Quantity Estimation and Contract Management
1
Module 3: Bid Submission and Evaluation
Lecture By:
Akshatha B AB E, M.Tech, MISTE.
Assistant Professor
Dept. of Civil Engineering
“Bid” is increasingly being used by the bidder (the supply side)
and the term “tender” used on the procurement side (the buyer).
Bid – an approach to a client in order to gain significant new or
repeat business.
BIDDING PROCESS
EVALUATION OF BIDS
 The opening of bids should take place immediately after the deadline for
submission in the presence of bidders’ representatives who wish to
attend.
 Bids, modifications and withdrawals received after the deadline must
not be opened.
 The outer envelope of these late bids and modifications should be opened
first and the names of the bidders submitting late bids or modifications
read out and recorded. The inner envelopes of all late submissions must
be returned unopened to the respective bidders.
 All bids and modifications received prior to the deadline must be opened
next.
 No bid shall be rejected or an opinion/judgment voiced as to its
responsiveness at the bid opening, except for late bids.
 Immediately after the opening of bids, all bids which were opened must
Opening ofBids
Preliminary Examination of Bids
Each bid will be examined to determine if it:
 is properly signed and accompanied by a power of attorney;
 is accompanied by the required bid security;
 is complete and generally in order
 is substantially responsive to the bidding documents
 is free of computational errors
 is requires any clarifications (any such clarification must be noted).
The evaluation committee must decide which deviations or reservations
identified at this point are quantifiable
At the end of this stage, the committee should be agreed on:
 those bids which are substantially nonresponsive and should not be
considered further; and
 any clarification which should be requested from bidders.
 The outcome of the examination should be summarized
 All requests for clarification must be made in writing, and the response
must also be given in writing.
 A log of all requests for clarification and responses must be kept.
 Requests for clarification can be sought at any time, up to the contract
award decision.
Requests for Clarification
 Bids which have not been declared substantially nonresponsive will then
have to be evaluated in depth.
Before a bid can be evaluated the following must be done:
 Computational errors must be corrected in accordance with the relevant
provision in the instructions to bidders.
 Bid prices must be converted to a common currency in accordance with
the relevant provision in the instructions to bidders;
 adjustments should be made for any obvious omissions, deviations or
variations which are not considered to be quantifiable and which can be
quantified.
 The adjusted bid price resulting from the above would constitute the
basis for the subsequent evaluation and comparison of bids.
 The detailed evaluation of a bid involves first checking that the technical
characteristics, functional performance and commercial conditions of the
Evaluation and Comparison of Bids
 The next step is to apply the evaluation criteria specified in the bidding
documents and adjust each bid as appropriate using the evaluation
criteria.
 Where there are a large number of bids to be evaluated (over six) and the
spread of bid prices is relatively wide, it is not necessary, in the first
instance, to evaluate all bids in detail.
 One can usually determine, from the specified evaluation criteria, the
range of bid prices relative to the lowest bid price which stand a reliable
chance of being the lowest evaluated bid. In such cases it is
recommended that, in the first instance, only those bids within this range
should be subjected to a detailed evaluation.
 The evaluated bid prices are compared and ranked in ascending order to
Evaluation and Comparison of Bids
 A successful bidder must be qualified to satisfactorily perform the
contract. Therefore, it must be determined whether the bidder offering the
lowest evaluated bid is so qualified.
 If bidders were prequalified prior to bidding, then a simple check should
be made to determine that the lowest evaluated bidder still satisfies the
qualifying requirements specified for prequalification.
 If no prequalification was done, then it must be determined that the
lowest evaluated bidder has the relevant previous experience, and
financial, technical and production capability and capacity to perform the
contract. This must be based on the qualifying criteria specified in the
bidding documents.
 A positive determination is a prerequisite for the award of the contract to
Post-qualification
 The successful bidder whose bid has been determined to be substantially
responsive and has been determined to be the lowest evaluated bidder
and who has been determined to be qualified to perform the contract
satisfactorily, must be recommended for award of the contract.
Award Recommendation
 A bid evaluation report with the award recommendation must be
prepared.
 The bid evaluation report should be in the following manner:
 Receipt and Opening of Bids
 Examination of Bids
 Substantially Nonresponsive Bids
 Correction pf Arithmetic Errors
 Currency Conversion
 Adjustment for Nonmaterial Deviations
 Bids Subject to Detailed Evaluation
 Evaluation of Bids
 Comparison of Bids
 Lowest Evaluated Responsive Bid
 Post-qualification
 Award Recommendation
 Evaluation Report in the manner and detail outlined therein, including all
Bid Evaluation Report
 When the award recommendation has been approved, a notification of
award (letter of acceptance) should be sent out immediately to the
successful bidder.
 Negotiations must not be held with the successful bidder with the
intention of getting a reduction in price or a change in the scope of the
contract.
 Negotiations are only allowed under exceptional circumstances and with
the Bank’s prior concurrence.
Notification of Award
Bid Submission and Evaluation

