Balance Score Card –
        Maintain “Agile Equilibrium”



Archana Joshi
Sr. Manager, Wipro Technologies
Email: archana.p.joshi@gmail.com
Archana.joshi@wipro.com
User Story
As an IT Head,

I need to measure the performance of my group

so that I can understand how Agile methods are aligning
with my organizational goals




                                         2
Acceptance Criteria
1. The framework should look at measuring the
      Knowledge , Skills and Abilities needed to ….. Build
   efficiencies to….. Effectively deliver services to….the
   client

2. Periodic reporting should be enabled by the
   framework

3. The framework should consist of leading and lagging
   performance indicators based on IT goals
                                            3
Fulfilling ATDD - 1
Deliver Services                                   To the client

                                  Customer
                     Finance
                                    Value




                      Internal    Learning &
                     Processes   Development

Build Efficiencies                             Knowledge skills
                                                 and abilities
                                               4
Tasks for BSC User Story
#   User Story Tasks
1   Create the Strategy Map

2   Understand what do you mean by performance

3   Highlight the key initiatives

4   Identify the targets

5   Identify the 5 Ws – Why, What, Where, When, Who, How




                                                      5
Strategy Map: Goal to Objectives
                 Strategic Goal: Improve Project Performance


                          Service value
    Finance
                            delivered




   Customer                                 Customer
     Value                                Intimacy and
                                           Satisfaction


                       On Time                            Decrease in
    Internal
    Process            Project                            Production
                       Delivery                             Defect



  Learning and                      Enable Agile
  Development                     Transformation

                                                                6
1. Create the strategy map

2. Now identify the different performance
   measures that you would track for each
   of the objective

3. Fill in the 5W template




                                            7
Fulfilling ATDD-2: The 5 W’s
Title                                 What to achieve (Target)



When (Frequency)   Who reviews                      Who Collects




Why (Purpose)      How (Initiative)                 Where (Source of Data)




                                                         8
Match the following
     Velocity

      CSAT
                                       Customer
                           Finance
De-scoping Index
                                         Value

Feature Burn-up

 Agile Utilization

  Retrospective
      Index                Internal    Learning &
                          Processes   Development
Build Success Rate




                                              9
Sample Balance Score Card created with Agile Focus

 Strategy       Strategic                  Performance Measures                                      Initiatives                             Targets
   Map         Objectives
Financial    Service Value      1.   Margin Contribution (Cost)               •   Measure IT contribution to Cost                       1.   20%
Compliance   delivered          2.   Earned Value/Release – Feature Burn-up   •   Enable operations to release value every month to     2.   1 release
                                                                                  production                                                 / month
Customer     Customer           1.   Customer Satisfaction –CSAT              •   Implement CSAT for end users of software              1.   >6/qtr
Value        Intimacy
Internal     On Time            1.   Velocity                                 •   Ensure operational measures are collected and         1.   Team sp.
Process      Project Delivery   2.   Avg Project Request Cycle Time -             collated every sprint, by every sprint team.          2.   #prr/days
                                     Requested                                •   SM to help teams track during the release             3.   #prr/days
                                3.   Avg Project Request Cycle Time -                                                                   4.   <10%
                                     Scheduled
                                4.   Sprint & Release Burndown performance
                                     trend deviation

             Decrease           1.   Defects in a sprint                      •   Ensure consistent defect management                   1.   0 P1,P2
             Defect in          2.   Test Coverage                            •   Measure coverage every sprint                         2.   >90%
             Production         3.   Production Defects                       •   Measure running tested features                       3.   0 P1, P2
                                4.   Build Success Rate                                                                                 4.   >90%

             Increase % of      1.   Story de-scoping index                   •   IT and Business measure needed. Indication of         1.   <10%
             agreed scope       2.   User Story Volatility                        partnership. Ensure collection and review.            2.   <5%


Learning     Enable Agile       1.   Agile Utilization                        •    Transformation team proactively working the          1.   >15 QoQ
and          Transformation     2.   Retrospective index                          roadmap to work toward 100% (of goal)                 2.   > 80%
Growth                                                                        •   Retrospective Actions to be tracked every sprint

             Enable People      1.   Agile Academy Compliance                 •   Define and formalize the Agile training program and   1.   >80%
             & Culture                                                            participation opportunities and guidelines.



