SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE
Name : William. Pasde
Date of Birth: 20 /08/ 1980
Contacts: Phone : 986 7531/ 7541
Digicel: 7011 7393
Email : William.Pasde@newcrest.com.au
Nationality: Papua New Guinea
Marital Status: Single
Telephone Numbers: Home: 7011 7393
Mobile: 7011 7393
WORK HISTORY
Current Position Held: GEOTHERMAL Mechanical Leading Hand Fitter-
Newcrest Mining-Lihir-
Prepare weekly work schedules using SAP system, Run
Morning Pre-start meetings, arrange and organize work
Request from contractors and other supervisory roles.
Nov 2016 --- 50MW Geothermal Power Plant- Lihir (5 weeks)
Mech Leading Hand Fitter – Lead the maintenance team,
Carry out turbine overhaul for Turbine 4 &3.Also
Assist Joy Global to do turbine rotor balancing.
Aug 2015 – Sep 2015 20MW GEOTHERMAL SHUT DOWN—Lihir (6 weeks)
MEACHANICAL LEADING HAND FITTER – Supervise PSJV
Contractors on the reburbishment of the cooling tower,rebuild
new
Structures, Fillets and drift eliminators. Install new Main Isolation
Gate
Valve and new Betis actuators on steam Generator 5.
April 2015—Jun 2015 TABUBIL DIESEL POWER STATION- OKTEDI
MECHANICAL FITTER –( 3 months)
Attached with Zenith Pacific carry out major overhaul
On Melees generator MO6.Invollved in installing liners, big ends,
Pistons, radiators. Also assist in recommisoning.
Feb 2014-April 2014 50MW GEOTHERMAL POWER STATION – Lihir-(10 weeks)
Position Held: MECHANICAL FITTER (Assisting Progen contractors)
Do major overhaul on 10Mw steam turbine # 1 rotor change out and other
maintenance work as required.
April 2014 50 MW GEOTHERMAl COOLING TOWER-Lihir
Position Held: MECHANICAL FITTER (2 weeks as leading hand fitter)
• Overhaul cooling tower fan gearbox
• Install new fan blades and adjust blades pitch angles
Oct 2013- Nov 2013 50 MW GEOTHERMAL POWER STATION
Position Held: MECHANICAL FITTER ( 8 weeks as leading hand fitter)
Steam Turbine no# 4.Remove out generator rotor and installed
New rotor.
Sep 2012-Nov 2012 50MW GEOTHERMAL POWER STATION ,Lihir(6weeks)
Position held as a Mechanical Fitter,(assisting progen contractors)
Major overhaul on steam turbine no# 4 turbine rotor. Change new
diaphragms, gland seals and turbine alignment.
Jun 2012 50 MW GEOTHERMAL POWER STATION,Lihir
Mechanical Fitter –(one week)Cooling tower fan gearbox overhaul.
MINE GEOTHERMAL-NEWCREST,Lihir
Feb 2011 – March 2012 Position held as a geothermal technician;
• Monitor steam relief wells, repairing pipes and servicing vales
• Enter field data into data base
• Supervise Business partners which contracted to the section
Jul 2009 – Feb 2011 PNG POWER LIMITED (RAMU HYDRO POWER STATION)
HYDRO MECHANICAL FITTER
• Install new draft tube main inlet valve seal
• Fabricate and install cooling water pipes for 15MW – 20 MW
Elin Bovin Generators.
2
• Align raw water pumps for cooling system for lower and upper
guide bearings on Francis vertical turbines.
• Service and install submersible drainage pumps.
• Take lead on station shut downs.
• Service and maintenance of auxiliary equipments for 15MW and
20MW Francis Turbines.
Jun 2008 – Jun 2009 PNG POWER (ROUNA HYDRO POWER STATION)
HYDRO MECHANICAL FITTER
• Service of hydraulic jet valve for Sirinumu Dam.
• Attached with Rouna 3 Hydro Station Project Team in overhaul
restoration works, test running and recommissioning of 2X6 mw
turbines.
• Seconded to VATECH HYDRO Austria in the upgrade works on
Rouna 2 hydro Power Station.
• Service and maintenance of auxiliary equipments and any break
down
• Also take part on stanby duty for any break downs after hours.
PNG POWER LIMITED
Mar 2005 –Jun 2008 Apprenticeship Training
Worked under supervision of Tradesmen and Engineers on:
• Lathes – turning jobs.
• Milling machines.
• Drilling machines.
• Surface and angle grinding machines.
• Gas welding.
• Electric welding.
• Fitting and maintenance jobs on hydro turbine generators
associated auxiliary equipment.
TRAINING/QUALIFICATION
Nov 2013 Lihir Training Centre (Basic slinging and Gantry crane course)
Sep 2011 Lihir Training Centre ( MS 2007 Introduction Excel)
Aug 2011 Lihir Training Centre ( MSWord 20M07 Introduction)
Jun 2010—Sep 2010 PNG Power Training College (Basic welding, pumps& pumping
and basic pump alignment)
Oct 2006 – Jun 2008 Port Moresby Technical College (Trade certificate in MFM)
3
Mar 2000 – Nov 2000 Lae Technical College (PETT MFM Certificate)
EDUCATION
Feb 1994 –Dec 1997 Palmalmal High School, Pomio,E.N.B.P
Feb 1988- Dec 1993 Malakur Primary School,Pomio,E.N.B.P
INTERESTS
• Aussie Rules
• Swimming
• Soccer
• Rugby
REFEREES
Timothy Oshea
Electrical Coordinator-Power & Utilities (Newcrest-Lihir)
Telephone:986 5740
Email: timothy.oshea@newcrest.com.au
Joseph .Searson
Senior Engineer-Power & Utilities
Email: joseph.searson@newcrest.com.au
Telephone:986 5739
Arua .Mea
Team Leader Hydro Maintenance Planning (PNG POWER Ltd)
Telephone:324 3455 /72190918
Email: amea@pngpower.com.pg
4

