SlideShare a Scribd company logo
1 of 5
Page 1 of 5
Harikumar
Vishnu Bhavanam
Muthukulam North
Choolatheruvu P.O
Alappuzha District
Kerala -690506
Home -Phone: (H) - +91-4792147899
(M)- +91-9400647899
KSA: (M)- +966581136539
Email: sumi.hari945@gmail.com
Objective
To work as a Mechanical Supervisor in Rotating Equipment Turbine Installation
Core Strengths
Good Technical Knowledge, Excellent Communication Skills, Effective Leadership Quality
HSE Awareness
TechnicalQualification
Diploma in Mechanical Engineering
Petrofac Harweel / PDO
Mina Al Fahal / PDO
Nimr /PDO- Permit Holder at Nimr & Amal, PDO
Work Experience
Around Twenty Four (24) years of work experience in the field of erection & maintenance of
Gas & Steam Turbine generating plants and its associated auxiliaries such as Heavy Duty
Pumps, Compressors, Gas Turbines, Steams Turbines, Feed Water Pumps and Boilers in India &
Middle East
Performs alignment of mechanical equipment such as Pump and Compressors, Cable of using
relevant measurement equipments, carries out diagnosing and trouble shooting of all rotating
machinery (Turbine Compressors and Pumps) and other equipment on the barge, performs
maintenance work for accommodation and galley equipment as required, checks and maintains
spare parts requirement with Mechanical Foreman and Storekeeper, acts as a member of the
emergency team and participating in firefighting exercises and Permit Holder
Page 2 of 5
Work Highlights on Rotating Equipments
 Overhauling vertical in line between bearings, horizontal axially split and trolley split.
 Multi stage horizontal axially split and radically split submersible deep well , handling
different types of mechanical seals such as single, bellow, back to back, tandem dozing
and reciprocating pumps
 Installation and alignment of rotating equipment using rim and face and reverse, laser
methods.
 Inspection of Journal and thrust bearing
 Setting the axial centering and radial centering of rotor
 The bearing clearance and crush of journal bearing
 Setting the axial float of rotor
 Renewal of wear rings
 Setting of various types of mechanical seals
 Checking and setting the nozzle clearances of turbine
 Renewal of suction and discharge valves
 Checking piston end clearances
 Renewal of stuffing box packing
 Centrifuge compressor, reciprocating compressor, turbine centrifugal pumps ,
reciprocation pumps, rotary pumps, bellowers, fans, gear boxes etc
 Worked in various shutdowns in refineries and petro chemical plants
 Good knowledge in seal and lube oil system, oil film seals and dry gas seals
 Working knowledge of static equipments such as vessels, heat exchangers, tower tanks
heater relief valves, isolation valves, reactors etc
 Working knowledge of rigging and crane signaling
 Attended a part in quality circles, modification jobs and safety
 Involved in permit work system
Details of Experiences
 Presently working as Equipment Supervisor in L&T Atco Saudi, KSA from Oct 2013
onwards
o Project- SADARA POLYETHYLENE
Page 3 of 5
 Worked as Mechanical Supervisor in Rainbow Hyma Constructions from Dec 2011
to Dec 2012
 Worked as Mechanical supervisor in Power Tech (BOGS) Engineering Company,
Oman from Oct 2008 to Nov 2011
o Project – Fabrication , Erection and Testing of Off Plot Flow Line (Amal East)
Client – Petroleum Development Oman
o Erection of Equipment and piping of Harwell Closer II Project
Client – Petroleum Development Oman
 Worked as Mechanical Technician in Al Hassan Engineering Co. SAOG (2005)
o Installation & Commissioning of 2x120MW frame 9E gas Turbine Generator &
Accessories and Associated Equipments
Client – Petroleum Development Oman
o Installation of 20 TPH capacity Extruder, Motor and Gearbox, Power conveying
Centrifugal Compressors, Pellet Conveying Compressors, Carrier Gas
Compressors, Reactor Agitator Drive, Pumps and Silos
Client – Oman Polypropylene for Oman Ply Propylene Project
 Worked as Mechanical Technician I Naser Al Hajri Engineering, Qatar (2005)
o Insulation and Commissioning of Gas to liquid plant and Associated Equipments
 Worked as Mechanical Technician in Al Hassan Engineering Co Oman (2002)
o Installation and Commissioning of 2x70MW Gas turbine, Generator and
Accessories
o Installation, alignment and commissioning of 2xv.94.2 (120 MW) Gas Turbine
and 1 No of Steam Turbine 227 MW (ANSALDO)
 Worked as Mechanical Technician in Consolidated Contracting Co, Abu Dhabi
(1999)
o Installation , alignment and commissioning of pumps in Fan coolers, Heat
exchangers, Columns and Vessels of OGD II projects
 Worked as Millwright Fitter in EEPL , NTPC, Kayamkulam (1998)
 Worked as Millwright Fitter in UB Engineering, Kuwait (1999)
Page 4 of 5
o Installation of water desalination plant and maintenance of steam Turbine in Az-
Zour DSL (OJ 053)
 Worked as Millwright Fitter in Jayes Engineering Contractor, India (1989)
PersonalDetails
Date of Birth : 25 May 1967
Father Name : Parameswaran Nair
Nationality : Indian
Marital Status : Marries
Languages Known : English, Hindi, Malayalam and Tamil
Passport Number : K 7252748
Place of Issue : Kochi, India
Date of Issue : 04-02-2013
Date of Expiry : 03-02-2023
Declaration:
I hereby declare that above furnished details are correct and details will be
provided as required.
Place: KSA Harikumar P
Date: 10.03.15
Page 5 of 5