                      Note: This is a sample representation                                                    10
Fulfilling ATDD-3
           Performance Measures                              Leading / Lagging


1.   Margin Contribution (Cost)               1.   Leading
2.   Earned Value/Release – Feature Burn-up   2.   Lagging


1.   Customer Satisfaction –CSAT              1.   Lagging

                                                                                      Cause and Effect
1.   Velocity                                 1.   Leading
2.   Avg Project Request Cycle Time -         2.   Lagging
     Requested
3.   Avg Project Request Cycle Time -         3.   Lagging
     Scheduled
4.   Sprint & Release Burndown performance    4.   Leading                               With leading
     trend deviation                                                                    indicators you
1.   Defects in a sprint                      1.   Leading
2.   Test Coverage                            2.   Leading                            should be able to
3.
4.
     Production Defects
     Build Success Rate
                                              3.
                                              4.
                                                   Lagging
                                                   Leading
                                                                                        correlate how
1.   Story de-scoping index                   1.   Leading
                                                                                            lagging
2.   User Story Volatility                    2.   Leading                              indicators will
1.   Increase Agile Utilization               1.   Lagging
                                                                                          shape up
2.   Retrospective index                      2.   Leading


1.   Increase Agile Academy Compliance        1.   Leading




                                                                                 11
Acceptance Criteria
1. The framework should look at measuring the
      Knowledge , Skills and Abilities needed to ….. Build
   efficiencies to….. Effectively deliver services to….the
   client

2. Periodic reporting should be enabled by the
   framework

3. The framework should consist of leading and lagging
   performance indicators based on IT goals
                                            12
Always remember

                    “Not everything
                  that can be counted
                         counts
                           &
                  Not everything that
                     counts can be
                        counted”



                          Thank You
                                   Archana Joshi
                          Sr. Manager, Wipro Technologies
                         Email: archana.p.joshi@gmail.com
                                 Archana.joshi@wipro.com

More Related Content

What's hot

Business Continuity Presentation
Business Continuity PresentationBusiness Continuity Presentation
Business Continuity PresentationJack_Gabriel
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Cmmi svc july 2011
Cmmi svc   july 2011Cmmi svc   july 2011
Cmmi svc july 2011Jorge Boria
 
Reliability Engineering Blended Learning Training
Reliability Engineering Blended Learning TrainingReliability Engineering Blended Learning Training
Reliability Engineering Blended Learning TrainingRicky Smith CMRP, CMRT
 
SAP BPM Jump Start to Value Package
SAP BPM Jump Start to Value PackageSAP BPM Jump Start to Value Package
SAP BPM Jump Start to Value PackageIncture Technologies
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel daveNASAPMC
 
SIM presentation Oct 9 2012
SIM presentation Oct 9 2012SIM presentation Oct 9 2012
SIM presentation Oct 9 2012sdlc_coach
 
Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success Brent Barton
 
How to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyHow to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyIBM
 
Realizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPMRealizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPMEPM Live
 
Re-architecting Your Supply Chain for High Velocity Growth
Re-architecting Your Supply Chain for High Velocity GrowthRe-architecting Your Supply Chain for High Velocity Growth
Re-architecting Your Supply Chain for High Velocity GrowthIntrigo Systems
 
Agile games night
Agile games night Agile games night
Agile games night BestBrains
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
6 Sigma
6 Sigma6 Sigma
6 Sigmap
 
Engineering Your Supply Chain for Exponential Growth
Engineering Your Supply Chain for Exponential GrowthEngineering Your Supply Chain for Exponential Growth
Engineering Your Supply Chain for Exponential GrowthIntrigo Systems
 

What's hot (20)

Business Continuity Presentation
Business Continuity PresentationBusiness Continuity Presentation
Business Continuity Presentation
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
All That Jazz
All That JazzAll That Jazz
All That Jazz
 
Cmmi svc july 2011
Cmmi svc   july 2011Cmmi svc   july 2011
Cmmi svc july 2011
 
Why Agile?
Why Agile?Why Agile?
Why Agile?
 
