The Agile Toolkit
An overview of Agile development, metrics, and
how to get started




                       Copyright 2003-2008, Rally Software Development Corp   Confidential and Proprietary
Traditional Software Development
Long, Large, Linear, Late

   Time to                                          12 to 36 months
   Market




  Lifecycle     Define                        Code                    Test             Deploy




                                        Tech                    Test         Funct
Deliverables   MRD       PRD                            Code                         Doc   Train
                                        spec                    plan          test



Proprietary
      Point
 Solutions




                         Confidential and Proprietary                                              2
Typical Software Challenges
 Lack of consensus
       Products pulled in too many directions
       Priorities in too many directions (everything can’t be critical)
       Too much generalization among feature requests
 Market agility
       Changing market conditions requires adaptive enhancement
 Big products
       Software quality becomes expensive with traditional approaches
 Lack of visibility into what’s coming
       Gap between request and delivery (easy to forget what was asked for)
 Limited or no understanding of product definition or
 enhancement process
       Not clear on how to participate in process
       Not sure how to identify requirements


                    Confidential and Proprietary                              3
Traditional vs Incremental Delivery




                    Revenue from $4m to $5m
                    Investment from $2.19m to $1.11m
                    ROI 11% to 59%
                    NPV -315 to 151
           Confidential and Proprietary                4
Typical Agile Objections

 Agile is an excuse to be ad-hoc and undisciplined
   Technical excellence is a tenet of all Agile approaches
   Continuous testing and integration drive higher quality

 No methodology for estimating
   All features (stories) are identified and planned and early estimates can be used for
   funding decisions
   Agile projects normally have far more planning and feedback cycles than typical
   waterfall projects

 We would need to ask too much of our customers
   Type of involvement can vary widely; For example, customers can vote features up
   or down and provide feedback at different stages to minimize time commitment

 We can’t trust our development team(s)
   Accountability and trust have shown to improve team morale, and more importantly,
   team productivity

                     Confidential and Proprietary                                          5
Benefits of Agile

         93% increased productivity1
         88% increased quality1
         83% improved stakeholder
         satisfaction1
         49% reduced costs1
         66% three-year, risk-adjusted return
         on investment2
         Reasons for Agile adoption include:
               47% to better manage project scope3
               45% to creating clear business
               requirements3
               40% to speed or better predict time to
               market3

1 “Agile Methodologies: Survey Results,” by Shine Technologies, 2003; 2 Forrester Research, 2004;
3 “Agile 2006 Survey Results and Analysis,” by Digital Focus, October 2005



                                      Confidential and Proprietary                                  6
Agile Manages Business Risks & Expectations


                        project run rate

                        risk of failure(unmet expectations)

                        cumulative production (business) value




         Waterfall                                               Agile
 Risk                                                Risk
and $                                               and $




           Time                                                    Time




                     Confidential and Proprietary                         7
Agile Delivers Success – Speed - Value

        Deliver on-time, on-budget, meet highest-priority requirements


           Before Agile                                                             With Agile

                                                                           77% of Agile projects
                                                                               Successful2
                                                                           Better Project Management
                                                                             Iterative Development
                                                                           Web Infrastructure Growth


    Only 16% of software                                          3X faster, productivity up 20-50%3
    projects successful1


                                                                    Avoiding development on the
                                                                      wrong requirements can
                                                                  reduce costs (Gartner Research) 4

     1Standish Group Report: There’s Less Development Chaos Today, by David Rubinstein SD Times March 1,
     2007, 2“Agile Has Crossed the Chasm,” Dr. Dobb’s Journal, July 2, 2007. 3QSMA and Cutter Consortium ROI
     case study on BMC Software, 2008. Proprietary Inc. 2005
                          Confidential and 4 Gartner,                                                          8
Making an Impact with Agile
     Forrester Total Economic Impact Studies (1)
          5 Companies piloting Agile methods
          3 yr, Risk-adjusted ROI of 23% – 66%