More Related Content

What's hot (19)

CV-M.Gale
CV-M.GaleCV-M.Gale
CV-M.Gale
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Taj Resume
Taj ResumeTaj Resume
Taj Resume
 
Resume - Chris Massey
Resume - Chris MasseyResume - Chris Massey
Resume - Chris Massey
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Somvir Resume
Somvir ResumeSomvir Resume
Somvir Resume
 
TraciMilitaryResume-16
TraciMilitaryResume-16TraciMilitaryResume-16
TraciMilitaryResume-16
 
Vocational training report format
Vocational training report formatVocational training report format
Vocational training report format
 
Lucas Meiring resume - updated 1
Lucas Meiring resume - updated 1Lucas Meiring resume - updated 1
Lucas Meiring resume - updated 1
 
SYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CVSYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CV
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
Resume of sadiq nawaz
Resume of sadiq nawazResume of sadiq nawaz
Resume of sadiq nawaz
 
NEW RESUME
NEW RESUMENEW RESUME
NEW RESUME
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Nabil Ibrahim C
Nabil  Ibrahim CNabil  Ibrahim C
Nabil Ibrahim C
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
Nasser Rabie Resume
Nasser Rabie ResumeNasser Rabie Resume
Nasser Rabie Resume
 
MB CV
MB CVMB CV
MB CV
 

Viewers also liked (18)

Season
SeasonSeason
Season
 
Earn100 Networking Business
Earn100 Networking BusinessEarn100 Networking Business
Earn100 Networking Business
 
Hilagang Asya
Hilagang AsyaHilagang Asya
Hilagang Asya
 
16th congress senators
16th congress senators16th congress senators
16th congress senators
 
Butterflies life cycle 1
Butterflies life cycle 1Butterflies life cycle 1
Butterflies life cycle 1
 
panitikan sa panahon ng espanyol
panitikan sa panahon ng espanyolpanitikan sa panahon ng espanyol
panitikan sa panahon ng espanyol
 
DISSERTATION_LDOC1 A NOVEL BIOMARKER OF PROGNOSIS IN CHRONIC LYMPHOCYTIC LEUK-1
DISSERTATION_LDOC1 A NOVEL BIOMARKER OF PROGNOSIS IN CHRONIC LYMPHOCYTIC LEUK-1DISSERTATION_LDOC1 A NOVEL BIOMARKER OF PROGNOSIS IN CHRONIC LYMPHOCYTIC LEUK-1
DISSERTATION_LDOC1 A NOVEL BIOMARKER OF PROGNOSIS IN CHRONIC LYMPHOCYTIC LEUK-1
 
PhD-Defense-May 13 2011
PhD-Defense-May 13 2011PhD-Defense-May 13 2011
PhD-Defense-May 13 2011
 
CV1 (2015) (H)
CV1 (2015) (H)CV1 (2015) (H)
CV1 (2015) (H)
 
[CLP] IT industry Day 2 - 3
[CLP] IT industry  Day 2 - 3[CLP] IT industry  Day 2 - 3
[CLP] IT industry Day 2 - 3
 
