CASE STUDY I
TABLE OF CONTENTS
• Introduction
• Site
• Masterplan
• Design concept
• Features
• Innovative features
• Floor plans
• Elevation and section
• Design approaches
TRIODOS BANK,NETHERLAND
CASE STUDY
ON
OFFICE BUILDING
INTRODUCTION
❖ OFFICE BUILDING:TRIODOS BANK
❖ ARCHITECT: RAU ARCHITECTS
❖ LOCATION: DRIEBERGEN-REJSENBURH,
❖ DE REEHORST, THE NETHERLAND
❖ AREA: 7497M2
❖ ARCHITECTURAL STYLE: SUSTAINABLE ARCHITECTURE
AREA STATEMENT:
TOTAL LAND AREA FOR REEHORST ESTATE: 27.5 hectares
BUILT UP AREA: 7497 SQ. MN.
TRIODOS OFFICE: 3327 SQ. M.
OTHER FACILITY: 4170 SQ. M.
TOTAL FLOOR AREA: 12994 SQ. M.
OFFICES: 9688 SQ. M.
INDUSTRY: 155 SQ. M.
MEETING AREA: 2207 SQ. M.
PARKING FACILITY: 3300 SQ.M.
EXTERIOR
THE EXTERIOR OF THE BUILDING IS DESIGNED IN A PLACID MANNER TO
IMPART A SOOTHING VISUAL SENSE TO THE PATRONS.
▪ ITS SOOTHING MERGED WITH SURROUNDING KEEPING PROPERY OF SITE AS
IT
▪ NEUTRAL AND NATURAL COLOR COMBINATION
❖ IN THE FAÇADE WE DISCOVER HIGHLY
DISTINCT FRAMES MADE ENTIRELY OF
STEEL.
❖ THESE FRAME ARE THE PART OF THE
SUPPORTING STRUCTURE
❖ THERE IS PROJECTING ELEMENTS
AROUND THE ENTIRE FAÇADE, WHICH
ARE INSTALLED ON THE FLOOR HEIGHT
❖ THESE ELEMENTS HELP TO FORM THE
MAINTENANCE PATH FOR CLEANER TO
WALK
❖ THESE PROJECTING ELEMENT HELP TO
CREATE A PIECE OF SHADING ON TH
FAÇADE
GLASSES FACADES BRING
IN THE DAYLIGHT DEEPLY
CONTACT WITH THE
BEAUTIFUL ENVIRONMENT
IE INSIDE AND OUTSIDE
FORM ONE WHOLE
❖WE HAVE 3 CORES AND 3 TOWERS THAT ARE ABSOLUTELY
IDENTICAL
❖THE COMPOSITION AND FORM OF THE FIVE STOREY
BUILDING ARE INSPIRED BY NATURE , THE RHYTHM OF THE
LANDSCAPE IN THE SURROUNDING STATE AND FIGHT
PATHS OF THE BATS
❖THE 3 TRANPARENT UNIFORM TOWER RUN FROM SOUTH TO
NORTH AND ARE ALTERNATELY CONNECTED ON THE
GROUNG, FIRST AND SECOND FLOOR
❖ORGANIC FORM OF MUSHROOM CAN BE SEEN
❖BECAUSE OF ITS SHAPE THREE NEW LANDSCAPE ARE
CREATED BETWEN THE EDGE OF THE FOREST AND
BUILDING
CONCEPT
SUSTAINABLE DESIGN
DEMOUNTABLE
HYBRIDWOOD
CONSTRUCTION
MAKE IT
COMPLETELY
DISASSEMBLE AND
BUILD IN
DIFFERENT AREA
DESIGN BASED ON NATURE
(BIOMIMICRY) AND CIRCULARITY
ENERGY NEUTRAL
BUILDING:HEAT
AND
COLD STORAGE
RAINWATER IS USE
FOR
BUILDING AND
ROOF
GARDEN
SOLAR PV ROOF OF THE
PARKING SUPPLIES ENERGY
FOR BUILDING AND CARS
INCENTIVE FOR USE
OF PUBLIC TRASPORT
THROUGH PROXIMITY
OF TRAIN AND BUS
SECTION
❖THERE IS MAIN ENTRANCE IN
FRONT FAÇADE (EAST)
ELEVATED 90CM FROM GROUND
❖THERE IS PAVEMENTS AROUND
THE BUILDING
❖THERE DOOR IN SOUTH AND
WEST FAÇADE TOO
WEST ELEVATION SOUTH ELEVATION
HORIZONTAL COMMUNICATION
❖THE MAIN ENTRANCE AREA IS 4M WIDE
❖3 CORE TOWER IS CONNECTED WITH
EACH OTHER
LOBBY WITH MAIN ENTANCE
GROUND FLOOR 3DVIEW
❖SUFFICIENT AMOUNT OF
CIRCULATION IN ALL FLOOR
❖CIRCULAR STAIRCASE IN
EACH CORE TOWER ACT AS
VETICAL CIRCULATION
VERTICAL COMMUNICATION
PROVISION OF 3
FIRE ESCAPE
AT THREE CORE
PROVISION OF LIFT
AT THREE CORE
AREA
GROUND FLOOR
1ST FLOOR
1: IN BASEMENT THERE IS SPACE FOR
BYCYCLE SHEED
1 OUTSIDE PARKING
❖IN THE EAST SIDE OF THE BUILDING THERE
IS PARKING SPACE OF 3300 SQ.M
❖PV CELLS ON THE ROOF ABOVE THE CAR
PARK PROVIDE THE BUILDING ENERGY
❖PARKING CAPACITY OF 250 CARS
IS PROVIDED
PARKING SPACE
BASEMENT FLOOR PLAN
STORAGE AND STOCK KITCHEN
SHOWERS
TECHNICAL INSTALLATION
BICYCLE SHEED
REST AREAS
N
N
GROUND FLOOR PLAN
RESTRAURANT
CIRCULAR STAIR
LIFT AND EMERGENCY
STAIR
CONFERENCE CENTER
1ST FLOOR PLAN
GREEN ROOF
12.PRVATE
WORKSTATION
OPEN
WORKSTATION
N
TOTAL OF 600
WORKSTATION
IS PROVIDED
OPEN WORKSPACE
2ND FLOOR PLAN
N
3RD FLOOR PLAN
THE WORKSTATION OF THE EMPLOYEES USED THE SAME LAYOUT WITHWORKPLACES OVERLOKING
THE SURROUNDING AND INNER RINGWITH PANTRIES, PHONEBOOTHS AND CONCENTRATION WORKSTATION
12.WORKSTATION
13.PANTRIES
5TH FLOOR PLAN
4TH FLOOR PLAN
N
THESE FLOORTOO FOLLOW
THE SIMILAR PATTERN LAYOUT
WC
STAIRCASE
WORKSTATION
GREEN ROOF
NORTH ELEVATION SOUTH ELEVATION
WEST ELEVATION EAST ELEVATION
❖THE BUILDING IS COMPLETELY MADE UP OF
HYBRID WOODEN MATERIAL
❖THE BUILDING IS COMPLETELY SCREWED
TOGETHER WITH 165312 SCREW THAT CAN
COMPLETELY DISMANTLED WITH OUT LOOSING IT
VALUE
❖THW FURNITURE ARE ALL MADE FROM WOOD
❖EVEN THE SUPPORTING MEMBER AND STAIR IS
MADE OF WOOD
❖PROVISION OF GREEN ROOF
MATERIAL
LOBBY
PILLAR OF
WOOD
GREEN ROOF
LIGHTING:
THE INTERIOR OF THE BANK IS ILLUMINATED BY
NATURAL LIGHTING AS WELL AS ARTIFICIAL
NATURAL LIGHTING:
❖THE PROVISION OF TRANPARENT WINDOW ALL
AROUND THE BUILDING HELP TO INTREGATE THE
BUILDING IN ENVIRONMENT
❖USE OF NATURAL COLOR LIKE GROUND FLOOR WITH
EARTH TONE AND ON THE FLOOR ACCENTS IN BLUE
AND GREEN HELP TO BLEND IN NATURE
ARTIFICIAL LIGHTING
❖LED IS USE IN THE CEILING OF THE BUILDING FOR
ARTIFICIAL LIGHTING
SERVICES
I. PLUMBING SERVICES
❖THE BUILDING GETS THE WATER SUPPLY
FROM THE SANITORY SERVICE
❖THE BUILDING HAVE THE EFFLUENT
SYSTEM WHICH COLLECTS THE RAIN
WATER FROM THE ROOF WHICH IS USED
IN FLUSHING AS WELL AS ROOF GARDEN
❖EXPECTED WATER CONSUMTION 3766
SQ.M. PER YEAR
❖GRAY WATER CONSUMTION 480 SQ. M.
PER YEAR
ACOUSTIC
❖THE CURVE IS NATURALLY BUILT FROM
SEGMENT AND BECAUSE OF THESE
SEGMENT THE REFLECTION OF SOUND IS
ALWAYS DIFFERENT AND CANCEL EACH
OTHER OUT
❖IN LARGE SPACES USE OF FELT FOR
SOUND INSULATION
❖USE OF LINEN IN DIVIDING WALL
❖CLIMATED CEILING ARE PERFORATED
II. ELECTRICAL SERVICE
❖THE WHOLE ELECTRICITY CONTROL OS DONE THROUGH
ELECTRICITY ROOM AT THE BASEMENT
❖ALL ELECTRIC POWER IS PROVIDED BY SOLAR PV PANEL
ABOVE THE PARKING FROM THE WEST SIDE OF BUILDING
❖ENERGY CONSUMTION :
BUILDING REALTED: 350MWH PER YEAR USER BOUND:
180MWH PER YEAR TOTAL: 530MWH PER YEAR
ELECTRIC PANEL ABOVE PARKING
III.VENTILATION
❖HEAT RECOVERY ON THE VENTILATION
❖LOW TEMPERATURE HEATING AND HIGH
TEMERATURE COOLING
CLIMATE CEILING IS USED
❖UNDERGROUND HEAT/COLD STORAGE
WITH A HEAT PUMP HELP TO REGULATE
THE TEMPERATURE OF BUILDING
ARCHITECTURAL FEATURES:
➢ONE OF THE MAIN FEATURE IS USE AND FLEXIBILY OF HYBRID WOOD MATERIAL AND ITS
DEMOUNTABLE ABILITY.
➢ANOTHER FEATURE IS BIOMIMICRY I.E. LEARNING FROM NATURE FOR SUSTAINABLE
SOLUTION
➢IN THIS CASE FORM OF BUILDING IS DESIGN WITH RESPECT TO THE PATH OF BATS AND
HEIGHT DOESNOT EXCEED THE SUROUNDING TREE I.E 25M
➢ORGANIC FORM OF MUSHROOM HELP TO MERGED BUILDING IN SURROUNDING
➢USE OF SOLAR PV PANEL IN ROOF OF PARKING CREATE THE ZERO ENERGY BUILDING
➢USE OF FREE WORKSTATION BY INTRODUCING THE ZONE WHERE PEOPLE WORK
TOGETHER
➢COMPLETE BLEND OF INTERIOR AND EXTERIOR ENVIRONMENT AS ONE USING
TRANSPARENT GLASS
CASE STUDY II
AKSHAYA SHANTI OFFICE
➢Introduction:
• Location-Chennai,India
• Completed year-2020
• Height of building-27m
• Architect:Sanjay puri architects
• North-south oriented building
• Landmark-Government estate
• History-space formerly used as shanti theatre
• Present in the heart of arterial mount road.
• Main aim: create energy efficient space that open into outdoor spaces.
➢Site:
• Area-8000sq.m
• Narrow entry from mount road
• Topography- plain land
• Climate:35 degree (most of the year)
• Excellent connectivity to key location of site
• Plot sandwiched between existing building on all sides
SITE PLAN
• Quick accessibility across the site
➢ Cantilevered cuboid volumes create a sculptural office building in chennai.
➢ Property placed bang in between LIC and government estate with the metro connection.
•Design concept:
-to design building resonse to the climatic condition of the region.
-cantilevered space out at first floor and step back anfd forth at upper floor creating
linear north face terrace at every floor.
-open terrace on every floor along with roof topped landscape garden provide space
for office occupants.
Basement plan
Basement containing car parking in a
managed way with lifts and staircase
within.
Ground floor plan
Deliberately kept small to allow easy
vehicular circulation within the site
First floor
Fifth floor
Terrace plan
➢Architectural Features:
• Conceived and built with an eye of an
ultra modern aesthetics to match requireme-
nt of new age business.
• Unique mold of form and function.
• Every little facet is designed to ensure ma-
ximum ease and convenience.
• Car parking:
-ample mechanical car parking facility
for upto 134 car parks ;basement car
Park-64 cars , rotary car park-70 cars.
-has best car park efficiency in chennai
-one car park-647 sq.ft.