     Agile Methodologies Survey (2) , 131 respondents:
          93% stated that productivity was better or significantly better
          49% stated that costs were reduced or significantly reduced, (46%
          stated that costs were unchanged)
          88% stated that quality was better or significantly better
          83% stated that business satisfaction was better or significantly
          better



1) Forrester Consulting, 2004
2) Agile Methodologies Survey Results, Shine Technologies Pty Ltd, 2003


                              Confidential and Proprietary                    9
Key Findings – All Agile Teams

                                              Development teams
 Benchmarked 26 Agile
  development projects,                       utilizing Agile practices
  against QSMA’s database of                  were on average:
  7,500 primarily traditional
  development projects across                   37% faster delivering
  500 organizations in 18                     their software to market
  countries
                                               16% more productive
 Assessed the performance of
                                  Able to maintain normal
  Agile development projects in
  three key areas:              defect counts despite
  productivity, time-to-        significant schedule
  marketand quality             compression



               Confidential and Proprietary                               10
37% Faster Time to Market

• Teams increased speed
  despite having large
  teams and being
  geographically dispersed
• Overall, Agile companies
  experience an average
  increase in speed of 37%

• Rally customers who
  participated in the study
  saw an average increase
  of 50% in their time-to-
  market when compared
  to the industry average.




         QSMA and Cutter Consortium ROI case study on Agile teams, 2008.

                             Confidential and Proprietary                  11
Agile Teams - 16% Increase in Productivity

• Productivity is often the
  most difficult measure for
  organizations to improve
• Metrics for large, globally
  distributed teams often
  trend towards lower
  productivity
• Overall, Agile companies
  experienced 16% increase
  in productivity

• Rally customers who
  participated in the study
  saw an average increase
  of 25%



          QSMA and Cutter Consortium ROI case study on Agile teams, 2008.

                              Confidential and Proprietary                  12
Steady Defects Despite Speed

• Typically, “haste makes
  waste”
• Despite cutting
  schedules by more than
  50%, defect counts for
  the measured projects
  remained steady
• Two Rally customers
  maintained average
  defect counts, and two
  customers were on the
  upper end of industry
  averages when
  compared to similar
  sized projects taking
  more than twice as long
  to deliver.
         QSMA and Cutter Consortium ROI case study on Agile teams, 2008.

                             Confidential and Proprietary                  13
The Agile Paradigm Shift
                         Waterfall                              Agile
   Fixed             Requirements                   Resources                 Time




                                                                VALUE
                                                                driven

                            PLAN
                            driven



 Estimated   Resources                           Time           Features

                     The plan creates                   Release themes and feature
                  cost/schedule estimates                  intent drive estimates


                  Confidential and Proprietary                                       14
Impact on Your Business

 Highest priority is to satisfy the customer through early and
 continuous delivery of valuable software
 Deliver working software frequently, from a couple of
 weeks to a month, with a preference to the shorter
 timescale
 Working software is the primary measure of progress
 Continuous attention to technical excellence and good
 design enhances agility
 Simplicity - the art of maximizing the amount of work not
 done - is essential


                Confidential and Proprietary                     15
Moving to Agile Development
                                                                 Agile Development

                                                        Iterative &                   Acceptance
                Waterfall           Iterative                           Parallel
                                                       Incremental                    Test Driven



                Freeze &          Control scope         Just-in-time    Continuous      Define by
 Requirements
                 signoff             creep              elaboration      definition    acceptance


   Project      Critical path        Critical drop/        1-4 week     Continuous      Automated
 Management       through             milestones         time boxes        flow            flow
                  phases

                                                                          Define-         Define-
                                         Multiple          Highest
 Development    All features                                             develop-        develop-
                                          drops           priority to
    Team         in parallel                                             accept by       accept by
                                          to QA          acceptance
                                                                           story           story
                                        “Test           Acceptance                         Tests
     QA         Last phase                                              Automated
                                        what’s          tests inside                    written first
    Team           only                                                 testing by
                                       working”
                                                          iteration       story




