Weekly Journals
First Week: (January 18 – January 22, 2015)
During the first week of my work at SMC, I gathered elaborated information about the emerging
of the MIS & IT department within the organization. Most importantly the working environment
here taught me to be more corporate than being casual as it was in the University premises.
Moreover, the basic things regarding MIS & IT department which were learnt are:
 Receiving and saving daily sales data using mail servers from different Area Offices.
 Transferring the data from the Received folder to the database.
 Checking and rechecking the database if it was updated properly.
 Troubleshooting errors in IMIS platform.
 User end support including network, hardware and other software related issues.
 Backing up the weekly sales data to the central server from CD drives.
It is a daily job to store and backup the daily reports on sales, procurements and HR on the server
having proper references. Manual updates and backups of the weekly data are equally important
to make sure that no errors are occurred. In addition to backing up and storing these data, providing
support to any users who face difficulties during the operation of their technical works are of one
of the most prioritized tasks here along with other hardware and software solutions including
network related issues.
It has been a great week of work and learning experiences in my first corporate life in the
organization SMC. I am looking forward to learn as much as I can from the seniors; co-workers
and other employees and I will dedicate all my time here to gather as much knowledge as I can
from the practical work field.
Findings during the First Week:
Some findings from my point of view during the first week are:
 The procurement process is a lengthy for a regular operational company like SMC.
 MIS & IT department holds the major functionality within the organization but it has fewer
or reserved facilities in terms of spaces for the department, arrangements of the staff-desk
placements and number of expert officials to manage and operate.
Page | ii
Second Week: (January 25 – January 29, 2015)
Experiences kept on growing further and further as my work durations were increasing. Newer
things along with corporate behaviors and corporate policies were learnt. Few of the tasks that
were performed during the second week were:
 Configuring user accounts with user privileges and administrative accounts on MS
Windows 8 and 8.1.
 Setting up privacy securities and privileges for user accounts on MS Windows 8.
 Configuring network settings.
 Configuring Remote Desktop connections from administrator accounts and through user
end operations.
 Copying preconfigured user profiles from one Hard Disc Drive to another one.
 Setting up and configuring all the setting of new brand PCs (HP/Dell) for new sets of users.
 Month end data entry records in the database server based on e-mail and telephone
confirmation from every Area Offices.
 Hardware and software troubleshooting.
During the end of the month all the Area Offices are to send the confirmation messages of their
completion of data entry of sales and other inventory related factors. Based on their confirmation;
either via emails or through telephones the completed data has to be updated on the central server
which would be used for forecasting and data analysis during the month-end meeting of the senior
management.
Operations of the “Indent” procedure for the inventory and the required materials for regular office
operations are also shown for the matter of ease. The procedures are performed using the same
database management software, Integrated Management Information Systems (IMIS) which is
also used for more than many other official record keepings and day to day operations of SMC
Head Office along with other zonal offices.
Findings during the Second Week:
Few of the major findings from my work placement during the second week are:
 The entry and exit process for the regular employee are not flexible and often causes queues
during rush hours.
 Communication between other departments and MIS & IT department is not good enough
to keep the organizational operations up-to-date.
 MIS & IT department is not “One” Separate entity within this organization; rather it is
merged with the Finance division as well.
Page | iii
 Very little space for the IT operations to conduct the Hardware related troubleshooting
efficiently and effectively.
Third Week: (February 1 – February 5, 2015)
During the third week of my work in SMC it was a rushing environment for my position of work
as many of the Program Divisional Computers from various areas came up with different
functional issues to be fixed within a short length of time. During the week the following tasks
were undergone:
 Assessing the hardware components of the computers arrived from the zonal operations of
Program Division and providing feedback of those.
 Troubleshooting the possible problems of the Computers and re-setting the systems up.
 Providing the list of hardware needed to repair the computers based on the assessment
conducted on the computers.
 Including the computers data within the database and integrating the systems with IMIS
central database.
 Setting up e-mail addresses for the users of the computers provided by the SMC domain.
Along with these tasks, it was also mandatory to provide stand by user end support for the Head
Office operations. Among these operations replacing printer tonners/ cartridges, providing
network supports, various software related troubleshoots were to be mentioned.
Findings during the Third Week:
From the works and issues faced during the second week, the followings are of importance:
 Lack of user guidelines for the users of the Program Division zonal offices.
 Lack of communication in between the departments (MIS & IT and Program Division
especially).
 No classified vendor for on-spot computer hardware components support on credit terms.
 Local “all from one” vendors of the hardware components; who are actually stationary
items’ sellers, are to some extent “expensive” which could be affecting for the organization.
Page | iv
Fourth Week: (February 8 – February 12, 2015)
Moving on to the next week of my work in SMC as an intern in Finance, MIS & IT Division, more
and more tasks are to be learnt and much were already learnt through the operational process.
During the fourth week of my work here, it was still rush for the incoming computers from the
zonal offices to be repaired and at the end of the week much more interesting tasks were assigned.
The tasks during the week were:
 Assessing and troubleshooting the incoming computers from the zonal operational offices
of SMC Program Division. (HIV-Clinic)
 Setting up the computers properly with the user privileges and providing those users with
e-mail id to keep regular updates from the IMIS.
 Providing network support on the second floor of the building where few of the
departments are to be shifted. Network supports included-
 Cabling the floor
 Placing the RJ45 connectors with the cables
 Checking the existing modulars for functionality
 Checking the functionality of the connections of the network on the floor
 Providing online connections with the central server to the network on the
floor
 Connecting the on-floor networks to the server on the 6th
floor using bridge
connection on a 24 port switch
 Rechecking the connections of all the workstations to be connected.
Findings during the Fourth Week:
Fourth week of my work at this organization, few of the following findings are to be noticed:
