• PROJECT: KAUST ARAMCO GENERAL CONSTRUCTION
SERVICES
•CONTRACT NO: 6600028921
•PMT: SAUDI ARAMCO/ CH2M HILL
•CONTRACTOR: NESMA & PARTNERS
•TOWN CENTER RECTIFICATION WORKS for BLDG 4300A,
4300B & 4300C
Construction of new RCC slab for new bedroom
BLDG.NO. BLDG.TYPE TYPICALROOMS NO.OFLEVEL LEVELTOBECO
UNIT201-203 Level 2, 3&4 0
UNIT204-211 Level 2&3 8 LEVEL3
UNIT201-203&208-209 Level 2, 3&4 0
UNIT204-207 Level 2&3 4 LEVEL3
UNIT101-108 Level 0&1 8 LEVEL1
UNIT201-202&207-208 Level 2, 3&4 0
UNIT203-206 Level 2&3
4 LEVEL3
TOWN CENTERHousingUnitsConversion Project
11
H4300B(3610) T-18 4
NO.OFUNITSTOBE TOTALNO.OFUNITS
H4300A(3610) T-17 8
H4300C (3610) T-20 12
9
16
WAR No. 4: Town Centre Rectification
SNS No.: TBA
Subject: Manpower Loadings
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W32 W33
Period 3-Apr-14
10-Apr-14
17-Apr-14
24-Apr-14
1-May-14
8-May-14
15-May-14
22-May-14
29-May-14
5-Jun-14
12-Jun-14
19-Jun-14
26-Jun-14
3-Jul-14
10-Jul-14
17-Jul-14
24-Jul-14
31-Jul-14
7-Aug-14
14-Aug-14
21-Aug-14
28-Aug-14
4-Sep-14
11-Sep-14
18-Sep-14
25-Sep-14
2-Oct-14
9-Oct-14
16-Oct-14
23-Oct-14
30-Oct-14
6-Nov-14
13-Nov-14
Planned MH (Direct)
7,394
10,989
12,246
15,140
10,277
11,922
25,673
33,995
33,440
34,053
30,451
38,243
39,073
42,196
46,476
50,097
48,690
49,286
49,161
42,930
48,054
48,926
36,075
39,922
36,322
34,015
32,416
32,897
32,441
17,431
15,840
10,999
1,559
1,018,629
Percentage increment
0.73%
1.08%
1.20%
1.49%
1.01%
1.17%
2.52%
3.34%
3.28%
3.34%
2.99%
3.75%
3.84%
4.14%
4.56%
4.92%
4.78%
4.84%
4.83%
4.21%
4.72%
4.80%
3.54%
3.92%
3.57%
3.34%
3.18%
3.23%
3.18%
1.71%
1.56%
1.08%
0.15%
Percentage cumulative
0.73%
1.80%
3.01%
4.49%
5.50%
6.67%
9.19%
12.53%
15.81%
19.16%
22.15%
25.90%
29.74%
33.88%
38.44%
43.36%
48.14%
52.98%
57.80%
62.02%
66.74%
71.54%
75.08%
79.00%
82.56%
85.90%
89.09%
92.32%
95.50%
97.21%
98.77%
99.85%
100.00%
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W32 W33
Period
3-Apr-14
10-Apr-14
17-Apr-14
24-Apr-14
1-May-14
8-May-14
15-May-14
22-May-14
29-May-14
5-Jun-14
12-Jun-14
19-Jun-14
26-Jun-14
3-Jul-14
10-Jul-14
17-Jul-14
24-Jul-14
31-Jul-14
7-Aug-14
14-Aug-14
21-Aug-14
28-Aug-14
4-Sep-14
11-Sep-14
18-Sep-14
25-Sep-14
2-Oct-14
9-Oct-14
16-Oct-14
23-Oct-14
30-Oct-14
6-Nov-14
13-Nov-14
Peak
Direct Mnpower 90hrs/wk 83 123 137 169 115 133 286 378 372 379 339 425 435 469 517 557 541 548 547 477 534 544 401 444 404 378 361 366 361 194 176 123 18 557
Average weekly Forthnight 18 545
Average weekly Forthnight 549
Monthly Average Manpower 71 526292
130 142 210 375 359 370
278 150539 364
506 364 185 71
124 332 376
473 424430 493 549 548
423 391
526128 257 395 526 407
382 452 537 545 512103 153
Town Center presentation