• Reception :
-on ground floor to the left side of entry.
-aesthetically designed reception lounge to receive clients in style.
• Reception lounge
• Lobby:
-easy movement across floors; with 3 high speed elevators
and 3 staircases.
-elevators :
✓ High speed 20 passenger capa-
City lifts.
✓ Easily accessible from the entra-
nce and presetn in basement also.
• Workstation:
-Starts only from the first floor upto 5th floor
-office area from 2,725 sq.ft
-open plan work stations.
-for about 1000 staffs.
• Cafeteria:
-present on the ground floor with large dining area.
-has kitchen and separate pantry.
-space for about 100 person at a time.
Restroom:
-each floor consisting of separate male and female
toilet.
-toilet separate each floor into three different part
acting as a buffer space between workstations.
➢Innovative features:
-Aesthetically green capped terrace garden.
-solar panel installed on the top floor to harness
ample solar energy available in this location
Providing energy for lighting.
-Amenitites including gym area for staffs.
Transformers:
-placed on the backside of building.
-used for the office work.
➢Design approaches:
• Design in response to climatic condition of the place.
• Orienting all the office spaces toward the north with
service core on south mitigating heat gain completely
rendering building energy efficient.
• Service core from southern side of building becoming
a buffer to reduce heat gain in response to hot climate.
• INFERENCES
-Cafeteria present only on the ground floor making it difficult for the staffs of
upper floor
-open plan office not good from privacy point of view of the staffs.
-attrium space missing which is an essential part in an office to make it open and
more fresh.
CASE STUDY III
NEPAL MERCHANT BANK LIMITED
❖First commercial bank of Nepal that has been able to upgrade from a
Finance Company to a full- fledged Commercial Bank.
❖Started as Nepal Merchant Banking and Finance Ltd. and was later
changed to NMB Bank Limited
Location: Babar Mahal, Head Branch,
kathmandu
Designer: Architecture Design Forum
(ADF)
Access: Opposite Kathmandu District
Court
Surrounding: Government offices
Land cover /Covered area: 12000
sq.ft.
• Summer are hot and temperature ranges
from 29°C -20.9°C.
• Winter are cold and temperature ranges
from 19.7°C -5°C
• Precipitation: 73%
• Humidity: 95%
• Wind: 11 km/h
CLIMATE
INTRODUCTION
main block
back space
basement parking
main
entrance
guard house
surface
parking
surface
parking
BUBBLE DIAGRAM OF SITE
ROOF PLAN
BUBBLE DIAGRAM OF BASEMENT
BASEMENT
entry
store
parking
ramp to upper
basement
parking
staircase
Lower Basement:
oEntry through ramp (15degree gradient)
oLower basement for parking, storage
oParking grid: 14'*19'-9.5”
oParking capacity: 40 bikes, 30 cars
Upper Basement:
oDual purpose: for official work cum two wheelers
parking.
oParking capacity:20 bikes
Ground Floor Plan
Ground
floor
Customer
service
Central
operation
Registrar
to share
Ground Floor
Planning
▪Pre-information desk at the
entrance for basic information
▪Information desk inside for
advanced information
▪Voucher desk
▪Reception cum customer care
unit
▪Waiting hall
▪Cash supervision unit
▪Teller unit
2nd
entry
Reception
customer
care
Lift
shaft
W/C
Stairs
Merchant
banking
Branch
manager
Vault
Cash
supervis
or
M.B storage /data
entry
Staircase
Entry
Back
entry
Locker
entry
Back
office
Back
office
Storage
Tellers
Waiting Area/ seating area
Printer / storage
L
o
b
b
y
▪Back office
▪ATM department at the back
▪Branch manager office
▪M.B. storage/data entry unit
▪File vault
▪Cash vault
▪Lockers unit
▪Storage
▪Restroom
RELATION OF SPACES
ATM
Reception →
Tellers
ATM Department →
 Information Desk
First Floor Plan
Corporate and
institutional
banking
General
Manager
Business and
retail banking
Credit
administratio
n and control
Deposit
transaction
banking
Trade
finance
FIRST FLOOR
First Floor
Planning
▪Reception for phone handling and
transferring
▪General Manager office
▪Trade and finance unit:
➢Trade and finance counter
➢Trade and finance head
➢Trade and finance staff unit
▪Meeting rooms Compliance unit
▪Marketing Unit:
➢Marketing head office
➢Marketing staff unit
▪Merchant banking staff unit
▪Credit administration unit:
➢Credit administration head
➢Credit administration staff
▪Business banking unit
▪Consumer finance unit
▪Server administration unit with a cold
room
▪Central printing filing and photocopy
unit
▪Pantry
▪Rest room
Meeti
ng
head
Meet
ing 1
bal
co
ny Trade
finance
counter
Credit
admin
head
Merchant
banking
staff
North balcony
Consumer
finance
head
Consumer
finance staff
Buisness
banking
head
Credi
t card
Meet
ing 2
recept
ion
Lift
Ladie
s w/c
Gent
s w/c
Trade
finance
counter
staff
G.M
compli
ance Central
printing/photocopy
Buisness
banking
staff Filling
Server
admin
Cold
room
Pantry
Trade &
finance
head
Marke
ting
staff
Merchant
banking
head
Credit
admin
staff
Staircase
Relation of space
 Ceiling tiles and
lighting fixtures
Reception →
 Pantry
Trade and Finance
Department →
Second Floor Plan
Second Floor
Planning
▪Reception and secretary
▪Waiting area
▪Meeting room
▪Administration /HR head
▪Administration staff unit
▪Accounts head
▪Account staffs
▪Chief executive officer
▪Head of operations
▪Deputy General Manager
▪Credit head
▪Credit section
▪Operation treasury
▪Dealing room
▪Board room
▪Filing ,printing, photocopy unit
▪Pantry
▪Restrooms
Meeting/
conference
room
Waiting
area
Library / audit
AC staff
1
AC
staff 2
Credit
head
Lobby
Reception
& secretary
Lift
Staircase
w/c w/c
Chief
executive
officer DGm
Credit
Operatio
n
treasury
Dealing
room
P
A
N
T
R
y
Filling
Admin /HR
/ head Admin
/HR/staff
AC head
Head of
departure
Board
room
Printer
Relation of spaces
Meeting Room →
Photocopy and Printing
 Treasury Department
Credit Section →
Third Floor Planning
Top Floor Planning
Reception
Credit
administration
Waiting area
Shares
department
Documentation
Machine
Room
Canteen
Building Material And
Construction Technolgy
Glass andWood Partitions
False Ceiling
➢R.C.C Framed Structured
➢Seismic Wave Resistant Technology
➢4"shear wall in the basement
➢RCC wall for vault and locker room
➢Plaster of Parish for interior of buildings
➢Japanese texture for exterior of building
➢Gypsum, wooden, aluminum partitions
➢Column Size :1'8"*1’8”
➢Column difference :14'*19'-9.5"
➢Beam: 2’x1’6’’
➢Slab Thickness: 6”
➢Floor to floor height:
▪Lower Basement: 11’
▪Upper Basement: 8’
▪Other Floors : 12’
➢(Panaromic)lift size: 8’ x 6’
➢Riser height:6"
➢False ceilings of gypsum board
➢Use of acoustic tiles on the ceiling
FRONT FACADE
Positive Aspects
➢Adequate parking facilities
➢Back space utilised for parking
➢Dual utility of the upper basement
➢Provision of adequate writing desk in the hall specially positioned in
such a way that it would not disturb the flow of customers to the counter
area
➢Large public space to the entrance
➢Sufficient day lighting
➢North balcony at each floor
➢Comfortable working space
➢Rest room near by the public area
➢Vault is properly placed in the basement area with adequate security
provisions and not accessible to the public
➢Proper spatial planning
➢Proper organization of the working spaces viz., floor wise work
distribution
➢Smoke detectors placed on ceilings, fire extinguishers placed properly at all
floors
➢Attractive interior decoration Use of frosted double glasses to provide a
audio-visual barrier between the private and the public area
➢HVAC system
➢Enough circulation spaces both vertical and horizontal
➢Advanced security system with the provision of intruder alarms, fire
alarms, CCTV camera, access control system cards.
Card Access System
Negative Aspects
➢Absence of easy access to the Branch manager's office.
➢Lack of direct visibility of the cashier section and the
customer's area from the manager's office.
➢ Ramp connecting the adjacent basement floors with a high
gradient causing inconvenience in circulation
➢Floor to floor height of the upper basement is insufficient
➢Shares department not well managed as per the
requirement
➢Lack of preliminary recreational facilities as per the
requirements of the international standards
PLANNING ANALYSIS
➢ Staircase, lobby, lift, reception with waiting area are near
to the entrance.