                        Confidential and Proprietary                                                    16
Agile Definitions - Scrum

 A software management process; not a software
 engineering process
       Derived in part form lean flow manufacturing principles
       Extreme visibility into process and results


 Lightweight process (just 3 roles)
       Driven by team empowerment and team accountability


 Explicit role of the Product Owner and Product Backlog
       Ensures coupling to real market needs
       Assume some requirements and architectural runway exists


 Continuous inspection and adaptation drive organizational
 change


                    Confidential and Proprietary                  17
Agile Definitions - Scrum’s 3 Roles

 Scrum Master
      Primarily a facilitator/servant-leader, can act as team member
      Teaches customer how to focus on product development to maximize
      ROI and meet their objectives through Scrum


 Product Owner
      Owns Product Development Roadmap and Product Backlog Priority
      Works with customer and other business stakeholders during Release
      Planning process
      Is open to negotiations that will occur


 Delivery Team
      Developers, testers, architects, tech writers, product owner, business
      people, subject matter experts

                  Confidential and Proprietary                                 18
The Scrum Framework

                                      Daily Scrum Meeting
                                      • Done since last meeting
                                      • Plan for today
                                      • Obstacles?                          Daily




                Sprint Planning Meeting
                                                                                                 Sprint Demo and Review
                • Review Product Backlog
                                                         Backlog tasks          2-4 weeks        Meeting
                • Estimate Sprint Backlog
                                                         expanded                                • Demo done items
                • Commit to 2-4 weeks of work
                                                         by team                                 • Retrospective on the Sprint


 Vision
   Product Backlog:                                                                                Potentially Shippable
 Prioritized Features                                                                              Product Increment
                                                    Sprint Backlog
desired by Customer                                 • Product Backlog Items assigned to Sprint
                                                    • Estimated by team




                                   Confidential and Proprietary                                                            19
How Do You Get Started?
               Typical Rally rollout
     No commitment – no waiting – no hidden costs




              Confidential and Proprietary          20
How Do You Get Trained?



                                         Agile Rollout
                                           Planning



                                         Implementing
                                             Agile



                                            Team
                                          Jumpstart




          Confidential and Proprietary                   21
Why Rally for your Agile Rollout?
  Rally Services
     Introduce your teams to skills and tools needed to deliver your first
     Agile projects in 60 days; on-site and role-based training
  Rally’s expert coaches
     Published authors, industry speakers, and recognized Agile
     trainers with hundreds of customer engagements helping teams
     adopt and scale Agile
  Agile University
     Launched in 2006 to provide organizations with training to create a
     truly Agile organization; Over 100 faculty and dozens of public
     courses throughout the U.S.
  Proven success at helping companies transition to Agile
  Agile Commons
     Web community to help share and drive Agile best practices

                    Confidential and Proprietary                             22
Rally’s Complete Agile Solution

             Low-burden, flexible, easy-to-use product lifecycle
                          management software




          Private and group process training by the most recognized
                         Agile coaches in the industry




           Support and shared best practices at the first and largest
                         Agile Web 2.0 community




            Confidential and Proprietary                           23
Appendix & Backup Material




               Copyright 2003-2008, Rally Software Development Corp   Confidential and Proprietary
Tips for Success – Bottom Up Adoption
 Start building your case early
 Prepare industry stats and case studies (see Rally’s
 “Internal Champion Toolkit”)
 Find examples of Agile success throughout your
 organization and present a united front
 Explain to PMO and process leaders how they can win
 with Agile
 Use Rally resources to help you present to executives /
 leadership team
 Leverage the support of a happy customer
 Keep in mind that everyone deals with change based on
 their perceptions