More Related Content

What's hot (20)

ST's EFG Endorsement-Vernon Rowe Memo
ST's EFG Endorsement-Vernon Rowe MemoST's EFG Endorsement-Vernon Rowe Memo
ST's EFG Endorsement-Vernon Rowe Memo
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
New Sands Retreatment Plant 2
New Sands Retreatment Plant 2New Sands Retreatment Plant 2
New Sands Retreatment Plant 2
 
Mark McCroy resume
Mark McCroy resumeMark McCroy resume
Mark McCroy resume
 
cv of Shohid
cv of Shohidcv of Shohid
cv of Shohid
 
Sales Presentation: MJB India Gas Turbine Services
Sales Presentation: MJB India Gas Turbine ServicesSales Presentation: MJB India Gas Turbine Services
Sales Presentation: MJB India Gas Turbine Services
 
Chen_CV
Chen_CVChen_CV
Chen_CV
 
ANUPAM RESUME
ANUPAM RESUMEANUPAM RESUME
ANUPAM RESUME
 
Km74 double acting saw using scotch yoke mechanism (wecompress)
Km74 double acting saw using scotch yoke mechanism (wecompress)Km74 double acting saw using scotch yoke mechanism (wecompress)
Km74 double acting saw using scotch yoke mechanism (wecompress)
 
Chap Drive 2
Chap Drive 2Chap Drive 2
Chap Drive 2
 
Iqbal cv...final
Iqbal cv...finalIqbal cv...final
Iqbal cv...final
 
Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117Mechanical Hvac INMA 3117
Mechanical Hvac INMA 3117
 
Resume C Brewer
Resume C BrewerResume C Brewer
Resume C Brewer
 
Biskra 460 MW SCPP_Algeria
Biskra 460 MW SCPP_AlgeriaBiskra 460 MW SCPP_Algeria
Biskra 460 MW SCPP_Algeria
 
Profile_UGS Group of Companies
Profile_UGS Group of CompaniesProfile_UGS Group of Companies
Profile_UGS Group of Companies
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Richie New CV 2016
Richie  New CV 2016Richie  New CV 2016
Richie New CV 2016
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
jahangir
jahangirjahangir
jahangir
 
CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016CV-SOMA-DECEMBER-2016
CV-SOMA-DECEMBER-2016
 

Viewers also liked

Australopithecus afarensis
Australopithecus afarensisAustralopithecus afarensis
Australopithecus afarensisDuoc UC
 
Статистичні відомості за листопад
Статистичні відомості за листопадСтатистичні відомості за листопад
Статистичні відомості за листопадIryna1991
 
Hiring Hacks For Founders
Hiring Hacks For FoundersHiring Hacks For Founders
Hiring Hacks For Foundersdanarkind
 
Online assignment
Online assignmentOnline assignment
Online assignmentvarshapv27
 
Analysis of a Sixthform Magazine 2
Analysis of a Sixthform Magazine 2Analysis of a Sixthform Magazine 2
Analysis of a Sixthform Magazine 2ritapro98
 