➢ Office spaces, working environment in central part.
➢ Pantry , board room, locker, dealing room, back entry far
from the entrance
REVIEW ON PROPOSED OFFICE BUILDING
LALITPUR MUNICIPALITY
IV
LALITPUR MUNICIPALITY
• Proposed office building for Lalitpur municipality within its
existing premise.
• Designed by Subham Karki
About Site
▪ Proposed area for the building placement is 1900 m2
( 3-8-3-2.5 in ropanies)
▪ The municipality is situated just at the entry point which
leads towards the historical Patan durbar square.
▪ The site consists of municipality building, well
landscape area with pond, outdoor parking
Site approach :
▪ Has 3 approaches, on North, west and south
▪ South entrance as the main vechiular entrance to the
site
Views :
▪ Key views towards the garden and pond on east.
▪ View towards the west is blocked with residential building.
CONCEPTUAL APPROACH
Approach I – Axis Formation
• Axis of approach – defines the entrance of the building
• Axis of existing building – defines the alignment of the building
• Axis of temple – aligned centrally in the site. Symmetry in two
building
Approach II – Response to site
• Blockage of winter sun is minimum towards
the existing building
Approach III – Inspirations fromTraditional
Architecture
• Balance, symmetry and concept of plaza
• Slope overhanging roofs
• Sunken courtyard
Roof plan
Fire
pump
Ramp up Stairs
Lift
Parking
Lift
Parking
Parking
Car
Parking
(21
units)
Electrical &
solar room
Fire
tank
Regular
water
pump
Generator
room
Ramp
down
1.5 ft ht. file room
Bike
parking
Stairs
Bike parking
Bike
parking
Ramp
up
Car
parking
storage
Lift
Lift
Back
stairs
W/C
S
T
A
I
R
S
void
Meeting
room
Reference
section
Lift
Void
Library
55 seating
Lobby
Lift
E
N
T
R
A
N
C
E
Section
Revenue teller
Terrace
Back
stairs
Secret
ary
Departme
nt head
Melme
lap
kendra
w/c
Stairc
ase
Dalas
room
Lobby
Lift
Void
Deputy
chief offices
Lift
Secretary office
Judge
chamber
Back
stairs
w/c
8 engineer’s office
Stair
case
Engineers
private office
Seminar hall
Terrace
Lobby
Audit
room
Balc
ony
Relation of spaces
Chief
account
officer
Balcony
Lobby
Stair
case
Account
section
Terrace
w/c
Relation of spaces
BUILDING SERVICE
• Rain water harvested from the roof and
site are treated on basement.
• The slope roofs on south and west can be
utilized for solar panels placements.
• Electrical and other services room on the
basement
• Water tanks in lower basement
• Fire escape on each floor
• Hot air exist by stack effect
• Maximum use of day light through courtyard
and lobby atrium
• 2 lifts for easy vertical circulation
EAST ELEVATION
WEST ELEVATION
INFERENCE
• Maximum penetration of daylight using fenestration at different levels.
• Each floors have a common space like lobby
• Using terrace at different floor for refreshment and views.
CORPORATE OFFICE
SITE ANALYSIS CHECKLIST
• Entrance and access point (both pedestrian and vehicle
• Security ( gates , anvelliance)
• Boundary treatment (fencing, vegetation, landform, water)
• Circulation (existing travel route within the site)
• Noise level (quiet or loud areas)
• Services (electric, water, sewage, communication)
• Existing buildings (condition)
• Existing landscape feature
• Neighboring building (local, vernacular)
• Views in and out of the site ( areas to screen off and areas to draw attention to )
• Trees and vegetataion ( protected and rare species )
• Ecology
• Orientation ( sun and wind path )
• Light levels ( areas in direct sunlight, shaded area,
• Accessibility
• Surrounding context ( historical, heritage ,
conservation area)
• Existing material in and around the site to
• Topography
• Water table ( is it prone to field )
• Soil and ground condition
• Existing legal agreements ( bye laws , right of way,
OBECTIVES
To have greater efficiency in designing with respect to site.
To discover interrelationships between site factors.
To maximize data triggers and use those as catalyst in concept designing.
• PROJECT: Corporate Office
• OWNERSHIP: Private land.
• TYPE: Sub-Urban
o Location: Itahari, NTC Road
o Area: 8000 sq. metre
o Latitude: 26 ,40’,01”N
o Longitude: 87,16’17”E
o Altitude: 117m above sea level
o Perimeter: 401 m
o Orientation : South-east
General
SITE INTRODUCTION
▪ Flat grassland
▪ Rectangular shape
▪ Few subtropical trees as
vegetation
▪ High boundary wall on all
four sides
▪ Longest diagonal= 125m
▪ Length of primary entry =
90m
▪ Longest length = 110m(NW)
Site
Characteristics
• Main entry on SE side by NTC road
• Accessible from 3 sides by means of road on N,E & W with
south containing private houses
• Existing boundary wall with main gate as a entry point
Entry & Access point
Ref:worldweatheronline.com
Type
Subtropical Climate : 6 months hot, 3 months mild &3
months cold
Solar angle 85◦ at summer & 45◦ at winter
14.5 hr daylight in summer & 10.5 hr in winter
Morning sun on site at 6:30 am in summer & at 7:am
in winter
Temperature
Max about 37◦ C on ( April / May)
Min about 14◦C on ( Dec / Jan)
Average about 30 C
Rainfall
Max about 546mm on (July / Aug)
Min about 3.7mm on (Dec / Jan)
Average about 350mm
WIND
Prevailing wind from SE (5km/hr)
SITE CLIMATE
SITE STUDY
View towards the site
MAXIMUM PPT: 490MM IN AVERAGE
MINIMUM PPT: 6MM IN DECEMBER
SITE SURROUNDINGS
View from the site
NATURAL ASPECT ANALYSIS
Soil and Ground Condition
• Soil condition is favorable for construction
• No presence of black cotton soil
• Presence of underground water below 35 feet
• SORROUNDED BY TREES SO IT IS
ENVIRONMENT FRIENDLY
ECOLOGY
WATER TABLE
• WATER IS PROVIDED BY TAP AS WELLL GROUND
WATER IS PROVIDED 24 HOURS
• WATER LEVEL IS FOND BELOW 35 FT
TOPOGRAPHY
• Subtropical Climate : 6 months hot, 3
months mild &3 months cold
• Trees and natural vegetation is found
• Kheti khola near the site
Vegetation
• Coconut
,banyan
tree,
evergreen
and
deciduous
tree
MATERIALS AVAILABLE IN AND AROUND SITE
• CONCRETE, BRICKS, IRON, STEEL
• TIMBER , STONE , BAMBOO
• New Rcc beam-frame construction
• at road side areas
SURROUNDING CONTEXT AND SERVICES
• Private housing on one side representing
residential area
• House with two storey and three storey
• Rectangular plan
• Some traditional house with timber posts and
beams to make frames of wall
• Floor heights raised due to hot climate
PLANNING TECHNOLOGY
SOCIO-CULTURAL ASPECT ANALYSIS
Community groups
• Brahmins
• Limbhu
• Newar
• Tamang
• Chettri
Major Occupation
• Farming
• Buisness
Activities
• Celebrating different festivals , jatra and rally
• Since it is near to schools and offices
roadways might be crowded on office time
Circulation
• Primary route is NTC road
• EastWest Highway at about 250m South
• Koshi Highway at about 295m North
• Peak morning time = 8 to 10 am
• Peak evening time = 4 to 6 pm
• Transportation means by private or public vehicle
Utilities
• Electricity by NEA
• Drinking water by Itahari metropolitan City
• Easily accessible to numerous internet & wifi services
• Urban area with mediocre noise
• Trees on the site creating its own type of space
• Noise from south east main road and neighbor buildings
• Traffic noise from junction and main highway
. Narrow drainage
system near to the
road side
ByeLaws
• FAR:3.5
• GCR : 70-80%
• Set back : 5m from front & 3m from back
• Built up area = 60 %
DRAINAGE
SOUND
Itahari Sub-Metropolitan City Office
714 m and 10 min by foot
5 min by vehicles
Vishwa Adarsha college
125 m 2 min by foot
1 min by vehicle
Apex hospital itahari
800 m 1o min by foot
5 min by vehicles
Bhagwati temple
474 m 7 min by foot
3 min by vehicles
25KM FROM BIRATNAGAR
17KM FROM DHARAN
62.2KM FROM DHANKUTA
72KM FROM JHAPA
128KM FOR SAGARMATHA
124 KM FROM TAPLEJUN
ITAHARI JUNCTION
PROPOSED SITE
SURROUNDING LANDMARKS
SITE 3D MODEL
STRENGTH:
- ACCESSEBLE FROM 3 SIDES ROAD
- FLAT LAND EASY FOR COSTRUCTION
- TREE IN SITE ACT AS BUFFER
WEAKNESS:
- LACKS PROPER DRAINAGE
- SOUND POLLUTION FROM CINEMA
OPPORTUNITY:
- PRIME LOCATION FOR BANK AS IT IS
CENTER OF CITY
- OPEN AND SOCIAL ENVIRONMENT
- POTENTIAL FOR FUTURE EXPANSION
THREAT:
- CHANCE OF FLOODING
- NEAR BY SCHOOL, INDUSTRY
- AIR AND SOUND POLLUTION
SWOT
ANALYSIS
REFRENCES :
NEUFERT
ARCHDAILY
ARCHITECT HAND BOOK
TIME SAVER STANDARD
WBDG BUILDING
ARCHITIZER
ARCHELLO
AKSHAYA.COM
SENIORS
THANK YOU!

