SlideShare a Scribd company logo
1 of 1
Download to read offline
Ground Floor Level
55750
First Floor Level
59350
14 15 16 17 18 19 20 22 232413
Basement Level
51600
Second Floor Level
62950
Roof Level 2
66550
21
Ground Floor Level
55750
First Floor Level
59350
14151617181920222324 13
Basement Level
51600
Second Floor Level
62950
Roof Level 2
66550
21
www.autodesk.com/revit
Scale
LECTURER
Drawn by
Date
Project number
Institute of Technology Carlow
BSc. in Architectural Technology
Year 3 2015-2016
As indicated
26/04/201612:27:01
Proposed Elevations
Project Number 3
Carlow Primary Health Care Centre
22/04/2016
Xhevdet Haliti
Dan O Sullivan, Noel Dunne,
Mark Duffy
A138
1 : 200
Poposed South Elevation
1
1 : 200
Proposed North Elevation
2
GENERAL NOTES:
1. All construction to comply with current building
regs and codes of pratice & legislation
2. All work must be checked by building contractor
assigned certifier, design team and very importantly
the Builing contril Officer
3. All structural elements to be desiged and confirmed
by structural Engineer and to his specification
4. Drawings to be read in conjuction with specification
Site Area: 1.887 Hectares
Finish Ground floor: 55.75m
Site Boundaried outlined in Red
Paving externally , varying from
Acheson & Glover to
chasel bulevard
WALL FINISHES: FORTICRETE STONE & FIBRE
CEMENT CLADDING
1 : 5
Key Plan South Elevaion
3
1 : 5
Key Plan North Elevation
4
Fibre cement panels
Atrium curtain panels
Double glazed argon filled winows
Foticrete Rainscreen cladding
Solar water heaters&
Photovoltaics
Green roof
Fibre cement cladding
panels - 12x1250x2500mm
Basement out line
Atrium curtain panels
1000x3000mm,
aluminium uninterupted
finish
Glass rainling above 1100mm
@ accessible green roof
Stagered window projection
giving window a continuity,
and captuing sun light at
different time of the day
Outline of Basement
Structural Glazing at stairs

More Related Content

What's hot

Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Managementgrahamelanders
 
Johnson controls case study consultancy
Johnson controls case study   consultancyJohnson controls case study   consultancy
Johnson controls case study consultancygrahamelanders
 
CV_Alaa Eldin_Mech
CV_Alaa Eldin_MechCV_Alaa Eldin_Mech
CV_Alaa Eldin_MechAlaa El Deen
 
2 in 1 showcase
2 in 1 showcase2 in 1 showcase
2 in 1 showcaseJakub Věk
 
Project Management Services
Project Management ServicesProject Management Services
Project Management ServicesBruce Tharp
 
inte building 1-Section 2
inte building 1-Section 2inte building 1-Section 2
inte building 1-Section 2Shane Maguire
 
Chanonry Point Project
Chanonry Point ProjectChanonry Point Project
Chanonry Point ProjectEdward Brown
 

What's hot (17)

Inventory Portfolio
Inventory PortfolioInventory Portfolio
Inventory Portfolio
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Management
 
Johnson controls case study consultancy
Johnson controls case study   consultancyJohnson controls case study   consultancy
Johnson controls case study consultancy
 
CV_Alaa Eldin_Mech
CV_Alaa Eldin_MechCV_Alaa Eldin_Mech
CV_Alaa Eldin_Mech
 
Wtw process
Wtw processWtw process
Wtw process
 
2 in 1 showcase
2 in 1 showcase2 in 1 showcase
2 in 1 showcase
 
Curriculum vitae vn
Curriculum vitae   vnCurriculum vitae   vn
Curriculum vitae vn
 
M+S Technical - ENG
M+S Technical - ENGM+S Technical - ENG
M+S Technical - ENG
 
cv amr
cv amrcv amr
cv amr
 
12741
1274112741
12741
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
Project Management Services
Project Management ServicesProject Management Services
Project Management Services
 
inte building 1-Section 2
inte building 1-Section 2inte building 1-Section 2
inte building 1-Section 2
 
Mukusi Guesthouse
Mukusi GuesthouseMukusi Guesthouse
Mukusi Guesthouse
 
portfolio small 75
portfolio small 75portfolio small 75
portfolio small 75
 
Chanonry Point Project
Chanonry Point ProjectChanonry Point Project
Chanonry Point Project
 
