Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 1 of 17
MACHINING
Level - III
Learning Guide 17
Unit of Competence: Prevent and Eliminate MUDA
Module Title: Preventing and Eliminating MUDA
LG Code: IND MAC3 17 0217
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 2 of 17
Instruction Sheet Learning Guide #1
This learning guide is developed to provide you the necessary information regarding the following
content coverage and topics:
1. Prepare for work.
2. Identify MUDA.
3. Eliminate wastes/MUDA
4. Prevent occurrence of wastes/MUDA
This guide will also assist you to attain the learning outcome stated in the cover page. Specifically,
upon completion of this Learning Guide, you will be able to:
• Identify Safety equipment and tools
• Tools and techniques are used to draw and analyze current situation of the work
place.
• Wastes/MUDA are identified and measured based on relevant procedures.
• Necessary attitude and the ten basic principles for improvement are adopted to
eliminate waste/MUDA.
• wastes/MUDA are prevented by using visual and auditory control methods.
Learning Instructions:
1. Read the specific objectives of this Learning Guide.
2. Follow the instructions described below 3 to 17.
3. Read the information written in the information “Sheet.
4. Accomplish the “Self-check test.
5. Do the “LAP test”.
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 3 of 17
What is Waste?
The elimination of waste is the primary goal of any lean system. In effect, lean
declares war on waste – any waste. Waste or muda is anything that does not have
value or does not add value.
Waste is something the customer will not pay for. When the great Italian sculptor
Michelangelo was asked what he was sculpting, he responded he was not sculpting
but releasing the figure (value) inside by removing the unnecessary rocks (wastes).
Like Michelangelo, we should eliminate all forms of wastes in any process or
product until only what is valuable remains. The key is to spot waste and then stop
waste.
There are two types of wastes: obvious wastes and hidden wastes. It is important to
uncover and eliminate the latter since they are usually bigger. Wastes take the
shape of an iceberg, the tip consists of the obvious wastes while the seen bulk
under the water contain the hidden wastes. Wastes are not necessarily ugly, and
most are outside the waste can! Waste can be in the form of unnecessary output,
input, or processing. It can be in the form of materials, stocks, equipment,
facilities, manhours, utilities, documents, expenses, motion, and other activities
that do not add value.
The steps to effective waste elimination are:
1. Make waste visible.
2. Be conscious of the waste.
3. Be accountable for the waste.
4. Measure the waste.
5. Eliminate or reduce the waste
In other words, before one can stop waste, he should able to see it, recognize it as
waste, identify who is responsible, and finally appreciate its size and magnitude.
Waste that is not seen cannot be eliminated. When something is denied as waste, it
also cannot be stopped. When one refuses to accept responsibility for the waste,
then he will not eliminate it. Finally, when the waste is not measured, people may
think it is small or trivial and therefore will not be motivated to stop it. As the
saying goes “What is not measured, is not improved”.
Muda, Mura, Muri
Aside from “muda” or wastes, the lean system also attacks and avoids “mura” or
overload or overburden and “muri” or unevenness. Mura refers more specifically
to overloading an equipment, facility, or human resource beyond its capacity. This
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 4 of 17
undue stress may cause downtime, defects, delays, and even disasters. Muri refers
to unevenness in production volume.
The wild fluctuations due to extreme highs (peaks) and lows (valleys) in
production scheduling cause periods of overload and long idle time. One way to
reduce muri is to implement heijunka or production leveling. In a way, mura and
muri also cause wastes but in a particular way. Muda, mura, and muri cause
inefficiencies and high costs in any operation.
What are the seven types of wastes or “muda”?
A lean system declares war on wastes or “muda”. These wastes are classified into 7
types:
1. Over-production waste
2. Processing waste
3. Transport waste
4. Waiting-time waste
5. Inventory waste
6. Motion waste
7. Defects
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 5 of 17
➢ Over-production waste
✓ Definition
• producing more than what is needed
• producing faster than what is needed
✓ Causes
• volume incentives (sales, pay, purchasing)
• high capacity equipment
• line imbalance; poor scheduling/shifting
• poor production planning
• cost accounting practices that encourage build up of inventory
Over-production waste occurs when more goods are produced than can be sold,
resulting in idle finished goods inventory. Over-produced goods are often hidden
wastes since many think they are assets with value, when in fact most of them may
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 6 of 17
be obsolete or costing the company unnecessary expenses just to keep them until
they can be sold if ever. The just-in-time, pull system, and kanban rules prevent
over-production wastes. Also, lean systems favor smaller equipment over large
ones to avoid overproduction due to high but unnecessary capacity utilization.
Producing more than your customer is requesting or before they request it
➢ Processing waste
✓ Definition
• non-value added man processing
• non-value added machine processing
✓ Causes
• unclear customer specifications