               Confidential and Proprietary                25
Tips for Success – Top Down Adoption
 Don’t issue mandates, but broadcast the intent to try
 something new
 Help establish Agile as what the “best” teams and
 developers are doing (using case studies, etc.)
 Use a combination of training and coaching to promote
 understanding and enthusiasm
 Use Rally resources to help you build support
 Keep in mind that everyone deals with change based on
 their perceptions
 Conspicuously celebrate successes




               Confidential and Proprietary              26
Results of ‘Typical’ Software Projects
                       Success Rate of IT projects



   1994    16%               53%                    31%




                                                                                                                                   Source: Ron Jeffries
   1996       27%             33%                40%


                                                                    Succeeded
   1998       26%                46%                 28%            Challenged
                                                                    Failed


   2000       28%                   49%               23%


                                                                                 Actual Usage of Successfully Delivered Features
      *
   2006          35%                   46%             19%


                                                                                                Rarely
*The increase to 35% “Succeeded” was dedicated to better project                                 19%
management, iterative development and the emerging web                             Sometimes                        Never
infrastructure.                                                                      16%                            45%


Source: Standish Group Reports                                                                 Often     Always
                                                                                               13%         7%




                                             Confidential and Proprietary                                                                                 27
Agile Adoption Rapidly Growing
                                                     69% of organizations have adopted Agile
                                                     practices (expected to grow to 76% within
                                                     one year)1
                                                     23% use Agile organization-wide3
                                                     77% indicated that their Agile projects
                                                     have been successful1
                                                     60% use Scrum as the primary Agile
                                                     process, particularly in larger
                                                     organizations2
                                                     64% have dev teams from 1 to 100
                                                     people; 36% had more than 100 people
                                                     on the dev team2
                                                     60% are using a dedicated Agile project
                                                     management tool2
                                                     Second wave of adoption is now
                                                     underway with enterprise IT leading4



    1 - “Agile Has Crossed the Chasm,” by Scott Ambler, Dr. Dobb’s Journal, July 2, 2007; 2 – “2006 Agile Project Management
    Tooling Survey,” by Trail Ridge Consulting, December 2006 ; 3 – “Agile 2006 Survey,” by Digital Focus, October 2005 ; 4 –
    “Corporate IT Leads the Second WaveandAgile Adoption,” by Forrester Research, 11/30/05
                                Confidential of Proprietary                                                                     28
Choosing an Agile tool


                     Report project status


                         View staffing and
  Waterfall:             resource allocation       Agile:
   PLAN                                            VALUE
   driven                Ensure releases stay on
                                                   driven
                         schedule


                        Manage multiple Agile
                        projects at once



               Confidential and Proprietary                 29
Track Developer
                Capacity and Time

Confidential and Proprietary        30
Forecast Releases
        and Roadmap Schedule

Confidential and Proprietary   31
Plan Releases

Confidential and Proprietary         32
Manage a complex
             user story hierarchy

Confidential and Proprietary        33
Report Status

Confidential and Proprietary          34
Stay informed with custom
         notifications, IM integration
             and revision history

Confidential and Proprietary             35

Why Agile?