 Fewer or no IT technicians for laboring works as handling the hard-works (i.e. cleaning the
hardware to be used for works etc.) are not usually practiced within this organization.
 Effective but not so efficient task takers.
Page | v
Fifth Week: (February 15 – February 19, 2015)
During the Fifth Week of my work at SMC, I continued giving the most of what I know to the
works and simultaneously tried learning as much as possible from the corporate environment.
Every day I check into the office premises, I find something new to learn and something new to
provide for the organization. Among the tasks performed during the week the followings are the
most noticeable:
 Writing the assessments for the incoming PCs from HIV-ESP Clinics of SMC Programs
Division and sending them to the supervisor for further instructions.
 Keeping a daily record of the receipt and completion of the troubleshooting for the
components.
 Learning newer things about Network cabling and setups/ configurations.
 Learning to configure network printer from remote computer to client computer.
 Learnt to prepare “Conveyance Bills” for the holiday’s works in the office.
 Observing and learning the corporate structures, whistle-blowing environments, chain of
commands and few other management related matters.
 Providing user-end supports for newer problems related to the network configurations on
the 2nd
floor.
 Understanding the procurement procedure and keeping a good pace with the indent-
procurement-receipt cycle.
 Had an experience of working alone (the attachment officer had a sick call that day) on
the office desk and providing support to the user-ends without any supervision of the
attachment officer and it went all good as there were no objections from the users and the
supervisors.
 Configuring MS Outlook associating the new e-mail address provided by SMC MIS&IT
department and locating the e-mail server within.
 Had a brief understanding of the financial procedures which is also associated with the
Procurement, Administration, Sales & Marketing and also the Program Division in this
organization.
 Watched and tried to learn the configuration setup for the IP Phones, which refers to the
correct allotment of the IP blocks from the network, setting the IP configurations from
the network configuration utility of the IP Telephone menu etc.
Page | vi
Findings during the Fifth Week:
From my point of view, the few findings and feedback out of my work at fifth week are:
 Vague instructions to the assisting Area Offices about IT operations
 No proper access into few of the materials of IT resources to perform troubleshoots and
supports singlehandedly.
 Fewer resources to perform large number of supporting activities within a short length of
time.
 No proper balance of effectiveness and efficiency within the departmental officials of the
organization.
Sixth Week: (February 22 – February 26, 2015)
Continuing to the sixth week of my internship in SMC, the regular tasks continued along with
few newer things to learn about. Some of the tasks completed during the week are:
 Continuing servicing and repairing the incoming Computer systems from different zonal
offices of HIV-ESP Integrated Clinics.
 Assessment on a regular basis for those Computer systems were to be provided based on
the components needed and the servicing tasks required.
 A bit deeper knowledge about the IMIS software was gained from watching the superiors
operating the regular usages of the software.
 Providing the in-office user-end support continued.
 Providing support to the different area offices using “Team Viewer” software.
 Tried to focus on the management of the Information Systems within the official
purposes and the allotment of resources of the MIS & IT Department.
Findings during the Sixth Week:
Few findings and feedback out of my work during the Sixth week are:
 Proper balance of Effectiveness and Efficiency is needed within the departments for
smooth and flawless work environment.
 Proper chain of command is required for avoiding few unwanted matters.
Page | vii
Seventh Week: (March 01 – March 05, 2015)
During the seventh week of my work performed in SMC as an intern, I have learnt some more
official, managerial codes of conducts along with the basic IT related factors. Continuing to the
tasks assigned to me as an intern here I am happily and effectively trying to perform my duties as
efficiently as possible. Among the tasks completed during the week, the followings are noticeable:
 Daily user-end support within the Head Office premises.
 Standby support for any problems faced within the area offices and the zonal offices of
HIV-ESP Integrated Clinic of Program Division.
 Assessing the problematic computers of HIV-ESP Integrated Clinic; inbound for repairs.
 Tried to focus on the server configurations and the procedures while watching the
superiors troubleshooting the server.
 A little bit understanding on the data entry methods of the area sales officers.
 Understanding more about the managerial processes and the allocation of IT resources
within the organization.
 More experiences and knowledge about organizational behaviors and conducts as the
official environment taught me.
Findings during the Seventh Week:
Few of the findings from my point of view are:
 The organization believes in providing authentic software products. But there are few
cases where providing authentic software products become difficult and expensive.
 More open ended cooperation from the superiors, subordinates and colleagues are
expected.
 A very little scope for expanding knowledge on different disciplines as the corporate
structure stands very strict.
Page | viii
Eighth Week: (March 08 – March 12, 2015)
Along with learning day to day activities of the corporation and specially the IT related issues, I
have come to learn many more things during these days. Among these new and special
opportunities, interviewing new employees and assessing the test results are notable. Few of the
common things learnt and conducted are as follows:
 Providing User-end supports regarding network issues, printer related problems and yet
many more other issues.
 Learning the different server assemblies, i.e. mail server, anti-virus server, domain server
etc.
 Adding new user IDs and their mail addresses to the printer on the stated floors.
 Providing basic operational knowledge to few of the employees to scan and mail the
scanned images/pdf files to their mailing addresses.
 Troubleshooting computer systems from the superiors and specially the conducts and
mannerisms regarding the time and work.
 Troubleshooting the projector and network connections on different meeting rooms.
 Troubleshooting problems regarding fonts in Adobe Illustrator programs.
 Understanding the breakdown of the organization into SMC Enterprise Ltd which is a
“For-Profit” sub-organization for self-sustainability.
 Understanding the basic organogram of the whole organization as an entity.
Findings during the Eighth Week:
Few of the following findings are notable during the 8th
week of my work at SMC as an Intern:
 There is a very little scope for the new comers to learn newer things relevant to the
operations of the organization.
Page | ix
Ninth Week: (March 15 – March 19, 2015)
Working as an intern in SMC is a great opportunity for me to initiate my career opportunities
pushing my limits to further boundaries and learning newer things regularly. My presence in the
office every day brings me the hope and opportunity to learn something new within the line of