More Related Content

What's hot

Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPTKEVINMISTRY8
 
Unit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsUnit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsKunal Kacholiya
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTVISHNU VIJAYAN
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projectsTEJAS2011
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.pptMUST
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISORPROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISORDAVIDSON ECHIDIKE
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaGuta Mengesha
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 

What's hot (20)

Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
Contract Management
Contract ManagementContract Management
Contract Management
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPT
 
Unit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & ByelawsUnit 1-Contract Documents & Byelaws
Unit 1-Contract Documents & Byelaws
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Contract management
Contract managementContract management
Contract management
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 
Contract Management
Contract Management Contract Management
Contract Management
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISORPROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
PROJECT CONSTRUCTION SUPERVISION AND SUPER VISOR
 
Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 

Similar to Bid Submission and Evaluation

PowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptxPowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptxGetachewMekonnen22
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSGanesh Bhorkade
 
EVALUATION OF BID & AWARDING OF WORK
EVALUATION OF BID & AWARDING OF WORKEVALUATION OF BID & AWARDING OF WORK
EVALUATION OF BID & AWARDING OF WORK9021050570
 
COEHIX Research RFP
COEHIX Research RFPCOEHIX Research RFP
COEHIX Research RFPJoshua Sharf
 
WORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.pptWORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.pptJaafar47
 
CH-3-Introduction.pptx
CH-3-Introduction.pptxCH-3-Introduction.pptx
CH-3-Introduction.pptxssuserc0bf9b
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qumes manandhar
 
Srfp consultants 25 proposal evaluation
Srfp consultants 25   proposal evaluationSrfp consultants 25   proposal evaluation
Srfp consultants 25 proposal evaluationJoy Irman
 
Procurement Management Training 2.pptx
Procurement Management Training 2.pptxProcurement Management Training 2.pptx
Procurement Management Training 2.pptxBifleOrganization
 
Bid Evaluation methodology.pdf
Bid Evaluation methodology.pdfBid Evaluation methodology.pdf
Bid Evaluation methodology.pdfKanyagosumaya
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1Joy Irman
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2Joy Irman
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering proceduresRotich Kimaru
 
BIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptxBIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptxbenito procia
 

Similar to Bid Submission and Evaluation (20)

PowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptxPowerPoint Presentation -Getachew M.pptx
PowerPoint Presentation -Getachew M.pptx
 
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONSPURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
PURCHASE PROCEDURE IN AUTONOMOUS EDUCATIONAL ORGANISATIONS
 
EVALUATION OF BID & AWARDING OF WORK
EVALUATION OF BID & AWARDING OF WORKEVALUATION OF BID & AWARDING OF WORK
EVALUATION OF BID & AWARDING OF WORK
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
COEHIX Research RFP
COEHIX Research RFPCOEHIX Research RFP
COEHIX Research RFP
 
WORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.pptWORKS PROCUREMTN EVALUATION OF BIDS.ppt
WORKS PROCUREMTN EVALUATION OF BIDS.ppt
 