Toc and kanban in embedded domain
Toc and kanban in embedded domainToc and kanban in embedded domain
Toc and kanban in embedded domain
 
Reliability Engineering Blended Learning Training
Reliability Engineering Blended Learning TrainingReliability Engineering Blended Learning Training
Reliability Engineering Blended Learning Training
 
SAP BPM Jump Start to Value Package
SAP BPM Jump Start to Value PackageSAP BPM Jump Start to Value Package
SAP BPM Jump Start to Value Package
 
Magic of scrum with SAP
Magic of scrum with SAPMagic of scrum with SAP
Magic of scrum with SAP
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
SIM presentation Oct 9 2012
SIM presentation Oct 9 2012SIM presentation Oct 9 2012
SIM presentation Oct 9 2012
 
Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success
 
How to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindseyHow to make_it_real-hayden_lindsey
How to make_it_real-hayden_lindsey
 
Realizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPMRealizing the Business Value of PPM - What to Expect When Implementing PPM
Realizing the Business Value of PPM - What to Expect When Implementing PPM
 
Tut 2
Tut 2Tut 2
Tut 2
 
Re-architecting Your Supply Chain for High Velocity Growth
Re-architecting Your Supply Chain for High Velocity GrowthRe-architecting Your Supply Chain for High Velocity Growth
Re-architecting Your Supply Chain for High Velocity Growth
 
Agile games night
Agile games night Agile games night
Agile games night
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
Engineering Your Supply Chain for Exponential Growth
Engineering Your Supply Chain for Exponential GrowthEngineering Your Supply Chain for Exponential Growth
Engineering Your Supply Chain for Exponential Growth
 

Viewers also liked

Inkoop partnerschap en innovatieve samenwerking
Inkoop partnerschap en innovatieve samenwerkingInkoop partnerschap en innovatieve samenwerking
Inkoop partnerschap en innovatieve samenwerkingHans Ruiter
 
Objetivos del Balance Score Card
Objetivos del Balance Score CardObjetivos del Balance Score Card
Objetivos del Balance Score Cardjveroesg
 
Balance Score Card - Carlos Verde
Balance Score Card - Carlos VerdeBalance Score Card - Carlos Verde
Balance Score Card - Carlos VerdeCarlos Verde
 
The Canada We Want in 2020: Squaring the Carbon Circle
The Canada We Want in 2020: Squaring the Carbon CircleThe Canada We Want in 2020: Squaring the Carbon Circle
The Canada We Want in 2020: Squaring the Carbon CircleSustainable Prosperity
 
Purchasing Future Trends 2015
Purchasing Future Trends 2015Purchasing Future Trends 2015
Purchasing Future Trends 2015Bill Kohnen
 
Economic Instruments for Ecosystem Services in Canada
Economic Instruments for Ecosystem Services in CanadaEconomic Instruments for Ecosystem Services in Canada
Economic Instruments for Ecosystem Services in CanadaSustainable Prosperity
 
Balance Score Card & Just In Time
Balance Score Card & Just In TimeBalance Score Card & Just In Time
Balance Score Card & Just In TimePrathamesh Gawane
 
Innovation Driven Procurement
Innovation Driven ProcurementInnovation Driven Procurement
Innovation Driven ProcurementKoen Klokgieters
 
Capgemini Consulting Procurement Transformation
Capgemini Consulting Procurement TransformationCapgemini Consulting Procurement Transformation
Capgemini Consulting Procurement Transformationtdolder
 
What is Procurement
What is ProcurementWhat is Procurement
What is ProcurementFahad Ali
 
Vision 2020: The Future of Procurement
Vision 2020: The Future of ProcurementVision 2020: The Future of Procurement
Vision 2020: The Future of ProcurementSAP Ariba
 
Balanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and MeasurementBalanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and MeasurementKenny Ong
 
Basics Of Procurement Process
Basics Of Procurement ProcessBasics Of Procurement Process
Basics Of Procurement ProcessRameswara Vedula
 
Implementing Kanban to Improve your Workflow
Implementing Kanban to Improve your WorkflowImplementing Kanban to Improve your Workflow
Implementing Kanban to Improve your WorkflowJennifer Davis
 
Acid Base Balance and ABG by Dr.Tinku Joseph
Acid Base Balance and ABG by Dr.Tinku JosephAcid Base Balance and ABG by Dr.Tinku Joseph
Acid Base Balance and ABG by Dr.Tinku JosephDr.Tinku Joseph
 
Balanace score card ppt
Balanace score card pptBalanace score card ppt
Balanace score card pptAravind Reddy
 

Viewers also liked (20)

Inkoop partnerschap en innovatieve samenwerking
Inkoop partnerschap en innovatieve samenwerkingInkoop partnerschap en innovatieve samenwerking
Inkoop partnerschap en innovatieve samenwerking
 