work. Few of the notable incidents and works I have done during the week are –
 Creating new log-on profile for the newly recruited employees for their personal usages
and official works.
 Maintaining a good cooperative relationship among the employees and also the
subordinates and supervisors.
 Network Scanner setup for the “to-be enlisted” employees.
 Composing articles requested by the MD of the organization.
 Checking and assessing the newly bought DVD players for training purposes and
awareness programs.
 Providing user-end support for IT related issues.
 Configuring user’s email databases and updating their contacts lists as per company
provided lists.
 Tried to learn few things regarding the new “Leave Management Systems” which is yet
to be launched and to be functional.
 Tried to gather as much information and knowledge as possible on the existing database
management systems – IMIS.
 Coming out of the box, I looked forward and tried to learn about the financial
management and the accounts management systems.
 Focusing on the corporate behaviors and codes of conducts I tried to learn about the
events and memorandum notices of the organization.
Findings during the Ninth Week:
There are a few things to be noticed during my 9th
week of work at SMC –
 Some/ Few of the employees take IT officers as only service people and treat them
accordingly, which is demoralizing for the officials providing IT support.
 Lesser spaces and scopes for hardware assembling and storing.
 The “off-the-book” codes of conducts restrict the IT Officials to perform some activities
which takes much more time to complete due to lack of labors.
Page | x
Tenth Week: (March 22 – March 25, 2015)
As the duration of my internship at SMC grows, the experiences and knowledge also follows the
same path. All along the 9 weeks I have acquired lots of knowledge and lots of newer
experiences which would definitely help me on the work field during my job life. It is to mention
that, every new day in SMC comes with newer things to learn. During the 10th
week of my
internship, the following tasks and activities are to be noticed:
 IMIS data backup from CD/DVD to the central server database.
 Providing one stop support to the users of the building.
 Troubleshooting PCs and other IT/Network related issues.
 Inputting the new employees’ ID Cards in to the attendance machine for electronic
management of their entry and exit.
 Matching the Inputted ID Card numbers with the employees’ actual identities and
fingerprints for fingerprint recognition.
 Configuring SMC domain provided email for new employees.
 Checking and troubleshooting UPS related issues.
 Checking and troubleshooting Printer related issues for different users.
 Providing support and troubleshooting for Board Room Projector.
 Setting up network printers for new employees and enrolling their ID, Names and email
addresses into the printers.
 Troubleshooting new problems arisen with the recently serviced computer system for
newer problems and solutions for them.
 Tried to learn to troubleshoot damaged/password protected/write protected HDD
recovered from a laptop.
 Continuing to try and learn more about database management systems and proper
resource allocation management for the MIS & IT department.
Findings during the Tenth Week:
Few critiques according to my viewpoints are:
 Not enough/any backup computer hardware systems for the officers who need to use the
computer the whole time for their job duties.
 Insufficient IT resources to perform large scale of repairing tasks.
Page | xi
Eleventh Week: (March29 – April 02, 2015)
Days pass by along with an extensive increase in my experience folder for working in an
organization as large as SMC and at the same time my internship period begins to come to an
end. I have only 2 more weeks representing 10 working days left for working as an intern at
SMC. But the experience basket of mine keeps on increasing on a greater flow. Few of the major
notable incidents and tasks during this week are as follows:
 Providing day to day user end support within the SMC building premises.
 Providing IT support for various issues even outside of the premises where important
meetings are to be held.
 Running spontaneous checks on the existing computer systems of the organization.
 Learning about the interface of the organizational database management system: IMIS.
 Learning about codes of conducts while providing IT support to the superiors.
 Helping out colleagues and employees with various difficulties during free times.
 Managing the situations created by sudden rain fall and water flows within the rooms
which could have damaged the electronic systems.
 Organizing a large quantity of user requests and providing support according to urgency
and priority basis.
 Little amount of book keeping regarding the IT resources of SMC.
 Counseling the employees having issues regarding IT equipment and providing them
support based on availability of the resources.
 Coordination with the co-workers and superiors for better work environment.
 Learning the process of the new leave management systems launched a week ago.
Findings during the Eleventh Week:
Few of the findings and critiques on my view point are stated below:
 The MIS & IT department is not a solely separate entity within this organization which
could affect many important decision making and procurement process when necessary.
 Less staffs and experts available for the area offices for the IT issues makes the support
more complicated.
 Not enough authority and privileges for the supporting IT-Officer to provide one-stop
service to the users all the time.
Page | xii
Twelfth Week: (April 05 – April 09, 2015)
During the week I have learnt few new and interesting things and the management protocols and
reasoning strategy behind the decisions been taken. The notable incidents and experiences
gathered during this week are as follows:
 Providing user end support on a daily basis
 Learnt new tricks and tactics for printer troubleshooting.
 Tried to concentrate a bit on priority management strategy.
 Troubleshooting meeting room laptops and computers along with the network and
projector setup within a short amount of time.
 Learning about POP3 e-mail servers and IMAP e-mail servers and their differences.
 Learnt the reasons behind providing POP3 services to the employees of SMC instead of
IMAP.
 Cabling the network connections and preparing the network cables for the connections
for board room laptops and projectors.
 Learned about managing office time for different work schedules and proper work
management.
 Learned about providing support as an IT-Officer alone as my supporting IT officer was
on a leave once this week.
 Depending on the priority, few major services for the users e.g. network troubleshoot,
printer troubleshoot, pc hardware and software troubleshoot etc. are provided.
 IMIS errors and their relevant troubleshoot processes are learnt.
Findings during the Twelfth Week:
 The organization does not provide the users with the newest IT platforms and technological
features competing with the modern organizational pace (POP3-IMAP) regarding the reasons of
users’ needs and requirements.
Page | xiii
The IMIS Interface (Graphical)
Page | xiv
Page | xv
Page | xvi
Page | xvii
Page | xviii
Page | xix
Comments
Md. Abu Bakkar Khan Chowdhury
Sr. Systems Executive
Md. Giash Uddin
Manager, MIS & IT
Page | xx
Mr. Mofijul Haque Khan
Sr. Systems Executive
Md. Ruhul Amin
Finance Executive
Page | xxiMr. Shameem Akanda
Executive Graphics Design,
SMC-EL