NME Music Magazine Analysis
NME Music Magazine AnalysisNME Music Magazine Analysis
NME Music Magazine Analysisritapro98
 

Viewers also liked (11)

Top Floor Penthouse Apartment For Rent
Top Floor Penthouse Apartment For RentTop Floor Penthouse Apartment For Rent
Top Floor Penthouse Apartment For Rent
 
Resume
ResumeResume
Resume
 
Cómic 2ºESO'
Cómic 2ºESO'Cómic 2ºESO'
Cómic 2ºESO'
 
Australopithecus afarensis
Australopithecus afarensisAustralopithecus afarensis
Australopithecus afarensis
 
Статистичні відомості за листопад
Статистичні відомості за листопадСтатистичні відомості за листопад
Статистичні відомості за листопад
 
Hiring Hacks For Founders
Hiring Hacks For FoundersHiring Hacks For Founders
Hiring Hacks For Founders
 
Online assignment
Online assignmentOnline assignment
Online assignment
 
Analysis of a Sixthform Magazine 2
Analysis of a Sixthform Magazine 2Analysis of a Sixthform Magazine 2
Analysis of a Sixthform Magazine 2
 
NME Music Magazine Analysis
NME Music Magazine AnalysisNME Music Magazine Analysis
NME Music Magazine Analysis
 
Resume
ResumeResume
Resume
 
Historia del periodismo digital
Historia del periodismo digitalHistoria del periodismo digital
Historia del periodismo digital
 

Similar to Wiiliam CV update

MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERjongguanzon
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)Phillip Evans
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016Bill Satek
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...Umer Azeem
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016zuraidi Ismail
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.splendidchuy
 
Resume Yovino, Seth
Resume Yovino, SethResume Yovino, Seth
Resume Yovino, SethSeth Yovino
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15Antonio Biasiolo
 
Daniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman
 

Similar to Wiiliam CV update (20)

Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.Ahmad Ridwan - Updated CV.
Ahmad Ridwan - Updated CV.
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
 
PJMcManus
PJMcManusPJMcManus
PJMcManus
 
William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016William _Satek_Manager_Resume_May_2016
William _Satek_Manager_Resume_May_2016
 
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
FINAL YEAR INDUSTRIAL TRAINING REPORT-ALBARIO ENGINEERING NANDIPUR 435 Combin...
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
 
Resume Yovino, Seth
Resume Yovino, SethResume Yovino, Seth
Resume Yovino, Seth
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15ABB EPC_General Presentation_March 15
ABB EPC_General Presentation_March 15
 
Lyes boudiaf
Lyes boudiafLyes boudiaf
Lyes boudiaf
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Dariush.resume
Dariush.resumeDariush.resume
Dariush.resume
 
Daniel Snyman Resume
Daniel Snyman ResumeDaniel Snyman Resume
Daniel Snyman Resume
 
Mr johann van der westhuizen new cv 2
Mr johann van der westhuizen new cv 2Mr johann van der westhuizen new cv 2
Mr johann van der westhuizen new cv 2
 
Rich Mathias CV 2016
Rich Mathias CV 2016Rich Mathias CV 2016
Rich Mathias CV 2016
 
CVLA updated
CVLA updatedCVLA updated
CVLA updated
 
Mr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docxMr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docx
 

