Material Testing ,Machines And Equipment Requirements-
•Sieving
•Sieve Shakers
•Screening
•Sampling & Dividing
•Aggregates
•Asphalt
•Concrete
•Soils
•Ovens & Furnaces
•Crushers, Pulverizers & Mills
•Temperature & Humidity
•Pans, Tools & Glassware
•Scales & Balances
Prepared by-
Prof. Basweshwar S. J.
Necessity of material testing
• Materials Testing is performed for a variety of reasons and can
provide a wealth of information about the tested materials,
prototypes or product samples.
• The data collected during testing and the final test results can be
very useful to engineers, designers, production managers and
others.
• Here are some of the reasons material testing is important:
•Meeting requirements of regulatory agencies
•Selecting appropriate materials and treatments for an application
•Evaluating product design or improvement specifications
•Verifying a production process
Prepared by-
Prof. Basweshwar S. J.
Various testing methods-
• Many products are used in critical applications
where a failure could result in extensive
damage or injury.
• Some examples are manufactured fasteners
and parts that have a vital role in maintaining
the safety of aircraft, bridges, vehicles, nuclear
reactors, military equipment and medical
implants. In addition, many jurisdictions have
adopted legislation restricting the use of
hazardous materials.
• In cases like these, governments and
regulatory bodies set compliance requirements
that must be met by manufacturers.
• Companies must adhere to these standards,
which generally specify test procedures, to
prove compliance
• It’s typical for a business to
purchase mechanical testing services when
specifying material for a new product design.
• Testing may be performed to evaluate
mechanical properties such as strength,
hardness, elasticity and fracture toughness.
• Corrosion testing can determine if the
material will hold up under given conditions
such as humidity or a salt water
environment.
Prepared by-
Prof. Basweshwar S. J.
Destructive tests, classification of destructive tests---static, impact testing
• Testing is often performed early on during product
development to evaluate a planned production
process.
• It can also be just as relevant to provide validation for
final products on an ongoing basis.
• Various types of non-destructive testing services are
used to evaluate finished products without causing
damage to the items.
• Materials testing also plays a large role in failure
analysis investigations to help identify defective
products, inadequate materials and, ultimately, the
cause of a failure.
• When materials testing services are purchased from
an independent laboratory like Laboratory Testing Inc.,
a certified test report is provided that
documents applicable
accreditations, specifications/standards, other test
criteria and complete test results.
Prepared by-
Prof. Basweshwar S. J.
Non-destructive testing—its classification
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.
Types of testings
•Adhesion Testing
•Bending / Flexural Testing
•Bond Strength Testing
•Break Strength Testing
•Coefficient of Friction Testing
•Compression Testing
•Creep Testing
•Crush Resistance Testing
•Deformation Testing
•Delamination Strength Testing
•Ductility Testing
•Durability Testing
•Elastic Limit Testing
•Elongation Testing
•Flexural Strength Testing
•Friction Testing
•Modulus of Elasticity Testing
•Peel Strength Testing
•Puncture Testing
•Rupture Testing
•Shear Strength Testing
•Stress-Relaxation Testing
•Tear Resistance Testing
•Tear Strength Testing
•Tensile Testing
•Toughness Testing
•Youngs Modulus Testing
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.
Prepared by-
Prof. Basweshwar S. J.

More Related Content

What's hot

Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
Abhishek Gupta
 
Physical properties of Building materials.
Physical properties of Building materials.Physical properties of Building materials.
Physical properties of Building materials.
Mohammad Naser Rozy
 
Non-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In StructuresNon-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In Structures
26032015
 
Universal testing machines
Universal testing machinesUniversal testing machines
Universal testing machines
Gulfam Hussain
 
Universal testing machines
Universal testing machinesUniversal testing machines
Universal testing machines
Shivam Tiwari
 

What's hot (20)

Concrete technology ndt methods
Concrete technology   ndt methodsConcrete technology   ndt methods
Concrete technology ndt methods
 
Durability of Concrete structures by Dr.Vinay Kumar B M
Durability of Concrete structures by Dr.Vinay Kumar B MDurability of Concrete structures by Dr.Vinay Kumar B M
Durability of Concrete structures by Dr.Vinay Kumar B M
 
Concrete Mix Design
Concrete Mix DesignConcrete Mix Design
Concrete Mix Design
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Nano concrete ppt
Nano concrete  pptNano concrete  ppt
Nano concrete ppt
 
Physical properties of Building materials.
Physical properties of Building materials.Physical properties of Building materials.
Physical properties of Building materials.
 