Pp 05-new
Pp 05-newPp 05-new
Pp 05-new
 
Artikel FMM 15606-25-2
Artikel FMM 15606-25-2Artikel FMM 15606-25-2
Artikel FMM 15606-25-2
 
About interview tips
About interview tipsAbout interview tips
About interview tips
 
چکيده همايش سنندج
چکيده همايش سنندجچکيده همايش سنندج
چکيده همايش سنندج
 
Shaurya singh Sky Card pitch
Shaurya singh  Sky Card pitchShaurya singh  Sky Card pitch
Shaurya singh Sky Card pitch
 
Sme and fmb dilemma
Sme and fmb dilemmaSme and fmb dilemma
Sme and fmb dilemma
 
Amsterdam meeting TAT - minutes
Amsterdam meeting TAT - minutesAmsterdam meeting TAT - minutes
Amsterdam meeting TAT - minutes
 
MIND YOUR OWN BUSINESS #2 PTR. VETTY GUTIERREZ - 4PM AFTERNOON SERVICE
MIND YOUR OWN BUSINESS #2 PTR. VETTY GUTIERREZ - 4PM AFTERNOON SERVICEMIND YOUR OWN BUSINESS #2 PTR. VETTY GUTIERREZ - 4PM AFTERNOON SERVICE
MIND YOUR OWN BUSINESS #2 PTR. VETTY GUTIERREZ - 4PM AFTERNOON SERVICE
 

Similar to Harikumar (20)

Cruz Mech Tech
Cruz Mech TechCruz Mech Tech
Cruz Mech Tech
 
my_resume-1
my_resume-1my_resume-1
my_resume-1
 
Nizami_CV
Nizami_CVNizami_CV
Nizami_CV
 
ABDULAZEE1
ABDULAZEE1ABDULAZEE1
ABDULAZEE1
 
ABDULAZEE1
ABDULAZEE1ABDULAZEE1
ABDULAZEE1
 
Imran
ImranImran
Imran
 
NANIK COMMISSIONING
NANIK COMMISSIONINGNANIK COMMISSIONING
NANIK COMMISSIONING
 
hassan mohamed chief mech resume
hassan mohamed chief mech resumehassan mohamed chief mech resume
hassan mohamed chief mech resume
 
Update Profile Siraj......
Update Profile Siraj......Update Profile Siraj......
Update Profile Siraj......
 
resume (1) (1)
resume (1) (1)resume (1) (1)
resume (1) (1)
 
Curriculum Vitae - Sadeq Al Marhoon - July 2016
Curriculum Vitae - Sadeq Al Marhoon - July 2016Curriculum Vitae - Sadeq Al Marhoon - July 2016
Curriculum Vitae - Sadeq Al Marhoon - July 2016
 
Chidambaram_cv
Chidambaram_cvChidambaram_cv
Chidambaram_cv
 
new_cv-2016
new_cv-2016new_cv-2016
new_cv-2016
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
nasrulla resume
nasrulla resumenasrulla resume
nasrulla resume
 
Nizami cv
Nizami cvNizami cv
Nizami cv
 
UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy UP DATED WORD FILE CV. Master copy
UP DATED WORD FILE CV. Master copy
 
