SlideShare a Scribd company logo
1 of 2
AHSAN KEERIO (+92)-3009232104
Project Engineer (Electrical) : ahsan_keerio@outlook.com
Add: 201-G Citizen Colony, Hyderabad Sind
EDUCATION
2007-2009 Intermediate in Pre-Engineering
Superior Collage of Science, Hyderabad
2010-2014 Bachelor’s of Electrical Engineering (Power System)
Mehran University of Science and Technology, Hyderabad.
EXPERIENCE
Three Gorges First Wind Farm Pakistan (Pvt.) Ltd. (China Three Gorges Corporation)
Assistant Engineer (August, 2014 – Present)
o Highlights
•• Testing, pre-commissioning and Commissioning of Goldwind GW77/1500 wind turbines.
•• Installation, Testing and commissioning of 132/33KV Switchgear
•• Engineering & design review
•• Project management, Planning, Scheduling and Construction Supervision
•• Operation and Maintenance of the Power Plant
o Current Position & Role
Currently I’m working as Assistant Engineer with China Three Gorges 49.5MW, 132KV Grid Connected wind farm
Located at Jhimpir, District Thatta, Sind, Pakistan, and involved in O&M of the Power Plant.
•• Assisting and reviewing the Monthly Invoices,
•• Managing the Operation team in absence of line manager.
•• In coordination with CPPA, NTDC and HESCO till the completion of all activities regarding wind mast and metering
panels.
•• Making the initial and final standard operating procedures regarding maintenance or overhauling of switchyard and all
related equipments.
•• Being a part of important meetings with Auditors and all the Delegates.
•• Review of all data records and their delivery on due time to the respective concerns.
•• Responsible for providing, aligning the Wind Mast Data with high level of accuracy.
Previously I was involved in complete Wind farm Engineering from its conceptual stage to design, detailed engineering,
Design drawings approvals from NTDC, pre-commissioning, Commissioning & Testing of the same power plant.
o Operation and Maintenance Responsibilities
•• Managed routine operations and maintenance of Wind Turbines (Model NO. Goldwind GW77/1500, 1.5 MW each)
•• Managed routine operations and maintenance of 132/33 KV Grid and ensure the safe working practices
•• Follow up Day-to-day corrective maintenance of wind turbines
•• Planning and Scheduling the Preventive maintenance of Wind Turbines and 132/33KV Grid Station
•• Develop SOP’s for Isolation & de-isolation of the Trafo's , bus bars and outgoing lines of 132KV Grid Station
•• Daily Inspection of the Power plant and Prepare DPR (Daily Performance Report) of the power plant
•• Complete Wind data analysis of both Up/Down stream wind masts and collection & calculation of all
technical data (i.e. non project missed volume) regarding Monthly Invoicing to Power Purchaser (CPPA,
NTDC).
••Prepare Shift schedule, Handling of Staff in shifts and staff training. I.e. recording of Events/maintenance,
Activities.
o Project Phase Responsibilities
•• Review detailed design of 132/33KV Grid Station and telecommunication system according to NTDC & IEC
Standards & specifications
•• E-BOP equipment selection
•• Selection, Contract finalization & Installation of V-SAT for data transfer to NPCC
Islamabad
•• Selection, Contract finalization & Installation of both Up/Down stream wind masts
•• Liaison with Power Purchaser (CPPA, NTDC, HESCO) and Regulators (NPCC, AEDB)
•• Planning & management of the electrical related assignments and reporting to top
management
Construction Supervision:
•• Installation, testing, pre-commissioning and Commissioning of Goldwind GW77/1500 wind turbines
•• Development of FAT protocols for GOLDWIND GW 77/1500 Wind turbines
•• Testing and commissioning of 132/33KV Switchgear & 45MVA Power transformers
•• Development of Site testing protocols for HV substation equipment
•• Liaison with Contractors, WTG Supplier, Independent Engineer etc
••Key role to achieve reliability run test (RRT) and commercial operation (COD) of the plant
INTERNATIONAL TECHNICAL TRAININGS
Zorlu wind farm 56.5 Mw (one month Internship)
January 2014
•• Understanding about basics of wind turbine vestas 1.8Mw and vensys 1.5Mw.
•• Basics of Air flow.
500/220/132kv G/s NTDCL Jamshoro
March 2014 to May2014
Trainee Engineer
•• Main topics Includes: Protection Schemes, Control Schemes, Protection And
Instrumentation.
•• Testing of Distance Relays Protection Relays Over Current and Differential Relays, Testing of Power
and Autotransformer.
LANGUAGE SKILLS
– English (Fluent), Urdu/Hindi, Sindhi (Native).
REFERENCES;
Abdul Hameed
General Manager,
Three Gorges First Wind Farm Pakistan Pvt. Ltd.
Aitizaz Ahmed
Head of the Dept; O&M
Three Gorges First Wind Farm Pakistan Pvt. Ltd.
More references will be furnished on demand.