More Related Content

What's hot

PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00Mansoor Sakharkar
 
Chanonry Point Project
Chanonry Point ProjectChanonry Point Project
Chanonry Point ProjectEdward Brown
 
GENAIR - MAIN EXTRACTION SYSTEM
GENAIR - MAIN EXTRACTION SYSTEMGENAIR - MAIN EXTRACTION SYSTEM
GENAIR - MAIN EXTRACTION SYSTEMWium Van Der Post
 
Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsClaire Zhuangg
 
021 - Outline Section A-A
021 - Outline Section A-A021 - Outline Section A-A
021 - Outline Section A-ADanny Chiverton
 
inte building 1-Elev 1
inte building 1-Elev 1inte building 1-Elev 1
inte building 1-Elev 1Shane Maguire
 
flow monitoring project & produksi
flow monitoring project & produksiflow monitoring project & produksi
flow monitoring project & produksiSutan_PP
 
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 VAnchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 VCS Unitec
 

What's hot (12)

PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00
 
Chanonry Point Project
Chanonry Point ProjectChanonry Point Project
Chanonry Point Project
 
Fp2.02 rev 1
Fp2.02 rev 1Fp2.02 rev 1
Fp2.02 rev 1
 
GENAIR - MAIN EXTRACTION SYSTEM
GENAIR - MAIN EXTRACTION SYSTEMGENAIR - MAIN EXTRACTION SYSTEM
GENAIR - MAIN EXTRACTION SYSTEM
 
Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah Sections
 
021 - Outline Section A-A
021 - Outline Section A-A021 - Outline Section A-A
021 - Outline Section A-A
 
inte building 1-Elev 1
inte building 1-Elev 1inte building 1-Elev 1
inte building 1-Elev 1
 
Chevron Depropanizer Project
Chevron Depropanizer ProjectChevron Depropanizer Project
Chevron Depropanizer Project
 
flow monitoring project & produksi
flow monitoring project & produksiflow monitoring project & produksi
flow monitoring project & produksi
 
06217-02 (1)
06217-02 (1)06217-02 (1)
06217-02 (1)
 
Ardoyne-Elevations
Ardoyne-ElevationsArdoyne-Elevations
Ardoyne-Elevations
 
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 VAnchor Stand Schematic for CS Unitec Core Drills: BST 300 V
Anchor Stand Schematic for CS Unitec Core Drills: BST 300 V
 

Similar to Town Center presentation

Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
 
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Krm Chari
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
EarthQuake Reistant Building
EarthQuake Reistant BuildingEarthQuake Reistant Building
EarthQuake Reistant BuildingHemant Srivastava
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...IRJET Journal
 
practical training ppt
practical training pptpractical training ppt
practical training pptSagar Shah
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projectsKapugantikapuganti Gupta
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUMEVEERABHARATHI MUNI
 
Project management report of stadium
Project management report of stadiumProject management report of stadium
Project management report of stadiumSLIIT, Sri Lanka
 
HVAC analysis.pptx
HVAC analysis.pptxHVAC analysis.pptx
HVAC analysis.pptxkylenesti2
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONcyberyogi07
 

Similar to Town Center presentation (20)

Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
Buildingworkmethodstatement cm-ms-bw-001-141120013134-conversion-gate01(1)
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
EarthQuake Reistant Building
EarthQuake Reistant BuildingEarthQuake Reistant Building
EarthQuake Reistant Building
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
 
practical training ppt
practical training pptpractical training ppt
practical training ppt
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
ELECTRICAL DESIGN ENGINEER - RESUME
ELECTRICAL DESIGN ENGINEER -  RESUMEELECTRICAL DESIGN ENGINEER -  RESUME
ELECTRICAL DESIGN ENGINEER - RESUME
 
Training PPT
Training PPTTraining PPT
Training PPT
 
Project management report of stadium
Project management report of stadiumProject management report of stadium
Project management report of stadium
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
A2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLANA2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLAN
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Bhel report block 4
Bhel report block 4Bhel report block 4
Bhel report block 4
 