More Related Content

What's hot

Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case studySimi Sayed
 
Teri university case study
Teri university case studyTeri university case study
Teri university case studyDeepika Verma
 
shopping mall case study
shopping mall case studyshopping mall case study
shopping mall case studyAtul Verma
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyARYAN GUPTA
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architectureAbhishek Tiwari
 
SPA VIJAYAWADA -case study
SPA VIJAYAWADA -case studySPA VIJAYAWADA -case study
SPA VIJAYAWADA -case studyAR.PRASHANTHINI M
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study Nitesh Parmar
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office BuildingsRohan Narvekar
 
HOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSARHOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSARanonymous
 
India habitat centre observations by architect student
India habitat centre observations by architect studentIndia habitat centre observations by architect student
India habitat centre observations by architect studentShailja km
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.Milan Jain
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Bookrajensen00
 
Case Study of A Single family Residence (1).pdf
Case Study of A Single family Residence (1).pdfCase Study of A Single family Residence (1).pdf
Case Study of A Single family Residence (1).pdfMHSHAON5
 
Oasis Hotel Downtown
Oasis Hotel DowntownOasis Hotel Downtown
Oasis Hotel DowntownKritikaPatel15
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square MumbaiTapu Taba
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use buildingTonmoy Barua
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case studyRadhikaJadhav8
 
Case study School Design
Case study School DesignCase study School Design
Case study School DesignMukesh Ijam Limbu
 

What's hot (20)

Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
Teri university case study
Teri university case studyTeri university case study
Teri university case study
 
shopping mall case study
shopping mall case studyshopping mall case study
shopping mall case study
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
SPA VIJAYAWADA -case study
SPA VIJAYAWADA -case studySPA VIJAYAWADA -case study
SPA VIJAYAWADA -case study
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
Site analysis
Site analysisSite analysis
Site analysis
 