More Related Content

What's hot (17)

PM Ahmed Abdelhady CV
PM Ahmed Abdelhady CVPM Ahmed Abdelhady CV
PM Ahmed Abdelhady CV
 
comising
comisingcomising
comising
 
Sadanand dubey
Sadanand dubeySadanand dubey
Sadanand dubey
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
Bitu.word
Bitu.wordBitu.word
Bitu.word
 
Resume - Chris Massey
Resume - Chris MasseyResume - Chris Massey
Resume - Chris Massey
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 

Similar to Resume (20)

Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
CV
CVCV
CV
 
MNC-14
MNC-14MNC-14
MNC-14
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Resume mohan
Resume mohanResume mohan
Resume mohan
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
JAI RESUME
JAI RESUMEJAI RESUME
JAI RESUME
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
CV_ RKS 2016
CV_ RKS 2016 CV_ RKS 2016
CV_ RKS 2016
 
Jeevan1
Jeevan1Jeevan1
Jeevan1
 
ajit-cv-2015
ajit-cv-2015ajit-cv-2015
ajit-cv-2015
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 

Resume

  • 1. AHSAN KEERIO (+92)-3009232104 Project Engineer (Electrical) : ahsan_keerio@outlook.com Add: 201-G Citizen Colony, Hyderabad Sind EDUCATION 2007-2009 Intermediate in Pre-Engineering Superior Collage of Science, Hyderabad 2010-2014 Bachelor’s of Electrical Engineering (Power System) Mehran University of Science and Technology, Hyderabad. EXPERIENCE Three Gorges First Wind Farm Pakistan (Pvt.) Ltd. (China Three Gorges Corporation) Assistant Engineer (August, 2014 – Present) o Highlights •• Testing, pre-commissioning and Commissioning of Goldwind GW77/1500 wind turbines. •• Installation, Testing and commissioning of 132/33KV Switchgear •• Engineering & design review •• Project management, Planning, Scheduling and Construction Supervision •• Operation and Maintenance of the Power Plant o Current Position & Role Currently I’m working as Assistant Engineer with China Three Gorges 49.5MW, 132KV Grid Connected wind farm Located at Jhimpir, District Thatta, Sind, Pakistan, and involved in O&M of the Power Plant. •• Assisting and reviewing the Monthly Invoices, •• Managing the Operation team in absence of line manager. •• In coordination with CPPA, NTDC and HESCO till the completion of all activities regarding wind mast and metering panels. •• Making the initial and final standard operating procedures regarding maintenance or overhauling of switchyard and all related equipments. •• Being a part of important meetings with Auditors and all the Delegates. •• Review of all data records and their delivery on due time to the respective concerns. •• Responsible for providing, aligning the Wind Mast Data with high level of accuracy. Previously I was involved in complete Wind farm Engineering from its conceptual stage to design, detailed engineering, Design drawings approvals from NTDC, pre-commissioning, Commissioning & Testing of the same power plant. o Operation and Maintenance Responsibilities •• Managed routine operations and maintenance of Wind Turbines (Model NO. Goldwind GW77/1500, 1.5 MW each) •• Managed routine operations and maintenance of 132/33 KV Grid and ensure the safe working practices •• Follow up Day-to-day corrective maintenance of wind turbines •• Planning and Scheduling the Preventive maintenance of Wind Turbines and 132/33KV Grid Station •• Develop SOP’s for Isolation & de-isolation of the Trafo's , bus bars and outgoing lines of 132KV Grid Station •• Daily Inspection of the Power plant and Prepare DPR (Daily Performance Report) of the power plant •• Complete Wind data analysis of both Up/Down stream wind masts and collection & calculation of all technical data (i.e. non project missed volume) regarding Monthly Invoicing to Power Purchaser (CPPA, NTDC). ••Prepare Shift schedule, Handling of Staff in shifts and staff training. I.e. recording of Events/maintenance, Activities.
  • 2. o Project Phase Responsibilities •• Review detailed design of 132/33KV Grid Station and telecommunication system according to NTDC & IEC Standards & specifications •• E-BOP equipment selection •• Selection, Contract finalization & Installation of V-SAT for data transfer to NPCC Islamabad •• Selection, Contract finalization & Installation of both Up/Down stream wind masts •• Liaison with Power Purchaser (CPPA, NTDC, HESCO) and Regulators (NPCC, AEDB) •• Planning & management of the electrical related assignments and reporting to top management Construction Supervision: •• Installation, testing, pre-commissioning and Commissioning of Goldwind GW77/1500 wind turbines •• Development of FAT protocols for GOLDWIND GW 77/1500 Wind turbines •• Testing and commissioning of 132/33KV Switchgear & 45MVA Power transformers •• Development of Site testing protocols for HV substation equipment •• Liaison with Contractors, WTG Supplier, Independent Engineer etc ••Key role to achieve reliability run test (RRT) and commercial operation (COD) of the plant INTERNATIONAL TECHNICAL TRAININGS Zorlu wind farm 56.5 Mw (one month Internship) January 2014 •• Understanding about basics of wind turbine vestas 1.8Mw and vensys 1.5Mw. •• Basics of Air flow. 500/220/132kv G/s NTDCL Jamshoro March 2014 to May2014 Trainee Engineer •• Main topics Includes: Protection Schemes, Control Schemes, Protection And Instrumentation. •• Testing of Distance Relays Protection Relays Over Current and Differential Relays, Testing of Power and Autotransformer. LANGUAGE SKILLS – English (Fluent), Urdu/Hindi, Sindhi (Native). REFERENCES; Abdul Hameed General Manager, Three Gorges First Wind Farm Pakistan Pvt. Ltd. Aitizaz Ahmed Head of the Dept; O&M Three Gorges First Wind Farm Pakistan Pvt. Ltd. More references will be furnished on demand.