Wiiliam CV update

  • 1. CURRICULUM VITAE Name : William. Pasde Date of Birth: 20 /08/ 1980 Contacts: Phone : 986 7531/ 7541 Digicel: 7011 7393 Email : William.Pasde@newcrest.com.au Nationality: Papua New Guinea Marital Status: Single Telephone Numbers: Home: 7011 7393 Mobile: 7011 7393 WORK HISTORY Current Position Held: GEOTHERMAL Mechanical Leading Hand Fitter- Newcrest Mining-Lihir- Prepare weekly work schedules using SAP system, Run Morning Pre-start meetings, arrange and organize work Request from contractors and other supervisory roles. Nov 2016 --- 50MW Geothermal Power Plant- Lihir (5 weeks) Mech Leading Hand Fitter – Lead the maintenance team, Carry out turbine overhaul for Turbine 4 &3.Also Assist Joy Global to do turbine rotor balancing. Aug 2015 – Sep 2015 20MW GEOTHERMAL SHUT DOWN—Lihir (6 weeks) MEACHANICAL LEADING HAND FITTER – Supervise PSJV Contractors on the reburbishment of the cooling tower,rebuild new Structures, Fillets and drift eliminators. Install new Main Isolation Gate Valve and new Betis actuators on steam Generator 5.
  • 2. April 2015—Jun 2015 TABUBIL DIESEL POWER STATION- OKTEDI MECHANICAL FITTER –( 3 months) Attached with Zenith Pacific carry out major overhaul On Melees generator MO6.Invollved in installing liners, big ends, Pistons, radiators. Also assist in recommisoning. Feb 2014-April 2014 50MW GEOTHERMAL POWER STATION – Lihir-(10 weeks) Position Held: MECHANICAL FITTER (Assisting Progen contractors) Do major overhaul on 10Mw steam turbine # 1 rotor change out and other maintenance work as required. April 2014 50 MW GEOTHERMAl COOLING TOWER-Lihir Position Held: MECHANICAL FITTER (2 weeks as leading hand fitter) • Overhaul cooling tower fan gearbox • Install new fan blades and adjust blades pitch angles Oct 2013- Nov 2013 50 MW GEOTHERMAL POWER STATION Position Held: MECHANICAL FITTER ( 8 weeks as leading hand fitter) Steam Turbine no# 4.Remove out generator rotor and installed New rotor. Sep 2012-Nov 2012 50MW GEOTHERMAL POWER STATION ,Lihir(6weeks) Position held as a Mechanical Fitter,(assisting progen contractors) Major overhaul on steam turbine no# 4 turbine rotor. Change new diaphragms, gland seals and turbine alignment. Jun 2012 50 MW GEOTHERMAL POWER STATION,Lihir Mechanical Fitter –(one week)Cooling tower fan gearbox overhaul. MINE GEOTHERMAL-NEWCREST,Lihir Feb 2011 – March 2012 Position held as a geothermal technician; • Monitor steam relief wells, repairing pipes and servicing vales • Enter field data into data base • Supervise Business partners which contracted to the section Jul 2009 – Feb 2011 PNG POWER LIMITED (RAMU HYDRO POWER STATION) HYDRO MECHANICAL FITTER • Install new draft tube main inlet valve seal • Fabricate and install cooling water pipes for 15MW – 20 MW Elin Bovin Generators. 2
  • 3. • Align raw water pumps for cooling system for lower and upper guide bearings on Francis vertical turbines. • Service and install submersible drainage pumps. • Take lead on station shut downs. • Service and maintenance of auxiliary equipments for 15MW and 20MW Francis Turbines. Jun 2008 – Jun 2009 PNG POWER (ROUNA HYDRO POWER STATION) HYDRO MECHANICAL FITTER • Service of hydraulic jet valve for Sirinumu Dam. • Attached with Rouna 3 Hydro Station Project Team in overhaul restoration works, test running and recommissioning of 2X6 mw turbines. • Seconded to VATECH HYDRO Austria in the upgrade works on Rouna 2 hydro Power Station. • Service and maintenance of auxiliary equipments and any break down • Also take part on stanby duty for any break downs after hours. PNG POWER LIMITED Mar 2005 –Jun 2008 Apprenticeship Training Worked under supervision of Tradesmen and Engineers on: • Lathes – turning jobs. • Milling machines. • Drilling machines. • Surface and angle grinding machines. • Gas welding. • Electric welding. • Fitting and maintenance jobs on hydro turbine generators associated auxiliary equipment. TRAINING/QUALIFICATION Nov 2013 Lihir Training Centre (Basic slinging and Gantry crane course) Sep 2011 Lihir Training Centre ( MS 2007 Introduction Excel) Aug 2011 Lihir Training Centre ( MSWord 20M07 Introduction) Jun 2010—Sep 2010 PNG Power Training College (Basic welding, pumps& pumping and basic pump alignment) Oct 2006 – Jun 2008 Port Moresby Technical College (Trade certificate in MFM) 3
  • 4. Mar 2000 – Nov 2000 Lae Technical College (PETT MFM Certificate) EDUCATION Feb 1994 –Dec 1997 Palmalmal High School, Pomio,E.N.B.P Feb 1988- Dec 1993 Malakur Primary School,Pomio,E.N.B.P INTERESTS • Aussie Rules • Swimming • Soccer • Rugby REFEREES Timothy Oshea Electrical Coordinator-Power & Utilities (Newcrest-Lihir) Telephone:986 5740 Email: timothy.oshea@newcrest.com.au Joseph .Searson Senior Engineer-Power & Utilities Email: joseph.searson@newcrest.com.au Telephone:986 5739 Arua .Mea Team Leader Hydro Maintenance Planning (PNG POWER Ltd) Telephone:324 3455 /72190918 Email: amea@pngpower.com.pg 4