22, balaji nagar ext,
Near bank colony,
Post bhagven nagar,
Nagpur- 440027,
Maharashtra
Phone: +91 9503004725
09930020374
nileshmoon2013@gmail.com
nileshmoon2005@yahoo.co.in
Specialties
Pre-cast box girder
(Segments) construction with
long line method.
Pre-cast parapet construction
work.
Toll plaza construction.
Rigid and flexible pavement
construction
Structural engineering
Retaining and MSE wall
construction
Nilesh D Moon,
Civil Engineer Specializing in the Infrastructure Development
Projects.
 PE-certified civil engineer with five years and 4 months of experience
in the construction of National Highways, Metro rail project and Real
Estate.
 Wide experience in project management, Construction Management,
Civil Engineering, & execution of projects with a flair for adopting
modern construction methodologies.
 Core competency in resource configuration & optimization for
Site/Project Engineering.
 Proven track record in planning, estimating, scheduling, monitoring,
& implementing projects.
 Capabilities in swiftly ramping up projects with competent cross-
functional skills and ensuring on time deliverable.
 Addressing environmental safety issues in project management with
focus on HSE.
 Hands on experience in the development of plans and procedures for
cost control in infrastructure projects.
 Deft in Technical coordination as well as establishing and maintaining
quality standards as per QA/QC norms.
 Initiating, planning, and implementing process improvement
strategies.
 Motivating the team, leading by example and delivering results as per
set project objectives.
 Ability to work efficiently in demanding work environments, meeting
deadlines, and achieving targets
Education
NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND
RESEARCH, Hyderabad, AP
Post gradation diploma in Advance Construction Management in
Infrastructure, 7.09 CPI in 2010
 Internship: completed three months civil engineering internship as an
Engineer in Training (EIT) with Simplex Infrastructure Ltd., during
management study. Project included Construction methodology of
different structures like slipform for silo, preheater tower, etc. Progress
monitoring for various structure during construction phase.
 Thesis: Business strategies implementation of infrastructure
construction companies before and after recession
Engineering Tools
AutoCAD
Primavera P6 Professional
Project Management
MS Project
Windows XP with
M.S.OFFICE
NAGPUR UNIVERSITY, Nagpur, Maharashtra
BE in Civil Engineering, Yeshwantrao Chavan College Of Engineering,
71.02% in 2008
 Final Project: Studies in compressive strength and behaviours of
masonry mortars.
Competency profile
Technical Expertise
 Expertise in construction of pre-cast box girders (segments), pre-cast
parapet, retaining walls and MSE walls.
 Experience in industrial foundations and construction of under pass.
 Prowess in toll plaza construction and rigid pavement construction.
 Experience in construction of embankments, sub-grade, sub-base.
Functional Expertise:
 Project Planning & Management
 Finalizing requirements and specifications in consultation with
collaborators / promoters.
 Project scheduling including material & manpower planning.
 Anchoring on-site construction activities to ensure completion of
project within the time & cost parameters and effective resource
utilization to maximize the output.
 Preparing hazard identification plan (HIP) for critical jobs.
 Project Coordination
 Liaising with external agencies, contractor and materials dept. for
procurement of materials and mobilization, with clients for obtaining
on-time clearances & approvals for smooth execution.
 Interfacing with consultants on determining technical specifications,
for release of drawings & preparation of construction plans as per
specification
 Site & Construction Management/Resource Planning
 Anchor on-site construction activities to ensure completion of project
within the time & cost parameters.
 Ensuring strict cost control system and maintained fully participation
in the financial management.
 Supervising all construction activities, including providing technical
inputs for methodologies of construction & coordination with site
Personal Details
Date of birth : 03 September
1984
Languages known :
Hindi, Marathi, English
Nationality: Indian
Marital status: single
Passport no: H0060775
Current designation:
associate manager civil
Current CTC: 965000/- P.A.
Expected CTC: negotiable
management activities.
 Motivating and instructing subordinates and monitoring their
performance.
 Supervising a team of engineers for various types of job and resolving
bottlenecks.
Professional Experience
LODHA GROUP, MUMBAI , lodha casa rio dombiwali, thane
Associate Manager Civil, February 2014 to Present
(Reporting to the Deputy General Manager and having a reporting relationship with
10)
Job Profile:
Current Assignment: Posted at lodha casa rio project since february 2014
overseeing construction of all the infrastructure of buildings. Reporting to the
Deputy General Manager.
responsible for the following Key Result Areas-
 Handling execution of work for UG services and the main
infrastructure surrounding the building.
 Coordinating with contractor and subcontractors, BBS, Survey dept.,
carpentry and mechanical section Billing Section (contractors &
subcontractors)
 Responsible for effectively handling all the progress of site activities
and resources.
