Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Aziz updated cv
1. PROJECT MANAGER
ARSHAD AZIZ ABDUL AZIZ
E-mail:azizqureshi786@yahoo.com / azizkhanqureshi@gmail.com
Cell # +966 597800466 / 597462656
Riyadh, Kingdom of Saudi Arabia
_______________________________________
___________________________________
SUMMARY;
SUMMARYOF EXPERIENCE;
Has over 20 years of diversified professional experience in major civil and infrastructure projects with
proven track record in various fields of Civil Engineering mainly project management, construction
supervision and execution of large scale construction projects viz. Infrastructure, refinery, townships
infrastructure, cross-country pipeline etc. This has covered many high-profile, multi-disciplinary
projects with complex configurations and structures for public- and private-sector clients.
Professional experience in on-site project construction supervision gained in in Saudi Arabia, Kuwait
and Pakistan. A highly skilled, efficient and experienced professional, with a demonstrable track
record of management performance and technical leadership. Was instrumental in introducing
innovative design and construction practices in Kingdom of Saudi Arabia and Kuwait.
Also, supervised general engineering divisions and managed all aspects of specific construction
project/s including costs, schedules, engineering, specification requirements, and contracted time
frames in a cost-effective and beneficial way by performing the following duties personally and
through subordinate supervisors and staff.
______________________________________________________________________________________
KEY COMPETENCIES AND SKILLS;
Highly experienced professional having ample capabilities, skills and enormous experience in Civil
Construction and working for last 20 years in Gulf region and now in Kingdom of Saudi Arabia (CIVIL /
OIL & GAS Sector) with following but not limited to;
Project management;
Building Construction Projects;
Site management;
Health & safety regulations;
Hiring construction staff;
Budget / cost control;
Financial management;
Operational management;
Contract negotiations;
Tender / Bid management;
Construction materials
Scheduling / Forecast
Procurement
Commissioning
Final Handing over
______________________________________________________________________________
EDUCATION;
Session: 1990 - 1994
B.Sc. (Civil Engineering), University of Engineering &Technology Peshawar, Pakistan
ARSHAD AZIZ Cell # +966 597800466 / 597462656
2. PROJECT MANAGER
WORKEXPERIENCE;
OIL AND GAS PROJECT LOCATION POSITION DURATION
ALFA BRONZE GEN
TRADING & CONTRACTING
CO. WLL
KOC/DYCE/15051177/L/15-
002 Building & Construction
Project
Managing
Director
Jan 2014, to
Dec 2015
HEAVY ENGINEERING
INDUSTRIES & SHIP
BUILDING CO.
KNPC
Kuwait National Petroleum
Co. Building Project,
Project
Manager
Nov 14, 2006 to
June 14, 2008
GRAND PEARL
INTERNATIONAL GEN
TRADING & CONT. CO, WLL
Masque and walkways
Project, 3712 Kuwait.
Project
Manager
Dec 20,2003 to
Oct 27, 2006
SAUDI OGER LTD SAUDI
ARABIA
Mina Tent Project Makah
Maintenance & Construction,
Construction
Manager
Dec 28, 1994 to
July 15, 2001
F & K AL – SHUWAYER
FROM ( NBTC)
Joint Operation Wafra.
(10”16”29”30”) Gas, Oil,H2o
pipeline from MGC to PGP
Trunk Line Replacement.
Senior Civil
Engineer
Aug 2010 to
Dec 2013
M/S SAAD AL – DIN MURSI &
SONS CO.
Joint Operation Wafra
Building Maintenances.
Senior Civil
Inspection
Engineer
July 22 , 2008 to
May 12, 2010
H. HADI , AL – ZAMIH, EST.
(ARAMCO) RIYADH SAUDI
ARABIA.
ARAMCO
Building Maintenances,
Riyadh( ARAMCO)
Civil Engineer Nov 2, 2001 to
June 27, 2003
TOTAL YEARS 20 Years,4
Month
______________________________________________ _____________________________
PROFESSIONALLY APPROVED FROM:
SAUDI ARAMCO AL RIYADH SAUDI ARABIA.
KUWAIT OIL CO.
KUWAIT NATIONAL PETROLEUM CO.
JOINT OPERATION SAUDI ARABIAN CHEVRON INC, KUWAIT GULF COMPANY (K.S.C)
MINISTRY OF DEFENCE MILITARY ENGINEERING KUWAIT.
___________________________________________________________________________
SUMMARY EXPERIENCE;
MANAGING DIRECTOR
January, 2014 - December,2015
For Alfa Bronze General Trading & Contracting Co, WLL
Project # 16964KGOC/14-15
JOB RESPONSIBILITIES
ARSHAD AZIZ Cell # +966 597800466 / 597462656
3. PROJECT MANAGER
Worked with other top – tier executives to oversee the operations of company and organizations
across a variety of industries, such as banking, Healthcare, Marketing, Advertising, Information
Technology, and Government. And establish new business contacts. Interact with clients, and
recruit employees, I Develop strategic marketing and sales plans to boost profit and efficiency, and
also coordinate with the efforts of various departments such as legal and after that have to submit
reports to the top executives and boards of directors.
