1. Ahmed Nabil
Address: 2 Ajnan St. al hilal area - Al Doha - Qatar
Home: +237803206
Mobile: +97430803035 - +201009056773
E-Mail: ahmed_nabil_90@yahoo.com
Objective: Semiprofessional-level position in the mechanical power field with
opportunity for advancement
Education:
Faculty of Engineering, Cairo University
BSc. in Mechanical Power Engineering (May 2013)
Highlights:
Strong background in HVAC and Plumbing
Working knowledge of car maintenance
Strong background in all phases of the maintenance of power
station
Skilled with computer systems and software e.g. Microsoft
Office, AutoCAD(2D) HAP, EES, Ductsizer, and Fluent (CFD)
Work well in a high pressure environment
Well-organized and efficient
Speak English fluently
Self-starting, goal-oriented strategist whose confidence,
perseverance and vision promote success
Experience:
Al Fereej & El Afifi Consultancy & Designs Al Doha (Qatar)
July 2015 to Present
Working in design of HVAC (Mechanical Ventilation &
District Cooling and Life Safety)
Preparing QSAS Calculations for the civil defense
Working in design solutions for the following projects
Plot C-04 in Lusail City (Approved from Marafeq)
Plot A-21 in Lusail City (Approved from Marafeq and
Civil defense)
Plot R-50 in Lusail City (Pending for approval)
Plot R-51 in Lusail City (Pending for approval)
Plot R-52 in Lusail City (Pending for approval)
Plot R-38 in Lusail City (Pending for approval)
Plot R-39 in Lusail City (Pending for approval)
Qatar Embassy Building in Bangladesh (Approved )
2. Villas Compound in (Al Rayan & Al Thumama)
(Approved)
Villas Compound and Health Club in Onaiza
(Approved)
Misr International Trading & Supplies (MITAS) Egypt (Cairo)
Dec 2014 to July 2015
Working in seismic control and vibration isolation as a
technical office engineer
Participated in the quoting and seismic design solutions
for the following projects
New Giza City (Cairo – Alex Road)
Zewail City (Shiekh Zaied)
Grand Egyptian Museum (Giza)
Terminal Buildings (Cairo Air Port)
Petrojet head building (ElTagamou- Elkhames)
Dar Al-Fouad Hospital (Shiekh Zaied)
Heart Institute Building (Cairo)
Tiba Manzalawi International Egypt (Cairo)
Dec 2013 to Nov 2014
Working in VRF air conditioning system as a site engineer and
designer engineer .
Supervised and worked in design on the following projects
Pharmacy College (Biritsh University In Egypt)
Dentistry College (British University In Egypt)
Arope management tower (Massadak St Dokki)
Stanely Bridge Tower (Alexandria)
Combonian Sisters (Zamalek)
Electric Rooms at Nile ritz hotel (Tahrir Square)
Information technical rooms in Petrojet head building (El
Tagamou- Elkhames)
Tbarak Hosbital (El Tamgamou – Elkhames)
Hedya Store – Duct work (Mall of Arabia)
El Salab (Shiehk Zaied)
Shakespeare Restaurant (Capital Business)
MISR Engineering Premises Facility Management Electro Mech and HVAC
Egypt (Cairo)
Oct 2013 to Dec 2013
Worked as a site engineer (supervision on AHU and FCU
maintenance processes)
Installed a fire fighting pump in Nile tower (Mourad St Giza)
3. MISR Company for aluminum
Egypt (Cairo)
Trainee 7 to 14 July 2012
Designed power system facilities and equipment
Helped in the analysis and testing of metals
Have been trained on plumbing , turning and the
formation of aluminum metal
Assisted in the maintenance of electric power
plants associated with the factory
Assisted in the maintenance of the factory diesel stations
El Rawas for Cars Maintenance (Mitsubishi Lancer)
Egypt (Cairo)
Trainee 1 to 6 July 2012
Installed and replaced machinery, equipment and new
and replacement parts and instruments, using hand
tools and power tools.
Adjusted, connected and disconnected wiring, piping,
tubing and other parts, using hand tools and power tools.
Examined and tested machinery, equipment, components and parts for defects
and to ensure proper functioning
Graduation Project Summary
I made a full entire design of a boiler used in hospital, and a
full entire design of a heat exchanger
I made a load estimation of a surgery room and patient room ,
a full design of AHU and FCU used to overcome this thermal
load with a full design of ducts distribution in the building
I simulated this project using Fluent software showing the
distribution of temperature, speed and carbon dioxide percent
of air flowing in conditioned rooms
I got excellent degree in this project
under the supervision of Prof. Essam Eldin Khalil
References: Available upon request