 Coordinating site supervision work, managed various contractor
teams, and expedited the day to day progress of works.
 Ensured the safe, cost-effective and timely completion of all projects to
meet the company requirement.
 Maintained excellent relationships and stayed in constant contact with
all clients, which proved instrumental in generating additional project
work.
 Designing and implementing HSE and monitoring adherence to safety
standards and satisfactory work practices.
 Coordinating with the billing Engineer for submission of monthly
running account bills t and checking and approving the contractors
bills.
 Calculating quantities of material and rise the PR for the same.
 Completed the daily scheduled tasks with available resources
 Attending daily and weekly coordination meeting and discussing the
problems related to the construction project.
Contributions:
 Ensured project completion within the budget and time limits, as per
international quality standards set.
 Effectively supervised work on site with the project engineers
implemented Kaizen and increased productivity
LANCO INFRATECH LIMITED, Chennai Metro Rail Project, Chennai
Deputy Manager Civil, October 2011 to October 2013
(Reporting to the General Manager and having a reporting relationship with 20)
Job Profile:
Current Assignment: Posted at Chennai since October 2011 overseeing
construction of elevated viaduct pre-cast segments with long line method and
parapet in pre-cast casting yard. Reporting to the General Manager.
responsible for the following Key Result Areas-
 Handling execution of work for pre-casting of segments with long line
method and parapet in pre-cast casting yard.
 Coordinating with client & subcontractors, BBS, Survey dept.,
carpentry and mechanical section Billing Section (Client &
subcontractors)
 Responsible for effectively managing, supervising, and coordinating
all site activities and resources.
 Coordinating site supervision work, managed various sub-contractor
teams, and expedited the day to day progress of works.
 Ensured the safe, cost-effective and timely completion of all projects to
meet or exceed client expectations.
 Maintained excellent relationships and stayed in constant contact with
all clients, which proved instrumental in generating additional project
work.
 Overseeing all critical developments of the program, including the
designing of the Master Plan, phasing and compliance with the
technical specifications.
 Designing and implementing HSE and monitoring adherence to safety
standards and satisfactory work practices.
 Coordinating with the billing Engineer for submission of monthly
running account bills to client and for sub-contractors
 Calculating quantities of material as well as ensuring proper
manpower deployment to complete the project
 Supervising advance material planning & indent work.
 Completed the daily scheduled tasks with available resources
 Supervised, coordinated and controlled the site activities
 Attending daily and weekly coordination meeting and discussing the
problems related to the construction project.
 Assigned project engineers and civil foreman to respective areas as per
the requirements of the project to be ensure project completion as per
schedule.
Contributions:
 Ensured project completion within the budget and time limits, as per
international quality standards set and to the satisfaction of clients.
 Effectively supervised work on site with the project engineers
implemented Kaizen and increased productivity.
LANCO INFRATECH LIMITED, Four Laning of NH-48 From Nelamangala
Junction On Km (28+200) To Devihalli Km (107+685) In The State of Karnataka”
Management trainee/Deputy Manager, April 2010 to October 2011
(Reporting to the Deputy manager / General Manager and having a reporting
relationship with 30)
 Worked as an In-Charge of 15 km stretch of road which includes all
the construction and maintenance activity.
 Execution of Highway works, Structure works (Retaining Wall and
MSE walls), and other miscellaneous works.
 Monitored the Progress earthwork for embankment ,sub grade and
sub base
 Coordinating site supervision work, managed various sub-contractor
teams, and expedited the day to day progress of works.
 Developed an inspection system to ensure compliance with the
provisions of quality.
 Reviewed specifications, drawings, technical instructions, Designed
documents, plans, and procedures for robust quality system.
 Completed method statements.
 Participated in weekly meetings with the client, consultants, and the
contractors.
 Handled contractor management.
 Planned construction activities including resource allocation.
 Assigned project engineers and civil foreman to respective areas as per
the requirements of the project to be ensure project completion as per
schedule.
 Designing and implementing HSE and monitoring adherence to safety
standards and satisfactory work practices.
Contributions:
 Introduced best practices in the construction work and successfully
met the stringent quality standards.
 Maintained a successful track record of satisfactory work and punctual
delivery.
 Effectively supervised work on site with approval of the project
engineer and completed the construction work on time and within the
budgeted costs.
Extra-Curricular Activities/Achievements
 Active member of culture committee in NICMAR
 Active participation in national level student’s technical paper
presentation competition.
 Active participation in state level model competition.
 Volunteer experience in ‘GEID06.’
 Active participation in hall management as a member at YCCE FEST
7.0.
 Active participation in Asian level model competition at IIT Bombay.