More Related Content

What's hot

Sydney water customer information & billing system
Sydney water customer information & billing systemSydney water customer information & billing system
Sydney water customer information & billing systemNeeralie Prajapati
 
Innovative-Consulting Technology Capabilities. Statement
Innovative-Consulting Technology Capabilities. StatementInnovative-Consulting Technology Capabilities. Statement
Innovative-Consulting Technology Capabilities. StatementDiontealley
 
Brandy IT Resume 2016
Brandy IT Resume 2016Brandy IT Resume 2016
Brandy IT Resume 2016Brandy Fay
 
Luis Perez ITS written report
Luis Perez ITS written reportLuis Perez ITS written report
Luis Perez ITS written reportLuis Perez
 
Chapter 11 Enterprise Resource Planning System
Chapter 11 Enterprise Resource Planning SystemChapter 11 Enterprise Resource Planning System
Chapter 11 Enterprise Resource Planning SystemMuhammad Azmy
 
Technology Controls in Business - End User Computing
Technology Controls in Business - End User ComputingTechnology Controls in Business - End User Computing
Technology Controls in Business - End User Computingguestc1bca2
 
End User Computing (EUC)
End User Computing (EUC)End User Computing (EUC)
End User Computing (EUC)Jashisha Gupta
 
Priscilla_Y_Thankudas Resume USAJOBS
Priscilla_Y_Thankudas Resume USAJOBSPriscilla_Y_Thankudas Resume USAJOBS
Priscilla_Y_Thankudas Resume USAJOBSPriscilla Thakurdas
 
John Carter FL Resume
John Carter FL ResumeJohn Carter FL Resume
John Carter FL ResumeJohn Carter
 

What's hot (20)

Sydney water customer information & billing system
Sydney water customer information & billing systemSydney water customer information & billing system
Sydney water customer information & billing system
 
AnthonyWSewellJr
AnthonyWSewellJrAnthonyWSewellJr
AnthonyWSewellJr
 
Innovative-Consulting Technology Capabilities. Statement
Innovative-Consulting Technology Capabilities. StatementInnovative-Consulting Technology Capabilities. Statement
Innovative-Consulting Technology Capabilities. Statement
 
RAMBABU
RAMBABURAMBABU
RAMBABU
 
CV Benard Korir
CV Benard KorirCV Benard Korir
CV Benard Korir
 
Brandy IT Resume 2016
Brandy IT Resume 2016Brandy IT Resume 2016
Brandy IT Resume 2016
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Luis Perez ITS written report
Luis Perez ITS written reportLuis Perez ITS written report
Luis Perez ITS written report
 
DLaBette_resume
DLaBette_resumeDLaBette_resume
DLaBette_resume
 
Michaela Panganiban resume
Michaela Panganiban resumeMichaela Panganiban resume
Michaela Panganiban resume
 
Ch12
Ch12Ch12
Ch12
 
Terence McLeod (1)
Terence McLeod (1)Terence McLeod (1)
Terence McLeod (1)
 
Chapter 11 Enterprise Resource Planning System
Chapter 11 Enterprise Resource Planning SystemChapter 11 Enterprise Resource Planning System
Chapter 11 Enterprise Resource Planning System
 
Technology Controls in Business - End User Computing
Technology Controls in Business - End User ComputingTechnology Controls in Business - End User Computing
Technology Controls in Business - End User Computing
 
Computers in management
Computers in managementComputers in management
Computers in management
 
Office automation sysmtems
Office automation sysmtemsOffice automation sysmtems
Office automation sysmtems
 
End User Computing (EUC)
End User Computing (EUC)End User Computing (EUC)
End User Computing (EUC)
 
SrivatsanRangaswamy_resume
SrivatsanRangaswamy_resumeSrivatsanRangaswamy_resume
SrivatsanRangaswamy_resume
 
Priscilla_Y_Thankudas Resume USAJOBS
Priscilla_Y_Thankudas Resume USAJOBSPriscilla_Y_Thankudas Resume USAJOBS
Priscilla_Y_Thankudas Resume USAJOBS
 
John Carter FL Resume
John Carter FL ResumeJohn Carter FL Resume
John Carter FL Resume
 

Viewers also liked

Viewers also liked (11)

(25) negocios
(25) negocios(25) negocios
(25) negocios
 
Descripció1
Descripció1Descripció1
Descripció1
 
As mães e seus filhos uma leitura de O Tempo e o Vento, de Erico Verissimo
As mães e seus filhos uma leitura de O Tempo e o Vento, de Erico VerissimoAs mães e seus filhos uma leitura de O Tempo e o Vento, de Erico Verissimo
As mães e seus filhos uma leitura de O Tempo e o Vento, de Erico Verissimo
 
