- Participate during the preparation phase of EPC projects; technical evaluations and cost
estimation of equipment, manpower, plant installation /commissioning activities planning)
- Preparation of inquiry specification, technical bid evaluation, post order follow up, witness of
workshop & site acceptance test for various types of rotating and package equipment.
- Preparation of procedure for installation, pre-commissioning & commissioning assistance on
various types of rotating equipment.
- Participate in planning and implementation of changes in plant or projects as required.
- Experience on complete life cycle of various type of rotating equipment used in power plants,
oil / gas petrochemical plants starting from feed thru major overhauling.
- Capable to handle different role on need basis like, representative of client, part of PMC team,
representing the EPC company .Strong customer relationship and coordination skills.
- Package and rotating mechanical equipment, construction, installation, commissioning, start-
up, handover, operations and maintenance support and machine troubleshooting.
- Supervision and execution of mechanical installation/commissioning and handing over.
- Manage the claims of end user during the warranty period of EPC projects. Create, coordinate,
implement action plan with the project management team, vendors and end user.
- Project close out activities at the end of an EPC project.
. SUMMARY OF EXPERIENCE
Experienced mechanical engineer, over 19 years of diverse engineering experience. Includes
field supervision during installation and commissioning projects. Project engineering role while
working as a mechanical lead for power plant (EPC) projects. Over 10 years of experience in
maintenance, turnarounds, troubleshooting, installation / commissioning of plant equipment and
piping systems including the supervision of min.20 trade people and engineers. I had worked on
a number of field durability issues for OG& C, power EPC projects.
Equipment Detail Experiences for installation, commissioning and maintenance are:
• 25 MW GT10-B Siemens(ABB-Alstom) Gas Turbine LTSA Contract Management and it’s Inspections
including A, B, C, D, E
• 2x10 MW EK-1100 Siemens Steam Turbine Overhaul – Year 2007
• 2x12 MW DEKX 525 De Pretto Escherr Wyss (Man Turbo)Steam Turbine Overhaul – Year 2008
2. • 61 MW CCPP Power Plant Project Procurement, Construction, Commissioning and Performance
Tests Completed on year 2005
• 50 MW Siemens Westinghouse Gas Turbine LTSA Contract Management and it’s Inspections
including CCI, HGPI, MI
• 48 MW G.E. LM-6000 Gas Turbine LTSA Contract Management and it’s Inspections
• 75 MW CCPP Unit-1 Power Plant Maintenance Responsibility
• 61 MW CCPP Unit-1 Power Plant Maintenance Responsibility
• 25 MW Mitsubishi Steam Turbine Overhaul – Year 2005
• All types of process pumps.
• Balance of plant equipment.
. EXPERIENCE
Bosen CCPP Power Plant - 146 MW 2 Unit CCPP Power Plant (2000 – 2007)
I was having a coordinator role during the installation and commissioning stages of the
investment project. Following up the construction and commissioning activities, reporting to the
project management was the part of my role. Also implementing action plans (material and
manpower) with the project management team at each phase of the project. Implementing the
changes of plant in order to meet the estimates and to keep the activities within the budget was
one of my roles. Besides I was providing a link between project management team and the end
user management during the execution phase.
Initial startup and operation coordination was under my responsibility for the combine cycle
power plant formed by General Electric LM6000, Aalborg HRSG, Siemens ST3–C steam turbine
and related BOP equipment.
TUPRAS -Turkish Petroleum Refineries Corp. (2007 – ...)
Maintenance Chief Engineer
Power plant investment technical coordination for the refinery with 10 Million Ton Crude/Year
capacity formed by Siemens SGT-600 gas türbine, Aalborg SF HRSG with the related BOP
equipment.
Responsible from construction to initial startup and continuous operation of the plants with the
below activities included:
• 10 Million Ton Crude/Year Capacity Refinery’s Utilities Static Equipment + Rotating Equipment
Maintenance Responsibility
• 10 Million Ton Crude/Year Capacity Refinery’s Petrol Movement Unit and Tank Farm Static Equipment
+ Rotating Equipment Maintenance Responsibility
• 300.000 Ton Oil /Year Capacity Oil Refinery’s Static Equipment + Rotating Equipment Maintenance
Responsibility
· EDUCATION
-BSc ITU (Istanbul Technical University / Istanbul - Turkey)- Mechanical Eng. (1992-1996)
· LANGUAGE / COMPUTER
Turkish : Native
English : Fluent, MS Office Applications (word, excel, power point...etc)