Objetivos del Balance Score Card
Objetivos del Balance Score CardObjetivos del Balance Score Card
Objetivos del Balance Score Card
 
Tugas
TugasTugas
Tugas
 
Balance Score Card - Carlos Verde
Balance Score Card - Carlos VerdeBalance Score Card - Carlos Verde
Balance Score Card - Carlos Verde
 
The Canada We Want in 2020: Squaring the Carbon Circle
The Canada We Want in 2020: Squaring the Carbon CircleThe Canada We Want in 2020: Squaring the Carbon Circle
The Canada We Want in 2020: Squaring the Carbon Circle
 
Purchasing Future Trends 2015
Purchasing Future Trends 2015Purchasing Future Trends 2015
Purchasing Future Trends 2015
 
Strategic map bsc
Strategic map bscStrategic map bsc
Strategic map bsc
 
BALANCE SCORE CARD
BALANCE SCORE CARD BALANCE SCORE CARD
BALANCE SCORE CARD
 
Economic Instruments for Ecosystem Services in Canada
Economic Instruments for Ecosystem Services in CanadaEconomic Instruments for Ecosystem Services in Canada
Economic Instruments for Ecosystem Services in Canada
 
Balance Score Card & Just In Time
Balance Score Card & Just In TimeBalance Score Card & Just In Time
Balance Score Card & Just In Time
 
Innovation Driven Procurement
Innovation Driven ProcurementInnovation Driven Procurement
Innovation Driven Procurement
 
Capgemini Consulting Procurement Transformation
Capgemini Consulting Procurement TransformationCapgemini Consulting Procurement Transformation
Capgemini Consulting Procurement Transformation
 
Balance Score Card
Balance Score CardBalance Score Card
Balance Score Card
 
What is Procurement
What is ProcurementWhat is Procurement
What is Procurement
 
Vision 2020: The Future of Procurement
Vision 2020: The Future of ProcurementVision 2020: The Future of Procurement
Vision 2020: The Future of Procurement
 
Balanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and MeasurementBalanced Scorecard for Strategic Planning and Measurement
Balanced Scorecard for Strategic Planning and Measurement
 
Basics Of Procurement Process
Basics Of Procurement ProcessBasics Of Procurement Process
Basics Of Procurement Process
 
Implementing Kanban to Improve your Workflow
Implementing Kanban to Improve your WorkflowImplementing Kanban to Improve your Workflow
Implementing Kanban to Improve your Workflow
 
Acid Base Balance and ABG by Dr.Tinku Joseph
Acid Base Balance and ABG by Dr.Tinku JosephAcid Base Balance and ABG by Dr.Tinku Joseph
Acid Base Balance and ABG by Dr.Tinku Joseph
 
Balanace score card ppt
Balanace score card pptBalanace score card ppt
Balanace score card ppt
 

Similar to Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4

Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentationvishalnvora1
 
Top 10 Business Reasons for ALM
Top 10 Business Reasons for ALMTop 10 Business Reasons for ALM
Top 10 Business Reasons for ALMImaginet
 
Condensed Itu Workshop Report
Condensed Itu Workshop ReportCondensed Itu Workshop Report
Condensed Itu Workshop Reportjalilmaraicar
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayneNASAPMC
 
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...Dubai Quality Group
 
Dean.david
Dean.davidDean.david
Dean.davidNASAPMC
 
XP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua ArnoldXP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua ArnoldJoshua Arnold
 
Joshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of DelayJoshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of DelayJoshua Arnold
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
rapid productivity methodology
rapid productivity methodologyrapid productivity methodology
rapid productivity methodologyPivotal CRM
 
Top 7 Myths of Agile Testing - Busted!
Top 7 Myths of Agile Testing - Busted!Top 7 Myths of Agile Testing - Busted!
Top 7 Myths of Agile Testing - Busted!Aricent
 
How to live with agile - Aware in BugDay Bangkok 2012
How to live with agile - Aware in BugDay Bangkok 2012How to live with agile - Aware in BugDay Bangkok 2012
How to live with agile - Aware in BugDay Bangkok 2012Prathan Dansakulcharoenkit
 
Operation and Support using Agile
Operation and Support using AgileOperation and Support using Agile
Operation and Support using AgileTal Aviv
 
Lean Administration And Fast Closing
Lean Administration And Fast ClosingLean Administration And Fast Closing
Lean Administration And Fast Closingggiacoma
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Pedro S. Pereira
 