Endo.practical
Endo.practicalEndo.practical
Endo.practical
 
Enlace Ciudadano Nro 271 tema: presentación plan generación eléctrica
Enlace Ciudadano Nro 271 tema:  presentación plan generación eléctricaEnlace Ciudadano Nro 271 tema:  presentación plan generación eléctrica
Enlace Ciudadano Nro 271 tema: presentación plan generación eléctrica
 
Luna
LunaLuna
Luna
 
Arquitecturas de redes andrea
Arquitecturas de redes andreaArquitecturas de redes andrea
Arquitecturas de redes andrea
 
Life skills lecture#1
Life skills lecture#1Life skills lecture#1
Life skills lecture#1
 
thesis_library__SaeedPakazad
thesis_library__SaeedPakazadthesis_library__SaeedPakazad
thesis_library__SaeedPakazad
 
Español1
Español1Español1
Español1
 
Tics
TicsTics
Tics
 

Similar to 07. Abstract

Case 1 modernization of ntuc income 2
Case 1 modernization of ntuc income 2Case 1 modernization of ntuc income 2
Case 1 modernization of ntuc income 2dyadelm
 
The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...IOSRJBM
 
Calvin Diaz updated resume
Calvin Diaz updated resumeCalvin Diaz updated resume
Calvin Diaz updated resumeDiaz Calvin
 
IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxpriestmanmable
 
vignesh rajaraman (2)
vignesh rajaraman (2)vignesh rajaraman (2)
vignesh rajaraman (2)Vicky Anu
 
How To Build Mature SM - final
How To Build Mature SM - finalHow To Build Mature SM - final
How To Build Mature SM - finalDanijel Božić
 
Ken Mutugi Detailed CV
Ken Mutugi Detailed CVKen Mutugi Detailed CV
Ken Mutugi Detailed CVKenneth Mutugi
 
JeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeff Davis
 
Modernization of ntuc income
Modernization of ntuc incomeModernization of ntuc income
Modernization of ntuc incomeniz73
 
CV - Paul Bokor
CV - Paul BokorCV - Paul Bokor
CV - Paul BokorPaul Bokor
 
NetIQ AppManager & NetIQ Operations Center. NCU Ltd
NetIQ AppManager & NetIQ Operations Center. NCU LtdNetIQ AppManager & NetIQ Operations Center. NCU Ltd
NetIQ AppManager & NetIQ Operations Center. NCU LtdNCU Ltd
 
Tina Hauman Resume
Tina Hauman ResumeTina Hauman Resume
Tina Hauman ResumeTina Hauman
 
Jack williams resume updated 1 2016
Jack williams resume updated 1 2016Jack williams resume updated 1 2016
Jack williams resume updated 1 2016Jack Williams
 

Similar to 07. Abstract (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Case 1 modernization of ntuc income 2
Case 1 modernization of ntuc income 2Case 1 modernization of ntuc income 2
Case 1 modernization of ntuc income 2
 
The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...
 
Calvin Diaz updated resume
Calvin Diaz updated resumeCalvin Diaz updated resume
Calvin Diaz updated resume
 
mukesh pal singh
mukesh pal singhmukesh pal singh
mukesh pal singh
 
IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docx
 
vignesh rajaraman (2)
vignesh rajaraman (2)vignesh rajaraman (2)
vignesh rajaraman (2)
 
How To Build Mature SM - final
How To Build Mature SM - finalHow To Build Mature SM - final
How To Build Mature SM - final
 
MF-CONNECT 3000
MF-CONNECT 3000MF-CONNECT 3000
MF-CONNECT 3000
 
AmitKumar
AmitKumarAmitKumar
AmitKumar
 
Ken Mutugi Detailed CV
Ken Mutugi Detailed CVKen Mutugi Detailed CV
Ken Mutugi Detailed CV
 
JeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeffDavisProjectPortfolio
JeffDavisProjectPortfolio
 
Lec3
Lec3Lec3
Lec3
 
Cs414 lec3 f2014
Cs414 lec3 f2014Cs414 lec3 f2014
Cs414 lec3 f2014
 
Modernization of ntuc income
Modernization of ntuc incomeModernization of ntuc income
Modernization of ntuc income
 
CV - Paul Bokor
CV - Paul BokorCV - Paul Bokor
CV - Paul Bokor
 
NetIQ AppManager & NetIQ Operations Center. NCU Ltd
NetIQ AppManager & NetIQ Operations Center. NCU LtdNetIQ AppManager & NetIQ Operations Center. NCU Ltd
NetIQ AppManager & NetIQ Operations Center. NCU Ltd
 
Tina Hauman Resume
Tina Hauman ResumeTina Hauman Resume
Tina Hauman Resume
 
ERUGO RESUME
ERUGO RESUMEERUGO RESUME
ERUGO RESUME
 
Jack williams resume updated 1 2016
Jack williams resume updated 1 2016Jack williams resume updated 1 2016
Jack williams resume updated 1 2016
 

More from Ahmed Rajiv Rahman

More from Ahmed Rajiv Rahman (6)