• frequent engineering changes
• excessive quality (refinements)
• inadequate value analysis/value engineering
• unclear work instructions
Processing waste comes from unnecessary processing that does not add value to
the item being produced or worked on. Examples are additional steps that do not
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 7 of 17
enhance quality or steps that simply adds excess quality which customers do not
require. Unnecessary documentation is also a form of processing waste. Identify
value-adding and non-value adding activities in the process using techniques such
as value stream analysis and the waterfall diagram.
Unnecessary manual work that does not contribute value to the product
➢ Transport waste
✓ Definition
• unnecessary material movement
• unnecessary tools or equipment movement
✓ Causes
• poor route planning
• distant suppliers
• complex material flows
• poor layout
• disorganized workplace
• line imbalance
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 8 of 17
When anything – people, equipment, supplies, tools, documents, or materials – is
moved or transported unnecessarily from one location to another, transport waste is
generated. Examples are transporting the wrong parts, sending materials to the
wrong location or at the wrong time, transporting defects, and sending documents
that should not be sent at all. One way to cut transport waste is co-location,
wherein customers are served by nearby suppliers, usually less than one-hour
driving distance away. Departments working with each other or serving each other
are also put near each other to cut transport waste. For example, materials and tools
departments may be moved, relocated, or pre-positioned beside or nearer the user
departments or their internal customers.
Unnecessary conveyance of products, from one location to another, or handoff
from one employee to another
➢ Waiting time waste
✓ Definition
• man idle or waiting time
• machine idle or waiting time
✓ Causes
• unsynchronized processes; line imbalance
• inflexible work force
• over-staffing
• unscheduled machine downtime
• long set-up
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 9 of 17
• material shortage or delay
• manpower shortage or delay
When resources like people and equipment are forced to wait unnecessarily
because of delays in the arrival or availability of other resources including
information, there is waiting time waste. Waiting for late attendees in a meeting,
waiting for tools to start work, waiting for a signature for a process to continue,
waiting for a late vehicle to transport workers to a project site are examples
of this waste.
Waiting done by customers or by employees
➢ Inventory Waste
✓ Definition
• excessive process (WIP) inventories
• excessive raw material inventories and supplies
✓ Causes
• over-production
• imbalanced line
• big batch sizes
• long lead times
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 10 of 17
• local optimization (turf mentality)
• large minimum order quantities
• high rework rate
• JIT-incapable suppliers
• lack of material requisition and issuance standards
Inventory wastes come from the purchasing, issuance, storage of excess or
excessive supplies, materials, and other resources. This waste can also be caused
by overproduction as excess materials and work-in-process are accumulated.
Inventory waste is often due to lack of planning and failure to match purchases
with the actual consumption or usage rate of a particular resource. Another
example is the storing of slow-moving and obsolete stocks like tools and materials.
More materials or information than is required
➢ Motion Waste
✓ Definition
• unnecessary movement and motions of worker
✓ Causes
• poor lay-out and housekeeping
• disorganized work place and storage locations
• unclear, non-standardized work instructions
• unclear process and materials flow
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 11 of 17
Motion waste happens when unnecessary body movements are made when
performing a task. Examples are searching, reaching, walking, bending, lifting, and
other unnecessary bodily movements. Workers commit this form of waste by
searching for tools or documents when their workplace is cluttered or disorganized.
Motion waste often delays the start of work and disrupts workflow.
Unnecessary physical or mental motion often associated with searching
➢ Defects
✓ Definition
• processing due to the production of defects
• processing due to rework or repair of defects
• materials used due to defect and rework
✓ Causes
• unclear customer specifications
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 12 of 17
• incapable processes
• lack of process control
• unskilled personnel
• departmental rather than total quality
• incapable suppliers
Quality is doing the right thing right the first time. It is about prevention and
planning, not correction and inspection. Bad quality or defects do not only result in
customer dissatisfaction and damage to company image, but also in wastes due to
additional costs and time to recall, rework, repair, and replace the defective items.
Continuous quality improvement and preventive measures are the most effective
means to cut defect wastes.
A mistake which reaches the customer
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 13 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 14 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 15 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 16 of 17
Ethiopian TVET
Program
STEP-GIZ
CT program for Remote Teaching
Title: Machining L-3
Prevent and Eliminate MUDA
July 2020 Page 17 of 17