CH-3-Introduction.pptx
CH-3-Introduction.pptxCH-3-Introduction.pptx
CH-3-Introduction.pptx
 
Cp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post qCp 2 selection of contractor - pq and post q
Cp 2 selection of contractor - pq and post q
 
Tender
TenderTender
Tender
 
Srfp consultants 25 proposal evaluation
Srfp consultants 25   proposal evaluationSrfp consultants 25   proposal evaluation
Srfp consultants 25 proposal evaluation
 
Procurement Management Training 2.pptx
Procurement Management Training 2.pptxProcurement Management Training 2.pptx
Procurement Management Training 2.pptx
 
Bid Evaluation methodology.pdf
Bid Evaluation methodology.pdfBid Evaluation methodology.pdf
Bid Evaluation methodology.pdf
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
 
ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 2ACH 231 Lecture 07 (Contract Documents) Part 2
ACH 231 Lecture 07 (Contract Documents) Part 2
 
Tendering process cvc_guidelines
Tendering process cvc_guidelinesTendering process cvc_guidelines
Tendering process cvc_guidelines
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering procedures
 
BIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptxBIDDING PROCEDURES AND UPDATES.pptx
BIDDING PROCEDURES AND UPDATES.pptx
 
Tender
TenderTender
Tender
 

More from AkshathaBhandary

1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf
1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf
1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdfAkshathaBhandary
 
Disaster Management Technical Seminar
Disaster Management Technical SeminarDisaster Management Technical Seminar
Disaster Management Technical SeminarAkshathaBhandary
 
Highway Vertical Alignment
Highway Vertical AlignmentHighway Vertical Alignment
Highway Vertical AlignmentAkshathaBhandary
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional ElementsAkshathaBhandary
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal AlignmentAkshathaBhandary
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkAkshathaBhandary
 
Trenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportTrenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportAkshathaBhandary
 
Trenchless Technology a Review
Trenchless Technology a Review Trenchless Technology a Review
Trenchless Technology a Review AkshathaBhandary
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro projectAkshathaBhandary
 

More from AkshathaBhandary (13)

1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf
1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf
1. 1 Stabilization of Laterite Soil Using Waste Paper Sludge.pdf
 
Disaster Management Technical Seminar
Disaster Management Technical SeminarDisaster Management Technical Seminar
Disaster Management Technical Seminar
 
Highway Vertical Alignment
Highway Vertical AlignmentHighway Vertical Alignment
Highway Vertical Alignment
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal Alignment
 
Sight Distance
Sight DistanceSight Distance
Sight Distance
 
Valuation 08.04.2020
Valuation 08.04.2020Valuation 08.04.2020
Valuation 08.04.2020
 
Contract management
Contract managementContract management
Contract management
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office Work
 
Trenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar ReportTrenchless Technology Technical Seminar Report
Trenchless Technology Technical Seminar Report
 
Trenchless Technology a Review
Trenchless Technology a Review Trenchless Technology a Review
Trenchless Technology a Review
 
Internship Report on metro project
Internship Report on metro projectInternship Report on metro project
Internship Report on metro project
 

Recently uploaded

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Bid Submission and Evaluation