05. Executive Summery
05. Executive Summery05. Executive Summery
05. Executive Summery
 
04. Acknowledgement
04. Acknowledgement04. Acknowledgement
04. Acknowledgement
 
03. Preface
03. Preface03. Preface
03. Preface
 
02. Decleration
02. Decleration02. Decleration
02. Decleration
 
01. Letter of Transmittal
01. Letter of Transmittal01. Letter of Transmittal
01. Letter of Transmittal
 
06. Body
06. Body06. Body
06. Body
 

07. Abstract

  • 1. Page | i Weekly Journals First Week: (January 18 – January 22, 2015) During the first week of my work at SMC, I gathered elaborated information about the emerging of the MIS & IT department within the organization. Most importantly the working environment here taught me to be more corporate than being casual as it was in the University premises. Moreover, the basic things regarding MIS & IT department which were learnt are:  Receiving and saving daily sales data using mail servers from different Area Offices.  Transferring the data from the Received folder to the database.  Checking and rechecking the database if it was updated properly.  Troubleshooting errors in IMIS platform.  User end support including network, hardware and other software related issues.  Backing up the weekly sales data to the central server from CD drives. It is a daily job to store and backup the daily reports on sales, procurements and HR on the server having proper references. Manual updates and backups of the weekly data are equally important to make sure that no errors are occurred. In addition to backing up and storing these data, providing support to any users who face difficulties during the operation of their technical works are of one of the most prioritized tasks here along with other hardware and software solutions including network related issues. It has been a great week of work and learning experiences in my first corporate life in the organization SMC. I am looking forward to learn as much as I can from the seniors; co-workers and other employees and I will dedicate all my time here to gather as much knowledge as I can from the practical work field. Findings during the First Week: Some findings from my point of view during the first week are:  The procurement process is a lengthy for a regular operational company like SMC.  MIS & IT department holds the major functionality within the organization but it has fewer or reserved facilities in terms of spaces for the department, arrangements of the staff-desk placements and number of expert officials to manage and operate.
  • 2. Page | ii Second Week: (January 25 – January 29, 2015) Experiences kept on growing further and further as my work durations were increasing. Newer things along with corporate behaviors and corporate policies were learnt. Few of the tasks that were performed during the second week were:  Configuring user accounts with user privileges and administrative accounts on MS Windows 8 and 8.1.  Setting up privacy securities and privileges for user accounts on MS Windows 8.  Configuring network settings.  Configuring Remote Desktop connections from administrator accounts and through user end operations.  Copying preconfigured user profiles from one Hard Disc Drive to another one.  Setting up and configuring all the setting of new brand PCs (HP/Dell) for new sets of users.  Month end data entry records in the database server based on e-mail and telephone confirmation from every Area Offices.  Hardware and software troubleshooting. During the end of the month all the Area Offices are to send the confirmation messages of their completion of data entry of sales and other inventory related factors. Based on their confirmation; either via emails or through telephones the completed data has to be updated on the central server which would be used for forecasting and data analysis during the month-end meeting of the senior management. Operations of the “Indent” procedure for the inventory and the required materials for regular office operations are also shown for the matter of ease. The procedures are performed using the same database management software, Integrated Management Information Systems (IMIS) which is also used for more than many other official record keepings and day to day operations of SMC Head Office along with other zonal offices. Findings during the Second Week: Few of the major findings from my work placement during the second week are:  The entry and exit process for the regular employee are not flexible and often causes queues during rush hours.  Communication between other departments and MIS & IT department is not good enough to keep the organizational operations up-to-date.  MIS & IT department is not “One” Separate entity within this organization; rather it is merged with the Finance division as well.
  • 3. Page | iii  Very little space for the IT operations to conduct the Hardware related troubleshooting efficiently and effectively. Third Week: (February 1 – February 5, 2015) During the third week of my work in SMC it was a rushing environment for my position of work as many of the Program Divisional Computers from various areas came up with different functional issues to be fixed within a short length of time. During the week the following tasks were undergone:  Assessing the hardware components of the computers arrived from the zonal operations of Program Division and providing feedback of those.  Troubleshooting the possible problems of the Computers and re-setting the systems up.  Providing the list of hardware needed to repair the computers based on the assessment conducted on the computers.  Including the computers data within the database and integrating the systems with IMIS central database.  Setting up e-mail addresses for the users of the computers provided by the SMC domain. Along with these tasks, it was also mandatory to provide stand by user end support for the Head Office operations. Among these operations replacing printer tonners/ cartridges, providing network supports, various software related troubleshoots were to be mentioned. Findings during the Third Week: From the works and issues faced during the second week, the followings are of importance:  Lack of user guidelines for the users of the Program Division zonal offices.  Lack of communication in between the departments (MIS & IT and Program Division especially).  No classified vendor for on-spot computer hardware components support on credit terms.  Local “all from one” vendors of the hardware components; who are actually stationary items’ sellers, are to some extent “expensive” which could be affecting for the organization.
  • 4. Page | iv Fourth Week: (February 8 – February 12, 2015) Moving on to the next week of my work in SMC as an intern in Finance, MIS & IT Division, more and more tasks are to be learnt and much were already learnt through the operational process. During the fourth week of my work here, it was still rush for the incoming computers from the zonal offices to be repaired and at the end of the week much more interesting tasks were assigned. The tasks during the week were:  Assessing and troubleshooting the incoming computers from the zonal operational offices of SMC Program Division. (HIV-Clinic)  Setting up the computers properly with the user privileges and providing those users with e-mail id to keep regular updates from the IMIS.  Providing network support on the second floor of the building where few of the departments are to be shifted. Network supports included-  Cabling the floor  Placing the RJ45 connectors with the cables  Checking the existing modulars for functionality  Checking the functionality of the connections of the network on the floor  Providing online connections with the central server to the network on the floor  Connecting the on-floor networks to the server on the 6th floor using bridge connection on a 24 port switch  Rechecking the connections of all the workstations to be connected. Findings during the Fourth Week: Fourth week of my work at this organization, few of the following findings are to be noticed:  Fewer or no IT technicians for laboring works as handling the hard-works (i.e. cleaning the hardware to be used for works etc.) are not usually practiced within this organization.  Effective but not so efficient task takers.