The interlace singapore
The interlace singaporeThe interlace singapore
The interlace singapore
 
Sustainable Office Buildings
Sustainable Office BuildingsSustainable Office Buildings
Sustainable Office Buildings
 
HOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSARHOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSAR
 
India habitat centre observations by architect student
India habitat centre observations by architect studentIndia habitat centre observations by architect student
India habitat centre observations by architect student
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
Case Study of A Single family Residence (1).pdf
Case Study of A Single family Residence (1).pdfCase Study of A Single family Residence (1).pdf
Case Study of A Single family Residence (1).pdf
 
Oasis Hotel Downtown
Oasis Hotel DowntownOasis Hotel Downtown
Oasis Hotel Downtown
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
 
Case study on Mixed use building
Case study on Mixed use buildingCase study on Mixed use building
Case study on Mixed use building
 
Raj Rewal Asian games village case study
Raj Rewal Asian games village case studyRaj Rewal Asian games village case study
Raj Rewal Asian games village case study
 
Case study School Design
Case study School DesignCase study School Design
Case study School Design
 

Similar to CASE STUDY AND SITE ANALYSIS.pdf

Ppt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaonPpt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaonkarankapoor804497
 
Ppt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaonPpt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaonkarankapoor804497
 
Case study
Case studyCase study
Case studyBarshaShah1
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran BhawanshreyaGupta396
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar BirkertsVishakha Thole
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Mayur Waghulde
 
Vcc canada
Vcc canadaVcc canada
Vcc canadaJonna Vasu
 
CASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHK
CASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHKCASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHK
CASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHKDeeshaKhamar1
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxDimple954080
 
high rise case study
high rise case studyhigh rise case study
high rise case studyParthPatel1739
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawanpraveen rohilla
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...DhvaniR2
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaAnchal Garg
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONManjeera Group
 
AMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptxAMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptxNehaKandur
 
Report on HIGH RISE
Report on HIGH RISE Report on HIGH RISE
Report on HIGH RISE Isratul Shaon
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai towerAmnarao3
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABISelf employed
 
Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...
Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...
Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...Riday Saha
 

Similar to CASE STUDY AND SITE ANALYSIS.pdf (20)

Ppt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaonPpt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaon
 
Ppt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaonPpt....centrum park housing, gurgaon
Ppt....centrum park housing, gurgaon
 
Case study
Case studyCase study
Case study
 
Indira Paryawaran Bhawan
  Indira Paryawaran Bhawan  Indira Paryawaran Bhawan
Indira Paryawaran Bhawan
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
Vcc canada
Vcc canadaVcc canada
Vcc canada
 
CASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHK
CASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHKCASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHK
CASE STUDY ON HOUSING #345BHK @3BHK@4BHK@5BHK
 
THE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptxTHE EDGE BUILDING PPT.pptx
THE EDGE BUILDING PPT.pptx
 
high rise case study
high rise case studyhigh rise case study
high rise case study
 
Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATIONMANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
 
AMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptxAMORE PACIFIC (1)-1.pptx
AMORE PACIFIC (1)-1.pptx
 
Report on HIGH RISE
Report on HIGH RISE Report on HIGH RISE
Report on HIGH RISE
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Norman foster
Norman fosterNorman foster
Norman foster
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...
Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...
Study of LOW-COST HOUSING, AFFORDABLE HOUSING, SUSTAINABLE HOUSING & INCREMEN...
 

Recently uploaded

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Recently uploaded (20)

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAĐĄY_INDEX-DM_23-1-final-eng.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

