1. EMPLOYMENT HISTORY
ENGR. MUHAMMAD TAUQEER
C/O Master Basharat Ali Deh #22 Jamrao, District Sanghar,Pakistan
+92-331-3831619 , +92-311-3670318 | tauqeerarain9211@yahoo.com
Personal Details: Father Name Nazeer Hussain
Date of Birth 1
st
January 1988
Gender Male
Nationality Pakistani
CIVIL ENGINEER
Technically sophisticated and highly dynamic Civil Engineer with progressive experience in directing complete spectrum
of construction projects with expertise in project management, estimating, labor management, site management and
quality control. Skilled at leading construction engineering projects, employing proactive management style to ensure
operational efficiency and timely completion; meeting all quality, safety and regulatory standards. Collaborate with
vendors and suppliers to determine material costs and secure best pricing. Perform site inspection and documentation to
determine client requirements and provide solutions.
Construction Planning | Project Management | Risk Assessment & Mitigation | Health & Safety Standards | Vendor &
Client Relationship | Quality Control & Assurance | Material/Inventory Management | Site Management/Reports |
Problem Solving | Communication Skills | MS Office
Inspection of all ongoing civil works activities for quality.
Participate in all meetings with the Contractor.
Submission of Daily Progress Reports on status and progress of the projects.
Make Bar Bending Schedule,Bill of Quantities.& Tender.
Prepared various Quote solitications and analyzed reports.
Monitor the construction schedule of the Contractor from all perspectives.
Played an integral role in directing numerous activities, including ( Foundations,Grey Structure & Finishing work).
Performed duties as strategic overlay to monitor Foundations concrete pouring, Grey Structure, Finsinhing
work & delivered daily progress reports to the GM & DGM(A/HR).
Evaluated, developed, and implemented policies and methodology for documentation and correspondence for all
planning and scheduling related matters.
Key Project:
Khairpur Sugar Mills ltd,khairpur Mirus (Different Projects at Sugar Mill)
Construction of Cane Carrier Foundation,Repair & Renovation work of Molassis Pits,TST Road, Water proofing of
Godown’s & Offices roofs, Finishing & Repair work of Buildings. Construction of ETP.
Make Bar Bending Schedule and Bill of Quantities.
As Built Drawing on AutoCAD.
Provided financial progress reports to Clients and to the finance of admin of my employer.
Prepared various Quote solitications and analyzed reports.
Key Project:
Marine Industrial Liquid Terminals, Karachi (Differnets Ethanol storage Tanks,Under Ground water Tank,Drum
Facility Building,API Separater,ISO Tank maintenance building,Pre-cast Boundary wall,K.E Room,Fire Under
Ground Tank,Filling & De-Canting station,Cleaning Bay#01 & 02,Weigh Bridge,Watch Tower,ETP Trench,Gate
Office).
Khairpur Sugar Mills ltd, Khairpur Mirus
Civil Engineer
Sep 2022- Dec 2023
IIW Industrial Engineer & Contractor , Karachi
Asst. Site/QC Engineer
May 2022- Aug 2022
2. TAJ CORPORATION, KANDHKOT
Site Engineer
Mar 2020 –June 2020
Inspection of all ongoing civil works activities for quality.
Participate in all meetings with the Contractor and the Client.
Submission of Daily, Weekly and Monthly Reports on status and progress of the projects.
Monitor the construction schedule of the Contractor from all perspectives.
Represent the Client on the site and Monitor the progress and quality of work.
Key Projects:
Construction of Sub-Station (Accommodation Building, Guard Room, Metering Room,Auxiliary Building, AIS
Area,Control Building), Pre-cast Watch Tower, Met Mast, OHL Tower & Wind Turbine Generator Foundation’s.