  • 5. Page | v Fifth Week: (February 15 – February 19, 2015) During the Fifth Week of my work at SMC, I continued giving the most of what I know to the works and simultaneously tried learning as much as possible from the corporate environment. Every day I check into the office premises, I find something new to learn and something new to provide for the organization. Among the tasks performed during the week the followings are the most noticeable:  Writing the assessments for the incoming PCs from HIV-ESP Clinics of SMC Programs Division and sending them to the supervisor for further instructions.  Keeping a daily record of the receipt and completion of the troubleshooting for the components.  Learning newer things about Network cabling and setups/ configurations.  Learning to configure network printer from remote computer to client computer.  Learnt to prepare “Conveyance Bills” for the holiday’s works in the office.  Observing and learning the corporate structures, whistle-blowing environments, chain of commands and few other management related matters.  Providing user-end supports for newer problems related to the network configurations on the 2nd floor.  Understanding the procurement procedure and keeping a good pace with the indent- procurement-receipt cycle.  Had an experience of working alone (the attachment officer had a sick call that day) on the office desk and providing support to the user-ends without any supervision of the attachment officer and it went all good as there were no objections from the users and the supervisors.  Configuring MS Outlook associating the new e-mail address provided by SMC MIS&IT department and locating the e-mail server within.  Had a brief understanding of the financial procedures which is also associated with the Procurement, Administration, Sales & Marketing and also the Program Division in this organization.  Watched and tried to learn the configuration setup for the IP Phones, which refers to the correct allotment of the IP blocks from the network, setting the IP configurations from the network configuration utility of the IP Telephone menu etc.
  • 6. Page | vi Findings during the Fifth Week: From my point of view, the few findings and feedback out of my work at fifth week are:  Vague instructions to the assisting Area Offices about IT operations  No proper access into few of the materials of IT resources to perform troubleshoots and supports singlehandedly.  Fewer resources to perform large number of supporting activities within a short length of time.  No proper balance of effectiveness and efficiency within the departmental officials of the organization. Sixth Week: (February 22 – February 26, 2015) Continuing to the sixth week of my internship in SMC, the regular tasks continued along with few newer things to learn about. Some of the tasks completed during the week are:  Continuing servicing and repairing the incoming Computer systems from different zonal offices of HIV-ESP Integrated Clinics.  Assessment on a regular basis for those Computer systems were to be provided based on the components needed and the servicing tasks required.  A bit deeper knowledge about the IMIS software was gained from watching the superiors operating the regular usages of the software.  Providing the in-office user-end support continued.  Providing support to the different area offices using “Team Viewer” software.  Tried to focus on the management of the Information Systems within the official purposes and the allotment of resources of the MIS & IT Department. Findings during the Sixth Week: Few findings and feedback out of my work during the Sixth week are:  Proper balance of Effectiveness and Efficiency is needed within the departments for smooth and flawless work environment.  Proper chain of command is required for avoiding few unwanted matters.
  • 7. Page | vii Seventh Week: (March 01 – March 05, 2015) During the seventh week of my work performed in SMC as an intern, I have learnt some more official, managerial codes of conducts along with the basic IT related factors. Continuing to the tasks assigned to me as an intern here I am happily and effectively trying to perform my duties as efficiently as possible. Among the tasks completed during the week, the followings are noticeable:  Daily user-end support within the Head Office premises.  Standby support for any problems faced within the area offices and the zonal offices of HIV-ESP Integrated Clinic of Program Division.  Assessing the problematic computers of HIV-ESP Integrated Clinic; inbound for repairs.  Tried to focus on the server configurations and the procedures while watching the superiors troubleshooting the server.  A little bit understanding on the data entry methods of the area sales officers.  Understanding more about the managerial processes and the allocation of IT resources within the organization.  More experiences and knowledge about organizational behaviors and conducts as the official environment taught me. Findings during the Seventh Week: Few of the findings from my point of view are:  The organization believes in providing authentic software products. But there are few cases where providing authentic software products become difficult and expensive.  More open ended cooperation from the superiors, subordinates and colleagues are expected.  A very little scope for expanding knowledge on different disciplines as the corporate structure stands very strict.
  • 8. Page | viii Eighth Week: (March 08 – March 12, 2015) Along with learning day to day activities of the corporation and specially the IT related issues, I have come to learn many more things during these days. Among these new and special opportunities, interviewing new employees and assessing the test results are notable. Few of the common things learnt and conducted are as follows:  Providing User-end supports regarding network issues, printer related problems and yet many more other issues.  Learning the different server assemblies, i.e. mail server, anti-virus server, domain server etc.  Adding new user IDs and their mail addresses to the printer on the stated floors.  Providing basic operational knowledge to few of the employees to scan and mail the scanned images/pdf files to their mailing addresses.  Troubleshooting computer systems from the superiors and specially the conducts and mannerisms regarding the time and work.  Troubleshooting the projector and network connections on different meeting rooms.  Troubleshooting problems regarding fonts in Adobe Illustrator programs.  Understanding the breakdown of the organization into SMC Enterprise Ltd which is a “For-Profit” sub-organization for self-sustainability.  Understanding the basic organogram of the whole organization as an entity. Findings during the Eighth Week: Few of the following findings are notable during the 8th week of my work at SMC as an Intern:  There is a very little scope for the new comers to learn newer things relevant to the operations of the organization.