CASE STUDY AND SITE ANALYSIS.pdf

  • 2. TABLE OF CONTENTS • Introduction • Site • Masterplan • Design concept • Features • Innovative features • Floor plans • Elevation and section • Design approaches
  • 4. INTRODUCTION ❖ OFFICE BUILDING:TRIODOS BANK ❖ ARCHITECT: RAU ARCHITECTS ❖ LOCATION: DRIEBERGEN-REJSENBURH, ❖ DE REEHORST, THE NETHERLAND ❖ AREA: 7497M2 ❖ ARCHITECTURAL STYLE: SUSTAINABLE ARCHITECTURE AREA STATEMENT: TOTAL LAND AREA FOR REEHORST ESTATE: 27.5 hectares BUILT UP AREA: 7497 SQ. MN. TRIODOS OFFICE: 3327 SQ. M. OTHER FACILITY: 4170 SQ. M. TOTAL FLOOR AREA: 12994 SQ. M. OFFICES: 9688 SQ. M. INDUSTRY: 155 SQ. M. MEETING AREA: 2207 SQ. M. PARKING FACILITY: 3300 SQ.M.
  • 5. EXTERIOR THE EXTERIOR OF THE BUILDING IS DESIGNED IN A PLACID MANNER TO IMPART A SOOTHING VISUAL SENSE TO THE PATRONS. ▪ ITS SOOTHING MERGED WITH SURROUNDING KEEPING PROPERY OF SITE AS IT ▪ NEUTRAL AND NATURAL COLOR COMBINATION
  • 6. ❖ IN THE FAÇADE WE DISCOVER HIGHLY DISTINCT FRAMES MADE ENTIRELY OF STEEL. ❖ THESE FRAME ARE THE PART OF THE SUPPORTING STRUCTURE ❖ THERE IS PROJECTING ELEMENTS AROUND THE ENTIRE FAÇADE, WHICH ARE INSTALLED ON THE FLOOR HEIGHT ❖ THESE ELEMENTS HELP TO FORM THE MAINTENANCE PATH FOR CLEANER TO WALK ❖ THESE PROJECTING ELEMENT HELP TO CREATE A PIECE OF SHADING ON TH FAÇADE GLASSES FACADES BRING IN THE DAYLIGHT DEEPLY CONTACT WITH THE BEAUTIFUL ENVIRONMENT IE INSIDE AND OUTSIDE FORM ONE WHOLE
  • 7. ❖WE HAVE 3 CORES AND 3 TOWERS THAT ARE ABSOLUTELY IDENTICAL ❖THE COMPOSITION AND FORM OF THE FIVE STOREY BUILDING ARE INSPIRED BY NATURE , THE RHYTHM OF THE LANDSCAPE IN THE SURROUNDING STATE AND FIGHT PATHS OF THE BATS ❖THE 3 TRANPARENT UNIFORM TOWER RUN FROM SOUTH TO NORTH AND ARE ALTERNATELY CONNECTED ON THE GROUNG, FIRST AND SECOND FLOOR ❖ORGANIC FORM OF MUSHROOM CAN BE SEEN ❖BECAUSE OF ITS SHAPE THREE NEW LANDSCAPE ARE CREATED BETWEN THE EDGE OF THE FOREST AND BUILDING
  • 8. CONCEPT SUSTAINABLE DESIGN DEMOUNTABLE HYBRIDWOOD CONSTRUCTION MAKE IT COMPLETELY DISASSEMBLE AND BUILD IN DIFFERENT AREA DESIGN BASED ON NATURE (BIOMIMICRY) AND CIRCULARITY ENERGY NEUTRAL BUILDING:HEAT AND COLD STORAGE RAINWATER IS USE FOR BUILDING AND ROOF GARDEN SOLAR PV ROOF OF THE PARKING SUPPLIES ENERGY FOR BUILDING AND CARS INCENTIVE FOR USE OF PUBLIC TRASPORT THROUGH PROXIMITY OF TRAIN AND BUS SECTION
  • 9. ❖THERE IS MAIN ENTRANCE IN FRONT FAÇADE (EAST) ELEVATED 90CM FROM GROUND ❖THERE IS PAVEMENTS AROUND THE BUILDING ❖THERE DOOR IN SOUTH AND WEST FAÇADE TOO WEST ELEVATION SOUTH ELEVATION
  • 10. HORIZONTAL COMMUNICATION ❖THE MAIN ENTRANCE AREA IS 4M WIDE ❖3 CORE TOWER IS CONNECTED WITH EACH OTHER LOBBY WITH MAIN ENTANCE GROUND FLOOR 3DVIEW ❖SUFFICIENT AMOUNT OF CIRCULATION IN ALL FLOOR
  • 11. ❖CIRCULAR STAIRCASE IN EACH CORE TOWER ACT AS VETICAL CIRCULATION VERTICAL COMMUNICATION PROVISION OF 3 FIRE ESCAPE AT THREE CORE PROVISION OF LIFT AT THREE CORE AREA GROUND FLOOR 1ST FLOOR
  • 12. 1: IN BASEMENT THERE IS SPACE FOR BYCYCLE SHEED 1 OUTSIDE PARKING ❖IN THE EAST SIDE OF THE BUILDING THERE IS PARKING SPACE OF 3300 SQ.M ❖PV CELLS ON THE ROOF ABOVE THE CAR PARK PROVIDE THE BUILDING ENERGY ❖PARKING CAPACITY OF 250 CARS IS PROVIDED PARKING SPACE
  • 13. BASEMENT FLOOR PLAN STORAGE AND STOCK KITCHEN SHOWERS TECHNICAL INSTALLATION BICYCLE SHEED REST AREAS N
  • 14. N GROUND FLOOR PLAN RESTRAURANT CIRCULAR STAIR LIFT AND EMERGENCY STAIR CONFERENCE CENTER
  • 15. 1ST FLOOR PLAN GREEN ROOF 12.PRVATE WORKSTATION OPEN WORKSTATION N TOTAL OF 600 WORKSTATION IS PROVIDED OPEN WORKSPACE
  • 16. 2ND FLOOR PLAN N 3RD FLOOR PLAN THE WORKSTATION OF THE EMPLOYEES USED THE SAME LAYOUT WITHWORKPLACES OVERLOKING THE SURROUNDING AND INNER RINGWITH PANTRIES, PHONEBOOTHS AND CONCENTRATION WORKSTATION 12.WORKSTATION 13.PANTRIES
  • 17. 5TH FLOOR PLAN 4TH FLOOR PLAN N THESE FLOORTOO FOLLOW THE SIMILAR PATTERN LAYOUT WC STAIRCASE WORKSTATION GREEN ROOF
  • 18. NORTH ELEVATION SOUTH ELEVATION WEST ELEVATION EAST ELEVATION
  • 19. ❖THE BUILDING IS COMPLETELY MADE UP OF HYBRID WOODEN MATERIAL ❖THE BUILDING IS COMPLETELY SCREWED TOGETHER WITH 165312 SCREW THAT CAN COMPLETELY DISMANTLED WITH OUT LOOSING IT VALUE ❖THW FURNITURE ARE ALL MADE FROM WOOD ❖EVEN THE SUPPORTING MEMBER AND STAIR IS MADE OF WOOD ❖PROVISION OF GREEN ROOF MATERIAL LOBBY PILLAR OF WOOD GREEN ROOF
  • 20. LIGHTING: THE INTERIOR OF THE BANK IS ILLUMINATED BY NATURAL LIGHTING AS WELL AS ARTIFICIAL NATURAL LIGHTING: ❖THE PROVISION OF TRANPARENT WINDOW ALL AROUND THE BUILDING HELP TO INTREGATE THE BUILDING IN ENVIRONMENT ❖USE OF NATURAL COLOR LIKE GROUND FLOOR WITH EARTH TONE AND ON THE FLOOR ACCENTS IN BLUE AND GREEN HELP TO BLEND IN NATURE ARTIFICIAL LIGHTING ❖LED IS USE IN THE CEILING OF THE BUILDING FOR ARTIFICIAL LIGHTING
  • 21. SERVICES I. PLUMBING SERVICES ❖THE BUILDING GETS THE WATER SUPPLY FROM THE SANITORY SERVICE ❖THE BUILDING HAVE THE EFFLUENT SYSTEM WHICH COLLECTS THE RAIN WATER FROM THE ROOF WHICH IS USED IN FLUSHING AS WELL AS ROOF GARDEN ❖EXPECTED WATER CONSUMTION 3766 SQ.M. PER YEAR ❖GRAY WATER CONSUMTION 480 SQ. M. PER YEAR ACOUSTIC ❖THE CURVE IS NATURALLY BUILT FROM SEGMENT AND BECAUSE OF THESE SEGMENT THE REFLECTION OF SOUND IS ALWAYS DIFFERENT AND CANCEL EACH OTHER OUT ❖IN LARGE SPACES USE OF FELT FOR SOUND INSULATION ❖USE OF LINEN IN DIVIDING WALL ❖CLIMATED CEILING ARE PERFORATED
  • 22. II. ELECTRICAL SERVICE ❖THE WHOLE ELECTRICITY CONTROL OS DONE THROUGH ELECTRICITY ROOM AT THE BASEMENT ❖ALL ELECTRIC POWER IS PROVIDED BY SOLAR PV PANEL ABOVE THE PARKING FROM THE WEST SIDE OF BUILDING ❖ENERGY CONSUMTION : BUILDING REALTED: 350MWH PER YEAR USER BOUND: 180MWH PER YEAR TOTAL: 530MWH PER YEAR ELECTRIC PANEL ABOVE PARKING III.VENTILATION ❖HEAT RECOVERY ON THE VENTILATION ❖LOW TEMPERATURE HEATING AND HIGH TEMERATURE COOLING CLIMATE CEILING IS USED ❖UNDERGROUND HEAT/COLD STORAGE WITH A HEAT PUMP HELP TO REGULATE THE TEMPERATURE OF BUILDING
  • 23. ARCHITECTURAL FEATURES: ➢ONE OF THE MAIN FEATURE IS USE AND FLEXIBILY OF HYBRID WOOD MATERIAL AND ITS DEMOUNTABLE ABILITY. ➢ANOTHER FEATURE IS BIOMIMICRY I.E. LEARNING FROM NATURE FOR SUSTAINABLE SOLUTION ➢IN THIS CASE FORM OF BUILDING IS DESIGN WITH RESPECT TO THE PATH OF BATS AND HEIGHT DOESNOT EXCEED THE SUROUNDING TREE I.E 25M ➢ORGANIC FORM OF MUSHROOM HELP TO MERGED BUILDING IN SURROUNDING ➢USE OF SOLAR PV PANEL IN ROOF OF PARKING CREATE THE ZERO ENERGY BUILDING ➢USE OF FREE WORKSTATION BY INTRODUCING THE ZONE WHERE PEOPLE WORK TOGETHER ➢COMPLETE BLEND OF INTERIOR AND EXTERIOR ENVIRONMENT AS ONE USING TRANSPARENT GLASS
  • 24. CASE STUDY II AKSHAYA SHANTI OFFICE
  • 25. ➢Introduction: • Location-Chennai,India • Completed year-2020 • Height of building-27m • Architect:Sanjay puri architects • North-south oriented building • Landmark-Government estate • History-space formerly used as shanti theatre • Present in the heart of arterial mount road. • Main aim: create energy efficient space that open into outdoor spaces. ➢Site: • Area-8000sq.m • Narrow entry from mount road • Topography- plain land • Climate:35 degree (most of the year) • Excellent connectivity to key location of site • Plot sandwiched between existing building on all sides SITE PLAN
  • 26. • Quick accessibility across the site ➢ Cantilevered cuboid volumes create a sculptural office building in chennai. ➢ Property placed bang in between LIC and government estate with the metro connection.
  • 27. •Design concept: -to design building resonse to the climatic condition of the region. -cantilevered space out at first floor and step back anfd forth at upper floor creating linear north face terrace at every floor. -open terrace on every floor along with roof topped landscape garden provide space for office occupants.
  • 28.
  • 29. Basement plan Basement containing car parking in a managed way with lifts and staircase within. Ground floor plan Deliberately kept small to allow easy vehicular circulation within the site