More Related Content

What's hot

Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method StudyDr. Mohit Sahu
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceManishaHalai1
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean managementPramod A
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementVijay325
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSMSedhuSiddarth
 
Anthropometric measurement.pptx
Anthropometric measurement.pptxAnthropometric measurement.pptx
Anthropometric measurement.pptxJEENAMV1
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2) TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2) Timothy Wooi
 

What's hot (20)

Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Kaizen+5s model
Kaizen+5s modelKaizen+5s model
Kaizen+5s model
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Downtime 8 Wastes
Downtime 8 WastesDowntime 8 Wastes
Downtime 8 Wastes
 
Andon presentation
Andon presentationAndon presentation
Andon presentation
 
Work Study, Method Study
Work Study, Method StudyWork Study, Method Study
Work Study, Method Study
 
Productivity management
Productivity managementProductivity management
Productivity management
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Waste Elimination
Waste  EliminationWaste  Elimination
Waste Elimination
 
Muda
MudaMuda
Muda
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
Anthropometric measurement.pptx
Anthropometric measurement.pptxAnthropometric measurement.pptx
Anthropometric measurement.pptx
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2) TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2)
 

Similar to Prevent and Eliminate MUDA.pdf

Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturinglakshya bhardwaj
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementAnushreeSingh49
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wastingJo Padilha
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanCIToolkit
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanCIToolkit
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturingshahrool
 
Preventing and eliminating muda and waste
Preventing and eliminating muda and wastePreventing and eliminating muda and waste
Preventing and eliminating muda and wasteGebreyohanstesfay2
 
Presentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating mudaPresentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating mudaGebreyohanstesfay2
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplacesIslamAbdouAbbas1
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdfmengist4
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophyDr. Chandan Vichoray
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...SN Panigrahi, PMP
 

Similar to Prevent and Eliminate MUDA.pdf (20)

Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
Module 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations ManagementModule 4_Session 6.pptx_Operations Management
Module 4_Session 6.pptx_Operations Management
 
Lean means eliminating wasting
Lean means eliminating wastingLean means eliminating wasting
Lean means eliminating wasting
 
LEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERINGLEAN SYSTEM ENGINEERING
LEAN SYSTEM ENGINEERING
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in Lean
 
Waste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in LeanWaste Analysis: Concept of Waste in Lean
Waste Analysis: Concept of Waste in Lean
 
Industrial engineer
Industrial engineerIndustrial engineer
Industrial engineer
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
 
Preventing and eliminating muda and waste
Preventing and eliminating muda and wastePreventing and eliminating muda and waste
Preventing and eliminating muda and waste
 
Presentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating mudaPresentation1.pptx preventing and eliminating muda
Presentation1.pptx preventing and eliminating muda
 
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
#Guide-Lean_Manufacturing guide teaches ability to transform workplaces
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy05 lean manufacturing and the jit philosophy
05 lean manufacturing and the jit philosophy
 
Lean Waste
Lean WasteLean Waste
Lean Waste
 
Session 1 2
Session 1 2Session 1 2
Session 1 2
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
Lean Concepts "8 Forms of Waste Cause & Effect : How to Eliminate / Reduce Wa...
 