 Active member in hosting fashion show and YCCE roadies in YCCE
FEST 8.0
 Event co-ordinator at the annual fest “PARINAMA 2009” of
NICMAR, Hyderabad
I hereby affirm that the information furnished in this form is true and correct.
Date:
Place:
NILESH D. MOON
nilesh moon resume

nilesh moon resume

  • 1.
    22, balaji nagarext, Near bank colony, Post bhagven nagar, Nagpur- 440027, Maharashtra Phone: +91 9503004725 09930020374 nileshmoon2013@gmail.com nileshmoon2005@yahoo.co.in Specialties Pre-cast box girder (Segments) construction with long line method. Pre-cast parapet construction work. Toll plaza construction. Rigid and flexible pavement construction Structural engineering Retaining and MSE wall construction Nilesh D Moon, Civil Engineer Specializing in the Infrastructure Development Projects.  PE-certified civil engineer with five years and 4 months of experience in the construction of National Highways, Metro rail project and Real Estate.  Wide experience in project management, Construction Management, Civil Engineering, & execution of projects with a flair for adopting modern construction methodologies.  Core competency in resource configuration & optimization for Site/Project Engineering.  Proven track record in planning, estimating, scheduling, monitoring, & implementing projects.  Capabilities in swiftly ramping up projects with competent cross- functional skills and ensuring on time deliverable.  Addressing environmental safety issues in project management with focus on HSE.  Hands on experience in the development of plans and procedures for cost control in infrastructure projects.  Deft in Technical coordination as well as establishing and maintaining quality standards as per QA/QC norms.  Initiating, planning, and implementing process improvement strategies.  Motivating the team, leading by example and delivering results as per set project objectives.  Ability to work efficiently in demanding work environments, meeting deadlines, and achieving targets Education NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND RESEARCH, Hyderabad, AP Post gradation diploma in Advance Construction Management in Infrastructure, 7.09 CPI in 2010  Internship: completed three months civil engineering internship as an Engineer in Training (EIT) with Simplex Infrastructure Ltd., during management study. Project included Construction methodology of different structures like slipform for silo, preheater tower, etc. Progress monitoring for various structure during construction phase.  Thesis: Business strategies implementation of infrastructure construction companies before and after recession
  • 2.
    Engineering Tools AutoCAD Primavera P6Professional Project Management MS Project Windows XP with M.S.OFFICE NAGPUR UNIVERSITY, Nagpur, Maharashtra BE in Civil Engineering, Yeshwantrao Chavan College Of Engineering, 71.02% in 2008  Final Project: Studies in compressive strength and behaviours of masonry mortars. Competency profile Technical Expertise  Expertise in construction of pre-cast box girders (segments), pre-cast parapet, retaining walls and MSE walls.  Experience in industrial foundations and construction of under pass.  Prowess in toll plaza construction and rigid pavement construction.  Experience in construction of embankments, sub-grade, sub-base. Functional Expertise:  Project Planning & Management  Finalizing requirements and specifications in consultation with collaborators / promoters.  Project scheduling including material & manpower planning.  Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.  Preparing hazard identification plan (HIP) for critical jobs.  Project Coordination  Liaising with external agencies, contractor and materials dept. for procurement of materials and mobilization, with clients for obtaining on-time clearances & approvals for smooth execution.  Interfacing with consultants on determining technical specifications, for release of drawings & preparation of construction plans as per specification  Site & Construction Management/Resource Planning  Anchor on-site construction activities to ensure completion of project within the time & cost parameters.  Ensuring strict cost control system and maintained fully participation in the financial management.  Supervising all construction activities, including providing technical inputs for methodologies of construction & coordination with site
  • 3.
    Personal Details Date ofbirth : 03 September 1984 Languages known : Hindi, Marathi, English Nationality: Indian Marital status: single Passport no: H0060775 Current designation: associate manager civil Current CTC: 965000/- P.A. Expected CTC: negotiable management activities.  Motivating and instructing subordinates and monitoring their performance.  Supervising a team of engineers for various types of job and resolving bottlenecks. Professional Experience LODHA GROUP, MUMBAI , lodha casa rio dombiwali, thane Associate Manager Civil, February 2014 to Present (Reporting to the Deputy General Manager and having a reporting relationship with 10) Job Profile: Current Assignment: Posted at lodha casa rio project since february 2014 overseeing construction of all the infrastructure of buildings. Reporting to the Deputy General Manager. responsible for the following Key Result Areas-  Handling execution of work for UG services and the main infrastructure surrounding the building.  Coordinating with contractor and subcontractors, BBS, Survey dept., carpentry and mechanical section Billing Section (contractors & subcontractors)  Responsible for effectively handling all the progress of site activities and resources.  Coordinating site supervision work, managed various contractor teams, and expedited the day to day progress of works.  Ensured the safe, cost-effective and timely completion of all projects to meet the company requirement.  Maintained excellent relationships and stayed in constant contact with all clients, which proved instrumental in generating additional project work.  Designing and implementing HSE and monitoring adherence to safety standards and satisfactory work practices.  Coordinating with the billing Engineer for submission of monthly running account bills t and checking and approving the contractors bills.  Calculating quantities of material and rise the PR for the same.  Completed the daily scheduled tasks with available resources
  • 4.