  • 1.
    The Agile Toolkit Anoverview of Agile development, metrics, and how to get started Copyright 2003-2008, Rally Software Development Corp Confidential and Proprietary
  • 2.
    Traditional Software Development Long,Large, Linear, Late Time to 12 to 36 months Market Lifecycle Define Code Test Deploy Tech Test Funct Deliverables MRD PRD Code Doc Train spec plan test Proprietary Point Solutions Confidential and Proprietary 2
  • 3.
    Typical Software Challenges Lack of consensus Products pulled in too many directions Priorities in too many directions (everything can’t be critical) Too much generalization among feature requests Market agility Changing market conditions requires adaptive enhancement Big products Software quality becomes expensive with traditional approaches Lack of visibility into what’s coming Gap between request and delivery (easy to forget what was asked for) Limited or no understanding of product definition or enhancement process Not clear on how to participate in process Not sure how to identify requirements Confidential and Proprietary 3
  • 4.
    Traditional vs IncrementalDelivery Revenue from $4m to $5m Investment from $2.19m to $1.11m ROI 11% to 59% NPV -315 to 151 Confidential and Proprietary 4
  • 5.
    Typical Agile Objections Agile is an excuse to be ad-hoc and undisciplined Technical excellence is a tenet of all Agile approaches Continuous testing and integration drive higher quality No methodology for estimating All features (stories) are identified and planned and early estimates can be used for funding decisions Agile projects normally have far more planning and feedback cycles than typical waterfall projects We would need to ask too much of our customers Type of involvement can vary widely; For example, customers can vote features up or down and provide feedback at different stages to minimize time commitment We can’t trust our development team(s) Accountability and trust have shown to improve team morale, and more importantly, team productivity Confidential and Proprietary 5
  • 6.
    Benefits of Agile 93% increased productivity1 88% increased quality1 83% improved stakeholder satisfaction1 49% reduced costs1 66% three-year, risk-adjusted return on investment2 Reasons for Agile adoption include: 47% to better manage project scope3 45% to creating clear business requirements3 40% to speed or better predict time to market3 1 “Agile Methodologies: Survey Results,” by Shine Technologies, 2003; 2 Forrester Research, 2004; 3 “Agile 2006 Survey Results and Analysis,” by Digital Focus, October 2005 Confidential and Proprietary 6
  • 7.
    Agile Manages BusinessRisks & Expectations project run rate risk of failure(unmet expectations) cumulative production (business) value Waterfall Agile Risk Risk and $ and $ Time Time Confidential and Proprietary 7
  • 8.
    Agile Delivers Success– Speed - Value Deliver on-time, on-budget, meet highest-priority requirements Before Agile With Agile 77% of Agile projects Successful2 Better Project Management Iterative Development Web Infrastructure Growth Only 16% of software 3X faster, productivity up 20-50%3 projects successful1 Avoiding development on the wrong requirements can reduce costs (Gartner Research) 4 1Standish Group Report: There’s Less Development Chaos Today, by David Rubinstein SD Times March 1, 2007, 2“Agile Has Crossed the Chasm,” Dr. Dobb’s Journal, July 2, 2007. 3QSMA and Cutter Consortium ROI case study on BMC Software, 2008. Proprietary Inc. 2005 Confidential and 4 Gartner, 8
  • 9.
    Making an Impactwith Agile Forrester Total Economic Impact Studies (1) 5 Companies piloting Agile methods 3 yr, Risk-adjusted ROI of 23% – 66% Agile Methodologies Survey (2) , 131 respondents: 93% stated that productivity was better or significantly better 49% stated that costs were reduced or significantly reduced, (46% stated that costs were unchanged) 88% stated that quality was better or significantly better 83% stated that business satisfaction was better or significantly better 1) Forrester Consulting, 2004 2) Agile Methodologies Survey Results, Shine Technologies Pty Ltd, 2003 Confidential and Proprietary 9
  • 10.
    Key Findings –All Agile Teams Development teams Benchmarked 26 Agile development projects, utilizing Agile practices against QSMA’s database of were on average: 7,500 primarily traditional development projects across 37% faster delivering 500 organizations in 18 their software to market countries 16% more productive Assessed the performance of Able to maintain normal Agile development projects in three key areas: defect counts despite productivity, time-to- significant schedule marketand quality compression Confidential and Proprietary 10