Recently uploaded

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

Prevent and Eliminate MUDA.pdf

  • 1. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 1 of 17 MACHINING Level - III Learning Guide 17 Unit of Competence: Prevent and Eliminate MUDA Module Title: Preventing and Eliminating MUDA LG Code: IND MAC3 17 0217
  • 2. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 2 of 17 Instruction Sheet Learning Guide #1 This learning guide is developed to provide you the necessary information regarding the following content coverage and topics: 1. Prepare for work. 2. Identify MUDA. 3. Eliminate wastes/MUDA 4. Prevent occurrence of wastes/MUDA This guide will also assist you to attain the learning outcome stated in the cover page. Specifically, upon completion of this Learning Guide, you will be able to: • Identify Safety equipment and tools • Tools and techniques are used to draw and analyze current situation of the work place. • Wastes/MUDA are identified and measured based on relevant procedures. • Necessary attitude and the ten basic principles for improvement are adopted to eliminate waste/MUDA. • wastes/MUDA are prevented by using visual and auditory control methods. Learning Instructions: 1. Read the specific objectives of this Learning Guide. 2. Follow the instructions described below 3 to 17. 3. Read the information written in the information “Sheet. 4. Accomplish the “Self-check test. 5. Do the “LAP test”.
  • 3. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 3 of 17 What is Waste? The elimination of waste is the primary goal of any lean system. In effect, lean declares war on waste – any waste. Waste or muda is anything that does not have value or does not add value. Waste is something the customer will not pay for. When the great Italian sculptor Michelangelo was asked what he was sculpting, he responded he was not sculpting but releasing the figure (value) inside by removing the unnecessary rocks (wastes). Like Michelangelo, we should eliminate all forms of wastes in any process or product until only what is valuable remains. The key is to spot waste and then stop waste. There are two types of wastes: obvious wastes and hidden wastes. It is important to uncover and eliminate the latter since they are usually bigger. Wastes take the shape of an iceberg, the tip consists of the obvious wastes while the seen bulk under the water contain the hidden wastes. Wastes are not necessarily ugly, and most are outside the waste can! Waste can be in the form of unnecessary output, input, or processing. It can be in the form of materials, stocks, equipment, facilities, manhours, utilities, documents, expenses, motion, and other activities that do not add value. The steps to effective waste elimination are: 1. Make waste visible. 2. Be conscious of the waste. 3. Be accountable for the waste. 4. Measure the waste. 5. Eliminate or reduce the waste In other words, before one can stop waste, he should able to see it, recognize it as waste, identify who is responsible, and finally appreciate its size and magnitude. Waste that is not seen cannot be eliminated. When something is denied as waste, it also cannot be stopped. When one refuses to accept responsibility for the waste, then he will not eliminate it. Finally, when the waste is not measured, people may think it is small or trivial and therefore will not be motivated to stop it. As the saying goes “What is not measured, is not improved”. Muda, Mura, Muri Aside from “muda” or wastes, the lean system also attacks and avoids “mura” or overload or overburden and “muri” or unevenness. Mura refers more specifically to overloading an equipment, facility, or human resource beyond its capacity. This
  • 4. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 4 of 17 undue stress may cause downtime, defects, delays, and even disasters. Muri refers to unevenness in production volume. The wild fluctuations due to extreme highs (peaks) and lows (valleys) in production scheduling cause periods of overload and long idle time. One way to reduce muri is to implement heijunka or production leveling. In a way, mura and muri also cause wastes but in a particular way. Muda, mura, and muri cause inefficiencies and high costs in any operation. What are the seven types of wastes or “muda”? A lean system declares war on wastes or “muda”. These wastes are classified into 7 types: 1. Over-production waste 2. Processing waste 3. Transport waste 4. Waiting-time waste 5. Inventory waste 6. Motion waste 7. Defects
  • 5. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 5 of 17 ➢ Over-production waste ✓ Definition • producing more than what is needed • producing faster than what is needed ✓ Causes • volume incentives (sales, pay, purchasing) • high capacity equipment • line imbalance; poor scheduling/shifting • poor production planning • cost accounting practices that encourage build up of inventory Over-production waste occurs when more goods are produced than can be sold, resulting in idle finished goods inventory. Over-produced goods are often hidden wastes since many think they are assets with value, when in fact most of them may
  • 6. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 6 of 17 be obsolete or costing the company unnecessary expenses just to keep them until they can be sold if ever. The just-in-time, pull system, and kanban rules prevent over-production wastes. Also, lean systems favor smaller equipment over large ones to avoid overproduction due to high but unnecessary capacity utilization. Producing more than your customer is requesting or before they request it ➢ Processing waste ✓ Definition • non-value added man processing • non-value added machine processing ✓ Causes • unclear customer specifications • frequent engineering changes • excessive quality (refinements) • inadequate value analysis/value engineering • unclear work instructions Processing waste comes from unnecessary processing that does not add value to the item being produced or worked on. Examples are additional steps that do not