     Attending dailyand weekly coordination meeting and discussing the problems related to the construction project. Contributions:  Ensured project completion within the budget and time limits, as per international quality standards set.  Effectively supervised work on site with the project engineers implemented Kaizen and increased productivity LANCO INFRATECH LIMITED, Chennai Metro Rail Project, Chennai Deputy Manager Civil, October 2011 to October 2013 (Reporting to the General Manager and having a reporting relationship with 20) Job Profile: Current Assignment: Posted at Chennai since October 2011 overseeing construction of elevated viaduct pre-cast segments with long line method and parapet in pre-cast casting yard. Reporting to the General Manager. responsible for the following Key Result Areas-  Handling execution of work for pre-casting of segments with long line method and parapet in pre-cast casting yard.  Coordinating with client & subcontractors, BBS, Survey dept., carpentry and mechanical section Billing Section (Client & subcontractors)  Responsible for effectively managing, supervising, and coordinating all site activities and resources.  Coordinating site supervision work, managed various sub-contractor teams, and expedited the day to day progress of works.  Ensured the safe, cost-effective and timely completion of all projects to meet or exceed client expectations.  Maintained excellent relationships and stayed in constant contact with all clients, which proved instrumental in generating additional project work.  Overseeing all critical developments of the program, including the designing of the Master Plan, phasing and compliance with the technical specifications.  Designing and implementing HSE and monitoring adherence to safety standards and satisfactory work practices.  Coordinating with the billing Engineer for submission of monthly
  • 5.
    running account billsto client and for sub-contractors  Calculating quantities of material as well as ensuring proper manpower deployment to complete the project  Supervising advance material planning & indent work.  Completed the daily scheduled tasks with available resources  Supervised, coordinated and controlled the site activities  Attending daily and weekly coordination meeting and discussing the problems related to the construction project.  Assigned project engineers and civil foreman to respective areas as per the requirements of the project to be ensure project completion as per schedule. Contributions:  Ensured project completion within the budget and time limits, as per international quality standards set and to the satisfaction of clients.  Effectively supervised work on site with the project engineers implemented Kaizen and increased productivity. LANCO INFRATECH LIMITED, Four Laning of NH-48 From Nelamangala Junction On Km (28+200) To Devihalli Km (107+685) In The State of Karnataka” Management trainee/Deputy Manager, April 2010 to October 2011 (Reporting to the Deputy manager / General Manager and having a reporting relationship with 30)  Worked as an In-Charge of 15 km stretch of road which includes all the construction and maintenance activity.  Execution of Highway works, Structure works (Retaining Wall and MSE walls), and other miscellaneous works.  Monitored the Progress earthwork for embankment ,sub grade and sub base  Coordinating site supervision work, managed various sub-contractor teams, and expedited the day to day progress of works.  Developed an inspection system to ensure compliance with the provisions of quality.  Reviewed specifications, drawings, technical instructions, Designed documents, plans, and procedures for robust quality system.  Completed method statements.  Participated in weekly meetings with the client, consultants, and the contractors.  Handled contractor management.
  • 6.
     Planned constructionactivities including resource allocation.  Assigned project engineers and civil foreman to respective areas as per the requirements of the project to be ensure project completion as per schedule.  Designing and implementing HSE and monitoring adherence to safety standards and satisfactory work practices. Contributions:  Introduced best practices in the construction work and successfully met the stringent quality standards.  Maintained a successful track record of satisfactory work and punctual delivery.  Effectively supervised work on site with approval of the project engineer and completed the construction work on time and within the budgeted costs. Extra-Curricular Activities/Achievements  Active member of culture committee in NICMAR  Active participation in national level student’s technical paper presentation competition.  Active participation in state level model competition.  Volunteer experience in ‘GEID06.’  Active participation in hall management as a member at YCCE FEST 7.0.  Active participation in Asian level model competition at IIT Bombay.  Active member in hosting fashion show and YCCE roadies in YCCE FEST 8.0  Event co-ordinator at the annual fest “PARINAMA 2009” of NICMAR, Hyderabad I hereby affirm that the information furnished in this form is true and correct. Date: Place: NILESH D. MOON