  • 31. ➢Architectural Features: • Conceived and built with an eye of an ultra modern aesthetics to match requireme- nt of new age business. • Unique mold of form and function. • Every little facet is designed to ensure ma- ximum ease and convenience. • Car parking: -ample mechanical car parking facility for upto 134 car parks ;basement car Park-64 cars , rotary car park-70 cars. -has best car park efficiency in chennai -one car park-647 sq.ft. • Reception : -on ground floor to the left side of entry. -aesthetically designed reception lounge to receive clients in style.
  • 32. • Reception lounge • Lobby: -easy movement across floors; with 3 high speed elevators and 3 staircases. -elevators : ✓ High speed 20 passenger capa- City lifts. ✓ Easily accessible from the entra- nce and presetn in basement also.
  • 33. • Workstation: -Starts only from the first floor upto 5th floor -office area from 2,725 sq.ft -open plan work stations. -for about 1000 staffs. • Cafeteria: -present on the ground floor with large dining area. -has kitchen and separate pantry. -space for about 100 person at a time. Restroom: -each floor consisting of separate male and female toilet. -toilet separate each floor into three different part acting as a buffer space between workstations.
  • 34. ➢Innovative features: -Aesthetically green capped terrace garden. -solar panel installed on the top floor to harness ample solar energy available in this location Providing energy for lighting. -Amenitites including gym area for staffs. Transformers: -placed on the backside of building. -used for the office work.
  • 35. ➢Design approaches: • Design in response to climatic condition of the place. • Orienting all the office spaces toward the north with service core on south mitigating heat gain completely rendering building energy efficient. • Service core from southern side of building becoming a buffer to reduce heat gain in response to hot climate.
  • 36. • INFERENCES -Cafeteria present only on the ground floor making it difficult for the staffs of upper floor -open plan office not good from privacy point of view of the staffs. -attrium space missing which is an essential part in an office to make it open and more fresh.
  • 37. CASE STUDY III NEPAL MERCHANT BANK LIMITED
  • 38. ❖First commercial bank of Nepal that has been able to upgrade from a Finance Company to a full- fledged Commercial Bank. ❖Started as Nepal Merchant Banking and Finance Ltd. and was later changed to NMB Bank Limited Location: Babar Mahal, Head Branch, kathmandu Designer: Architecture Design Forum (ADF) Access: Opposite Kathmandu District Court Surrounding: Government offices Land cover /Covered area: 12000 sq.ft. • Summer are hot and temperature ranges from 29°C -20.9°C. • Winter are cold and temperature ranges from 19.7°C -5°C • Precipitation: 73% • Humidity: 95% • Wind: 11 km/h CLIMATE INTRODUCTION
  • 39. main block back space basement parking main entrance guard house surface parking surface parking BUBBLE DIAGRAM OF SITE ROOF PLAN
  • 40. BUBBLE DIAGRAM OF BASEMENT BASEMENT entry store parking ramp to upper basement parking staircase Lower Basement: oEntry through ramp (15degree gradient) oLower basement for parking, storage oParking grid: 14'*19'-9.5” oParking capacity: 40 bikes, 30 cars Upper Basement: oDual purpose: for official work cum two wheelers parking. oParking capacity:20 bikes
  • 42. Ground Floor Planning ▪Pre-information desk at the entrance for basic information ▪Information desk inside for advanced information ▪Voucher desk ▪Reception cum customer care unit ▪Waiting hall ▪Cash supervision unit ▪Teller unit 2nd entry Reception customer care Lift shaft W/C Stairs Merchant banking Branch manager Vault Cash supervis or M.B storage /data entry Staircase Entry Back entry Locker entry Back office Back office Storage Tellers Waiting Area/ seating area Printer / storage L o b b y ▪Back office ▪ATM department at the back ▪Branch manager office ▪M.B. storage/data entry unit ▪File vault ▪Cash vault ▪Lockers unit ▪Storage ▪Restroom RELATION OF SPACES ATM
  • 43. Reception → Tellers ATM Department →  Information Desk
  • 44. First Floor Plan Corporate and institutional banking General Manager Business and retail banking Credit administratio n and control Deposit transaction banking Trade finance FIRST FLOOR
  • 45. First Floor Planning ▪Reception for phone handling and transferring ▪General Manager office ▪Trade and finance unit: ➢Trade and finance counter ➢Trade and finance head ➢Trade and finance staff unit ▪Meeting rooms Compliance unit ▪Marketing Unit: ➢Marketing head office ➢Marketing staff unit ▪Merchant banking staff unit ▪Credit administration unit: ➢Credit administration head ➢Credit administration staff ▪Business banking unit ▪Consumer finance unit ▪Server administration unit with a cold room ▪Central printing filing and photocopy unit ▪Pantry ▪Rest room Meeti ng head Meet ing 1 bal co ny Trade finance counter Credit admin head Merchant banking staff North balcony Consumer finance head Consumer finance staff Buisness banking head Credi t card Meet ing 2 recept ion Lift Ladie s w/c Gent s w/c Trade finance counter staff G.M compli ance Central printing/photocopy Buisness banking staff Filling Server admin Cold room Pantry Trade & finance head Marke ting staff Merchant banking head Credit admin staff Staircase Relation of space
  • 46.  Ceiling tiles and lighting fixtures Reception →  Pantry Trade and Finance Department →
  • 47. Second Floor Plan Second Floor Planning ▪Reception and secretary ▪Waiting area ▪Meeting room ▪Administration /HR head ▪Administration staff unit ▪Accounts head ▪Account staffs ▪Chief executive officer ▪Head of operations ▪Deputy General Manager ▪Credit head ▪Credit section ▪Operation treasury ▪Dealing room ▪Board room ▪Filing ,printing, photocopy unit ▪Pantry ▪Restrooms
  • 48. Meeting/ conference room Waiting area Library / audit AC staff 1 AC staff 2 Credit head Lobby Reception & secretary Lift Staircase w/c w/c Chief executive officer DGm Credit Operatio n treasury Dealing room P A N T R y Filling Admin /HR / head Admin /HR/staff AC head Head of departure Board room Printer Relation of spaces
  • 49. Meeting Room → Photocopy and Printing  Treasury Department Credit Section →
  • 50. Third Floor Planning Top Floor Planning Reception Credit administration Waiting area Shares department Documentation Machine Room Canteen
  • 51. Building Material And Construction Technolgy Glass andWood Partitions False Ceiling ➢R.C.C Framed Structured ➢Seismic Wave Resistant Technology ➢4"shear wall in the basement ➢RCC wall for vault and locker room ➢Plaster of Parish for interior of buildings ➢Japanese texture for exterior of building ➢Gypsum, wooden, aluminum partitions ➢Column Size :1'8"*1’8” ➢Column difference :14'*19'-9.5" ➢Beam: 2’x1’6’’ ➢Slab Thickness: 6” ➢Floor to floor height: ▪Lower Basement: 11’ ▪Upper Basement: 8’ ▪Other Floors : 12’ ➢(Panaromic)lift size: 8’ x 6’ ➢Riser height:6" ➢False ceilings of gypsum board ➢Use of acoustic tiles on the ceiling FRONT FACADE
  • 52. Positive Aspects ➢Adequate parking facilities ➢Back space utilised for parking ➢Dual utility of the upper basement ➢Provision of adequate writing desk in the hall specially positioned in such a way that it would not disturb the flow of customers to the counter area ➢Large public space to the entrance ➢Sufficient day lighting ➢North balcony at each floor ➢Comfortable working space ➢Rest room near by the public area ➢Vault is properly placed in the basement area with adequate security provisions and not accessible to the public ➢Proper spatial planning ➢Proper organization of the working spaces viz., floor wise work distribution ➢Smoke detectors placed on ceilings, fire extinguishers placed properly at all floors ➢Attractive interior decoration Use of frosted double glasses to provide a audio-visual barrier between the private and the public area ➢HVAC system ➢Enough circulation spaces both vertical and horizontal ➢Advanced security system with the provision of intruder alarms, fire alarms, CCTV camera, access control system cards. Card Access System