__________________________________________________________ _________________
PROJECT MANAGER
From Dec 2006 to December 2008
(K.N.P.C) Approved
Gulf Advance work Company, who is sub-Contractor of Heavy Engineering Industries & Ship
building Co. Contract # CA/PD/364
JOB RESPONSIBILITIES:
Agreeing project objectives
Representing the client's or organization’s interests
Providing advice on the management of projects
Organizing the various professional people working on a project
Carrying out risk assessment
Making sure that all the aims of the project are met
Making sure the quality standards are met
Using IT systems to keep track of people and progress
Recruiting specialists and sub-contractors
Monitoring sub-contractors to ensure guidelines are maintained
Overseeing the accounting, costing and billing
__________________________________________________________ _________________
PROJECT MANAGER
From March, 2003 to October, 2006
Grand Pearl International General Trading and Cont. Co.
Contract # 142/SC/Q2006.
Sanitary Sewer 250,400mm Pipe line & Buildings
As a Project Manager supervised and had budgetary authority for civil engineering projects. I
worked as Project Manager, the principal project administrator and communicator between the firm
and the Client.
Sub-consultants,
Local, State, and Federal Regulatory agencies,
Public Authorities and the General Construction Contractor.
JOB RESPONSIBILITIES:
A. GENERAL
ARSHAD AZIZ Cell # +966 597800466 / 597462656
4. PROJECT MANAGER
Be completely versed in the firm‐client contract for the project, and of the client's objectives.
Satisfy client’s goals.
Analyze the project scope, the client's RFP and firm's proposal with the Project Architect.
Organize the work on the project and set forth the procedures to be employed in
accomplishing the project.
B. Be the one point-of contact for all incoming and outgoing project information. Ensure proper
distribution of project information to all project team members and sub-consultants.
C. Contract for the services of outside consultants when required.
D. Administer the design budget.
E. Develop and monitor the project design schedule to meet Client and firm time objectives.
F. Notify the Client of changes in project scope, and prepare estimates for additional design
fees.
G. Keep the Client, Director of Operations and the firm Accounting Department informed on the
status of the project.
H. Develop and monitor the Client's construction budget and schedule. Identify long lead items
andproposed form of construction contract as easily as possible.
I. Attend project meetings, as necessary.
J. Establish documentation and administrative organization for the project
__________________________________________________________ _________________
CONSTRUCTION MANAGER
From 1994 to 2001
SAUDI OGER LTD, Riyadh K.S.A
Contract # 8415 Mina Pilgrim Project (Makah) (2) Riyadh Muraba Project # 8421 Mina
Accommodation Project # 8416
JOB RESPONSIBILITIES:
Schedule the project in logical steps and budget time required to meet deadlines.
Determine labor requirements and dispatch workers to the construction sites.
Inspect and review projects to monitor compliance with building and safety codes, and other
regulations.
Interpret and explain plans and contract terms to administrative staff, workers, and clients,
representing the owner or developer.
Prepare contracts and negotiate revisions, changes and additions to contractual agreements
with architects, consultants, clients, suppliers and subcontractors.
Obtain all necessary permits and licenses.
Direct and supervise workers.
Study job specifications to determine appropriate construction methods.
Select, contract, and oversee workers who complete specific pieces of the project, such as
painting or plumbing.
Requisition supplies and materials to complete construction projects.
Prepare and submit budget estimates and progress and cost tracking reports.
Develop and implement quality control programs.
Take actions to deal with the results of delays, bad weather, or emergencies at construction
site.
ARSHAD AZIZ Cell # +966 597800466 / 597462656
5. PROJECT MANAGER
Confer with supervisory personnel, owners, contractors, and design professionals to discuss
and resolve matters such as work procedures, complaints, and construction problems.
Plan, organize, and direct activities concerned with the construction and maintenance of
structures, facilities, and systems.
Investigate damage, accidents, or delays at construction sites, to ensure that proper
procedures are being carried out.
Evaluate construction methods and determine cost-effectiveness of plans, using computers.
Direct acquisition of land for construction projects.
__________________________________________________________ _________________
SENIOR CIVIL ENGINEER
From March 2010 To December, 2013
Wafra Trunk Lines Replacement with(NBTC) General Trading & Contracting Co. Under Joint
Operation (Saudi Arabian Chevron Inc. &Kuwait
Gulf Oil Company) # JO/HC092/FE09.
JOBRESPONSIBILITIES
Plan, coordinate and direct quality program designed to ensure consistency with established
standards. Establish proposed quality and reliability expectancy of finished product and direct
inspectors over testing activities.