Using Agile to move from info centric to user centric
Using Agile to move from info centric to  user centric Using Agile to move from info centric to  user centric
Using Agile to move from info centric to user centric Mia Horrigan
 
Lean project management
Lean project management Lean project management
Lean project management John Bun
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...John Carter
 

Similar to Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4 (20)

Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
Top 10 Business Reasons for ALM
Top 10 Business Reasons for ALMTop 10 Business Reasons for ALM
Top 10 Business Reasons for ALM
 
Condensed Itu Workshop Report
Condensed Itu Workshop ReportCondensed Itu Workshop Report
Condensed Itu Workshop Report
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 
APO 2.0
APO 2.0APO 2.0
APO 2.0
 
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
WQD2011 - Breakthrough Process Improvement - Mashreq Bank - Improving Sales, ...
 
Dean.david
Dean.davidDean.david
Dean.david
 
XP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua ArnoldXP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua Arnold
 
Joshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of DelayJoshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of Delay
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
rapid productivity methodology
rapid productivity methodologyrapid productivity methodology
rapid productivity methodology
 
Top 7 Myths of Agile Testing - Busted!
Top 7 Myths of Agile Testing - Busted!Top 7 Myths of Agile Testing - Busted!
Top 7 Myths of Agile Testing - Busted!
 
How to live with agile - Aware in BugDay Bangkok 2012
How to live with agile - Aware in BugDay Bangkok 2012How to live with agile - Aware in BugDay Bangkok 2012
How to live with agile - Aware in BugDay Bangkok 2012
 
Operation and Support using Agile
Operation and Support using AgileOperation and Support using Agile
Operation and Support using Agile
 
Lean Administration And Fast Closing
Lean Administration And Fast ClosingLean Administration And Fast Closing
Lean Administration And Fast Closing
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013
 
Using Agile to move from info centric to user centric
Using Agile to move from info centric to  user centric Using Agile to move from info centric to  user centric
Using Agile to move from info centric to user centric
 
Lean project management
Lean project management Lean project management
Lean project management
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
 
Killing the Myth: Agile & CMMI
Killing the Myth: Agile & CMMIKilling the Myth: Agile & CMMI
Killing the Myth: Agile & CMMI
 

More from AgileNCR2013

Agile NCR 2013 - Gaurav Bansal- web_automation
Agile NCR 2013 - Gaurav Bansal- web_automationAgile NCR 2013 - Gaurav Bansal- web_automation
Agile NCR 2013 - Gaurav Bansal- web_automationAgileNCR2013
 
Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr
Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr
Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr AgileNCR2013
 
Agile NCR 2013-Tushar Soimya - Executives role in agile
Agile NCR 2013-Tushar Soimya - Executives role in agileAgile NCR 2013-Tushar Soimya - Executives role in agile
Agile NCR 2013-Tushar Soimya - Executives role in agileAgileNCR2013
 
Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..
Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..
Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..AgileNCR2013
 
Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...
Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...
Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...AgileNCR2013
 
Agile NCR 2013- Jainendra Kumar - agilemethodology-pitneybowe-jai1
Agile NCR 2013-  Jainendra Kumar - agilemethodology-pitneybowe-jai1Agile NCR 2013-  Jainendra Kumar - agilemethodology-pitneybowe-jai1
Agile NCR 2013- Jainendra Kumar - agilemethodology-pitneybowe-jai1AgileNCR2013
 
Agile NCR 2013 - Puneet sachdev - Pragmatic Agile Adoption
Agile NCR 2013 - Puneet sachdev - Pragmatic Agile AdoptionAgile NCR 2013 - Puneet sachdev - Pragmatic Agile Adoption
Agile NCR 2013 - Puneet sachdev - Pragmatic Agile AdoptionAgileNCR2013
 
Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...
Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...
Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...AgileNCR2013
 
Agile NCR 2013 - Serge Beaumont - welcome to agile ncr 2014
Agile NCR 2013 - Serge Beaumont -  welcome to agile ncr 2014 Agile NCR 2013 - Serge Beaumont -  welcome to agile ncr 2014
Agile NCR 2013 - Serge Beaumont - welcome to agile ncr 2014 AgileNCR2013
 
Agile NCR 2013 - Seema Verma - energizing hr for agile excellence-competency...
Agile NCR 2013 - Seema Verma -  energizing hr for agile excellence-competency...Agile NCR 2013 - Seema Verma -  energizing hr for agile excellence-competency...
Agile NCR 2013 - Seema Verma - energizing hr for agile excellence-competency...AgileNCR2013
 