  • 11.
    37% Faster Timeto Market • Teams increased speed despite having large teams and being geographically dispersed • Overall, Agile companies experience an average increase in speed of 37% • Rally customers who participated in the study saw an average increase of 50% in their time-to- market when compared to the industry average. QSMA and Cutter Consortium ROI case study on Agile teams, 2008. Confidential and Proprietary 11
  • 12.
    Agile Teams -16% Increase in Productivity • Productivity is often the most difficult measure for organizations to improve • Metrics for large, globally distributed teams often trend towards lower productivity • Overall, Agile companies experienced 16% increase in productivity • Rally customers who participated in the study saw an average increase of 25% QSMA and Cutter Consortium ROI case study on Agile teams, 2008. Confidential and Proprietary 12
  • 13.
    Steady Defects DespiteSpeed • Typically, “haste makes waste” • Despite cutting schedules by more than 50%, defect counts for the measured projects remained steady • Two Rally customers maintained average defect counts, and two customers were on the upper end of industry averages when compared to similar sized projects taking more than twice as long to deliver. QSMA and Cutter Consortium ROI case study on Agile teams, 2008. Confidential and Proprietary 13
  • 14.
    The Agile ParadigmShift Waterfall Agile Fixed Requirements Resources Time VALUE driven PLAN driven Estimated Resources Time Features The plan creates Release themes and feature cost/schedule estimates intent drive estimates Confidential and Proprietary 14
  • 15.
    Impact on YourBusiness Highest priority is to satisfy the customer through early and continuous delivery of valuable software Deliver working software frequently, from a couple of weeks to a month, with a preference to the shorter timescale Working software is the primary measure of progress Continuous attention to technical excellence and good design enhances agility Simplicity - the art of maximizing the amount of work not done - is essential Confidential and Proprietary 15
  • 16.
    Moving to AgileDevelopment Agile Development Iterative & Acceptance Waterfall Iterative Parallel Incremental Test Driven Freeze & Control scope Just-in-time Continuous Define by Requirements signoff creep elaboration definition acceptance Project Critical path Critical drop/ 1-4 week Continuous Automated Management through milestones time boxes flow flow phases Define- Define- Multiple Highest Development All features develop- develop- drops priority to Team in parallel accept by accept by to QA acceptance story story “Test Acceptance Tests QA Last phase Automated what’s tests inside written first Team only testing by working” iteration story Confidential and Proprietary 16
  • 17.
    Agile Definitions -Scrum A software management process; not a software engineering process Derived in part form lean flow manufacturing principles Extreme visibility into process and results Lightweight process (just 3 roles) Driven by team empowerment and team accountability Explicit role of the Product Owner and Product Backlog Ensures coupling to real market needs Assume some requirements and architectural runway exists Continuous inspection and adaptation drive organizational change Confidential and Proprietary 17
  • 18.
    Agile Definitions -Scrum’s 3 Roles Scrum Master Primarily a facilitator/servant-leader, can act as team member Teaches customer how to focus on product development to maximize ROI and meet their objectives through Scrum Product Owner Owns Product Development Roadmap and Product Backlog Priority Works with customer and other business stakeholders during Release Planning process Is open to negotiations that will occur Delivery Team Developers, testers, architects, tech writers, product owner, business people, subject matter experts Confidential and Proprietary 18
  • 19.
    The Scrum Framework Daily Scrum Meeting • Done since last meeting • Plan for today • Obstacles? Daily Sprint Planning Meeting Sprint Demo and Review • Review Product Backlog Backlog tasks 2-4 weeks Meeting • Estimate Sprint Backlog expanded • Demo done items • Commit to 2-4 weeks of work by team • Retrospective on the Sprint Vision Product Backlog: Potentially Shippable Prioritized Features Product Increment Sprint Backlog desired by Customer • Product Backlog Items assigned to Sprint • Estimated by team Confidential and Proprietary 19