__________________________________________________________ _________________
SENIOR CIVIL INSPECTION ENGINEER
From March 2008 to January,2010
Building Maintenance Project) With M/S Saad Al – Din Mursi& Sons Co.Under Joint Operation
(Saudi Arabian Chevron Inc. &Kuwait Gulf Oil Company) Contract # JO/SC/GD07 Building
Maintenance Project,
JOB RESPONSIBILITIES:
Execute inspection activities to ensure the optimum reliability, availability and technical integrity of all
assets for structure and equipment and steel structure in his area of responsibility. Provide technically
sound and cost effective maintenance approaches, consistent with the company operating requirements
and safety standards.
Site inspection,examine new construction and renovation projects to verify structural integrity and
compliance withspecifications, codes and regulations. General duties include reviewing blueprints,
surveying the soil at construction sites, monitoring construction progress, examining all kind of Civil
systems, ensuring fire safety systems are in place, utilizing survey instruments to verify completed work,
taking photographs and maintaining a log. Also, worked for local governments prepare and issue
construction permits, violation notices and other correspondence.
__________________________________________________________ _________________
CIVIL ENGINEER:
ARSHAD AZIZ Cell # +966 597800466 / 597462656
6. PROJECT MANAGER
From Nov. 2001 to June 2003
H, HADI. AL-ZAMIH.EST (ARAMCO)Con. Contract # SA678/SB/AR2001
MY RESPONSIBILITIES
As civil engineer engages in many general responsibilities on a daily basis. These responsibilities
are a crucial part of their job and enable the civil engineer to engage in their profession to the best
of their ability. One general responsibility for me as civil engineer is to analyze various factors
concerning a construction job. Every time I proposed site location as well as the entire construction
job which is to be completed at such a site. & analyze the process for completing the construction
job every step of the way. By myself I make the plan for the construction project that will be taking
place in conjunction with the results they found due to their analysis of the proposed project. During
the process and at the end, I always inspect the product to ensure that all rules, regulations and
guidelines have been explicitly followed.
Responsibilities included but not limited to;
Manage, design, develop, create and maintain small-scale through to large-scale construction
projects in a safe, timely and sustainable manner
Conduct on site investigations and analyze data (maps, reports, tests, drawings and other)
Carry out technical and feasibility studies and draw up blueprints that satisfy technical
specifications
Assess potential risks, materials and costs
Provide advice and resolve creatively any emerging problems/deficiencies
Oversee and mentor staff and liaise with a variety of stakeholders
Handle over the resulting structures and services for use
Monitor progress and compile reports in project status
Manage budget and purchase equipment/materials
___________________________________________________________________________
Personal Profile:
Date of Birth: 02 May 1972
___________________________________________________________________________
Computer Literate:
MS Excel, MS Words, Internet
__________________________________________________________________________
Other Details:
Apart from English Fluency also knows Arabic Reading and writing Urdu, Hindi, Reading &writing.
Note: (Holding Saudi Arabia & Kuwait Driving License.
ARSHAD AZIZ Cell # +966 597800466 / 597462656
7. PROJECT MANAGER
From Nov. 2001 to June 2003
H, HADI. AL-ZAMIH.EST (ARAMCO)Con. Contract # SA678/SB/AR2001
MY RESPONSIBILITIES
As civil engineer engages in many general responsibilities on a daily basis. These responsibilities
are a crucial part of their job and enable the civil engineer to engage in their profession to the best
of their ability. One general responsibility for me as civil engineer is to analyze various factors
concerning a construction job. Every time I proposed site location as well as the entire construction
job which is to be completed at such a site. & analyze the process for completing the construction
job every step of the way. By myself I make the plan for the construction project that will be taking
place in conjunction with the results they found due to their analysis of the proposed project. During
the process and at the end, I always inspect the product to ensure that all rules, regulations and
guidelines have been explicitly followed.
Responsibilities included but not limited to;
Manage, design, develop, create and maintain small-scale through to large-scale construction
projects in a safe, timely and sustainable manner
Conduct on site investigations and analyze data (maps, reports, tests, drawings and other)
Carry out technical and feasibility studies and draw up blueprints that satisfy technical
specifications
Assess potential risks, materials and costs
Provide advice and resolve creatively any emerging problems/deficiencies
Oversee and mentor staff and liaise with a variety of stakeholders
Handle over the resulting structures and services for use
Monitor progress and compile reports in project status
Manage budget and purchase equipment/materials
___________________________________________________________________________
Personal Profile:
Date of Birth: 02 May 1972
___________________________________________________________________________
Computer Literate:
MS Excel, MS Words, Internet
__________________________________________________________________________
Other Details:
Apart from English Fluency also knows Arabic Reading and writing Urdu, Hindi, Reading &writing.
Note: (Holding Saudi Arabia & Kuwait Driving License.
ARSHAD AZIZ Cell # +966 597800466 / 597462656