1. CURRICULUM VITAE
Name : William. Pasde
Date of Birth: 20 /08/ 1980
Contacts: Phone : 986 7531/ 7541
Digicel: 7011 7393
Email : William.Pasde@newcrest.com.au
Nationality: Papua New Guinea
Marital Status: Single
Telephone Numbers: Home: 7011 7393
Mobile: 7011 7393
WORK HISTORY
Current Position Held: GEOTHERMAL Mechanical Leading Hand Fitter-
Newcrest Mining-Lihir-
Prepare weekly work schedules using SAP system, Run
Morning Pre-start meetings, arrange and organize work
Request from contractors and other supervisory roles.
Nov 2016 --- 50MW Geothermal Power Plant- Lihir (5 weeks)
Mech Leading Hand Fitter – Lead the maintenance team,
Carry out turbine overhaul for Turbine 4 &3.Also
Assist Joy Global to do turbine rotor balancing.
Aug 2015 – Sep 2015 20MW GEOTHERMAL SHUT DOWN—Lihir (6 weeks)
MEACHANICAL LEADING HAND FITTER – Supervise PSJV
Contractors on the reburbishment of the cooling tower,rebuild
new
Structures, Fillets and drift eliminators. Install new Main Isolation
Gate
Valve and new Betis actuators on steam Generator 5.
2. April 2015—Jun 2015 TABUBIL DIESEL POWER STATION- OKTEDI
MECHANICAL FITTER –( 3 months)
Attached with Zenith Pacific carry out major overhaul
On Melees generator MO6.Invollved in installing liners, big ends,
Pistons, radiators. Also assist in recommisoning.
Feb 2014-April 2014 50MW GEOTHERMAL POWER STATION – Lihir-(10 weeks)
Position Held: MECHANICAL FITTER (Assisting Progen contractors)
Do major overhaul on 10Mw steam turbine # 1 rotor change out and other
maintenance work as required.
April 2014 50 MW GEOTHERMAl COOLING TOWER-Lihir
Position Held: MECHANICAL FITTER (2 weeks as leading hand fitter)
• Overhaul cooling tower fan gearbox
• Install new fan blades and adjust blades pitch angles
Oct 2013- Nov 2013 50 MW GEOTHERMAL POWER STATION
Position Held: MECHANICAL FITTER ( 8 weeks as leading hand fitter)
Steam Turbine no# 4.Remove out generator rotor and installed
New rotor.
Sep 2012-Nov 2012 50MW GEOTHERMAL POWER STATION ,Lihir(6weeks)
Position held as a Mechanical Fitter,(assisting progen contractors)
Major overhaul on steam turbine no# 4 turbine rotor. Change new
diaphragms, gland seals and turbine alignment.
Jun 2012 50 MW GEOTHERMAL POWER STATION,Lihir
Mechanical Fitter –(one week)Cooling tower fan gearbox overhaul.
MINE GEOTHERMAL-NEWCREST,Lihir
Feb 2011 – March 2012 Position held as a geothermal technician;
• Monitor steam relief wells, repairing pipes and servicing vales
• Enter field data into data base
• Supervise Business partners which contracted to the section
Jul 2009 – Feb 2011 PNG POWER LIMITED (RAMU HYDRO POWER STATION)
HYDRO MECHANICAL FITTER
• Install new draft tube main inlet valve seal
• Fabricate and install cooling water pipes for 15MW – 20 MW
Elin Bovin Generators.
2
3. • Align raw water pumps for cooling system for lower and upper
guide bearings on Francis vertical turbines.
• Service and install submersible drainage pumps.
• Take lead on station shut downs.
• Service and maintenance of auxiliary equipments for 15MW and
20MW Francis Turbines.
Jun 2008 – Jun 2009 PNG POWER (ROUNA HYDRO POWER STATION)
HYDRO MECHANICAL FITTER
• Service of hydraulic jet valve for Sirinumu Dam.
• Attached with Rouna 3 Hydro Station Project Team in overhaul
restoration works, test running and recommissioning of 2X6 mw
turbines.
• Seconded to VATECH HYDRO Austria in the upgrade works on
Rouna 2 hydro Power Station.
• Service and maintenance of auxiliary equipments and any break
down
• Also take part on stanby duty for any break downs after hours.
PNG POWER LIMITED
Mar 2005 –Jun 2008 Apprenticeship Training
Worked under supervision of Tradesmen and Engineers on:
• Lathes – turning jobs.
• Milling machines.
• Drilling machines.
• Surface and angle grinding machines.
• Gas welding.
• Electric welding.
• Fitting and maintenance jobs on hydro turbine generators
associated auxiliary equipment.
TRAINING/QUALIFICATION
Nov 2013 Lihir Training Centre (Basic slinging and Gantry crane course)
Sep 2011 Lihir Training Centre ( MS 2007 Introduction Excel)
Aug 2011 Lihir Training Centre ( MSWord 20M07 Introduction)
Jun 2010—Sep 2010 PNG Power Training College (Basic welding, pumps& pumping
and basic pump alignment)
Oct 2006 – Jun 2008 Port Moresby Technical College (Trade certificate in MFM)
3
4. Mar 2000 – Nov 2000 Lae Technical College (PETT MFM Certificate)
EDUCATION
Feb 1994 –Dec 1997 Palmalmal High School, Pomio,E.N.B.P
Feb 1988- Dec 1993 Malakur Primary School,Pomio,E.N.B.P
INTERESTS
• Aussie Rules
• Swimming
• Soccer
• Rugby
REFEREES
Timothy Oshea
Electrical Coordinator-Power & Utilities (Newcrest-Lihir)
Telephone:986 5740
Email: timothy.oshea@newcrest.com.au
Joseph .Searson
Senior Engineer-Power & Utilities
Email: joseph.searson@newcrest.com.au
Telephone:986 5739
Arua .Mea
Team Leader Hydro Maintenance Planning (PNG POWER Ltd)
Telephone:324 3455 /72190918
Email: amea@pngpower.com.pg
4