More from AgileNCR2013 (10)

Agile NCR 2013 - Gaurav Bansal- web_automation
Agile NCR 2013 - Gaurav Bansal- web_automationAgile NCR 2013 - Gaurav Bansal- web_automation
Agile NCR 2013 - Gaurav Bansal- web_automation
 
Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr
Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr
Agile NCR 2013- Anirudh Bhatnagar - Hadoop unit testing agile ncr
 
Agile NCR 2013-Tushar Soimya - Executives role in agile
Agile NCR 2013-Tushar Soimya - Executives role in agileAgile NCR 2013-Tushar Soimya - Executives role in agile
Agile NCR 2013-Tushar Soimya - Executives role in agile
 
Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..
Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..
Agile NCR 2013 - Pooja Jagtap - presentation on thinking beyond strategic hr..
 
Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...
Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...
Agile NCR 2013- Shekhar Gulati - Open shift platform-for-rapid-and-agile-deve...
 
Agile NCR 2013- Jainendra Kumar - agilemethodology-pitneybowe-jai1
Agile NCR 2013-  Jainendra Kumar - agilemethodology-pitneybowe-jai1Agile NCR 2013-  Jainendra Kumar - agilemethodology-pitneybowe-jai1
Agile NCR 2013- Jainendra Kumar - agilemethodology-pitneybowe-jai1
 
Agile NCR 2013 - Puneet sachdev - Pragmatic Agile Adoption
Agile NCR 2013 - Puneet sachdev - Pragmatic Agile AdoptionAgile NCR 2013 - Puneet sachdev - Pragmatic Agile Adoption
Agile NCR 2013 - Puneet sachdev - Pragmatic Agile Adoption
 
Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...
Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...
Agile NCR 2013 - Milind Agnihotri - Agile &amp; the imperatives of effective ...
 
Agile NCR 2013 - Serge Beaumont - welcome to agile ncr 2014
Agile NCR 2013 - Serge Beaumont -  welcome to agile ncr 2014 Agile NCR 2013 - Serge Beaumont -  welcome to agile ncr 2014
Agile NCR 2013 - Serge Beaumont - welcome to agile ncr 2014
 
Agile NCR 2013 - Seema Verma - energizing hr for agile excellence-competency...
Agile NCR 2013 - Seema Verma -  energizing hr for agile excellence-competency...Agile NCR 2013 - Seema Verma -  energizing hr for agile excellence-competency...
Agile NCR 2013 - Seema Verma - energizing hr for agile excellence-competency...
 

Recently uploaded

The Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfThe Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfinsightssuccess2
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumzyqmx62fgm
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsFEXLE
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfMont Surfaces
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.FelixPerez547899
 
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraLuxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraShajara Artificial Plants
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Björn Rohles
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxmy Pandit
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettJacobBadgett
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corp.
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesDragon Dream Bar
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?Pristine Rings
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridHolger Mueller
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsSlidesAI
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.smalmahmud11
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Rahul Bedi
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfsuperbizness1227
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckHajeJanKamps
 

Recently uploaded (20)

The Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdfThe Leading Cyber Security Entrepreneur of India in 2024.pdf
The Leading Cyber Security Entrepreneur of India in 2024.pdf
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical TrialsSalesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
Salesforce in Life Sciences - Best Ways to Leverage The CRM for Clinical Trials
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | ShajaraLuxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
Luxury Artificial Plants Dubai | Plants in KSA, UAE | Shajara
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024Equinox Gold Corporate Deck May 24th 2024
Equinox Gold Corporate Deck May 24th 2024
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.Team-Spandex-Northern University-CS1035.
Team-Spandex-Northern University-CS1035.
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
USA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdfUSA classified ads posting – best classified sites in usa.pdf
USA classified ads posting – best classified sites in usa.pdf
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 