TRICOM pvt ltd 50MW Jhampir
NASDA Green Energy pvt ltd 50MW Jhampir
ACT2 Wind pvt ltd 50 MW Jhampir
Din Energy pvt ltd 50 MW Jhampir
Performed duties as strategic overlay to monitor and supervise site work (Foundations,Grey Structure & Finsihing
work).
Efficiently formulated bar bending schedule, steel works and concreting, and delivered comprehensive inspection
reports with high accuracy and consistency.
Make Petty contractor Bill and approve from Project Manager.
Key Project:
Construction of Petrol Pump (Office Block, Masjid, Market Shops, Toilets,Salam Mart & staff Building) Kandhkot.
RENEWABLE RESOURCES (Pvt) ltd, Jhampir/Nooriabad
Site Engineer
Oct 2020 – Nov 2021
3. RAJBY TEXTILES (PVT) LTD, KARACHI
Assistant Site Engineer
Mar 2016– Sep 2016
AZ CONSTRUCTION, NOORIABAD
Quantity Surveyor
May 2015 –Feb 2016
A S ENTERPRISES ENGINEER AND CONTRACTOR, KARACHI
Training Engineer
Sep 2013 –Apr 2015
EDUCATION
Monitored field sites construction and organized periodic inspections to ensure work areas, materials, and quality of
work up to standards and gained technical knowledge in structural equipment’s.
Applied in-depth level of expertise for conducting site measurements and preparing bill of quantities, technical
drawings and documents while following company policies.
Efficiently formulated bar bending schedule, steel works and concreting, and delivered comprehensive inspection
reports with high accuracy and consistency.
Played an integral role in directing numerous activities, including ( Foundations,Grey Structure & Finishing work).
Key Projects:
United Energy of Pakistan (Different Projects at Tando Adam)
Construction of TST Road, Treaty Air Cooler Floor, Pipe Support, Two Rig Location’s,Rock Moram Road, Wash
Room’s, Fixing of Cemented Brick’s Tiles, Pre-Cast Foundation, Pre-Cast Slab/Block, R.C.C Loading Dock, Chemical
Pad, Culverts, Paver and Kerb Stone Walk Way.
Performed duties as strategic overlay to monitor Foundations concrete pouring, Grey Structure, Finishing work,
Laboratory Test & delivered daily & weekly progress reports to project director and site engineer.
Directed analysis of proposed materials and methods of construction for acceptability based on suitability,
durability, and cost of maintenance for various types of development.
Evaluated, developed, and implemented policies and methodology for documentation and correspondence for all
planning and scheduling related matters.
Key Project:
Weaving Unit Extension Rajby Textile Mill Karachi (Loam Shed) and (Re-Beamer Ball Warper and Beam Stacker).
Make Bar Bending Schedule and Bill of Quantities.
As Built Drawing on AutoCAD.
Provided financial progress reports to Clients and to the finance of admin of my employer.
Prepared various Quote solitications and analyzed reports.
Conducted Meetings with project managers and other employes.
Key Project:
Soorty Denim Textile Mill Nooriabad (Renovation work of RD house, Construction of Check Post and Masjid.)
Rendered keen eye for details review of structure drawings; ensured layout as per drawing for site.
Researched numerous verticals to assure optimum quality of concrete pouring by conducting different test.
Inspected slump, FDT test and cube test as well as the quality assurance of rebar work.
Played an integral role in directing numerous activities, including (Foundations, Grey Structure & Finishing work).
Key Project:
Artistic Milliner Textile Mill Karachi (Construction of Weaving Unit#05)
Island Textile Mill Kotri (Construction of Spinning Unit#02)
Bachelor of Engineering in Civil from Mehran University of Engineering and Technology, Jamshoro, 2013
Courses: Primavera P-3 (In Project Planning and Scheduling) | AutoCAD 2D
Languages:English,Urdu,Sindhi,Punjabi,Turkish
REFRENCE
I Reliable Refrences can be furnished upon your Instigation.
MNAC,TANDO ADAM
Site Engineer
Oct 2016 –Feb 2020