  • 53. Negative Aspects ➢Absence of easy access to the Branch manager's office. ➢Lack of direct visibility of the cashier section and the customer's area from the manager's office. ➢ Ramp connecting the adjacent basement floors with a high gradient causing inconvenience in circulation ➢Floor to floor height of the upper basement is insufficient ➢Shares department not well managed as per the requirement ➢Lack of preliminary recreational facilities as per the requirements of the international standards PLANNING ANALYSIS ➢ Staircase, lobby, lift, reception with waiting area are near to the entrance. ➢ Office spaces, working environment in central part. ➢ Pantry , board room, locker, dealing room, back entry far from the entrance
  • 54. REVIEW ON PROPOSED OFFICE BUILDING LALITPUR MUNICIPALITY IV
  • 55. LALITPUR MUNICIPALITY • Proposed office building for Lalitpur municipality within its existing premise. • Designed by Subham Karki About Site ▪ Proposed area for the building placement is 1900 m2 ( 3-8-3-2.5 in ropanies) ▪ The municipality is situated just at the entry point which leads towards the historical Patan durbar square. ▪ The site consists of municipality building, well landscape area with pond, outdoor parking Site approach : ▪ Has 3 approaches, on North, west and south ▪ South entrance as the main vechiular entrance to the site Views : ▪ Key views towards the garden and pond on east. ▪ View towards the west is blocked with residential building.
  • 56. CONCEPTUAL APPROACH Approach I – Axis Formation • Axis of approach – defines the entrance of the building • Axis of existing building – defines the alignment of the building • Axis of temple – aligned centrally in the site. Symmetry in two building Approach II – Response to site • Blockage of winter sun is minimum towards the existing building Approach III – Inspirations fromTraditional Architecture • Balance, symmetry and concept of plaza • Slope overhanging roofs • Sunken courtyard Roof plan
  • 58. Ramp down 1.5 ft ht. file room Bike parking Stairs Bike parking Bike parking Ramp up Car parking storage Lift Lift
  • 61. Back stairs w/c 8 engineer’s office Stair case Engineers private office Seminar hall Terrace Lobby Audit room Balc ony Relation of spaces
  • 63. BUILDING SERVICE • Rain water harvested from the roof and site are treated on basement. • The slope roofs on south and west can be utilized for solar panels placements. • Electrical and other services room on the basement • Water tanks in lower basement • Fire escape on each floor • Hot air exist by stack effect • Maximum use of day light through courtyard and lobby atrium • 2 lifts for easy vertical circulation EAST ELEVATION WEST ELEVATION
  • 64. INFERENCE • Maximum penetration of daylight using fenestration at different levels. • Each floors have a common space like lobby • Using terrace at different floor for refreshment and views.
  • 65.
  • 66.
  • 68. SITE ANALYSIS CHECKLIST • Entrance and access point (both pedestrian and vehicle • Security ( gates , anvelliance) • Boundary treatment (fencing, vegetation, landform, water) • Circulation (existing travel route within the site) • Noise level (quiet or loud areas) • Services (electric, water, sewage, communication) • Existing buildings (condition) • Existing landscape feature • Neighboring building (local, vernacular) • Views in and out of the site ( areas to screen off and areas to draw attention to ) • Trees and vegetataion ( protected and rare species ) • Ecology • Orientation ( sun and wind path ) • Light levels ( areas in direct sunlight, shaded area, • Accessibility • Surrounding context ( historical, heritage , conservation area) • Existing material in and around the site to • Topography • Water table ( is it prone to field ) • Soil and ground condition • Existing legal agreements ( bye laws , right of way,
  • 69. OBECTIVES To have greater efficiency in designing with respect to site. To discover interrelationships between site factors. To maximize data triggers and use those as catalyst in concept designing. • PROJECT: Corporate Office • OWNERSHIP: Private land. • TYPE: Sub-Urban o Location: Itahari, NTC Road o Area: 8000 sq. metre o Latitude: 26 ,40’,01”N o Longitude: 87,16’17”E o Altitude: 117m above sea level o Perimeter: 401 m o Orientation : South-east General SITE INTRODUCTION ▪ Flat grassland ▪ Rectangular shape ▪ Few subtropical trees as vegetation ▪ High boundary wall on all four sides ▪ Longest diagonal= 125m ▪ Length of primary entry = 90m ▪ Longest length = 110m(NW) Site Characteristics • Main entry on SE side by NTC road • Accessible from 3 sides by means of road on N,E & W with south containing private houses • Existing boundary wall with main gate as a entry point Entry & Access point
  • 70. Ref:worldweatheronline.com Type Subtropical Climate : 6 months hot, 3 months mild &3 months cold Solar angle 85◦ at summer & 45◦ at winter 14.5 hr daylight in summer & 10.5 hr in winter Morning sun on site at 6:30 am in summer & at 7:am in winter Temperature Max about 37◦ C on ( April / May) Min about 14◦C on ( Dec / Jan) Average about 30 C Rainfall Max about 546mm on (July / Aug) Min about 3.7mm on (Dec / Jan) Average about 350mm WIND Prevailing wind from SE (5km/hr) SITE CLIMATE
  • 71. SITE STUDY View towards the site MAXIMUM PPT: 490MM IN AVERAGE MINIMUM PPT: 6MM IN DECEMBER
  • 73. NATURAL ASPECT ANALYSIS Soil and Ground Condition • Soil condition is favorable for construction • No presence of black cotton soil • Presence of underground water below 35 feet • SORROUNDED BY TREES SO IT IS ENVIRONMENT FRIENDLY ECOLOGY WATER TABLE • WATER IS PROVIDED BY TAP AS WELLL GROUND WATER IS PROVIDED 24 HOURS • WATER LEVEL IS FOND BELOW 35 FT TOPOGRAPHY • Subtropical Climate : 6 months hot, 3 months mild &3 months cold • Trees and natural vegetation is found • Kheti khola near the site Vegetation • Coconut ,banyan tree, evergreen and deciduous tree
  • 74. MATERIALS AVAILABLE IN AND AROUND SITE • CONCRETE, BRICKS, IRON, STEEL • TIMBER , STONE , BAMBOO • New Rcc beam-frame construction • at road side areas SURROUNDING CONTEXT AND SERVICES • Private housing on one side representing residential area • House with two storey and three storey • Rectangular plan • Some traditional house with timber posts and beams to make frames of wall • Floor heights raised due to hot climate PLANNING TECHNOLOGY SOCIO-CULTURAL ASPECT ANALYSIS Community groups • Brahmins • Limbhu • Newar • Tamang • Chettri Major Occupation • Farming • Buisness Activities • Celebrating different festivals , jatra and rally • Since it is near to schools and offices roadways might be crowded on office time
  • 75. Circulation • Primary route is NTC road • EastWest Highway at about 250m South • Koshi Highway at about 295m North • Peak morning time = 8 to 10 am • Peak evening time = 4 to 6 pm • Transportation means by private or public vehicle Utilities • Electricity by NEA • Drinking water by Itahari metropolitan City • Easily accessible to numerous internet & wifi services • Urban area with mediocre noise • Trees on the site creating its own type of space • Noise from south east main road and neighbor buildings • Traffic noise from junction and main highway . Narrow drainage system near to the road side ByeLaws • FAR:3.5 • GCR : 70-80% • Set back : 5m from front & 3m from back • Built up area = 60 % DRAINAGE SOUND
  • 76. Itahari Sub-Metropolitan City Office 714 m and 10 min by foot 5 min by vehicles Vishwa Adarsha college 125 m 2 min by foot 1 min by vehicle Apex hospital itahari 800 m 1o min by foot 5 min by vehicles Bhagwati temple 474 m 7 min by foot 3 min by vehicles 25KM FROM BIRATNAGAR 17KM FROM DHARAN 62.2KM FROM DHANKUTA 72KM FROM JHAPA 128KM FOR SAGARMATHA 124 KM FROM TAPLEJUN ITAHARI JUNCTION PROPOSED SITE SURROUNDING LANDMARKS
  • 78. STRENGTH: - ACCESSEBLE FROM 3 SIDES ROAD - FLAT LAND EASY FOR COSTRUCTION - TREE IN SITE ACT AS BUFFER WEAKNESS: - LACKS PROPER DRAINAGE - SOUND POLLUTION FROM CINEMA OPPORTUNITY: - PRIME LOCATION FOR BANK AS IT IS CENTER OF CITY - OPEN AND SOCIAL ENVIRONMENT - POTENTIAL FOR FUTURE EXPANSION THREAT: - CHANCE OF FLOODING - NEAR BY SCHOOL, INDUSTRY - AIR AND SOUND POLLUTION SWOT ANALYSIS
  • 79. REFRENCES : NEUFERT ARCHDAILY ARCHITECT HAND BOOK TIME SAVER STANDARD WBDG BUILDING ARCHITIZER ARCHELLO AKSHAYA.COM SENIORS