EQ Resume.pdf 2016
EQ Resume.pdf 2016EQ Resume.pdf 2016
EQ Resume.pdf 2016
 

Similar to Proposed Elevations (South & North)

Similar to Proposed Elevations (South & North) (20)

Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDF
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
Presentation Sample KAAU
Presentation Sample KAAUPresentation Sample KAAU
Presentation Sample KAAU
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
induarial trainin report
induarial trainin reportinduarial trainin report
induarial trainin report
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
0 construction method 2020 eng society
0 construction method 2020 eng society0 construction method 2020 eng society
0 construction method 2020 eng society
 
Hrc nmmc guidelines
Hrc nmmc guidelinesHrc nmmc guidelines
Hrc nmmc guidelines
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
mohamed salem cv final
mohamed salem cv finalmohamed salem cv final
mohamed salem cv final
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 

More from Xhevdet (Jeff) Haliti (12)

Extenal Canopy & Entrance
Extenal Canopy & EntranceExtenal Canopy & Entrance
Extenal Canopy & Entrance
 
Structural glazing details
Structural glazing detailsStructural glazing details
Structural glazing details
 
Electrical Lighing Layoout
Electrical Lighing LayooutElectrical Lighing Layoout
Electrical Lighing Layoout
 
GP Room Layout
GP Room LayoutGP Room Layout
GP Room Layout
 
General Arrangments - Site Plan
General Arrangments - Site PlanGeneral Arrangments - Site Plan
General Arrangments - Site Plan
 
FSC Cert- Basement & Ground floor
FSC Cert- Basement & Ground floorFSC Cert- Basement & Ground floor
FSC Cert- Basement & Ground floor
 
Plumbing - MEP
Plumbing - MEPPlumbing - MEP
Plumbing - MEP
 
DAC Cert - Ground floor
DAC Cert - Ground floorDAC Cert - Ground floor
DAC Cert - Ground floor
 
Wall Plans
Wall PlansWall Plans
Wall Plans
 
Atrium Details
Atrium DetailsAtrium Details
Atrium Details
 
Final_presentation
Final_presentationFinal_presentation
Final_presentation
 
Internship Team 4
Internship Team 4Internship Team 4
Internship Team 4
 

Proposed Elevations (South & North)

  • 1. Ground Floor Level 55750 First Floor Level 59350 14 15 16 17 18 19 20 22 232413 Basement Level 51600 Second Floor Level 62950 Roof Level 2 66550 21 Ground Floor Level 55750 First Floor Level 59350 14151617181920222324 13 Basement Level 51600 Second Floor Level 62950 Roof Level 2 66550 21 www.autodesk.com/revit Scale LECTURER Drawn by Date Project number Institute of Technology Carlow BSc. in Architectural Technology Year 3 2015-2016 As indicated 26/04/201612:27:01 Proposed Elevations Project Number 3 Carlow Primary Health Care Centre 22/04/2016 Xhevdet Haliti Dan O Sullivan, Noel Dunne, Mark Duffy A138 1 : 200 Poposed South Elevation 1 1 : 200 Proposed North Elevation 2 GENERAL NOTES: 1. All construction to comply with current building regs and codes of pratice & legislation 2. All work must be checked by building contractor assigned certifier, design team and very importantly the Builing contril Officer 3. All structural elements to be desiged and confirmed by structural Engineer and to his specification 4. Drawings to be read in conjuction with specification Site Area: 1.887 Hectares Finish Ground floor: 55.75m Site Boundaried outlined in Red Paving externally , varying from Acheson & Glover to chasel bulevard WALL FINISHES: FORTICRETE STONE & FIBRE CEMENT CLADDING 1 : 5 Key Plan South Elevaion 3 1 : 5 Key Plan North Elevation 4 Fibre cement panels Atrium curtain panels Double glazed argon filled winows Foticrete Rainscreen cladding Solar water heaters& Photovoltaics Green roof Fibre cement cladding panels - 12x1250x2500mm Basement out line Atrium curtain panels 1000x3000mm, aluminium uninterupted finish Glass rainling above 1100mm @ accessible green roof Stagered window projection giving window a continuity, and captuing sun light at different time of the day Outline of Basement Structural Glazing at stairs