Sudhakar Debarki
Sudhakar DebarkiSudhakar Debarki
Sudhakar Debarki
 
upinder_CV
upinder_CVupinder_CV
upinder_CV
 

Harikumar

  • 1. Page 1 of 5 Harikumar Vishnu Bhavanam Muthukulam North Choolatheruvu P.O Alappuzha District Kerala -690506 Home -Phone: (H) - +91-4792147899 (M)- +91-9400647899 KSA: (M)- +966581136539 Email: sumi.hari945@gmail.com Objective To work as a Mechanical Supervisor in Rotating Equipment Turbine Installation Core Strengths Good Technical Knowledge, Excellent Communication Skills, Effective Leadership Quality HSE Awareness TechnicalQualification Diploma in Mechanical Engineering Petrofac Harweel / PDO Mina Al Fahal / PDO Nimr /PDO- Permit Holder at Nimr & Amal, PDO Work Experience Around Twenty Four (24) years of work experience in the field of erection & maintenance of Gas & Steam Turbine generating plants and its associated auxiliaries such as Heavy Duty Pumps, Compressors, Gas Turbines, Steams Turbines, Feed Water Pumps and Boilers in India & Middle East Performs alignment of mechanical equipment such as Pump and Compressors, Cable of using relevant measurement equipments, carries out diagnosing and trouble shooting of all rotating machinery (Turbine Compressors and Pumps) and other equipment on the barge, performs maintenance work for accommodation and galley equipment as required, checks and maintains spare parts requirement with Mechanical Foreman and Storekeeper, acts as a member of the emergency team and participating in firefighting exercises and Permit Holder
  • 2. Page 2 of 5 Work Highlights on Rotating Equipments  Overhauling vertical in line between bearings, horizontal axially split and trolley split.  Multi stage horizontal axially split and radically split submersible deep well , handling different types of mechanical seals such as single, bellow, back to back, tandem dozing and reciprocating pumps  Installation and alignment of rotating equipment using rim and face and reverse, laser methods.  Inspection of Journal and thrust bearing  Setting the axial centering and radial centering of rotor  The bearing clearance and crush of journal bearing  Setting the axial float of rotor  Renewal of wear rings  Setting of various types of mechanical seals  Checking and setting the nozzle clearances of turbine  Renewal of suction and discharge valves  Checking piston end clearances  Renewal of stuffing box packing  Centrifuge compressor, reciprocating compressor, turbine centrifugal pumps , reciprocation pumps, rotary pumps, bellowers, fans, gear boxes etc  Worked in various shutdowns in refineries and petro chemical plants  Good knowledge in seal and lube oil system, oil film seals and dry gas seals  Working knowledge of static equipments such as vessels, heat exchangers, tower tanks heater relief valves, isolation valves, reactors etc  Working knowledge of rigging and crane signaling  Attended a part in quality circles, modification jobs and safety  Involved in permit work system Details of Experiences  Presently working as Equipment Supervisor in L&T Atco Saudi, KSA from Oct 2013 onwards o Project- SADARA POLYETHYLENE
  • 3. Page 3 of 5  Worked as Mechanical Supervisor in Rainbow Hyma Constructions from Dec 2011 to Dec 2012  Worked as Mechanical supervisor in Power Tech (BOGS) Engineering Company, Oman from Oct 2008 to Nov 2011 o Project – Fabrication , Erection and Testing of Off Plot Flow Line (Amal East) Client – Petroleum Development Oman o Erection of Equipment and piping of Harwell Closer II Project Client – Petroleum Development Oman  Worked as Mechanical Technician in Al Hassan Engineering Co. SAOG (2005) o Installation & Commissioning of 2x120MW frame 9E gas Turbine Generator & Accessories and Associated Equipments Client – Petroleum Development Oman o Installation of 20 TPH capacity Extruder, Motor and Gearbox, Power conveying Centrifugal Compressors, Pellet Conveying Compressors, Carrier Gas Compressors, Reactor Agitator Drive, Pumps and Silos Client – Oman Polypropylene for Oman Ply Propylene Project  Worked as Mechanical Technician I Naser Al Hajri Engineering, Qatar (2005) o Insulation and Commissioning of Gas to liquid plant and Associated Equipments  Worked as Mechanical Technician in Al Hassan Engineering Co Oman (2002) o Installation and Commissioning of 2x70MW Gas turbine, Generator and Accessories o Installation, alignment and commissioning of 2xv.94.2 (120 MW) Gas Turbine and 1 No of Steam Turbine 227 MW (ANSALDO)  Worked as Mechanical Technician in Consolidated Contracting Co, Abu Dhabi (1999) o Installation , alignment and commissioning of pumps in Fan coolers, Heat exchangers, Columns and Vessels of OGD II projects  Worked as Millwright Fitter in EEPL , NTPC, Kayamkulam (1998)  Worked as Millwright Fitter in UB Engineering, Kuwait (1999)
  • 4. Page 4 of 5 o Installation of water desalination plant and maintenance of steam Turbine in Az- Zour DSL (OJ 053)  Worked as Millwright Fitter in Jayes Engineering Contractor, India (1989) PersonalDetails Date of Birth : 25 May 1967 Father Name : Parameswaran Nair Nationality : Indian Marital Status : Marries Languages Known : English, Hindi, Malayalam and Tamil Passport Number : K 7252748 Place of Issue : Kochi, India Date of Issue : 04-02-2013 Date of Expiry : 03-02-2023 Declaration: I hereby declare that above furnished details are correct and details will be provided as required. Place: KSA Harikumar P Date: 10.03.15