  • 7. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 7 of 17 enhance quality or steps that simply adds excess quality which customers do not require. Unnecessary documentation is also a form of processing waste. Identify value-adding and non-value adding activities in the process using techniques such as value stream analysis and the waterfall diagram. Unnecessary manual work that does not contribute value to the product ➢ Transport waste ✓ Definition • unnecessary material movement • unnecessary tools or equipment movement ✓ Causes • poor route planning • distant suppliers • complex material flows • poor layout • disorganized workplace • line imbalance
  • 8. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 8 of 17 When anything – people, equipment, supplies, tools, documents, or materials – is moved or transported unnecessarily from one location to another, transport waste is generated. Examples are transporting the wrong parts, sending materials to the wrong location or at the wrong time, transporting defects, and sending documents that should not be sent at all. One way to cut transport waste is co-location, wherein customers are served by nearby suppliers, usually less than one-hour driving distance away. Departments working with each other or serving each other are also put near each other to cut transport waste. For example, materials and tools departments may be moved, relocated, or pre-positioned beside or nearer the user departments or their internal customers. Unnecessary conveyance of products, from one location to another, or handoff from one employee to another ➢ Waiting time waste ✓ Definition • man idle or waiting time • machine idle or waiting time ✓ Causes • unsynchronized processes; line imbalance • inflexible work force • over-staffing • unscheduled machine downtime • long set-up
  • 9. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 9 of 17 • material shortage or delay • manpower shortage or delay When resources like people and equipment are forced to wait unnecessarily because of delays in the arrival or availability of other resources including information, there is waiting time waste. Waiting for late attendees in a meeting, waiting for tools to start work, waiting for a signature for a process to continue, waiting for a late vehicle to transport workers to a project site are examples of this waste. Waiting done by customers or by employees ➢ Inventory Waste ✓ Definition • excessive process (WIP) inventories • excessive raw material inventories and supplies ✓ Causes • over-production • imbalanced line • big batch sizes • long lead times
  • 10. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 10 of 17 • local optimization (turf mentality) • large minimum order quantities • high rework rate • JIT-incapable suppliers • lack of material requisition and issuance standards Inventory wastes come from the purchasing, issuance, storage of excess or excessive supplies, materials, and other resources. This waste can also be caused by overproduction as excess materials and work-in-process are accumulated. Inventory waste is often due to lack of planning and failure to match purchases with the actual consumption or usage rate of a particular resource. Another example is the storing of slow-moving and obsolete stocks like tools and materials. More materials or information than is required ➢ Motion Waste ✓ Definition • unnecessary movement and motions of worker ✓ Causes • poor lay-out and housekeeping • disorganized work place and storage locations • unclear, non-standardized work instructions • unclear process and materials flow
  • 11. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 11 of 17 Motion waste happens when unnecessary body movements are made when performing a task. Examples are searching, reaching, walking, bending, lifting, and other unnecessary bodily movements. Workers commit this form of waste by searching for tools or documents when their workplace is cluttered or disorganized. Motion waste often delays the start of work and disrupts workflow. Unnecessary physical or mental motion often associated with searching ➢ Defects ✓ Definition • processing due to the production of defects • processing due to rework or repair of defects • materials used due to defect and rework ✓ Causes • unclear customer specifications
  • 12. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 12 of 17 • incapable processes • lack of process control • unskilled personnel • departmental rather than total quality • incapable suppliers Quality is doing the right thing right the first time. It is about prevention and planning, not correction and inspection. Bad quality or defects do not only result in customer dissatisfaction and damage to company image, but also in wastes due to additional costs and time to recall, rework, repair, and replace the defective items. Continuous quality improvement and preventive measures are the most effective means to cut defect wastes. A mistake which reaches the customer
  • 13. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 13 of 17
  • 14. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 14 of 17
  • 15. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 15 of 17
  • 16. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 16 of 17
  • 17. Ethiopian TVET Program STEP-GIZ CT program for Remote Teaching Title: Machining L-3 Prevent and Eliminate MUDA July 2020 Page 17 of 17