Non-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In StructuresNon-Destructive Testing of Concrete In Structures
Non-Destructive Testing of Concrete In Structures
 
workability test of concrete
workability test of concreteworkability test of concrete
workability test of concrete
 
Waste material concrete ppt
Waste material  concrete pptWaste material  concrete ppt
Waste material concrete ppt
 
Rebound hammer test
Rebound hammer testRebound hammer test
Rebound hammer test
 
Universal testing machines
Universal testing machinesUniversal testing machines
Universal testing machines
 
4 slab
4 slab4 slab
4 slab
 
Fresh Concrete
Fresh Concrete Fresh Concrete
Fresh Concrete
 
Universal testing machines
Universal testing machinesUniversal testing machines
Universal testing machines
 
aci 211_1_91.pdf
aci 211_1_91.pdfaci 211_1_91.pdf
aci 211_1_91.pdf
 
GGBS PPT
GGBS PPTGGBS PPT
GGBS PPT
 
coconut fiber.pptx
coconut fiber.pptxcoconut fiber.pptx
coconut fiber.pptx
 
Concrete testing
Concrete testingConcrete testing
Concrete testing
 
Nano materials in concrete
Nano materials in concreteNano materials in concrete
Nano materials in concrete
 
Steel fiber reinforced concrete
Steel fiber reinforced concreteSteel fiber reinforced concrete
Steel fiber reinforced concrete
 

Similar to Module VI MATERIAL TESTING AND EVALUATION [BTCVE506A]

QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
Ananda Ram Prasath
 
Mark Maples Word ResumeUse
Mark Maples Word ResumeUseMark Maples Word ResumeUse
Mark Maples Word ResumeUse
mark maples
 
validationofsoliddosageforms-160310152649.pdf
validationofsoliddosageforms-160310152649.pdfvalidationofsoliddosageforms-160310152649.pdf
validationofsoliddosageforms-160310152649.pdf
Vaibhavwagh48
 
Jay Ducy Resume
Jay Ducy ResumeJay Ducy Resume
Jay Ducy Resume
Jay Ducy
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
Pranesh Kumar
 
DEEPAK RESUME WITH 5 YEAR working EXP
DEEPAK RESUME WITH 5 YEAR working EXPDEEPAK RESUME WITH 5 YEAR working EXP
DEEPAK RESUME WITH 5 YEAR working EXP
Deepak Yadav
 

Similar to Module VI MATERIAL TESTING AND EVALUATION [BTCVE506A] (20)

M3. Final+Lecture_065919.pptxhsjsjshshsj
M3. Final+Lecture_065919.pptxhsjsjshshsjM3. Final+Lecture_065919.pptxhsjsjshshsj
M3. Final+Lecture_065919.pptxhsjsjshshsj
 
arun megarme
arun megarmearun megarme
arun megarme
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
 
Brendan Naughton CV
Brendan Naughton CVBrendan Naughton CV
Brendan Naughton CV
 
ars resume
ars resumears resume
ars resume
 
Mark Maples Word ResumeUse
Mark Maples Word ResumeUseMark Maples Word ResumeUse
Mark Maples Word ResumeUse
 
Validation of solid dosage forms
Validation of solid dosage formsValidation of solid dosage forms
Validation of solid dosage forms
 
Validation of solid dosage forms
Validation of solid dosage formsValidation of solid dosage forms
Validation of solid dosage forms
 
Validation of solid dosage forms in pharmaceutical industries
Validation of solid dosage forms in pharmaceutical industries Validation of solid dosage forms in pharmaceutical industries
Validation of solid dosage forms in pharmaceutical industries
 
validationofsoliddosageforms-160310152649.pdf
validationofsoliddosageforms-160310152649.pdfvalidationofsoliddosageforms-160310152649.pdf
validationofsoliddosageforms-160310152649.pdf
 
Jay Ducy Resume
Jay Ducy ResumeJay Ducy Resume
Jay Ducy Resume
 
Packaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to MarketPackaging Solutions that Improve Time to Market
Packaging Solutions that Improve Time to Market
 
TOM UNIT 1 (1).pptx
TOM UNIT 1 (1).pptxTOM UNIT 1 (1).pptx
TOM UNIT 1 (1).pptx
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
DEEPAK RESUME WITH 5 YEAR working EXP
DEEPAK RESUME WITH 5 YEAR working EXPDEEPAK RESUME WITH 5 YEAR working EXP
DEEPAK RESUME WITH 5 YEAR working EXP
 
resumenew1
resumenew1resumenew1
resumenew1
 
MukailaAbiodunAlimiCQE
MukailaAbiodunAlimiCQEMukailaAbiodunAlimiCQE
MukailaAbiodunAlimiCQE
 

More from Dr. BASWESHWAR JIRWANKAR

More from Dr. BASWESHWAR JIRWANKAR (20)

M3_IE_D&HE.pdf
M3_IE_D&HE.pdfM3_IE_D&HE.pdf
M3_IE_D&HE.pdf
 
TRANSPORTATION_ENGINEERING_BRIDGING.pdf
TRANSPORTATION_ENGINEERING_BRIDGING.pdfTRANSPORTATION_ENGINEERING_BRIDGING.pdf
TRANSPORTATION_ENGINEERING_BRIDGING.pdf
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
 