  • 20.
    How Do YouGet Started? Typical Rally rollout No commitment – no waiting – no hidden costs Confidential and Proprietary 20
  • 21.
    How Do YouGet Trained? Agile Rollout Planning Implementing Agile Team Jumpstart Confidential and Proprietary 21
  • 22.
    Why Rally foryour Agile Rollout? Rally Services Introduce your teams to skills and tools needed to deliver your first Agile projects in 60 days; on-site and role-based training Rally’s expert coaches Published authors, industry speakers, and recognized Agile trainers with hundreds of customer engagements helping teams adopt and scale Agile Agile University Launched in 2006 to provide organizations with training to create a truly Agile organization; Over 100 faculty and dozens of public courses throughout the U.S. Proven success at helping companies transition to Agile Agile Commons Web community to help share and drive Agile best practices Confidential and Proprietary 22
  • 23.
    Rally’s Complete AgileSolution Low-burden, flexible, easy-to-use product lifecycle management software Private and group process training by the most recognized Agile coaches in the industry Support and shared best practices at the first and largest Agile Web 2.0 community Confidential and Proprietary 23
  • 24.
    Appendix & BackupMaterial Copyright 2003-2008, Rally Software Development Corp Confidential and Proprietary
  • 25.
    Tips for Success– Bottom Up Adoption Start building your case early Prepare industry stats and case studies (see Rally’s “Internal Champion Toolkit”) Find examples of Agile success throughout your organization and present a united front Explain to PMO and process leaders how they can win with Agile Use Rally resources to help you present to executives / leadership team Leverage the support of a happy customer Keep in mind that everyone deals with change based on their perceptions Confidential and Proprietary 25
  • 26.
    Tips for Success– Top Down Adoption Don’t issue mandates, but broadcast the intent to try something new Help establish Agile as what the “best” teams and developers are doing (using case studies, etc.) Use a combination of training and coaching to promote understanding and enthusiasm Use Rally resources to help you build support Keep in mind that everyone deals with change based on their perceptions Conspicuously celebrate successes Confidential and Proprietary 26
  • 27.
    Results of ‘Typical’Software Projects Success Rate of IT projects 1994 16% 53% 31% Source: Ron Jeffries 1996 27% 33% 40% Succeeded 1998 26% 46% 28% Challenged Failed 2000 28% 49% 23% Actual Usage of Successfully Delivered Features * 2006 35% 46% 19% Rarely *The increase to 35% “Succeeded” was dedicated to better project 19% management, iterative development and the emerging web Sometimes Never infrastructure. 16% 45% Source: Standish Group Reports Often Always 13% 7% Confidential and Proprietary 27
  • 28.
    Agile Adoption RapidlyGrowing 69% of organizations have adopted Agile practices (expected to grow to 76% within one year)1 23% use Agile organization-wide3 77% indicated that their Agile projects have been successful1 60% use Scrum as the primary Agile process, particularly in larger organizations2 64% have dev teams from 1 to 100 people; 36% had more than 100 people on the dev team2 60% are using a dedicated Agile project management tool2 Second wave of adoption is now underway with enterprise IT leading4 1 - “Agile Has Crossed the Chasm,” by Scott Ambler, Dr. Dobb’s Journal, July 2, 2007; 2 – “2006 Agile Project Management Tooling Survey,” by Trail Ridge Consulting, December 2006 ; 3 – “Agile 2006 Survey,” by Digital Focus, October 2005 ; 4 – “Corporate IT Leads the Second WaveandAgile Adoption,” by Forrester Research, 11/30/05 Confidential of Proprietary 28
  • 29.
    Choosing an Agiletool Report project status View staffing and Waterfall: resource allocation Agile: PLAN VALUE driven Ensure releases stay on driven schedule Manage multiple Agile projects at once Confidential and Proprietary 29
  • 30.
    Track Developer Capacity and Time Confidential and Proprietary 30
  • 31.
    Forecast Releases and Roadmap Schedule Confidential and Proprietary 31
  • 32.
  • 33.
    Manage a complex user story hierarchy Confidential and Proprietary 33
  • 34.
  • 35.
    Stay informed withcustom notifications, IM integration and revision history Confidential and Proprietary 35