HVAC analysis.pptx
HVAC analysis.pptxHVAC analysis.pptx
HVAC analysis.pptx
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 

More from Allan Leyte

Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1Allan Leyte
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Allan Leyte
 
Sample MSProject with 16 DivisionFormat Variation(EOT)
Sample MSProject with 16 DivisionFormat Variation(EOT)Sample MSProject with 16 DivisionFormat Variation(EOT)
Sample MSProject with 16 DivisionFormat Variation(EOT)Allan Leyte
 
BHP01-0 Bouly baseline on MSproject Format
BHP01-0 Bouly baseline on MSproject FormatBHP01-0 Bouly baseline on MSproject Format
BHP01-0 Bouly baseline on MSproject FormatAllan Leyte
 
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)Allan Leyte
 
PRODUCTION RATE APPX. NEW
PRODUCTION RATE APPX. NEWPRODUCTION RATE APPX. NEW
PRODUCTION RATE APPX. NEWAllan Leyte
 
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel SchedulingAllan Leyte
 
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)Allan Leyte
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Allan Leyte
 
Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016Allan Leyte
 
Booster Pump cause of delay analysis
Booster Pump cause of delay analysisBooster Pump cause of delay analysis
Booster Pump cause of delay analysisAllan Leyte
 
Sample Bidcom Presentation - Structural Works 12-28-11
Sample Bidcom Presentation - Structural Works 12-28-11Sample Bidcom Presentation - Structural Works 12-28-11
Sample Bidcom Presentation - Structural Works 12-28-11Allan Leyte
 
Scheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMScheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMAllan Leyte
 
Offshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocolOffshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocolAllan Leyte
 

More from Allan Leyte (18)

Construction Methodology Scheduling1
Construction Methodology Scheduling1Construction Methodology Scheduling1
Construction Methodology Scheduling1
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
 
Sample MSProject with 16 DivisionFormat Variation(EOT)
Sample MSProject with 16 DivisionFormat Variation(EOT)Sample MSProject with 16 DivisionFormat Variation(EOT)
Sample MSProject with 16 DivisionFormat Variation(EOT)
 
BHP01-0 Bouly baseline on MSproject Format
BHP01-0 Bouly baseline on MSproject FormatBHP01-0 Bouly baseline on MSproject Format
BHP01-0 Bouly baseline on MSproject Format
 
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
 
WEIGHTING TABLE
WEIGHTING TABLEWEIGHTING TABLE
WEIGHTING TABLE
 
PRODUCTION RATE APPX. NEW
PRODUCTION RATE APPX. NEWPRODUCTION RATE APPX. NEW
PRODUCTION RATE APPX. NEW
 
Sample of Structural Steel Scheduling
Sample of Structural Steel SchedulingSample of Structural Steel Scheduling
Sample of Structural Steel Scheduling
 
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
Non Software Scheduling (Weekly Planned Concrete Pour Vs Actual Poured)
 
p3 s-curves
p3 s-curvesp3 s-curves
p3 s-curves
 
Wreport
WreportWreport
Wreport
 
Visio-Planning FlowChart-3
Visio-Planning FlowChart-3Visio-Planning FlowChart-3
Visio-Planning FlowChart-3
 
Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016
 
Booster Pump cause of delay analysis
Booster Pump cause of delay analysisBooster Pump cause of delay analysis
Booster Pump cause of delay analysis
 
Sample Bidcom Presentation - Structural Works 12-28-11
Sample Bidcom Presentation - Structural Works 12-28-11Sample Bidcom Presentation - Structural Works 12-28-11
Sample Bidcom Presentation - Structural Works 12-28-11
 
Scheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMScheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPM
 
Offshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocolOffshore Programme using QP-P3 protocol
Offshore Programme using QP-P3 protocol
 
progress photos
progress photosprogress photos
progress photos
 

Town Center presentation

  • 1.
  • 2. • PROJECT: KAUST ARAMCO GENERAL CONSTRUCTION SERVICES •CONTRACT NO: 6600028921 •PMT: SAUDI ARAMCO/ CH2M HILL •CONTRACTOR: NESMA & PARTNERS •TOWN CENTER RECTIFICATION WORKS for BLDG 4300A, 4300B & 4300C
  • 3. Construction of new RCC slab for new bedroom
  • 4. BLDG.NO. BLDG.TYPE TYPICALROOMS NO.OFLEVEL LEVELTOBECO UNIT201-203 Level 2, 3&4 0 UNIT204-211 Level 2&3 8 LEVEL3 UNIT201-203&208-209 Level 2, 3&4 0 UNIT204-207 Level 2&3 4 LEVEL3 UNIT101-108 Level 0&1 8 LEVEL1 UNIT201-202&207-208 Level 2, 3&4 0 UNIT203-206 Level 2&3 4 LEVEL3 TOWN CENTERHousingUnitsConversion Project 11 H4300B(3610) T-18 4 NO.OFUNITSTOBE TOTALNO.OFUNITS H4300A(3610) T-17 8 H4300C (3610) T-20 12 9 16
  • 5. WAR No. 4: Town Centre Rectification SNS No.: TBA Subject: Manpower Loadings W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W32 W33 Period 3-Apr-14 10-Apr-14 17-Apr-14 24-Apr-14 1-May-14 8-May-14 15-May-14 22-May-14 29-May-14 5-Jun-14 12-Jun-14 19-Jun-14 26-Jun-14 3-Jul-14 10-Jul-14 17-Jul-14 24-Jul-14 31-Jul-14 7-Aug-14 14-Aug-14 21-Aug-14 28-Aug-14 4-Sep-14 11-Sep-14 18-Sep-14 25-Sep-14 2-Oct-14 9-Oct-14 16-Oct-14 23-Oct-14 30-Oct-14 6-Nov-14 13-Nov-14 Planned MH (Direct) 7,394 10,989 12,246 15,140 10,277 11,922 25,673 33,995 33,440 34,053 30,451 38,243 39,073 42,196 46,476 50,097 48,690 49,286 49,161 42,930 48,054 48,926 36,075 39,922 36,322 34,015 32,416 32,897 32,441 17,431 15,840 10,999 1,559 1,018,629 Percentage increment 0.73% 1.08% 1.20% 1.49% 1.01% 1.17% 2.52% 3.34% 3.28% 3.34% 2.99% 3.75% 3.84% 4.14% 4.56% 4.92% 4.78% 4.84% 4.83% 4.21% 4.72% 4.80% 3.54% 3.92% 3.57% 3.34% 3.18% 3.23% 3.18% 1.71% 1.56% 1.08% 0.15% Percentage cumulative 0.73% 1.80% 3.01% 4.49% 5.50% 6.67% 9.19% 12.53% 15.81% 19.16% 22.15% 25.90% 29.74% 33.88% 38.44% 43.36% 48.14% 52.98% 57.80% 62.02% 66.74% 71.54% 75.08% 79.00% 82.56% 85.90% 89.09% 92.32% 95.50% 97.21% 98.77% 99.85% 100.00% W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27 W28 W29 W30 W31 W32 W33 Period 3-Apr-14 10-Apr-14 17-Apr-14 24-Apr-14 1-May-14 8-May-14 15-May-14 22-May-14 29-May-14 5-Jun-14 12-Jun-14 19-Jun-14 26-Jun-14 3-Jul-14 10-Jul-14 17-Jul-14 24-Jul-14 31-Jul-14 7-Aug-14 14-Aug-14 21-Aug-14 28-Aug-14 4-Sep-14 11-Sep-14 18-Sep-14 25-Sep-14 2-Oct-14 9-Oct-14 16-Oct-14 23-Oct-14 30-Oct-14 6-Nov-14 13-Nov-14 Peak Direct Mnpower 90hrs/wk 83 123 137 169 115 133 286 378 372 379 339 425 435 469 517 557 541 548 547 477 534 544 401 444 404 378 361 366 361 194 176 123 18 557 Average weekly Forthnight 18 545 Average weekly Forthnight 549 Monthly Average Manpower 71 526292 130 142 210 375 359 370 278 150539 364 506 364 185 71 124 332 376 473 424430 493 549 548 423 391 526128 257 395 526 407 382 452 537 545 512103 153