TRANSPORTATION_ENGINEERING_M4.pdf
TRANSPORTATION_ENGINEERING_M4.pdfTRANSPORTATION_ENGINEERING_M4.pdf
TRANSPORTATION_ENGINEERING_M4.pdf
 
TRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdfTRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdf
 
TRANSPORTATION_ENGINEERING_M2.pdf
TRANSPORTATION_ENGINEERING_M2.pdfTRANSPORTATION_ENGINEERING_M2.pdf
TRANSPORTATION_ENGINEERING_M2.pdf
 
TRANSPORTATION_ENGINEERING_M1.pdf
TRANSPORTATION_ENGINEERING_M1.pdfTRANSPORTATION_ENGINEERING_M1.pdf
TRANSPORTATION_ENGINEERING_M1.pdf
 
MODULE 5 EG.pdf
MODULE 5 EG.pdfMODULE 5 EG.pdf
MODULE 5 EG.pdf
 
MODULE-4 EG.pdf
MODULE-4 EG.pdfMODULE-4 EG.pdf
MODULE-4 EG.pdf
 
MODULE-3 EG.pdf
MODULE-3 EG.pdfMODULE-3 EG.pdf
MODULE-3 EG.pdf
 
MODULE-I EG.pdf
MODULE-I EG.pdfMODULE-I EG.pdf
MODULE-I EG.pdf
 
MODULE-II EG
MODULE-II EGMODULE-II EG
MODULE-II EG
 
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
 

Recently uploaded

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Module VI MATERIAL TESTING AND EVALUATION [BTCVE506A]

  • 1. MODULE-VI Material Testing ,Machines And Equipment Requirements Prepared by- Prof. Basweshwar S. J.
  • 2. Material Testing ,Machines And Equipment Requirements- •Sieving •Sieve Shakers •Screening •Sampling & Dividing •Aggregates •Asphalt •Concrete •Soils •Ovens & Furnaces •Crushers, Pulverizers & Mills •Temperature & Humidity •Pans, Tools & Glassware •Scales & Balances Prepared by- Prof. Basweshwar S. J.
  • 3. Necessity of material testing • Materials Testing is performed for a variety of reasons and can provide a wealth of information about the tested materials, prototypes or product samples. • The data collected during testing and the final test results can be very useful to engineers, designers, production managers and others. • Here are some of the reasons material testing is important: •Meeting requirements of regulatory agencies •Selecting appropriate materials and treatments for an application •Evaluating product design or improvement specifications •Verifying a production process Prepared by- Prof. Basweshwar S. J.
  • 4. Various testing methods- • Many products are used in critical applications where a failure could result in extensive damage or injury. • Some examples are manufactured fasteners and parts that have a vital role in maintaining the safety of aircraft, bridges, vehicles, nuclear reactors, military equipment and medical implants. In addition, many jurisdictions have adopted legislation restricting the use of hazardous materials. • In cases like these, governments and regulatory bodies set compliance requirements that must be met by manufacturers. • Companies must adhere to these standards, which generally specify test procedures, to prove compliance • It’s typical for a business to purchase mechanical testing services when specifying material for a new product design. • Testing may be performed to evaluate mechanical properties such as strength, hardness, elasticity and fracture toughness. • Corrosion testing can determine if the material will hold up under given conditions such as humidity or a salt water environment. Prepared by- Prof. Basweshwar S. J.
  • 5. Destructive tests, classification of destructive tests---static, impact testing • Testing is often performed early on during product development to evaluate a planned production process. • It can also be just as relevant to provide validation for final products on an ongoing basis. • Various types of non-destructive testing services are used to evaluate finished products without causing damage to the items. • Materials testing also plays a large role in failure analysis investigations to help identify defective products, inadequate materials and, ultimately, the cause of a failure. • When materials testing services are purchased from an independent laboratory like Laboratory Testing Inc., a certified test report is provided that documents applicable accreditations, specifications/standards, other test criteria and complete test results. Prepared by- Prof. Basweshwar S. J.
  • 11. Types of testings •Adhesion Testing •Bending / Flexural Testing •Bond Strength Testing •Break Strength Testing •Coefficient of Friction Testing •Compression Testing •Creep Testing •Crush Resistance Testing •Deformation Testing •Delamination Strength Testing •Ductility Testing •Durability Testing •Elastic Limit Testing •Elongation Testing •Flexural Strength Testing •Friction Testing •Modulus of Elasticity Testing •Peel Strength Testing •Puncture Testing •Rupture Testing •Shear Strength Testing •Stress-Relaxation Testing •Tear Resistance Testing •Tear Strength Testing •Tensile Testing •Toughness Testing •Youngs Modulus Testing Prepared by- Prof. Basweshwar S. J.