plant - 146 MW 2 Unit CCPP Power Plant (2000 – 2007) I was having a coordinator role during the installation and commissioning stages of the investment project. Following up the construction and commissioning activities, reporting to the project management was the part of my role. Also implementing action plans (material and manpower) with the project management team at each phase of the project. Implementing the changes of plant in order to meet the estimates and to keep the activities within the budget was one of my roles. Besides I was providing a link between project management team and the end user management during the execution phase. Initial startup and operation coordination was under my responsibility for the combine cycle power plant formed by General Electric LM6000, Aalborg HRSG, Siemens ST3–C steam turbine and related BOP equipment. TUPRAS -Turkish Petroleum Refineries Corp. (2007 – ...) Maintenance Chief Engineer Power plant investment technical coordination for the refinery with 10 Million Ton Crude/Year capacity formed by Siemens SGT-600 gas türbine, Aalborg SF HRSG with the related BOP equipment. Responsible from construction to initial startup and continuous operation of the plants with the below activities included: • 10 Million Ton Crude/Year Capacity Refinery’s Utilities Static Equipment + Rotating Equipment Maintenance Responsibility • 10 Million Ton Crude/Year Capacity Refinery’s Petrol Movement Unit and Tank Farm Static Equipment + Rotating Equipment Maintenance Responsibility • 300.000 Ton Oil /Year Capacity Oil Refinery’s Static Equipment + Rotating Equipment Maintenance Responsibility · EDUCATION -BSc ITU (Istanbul Technical University / Istanbul - Turkey)- Mechanical Eng. (1992-1996) · LANGUAGE / COMPUTER Turkish : Native English : Fluent, MS Office Applications (word, excel, power point...etc)