Agile NCR 2013 - Archana Joshi - maintaining agile equilibrium v4

  • 1. Balance Score Card – Maintain “Agile Equilibrium” Archana Joshi Sr. Manager, Wipro Technologies Email: archana.p.joshi@gmail.com Archana.joshi@wipro.com
  • 2. User Story As an IT Head, I need to measure the performance of my group so that I can understand how Agile methods are aligning with my organizational goals 2
  • 3. Acceptance Criteria 1. The framework should look at measuring the Knowledge , Skills and Abilities needed to ….. Build efficiencies to….. Effectively deliver services to….the client 2. Periodic reporting should be enabled by the framework 3. The framework should consist of leading and lagging performance indicators based on IT goals 3
  • 4. Fulfilling ATDD - 1 Deliver Services To the client Customer Finance Value Internal Learning & Processes Development Build Efficiencies Knowledge skills and abilities 4
  • 5. Tasks for BSC User Story # User Story Tasks 1 Create the Strategy Map 2 Understand what do you mean by performance 3 Highlight the key initiatives 4 Identify the targets 5 Identify the 5 Ws – Why, What, Where, When, Who, How 5
  • 6. Strategy Map: Goal to Objectives Strategic Goal: Improve Project Performance Service value Finance delivered Customer Customer Value Intimacy and Satisfaction On Time Decrease in Internal Process Project Production Delivery Defect Learning and Enable Agile Development Transformation 6
  • 7. 1. Create the strategy map 2. Now identify the different performance measures that you would track for each of the objective 3. Fill in the 5W template 7
  • 8. Fulfilling ATDD-2: The 5 W’s Title What to achieve (Target) When (Frequency) Who reviews Who Collects Why (Purpose) How (Initiative) Where (Source of Data) 8
  • 9. Match the following Velocity CSAT Customer Finance De-scoping Index Value Feature Burn-up Agile Utilization Retrospective Index Internal Learning & Processes Development Build Success Rate 9
  • 10. Sample Balance Score Card created with Agile Focus Strategy Strategic Performance Measures Initiatives Targets Map Objectives Financial Service Value 1. Margin Contribution (Cost) • Measure IT contribution to Cost 1. 20% Compliance delivered 2. Earned Value/Release – Feature Burn-up • Enable operations to release value every month to 2. 1 release production / month Customer Customer 1. Customer Satisfaction –CSAT • Implement CSAT for end users of software 1. >6/qtr Value Intimacy Internal On Time 1. Velocity • Ensure operational measures are collected and 1. Team sp. Process Project Delivery 2. Avg Project Request Cycle Time - collated every sprint, by every sprint team. 2. #prr/days Requested • SM to help teams track during the release 3. #prr/days 3. Avg Project Request Cycle Time - 4. <10% Scheduled 4. Sprint & Release Burndown performance trend deviation Decrease 1. Defects in a sprint • Ensure consistent defect management 1. 0 P1,P2 Defect in 2. Test Coverage • Measure coverage every sprint 2. >90% Production 3. Production Defects • Measure running tested features 3. 0 P1, P2 4. Build Success Rate 4. >90% Increase % of 1. Story de-scoping index • IT and Business measure needed. Indication of 1. <10% agreed scope 2. User Story Volatility partnership. Ensure collection and review. 2. <5% Learning Enable Agile 1. Agile Utilization • Transformation team proactively working the 1. >15 QoQ and Transformation 2. Retrospective index roadmap to work toward 100% (of goal) 2. > 80% Growth • Retrospective Actions to be tracked every sprint Enable People 1. Agile Academy Compliance • Define and formalize the Agile training program and 1. >80% & Culture participation opportunities and guidelines. Note: This is a sample representation 10
  • 11. Fulfilling ATDD-3 Performance Measures Leading / Lagging 1. Margin Contribution (Cost) 1. Leading 2. Earned Value/Release – Feature Burn-up 2. Lagging 1. Customer Satisfaction –CSAT 1. Lagging Cause and Effect 1. Velocity 1. Leading 2. Avg Project Request Cycle Time - 2. Lagging Requested 3. Avg Project Request Cycle Time - 3. Lagging Scheduled 4. Sprint & Release Burndown performance 4. Leading With leading trend deviation indicators you 1. Defects in a sprint 1. Leading 2. Test Coverage 2. Leading should be able to 3. 4. Production Defects Build Success Rate 3. 4. Lagging Leading correlate how 1. Story de-scoping index 1. Leading lagging 2. User Story Volatility 2. Leading indicators will 1. Increase Agile Utilization 1. Lagging shape up 2. Retrospective index 2. Leading 1. Increase Agile Academy Compliance 1. Leading 11
  • 12. Acceptance Criteria 1. The framework should look at measuring the Knowledge , Skills and Abilities needed to ….. Build efficiencies to….. Effectively deliver services to….the client 2. Periodic reporting should be enabled by the framework 3. The framework should consist of leading and lagging performance indicators based on IT goals 12