  • 9. Page | ix Ninth Week: (March 15 – March 19, 2015) Working as an intern in SMC is a great opportunity for me to initiate my career opportunities pushing my limits to further boundaries and learning newer things regularly. My presence in the office every day brings me the hope and opportunity to learn something new within the line of work. Few of the notable incidents and works I have done during the week are –  Creating new log-on profile for the newly recruited employees for their personal usages and official works.  Maintaining a good cooperative relationship among the employees and also the subordinates and supervisors.  Network Scanner setup for the “to-be enlisted” employees.  Composing articles requested by the MD of the organization.  Checking and assessing the newly bought DVD players for training purposes and awareness programs.  Providing user-end support for IT related issues.  Configuring user’s email databases and updating their contacts lists as per company provided lists.  Tried to learn few things regarding the new “Leave Management Systems” which is yet to be launched and to be functional.  Tried to gather as much information and knowledge as possible on the existing database management systems – IMIS.  Coming out of the box, I looked forward and tried to learn about the financial management and the accounts management systems.  Focusing on the corporate behaviors and codes of conducts I tried to learn about the events and memorandum notices of the organization. Findings during the Ninth Week: There are a few things to be noticed during my 9th week of work at SMC –  Some/ Few of the employees take IT officers as only service people and treat them accordingly, which is demoralizing for the officials providing IT support.  Lesser spaces and scopes for hardware assembling and storing.  The “off-the-book” codes of conducts restrict the IT Officials to perform some activities which takes much more time to complete due to lack of labors.
  • 10. Page | x Tenth Week: (March 22 – March 25, 2015) As the duration of my internship at SMC grows, the experiences and knowledge also follows the same path. All along the 9 weeks I have acquired lots of knowledge and lots of newer experiences which would definitely help me on the work field during my job life. It is to mention that, every new day in SMC comes with newer things to learn. During the 10th week of my internship, the following tasks and activities are to be noticed:  IMIS data backup from CD/DVD to the central server database.  Providing one stop support to the users of the building.  Troubleshooting PCs and other IT/Network related issues.  Inputting the new employees’ ID Cards in to the attendance machine for electronic management of their entry and exit.  Matching the Inputted ID Card numbers with the employees’ actual identities and fingerprints for fingerprint recognition.  Configuring SMC domain provided email for new employees.  Checking and troubleshooting UPS related issues.  Checking and troubleshooting Printer related issues for different users.  Providing support and troubleshooting for Board Room Projector.  Setting up network printers for new employees and enrolling their ID, Names and email addresses into the printers.  Troubleshooting new problems arisen with the recently serviced computer system for newer problems and solutions for them.  Tried to learn to troubleshoot damaged/password protected/write protected HDD recovered from a laptop.  Continuing to try and learn more about database management systems and proper resource allocation management for the MIS & IT department. Findings during the Tenth Week: Few critiques according to my viewpoints are:  Not enough/any backup computer hardware systems for the officers who need to use the computer the whole time for their job duties.  Insufficient IT resources to perform large scale of repairing tasks.
  • 11. Page | xi Eleventh Week: (March29 – April 02, 2015) Days pass by along with an extensive increase in my experience folder for working in an organization as large as SMC and at the same time my internship period begins to come to an end. I have only 2 more weeks representing 10 working days left for working as an intern at SMC. But the experience basket of mine keeps on increasing on a greater flow. Few of the major notable incidents and tasks during this week are as follows:  Providing day to day user end support within the SMC building premises.  Providing IT support for various issues even outside of the premises where important meetings are to be held.  Running spontaneous checks on the existing computer systems of the organization.  Learning about the interface of the organizational database management system: IMIS.  Learning about codes of conducts while providing IT support to the superiors.  Helping out colleagues and employees with various difficulties during free times.  Managing the situations created by sudden rain fall and water flows within the rooms which could have damaged the electronic systems.  Organizing a large quantity of user requests and providing support according to urgency and priority basis.  Little amount of book keeping regarding the IT resources of SMC.  Counseling the employees having issues regarding IT equipment and providing them support based on availability of the resources.  Coordination with the co-workers and superiors for better work environment.  Learning the process of the new leave management systems launched a week ago. Findings during the Eleventh Week: Few of the findings and critiques on my view point are stated below:  The MIS & IT department is not a solely separate entity within this organization which could affect many important decision making and procurement process when necessary.  Less staffs and experts available for the area offices for the IT issues makes the support more complicated.  Not enough authority and privileges for the supporting IT-Officer to provide one-stop service to the users all the time.
  • 12. Page | xii Twelfth Week: (April 05 – April 09, 2015) During the week I have learnt few new and interesting things and the management protocols and reasoning strategy behind the decisions been taken. The notable incidents and experiences gathered during this week are as follows:  Providing user end support on a daily basis  Learnt new tricks and tactics for printer troubleshooting.  Tried to concentrate a bit on priority management strategy.  Troubleshooting meeting room laptops and computers along with the network and projector setup within a short amount of time.  Learning about POP3 e-mail servers and IMAP e-mail servers and their differences.  Learnt the reasons behind providing POP3 services to the employees of SMC instead of IMAP.  Cabling the network connections and preparing the network cables for the connections for board room laptops and projectors.  Learned about managing office time for different work schedules and proper work management.  Learned about providing support as an IT-Officer alone as my supporting IT officer was on a leave once this week.  Depending on the priority, few major services for the users e.g. network troubleshoot, printer troubleshoot, pc hardware and software troubleshoot etc. are provided.  IMIS errors and their relevant troubleshoot processes are learnt. Findings during the Twelfth Week:  The organization does not provide the users with the newest IT platforms and technological features competing with the modern organizational pace (POP3-IMAP) regarding the reasons of users’ needs and requirements.
  • 13. Page | xiii The IMIS Interface (Graphical)
  • 19. Page | xix Comments Md. Abu Bakkar Khan Chowdhury Sr. Systems Executive Md. Giash Uddin Manager, MIS & IT
  • 20. Page | xx Mr. Mofijul Haque Khan Sr. Systems Executive Md. Ruhul Amin Finance Executive
  • 21. Page | xxiMr. Shameem Akanda Executive Graphics Design, SMC-EL