  • 1. Quantity Estimation and Contract Management 1 Module 3: Bid Submission and Evaluation Lecture By: Akshatha B AB E, M.Tech, MISTE. Assistant Professor Dept. of Civil Engineering
  • 2. “Bid” is increasingly being used by the bidder (the supply side) and the term “tender” used on the procurement side (the buyer). Bid – an approach to a client in order to gain significant new or repeat business. BIDDING PROCESS
  • 4.  The opening of bids should take place immediately after the deadline for submission in the presence of bidders’ representatives who wish to attend.  Bids, modifications and withdrawals received after the deadline must not be opened.  The outer envelope of these late bids and modifications should be opened first and the names of the bidders submitting late bids or modifications read out and recorded. The inner envelopes of all late submissions must be returned unopened to the respective bidders.  All bids and modifications received prior to the deadline must be opened next.  No bid shall be rejected or an opinion/judgment voiced as to its responsiveness at the bid opening, except for late bids.  Immediately after the opening of bids, all bids which were opened must Opening ofBids
  • 5. Preliminary Examination of Bids Each bid will be examined to determine if it:  is properly signed and accompanied by a power of attorney;  is accompanied by the required bid security;  is complete and generally in order  is substantially responsive to the bidding documents  is free of computational errors  is requires any clarifications (any such clarification must be noted). The evaluation committee must decide which deviations or reservations identified at this point are quantifiable At the end of this stage, the committee should be agreed on:  those bids which are substantially nonresponsive and should not be considered further; and  any clarification which should be requested from bidders.  The outcome of the examination should be summarized
  • 6.  All requests for clarification must be made in writing, and the response must also be given in writing.  A log of all requests for clarification and responses must be kept.  Requests for clarification can be sought at any time, up to the contract award decision. Requests for Clarification
  • 7.  Bids which have not been declared substantially nonresponsive will then have to be evaluated in depth. Before a bid can be evaluated the following must be done:  Computational errors must be corrected in accordance with the relevant provision in the instructions to bidders.  Bid prices must be converted to a common currency in accordance with the relevant provision in the instructions to bidders;  adjustments should be made for any obvious omissions, deviations or variations which are not considered to be quantifiable and which can be quantified.  The adjusted bid price resulting from the above would constitute the basis for the subsequent evaluation and comparison of bids.  The detailed evaluation of a bid involves first checking that the technical characteristics, functional performance and commercial conditions of the Evaluation and Comparison of Bids
  • 8.  The next step is to apply the evaluation criteria specified in the bidding documents and adjust each bid as appropriate using the evaluation criteria.  Where there are a large number of bids to be evaluated (over six) and the spread of bid prices is relatively wide, it is not necessary, in the first instance, to evaluate all bids in detail.  One can usually determine, from the specified evaluation criteria, the range of bid prices relative to the lowest bid price which stand a reliable chance of being the lowest evaluated bid. In such cases it is recommended that, in the first instance, only those bids within this range should be subjected to a detailed evaluation.  The evaluated bid prices are compared and ranked in ascending order to Evaluation and Comparison of Bids
  • 9.  A successful bidder must be qualified to satisfactorily perform the contract. Therefore, it must be determined whether the bidder offering the lowest evaluated bid is so qualified.  If bidders were prequalified prior to bidding, then a simple check should be made to determine that the lowest evaluated bidder still satisfies the qualifying requirements specified for prequalification.  If no prequalification was done, then it must be determined that the lowest evaluated bidder has the relevant previous experience, and financial, technical and production capability and capacity to perform the contract. This must be based on the qualifying criteria specified in the bidding documents.  A positive determination is a prerequisite for the award of the contract to Post-qualification
  • 10.  The successful bidder whose bid has been determined to be substantially responsive and has been determined to be the lowest evaluated bidder and who has been determined to be qualified to perform the contract satisfactorily, must be recommended for award of the contract. Award Recommendation
  • 11.  A bid evaluation report with the award recommendation must be prepared.  The bid evaluation report should be in the following manner:  Receipt and Opening of Bids  Examination of Bids  Substantially Nonresponsive Bids  Correction pf Arithmetic Errors  Currency Conversion  Adjustment for Nonmaterial Deviations  Bids Subject to Detailed Evaluation  Evaluation of Bids  Comparison of Bids  Lowest Evaluated Responsive Bid  Post-qualification  Award Recommendation  Evaluation Report in the manner and detail outlined therein, including all Bid Evaluation Report
  • 12.  When the award recommendation has been approved, a notification of award (letter of acceptance) should be sent out immediately to the successful bidder.  Negotiations must not be held with the successful bidder with the intention of getting a reduction in price or a change in the scope of the contract.  Negotiations are only allowed under exceptional circumstances and with the Bank’s prior concurrence. Notification of Award