LINER HANGER DESIGN AND
OPERATIONS
Abdulkadir TEKİN
Instructor
• Why Liner Hanger
• Design
 Running Tools
 Setting Sleeves
 Packer
 Liner Hanger
 Cementing Equipment
 Surface Cementing Equipment
 Tieback Equipment
 Others
• General Checklist and Liner Hanger
Mounting
• Liner Hanger Operations
• Liner Hanger Applications
2
OUTLINE
• Casing
 Prevents the demolition of the well
during drilling
 Enables covering some problematic
formations
 Provides direct access of drilling or
production liquid from surface
3
WHY LINER HANGER
• Casing Running Methods
 Surface
 Liner
 Tie Back
4
WHY LINER HANGER
Long String Liner Tieback
• Liner is used when casing can not run from the surface.
 Technical Reasons
 Operational Requirements
 Cost Advantage
 Time Restriction
5
WHY LINER HANGER
• How to run Liner Hanger?
6
DESIGN
Setting Tool Setting Sleeve
 Drill Pipe
• How to connect drill pipe to hanger?
• Information required for Liner Hanger Assembly selection
 Well Condition
 Well Type and Specifications
 Rig Type and Specifications
 Casing and DP Information
 Liner Equipment and Other
Accessories Rating.
7
DESIGN
• Liner Hanger Rating
 Hanging Capacity
 Burst and Collapse Pressure
 Tensile Load Capacity
 Maximum Torque Strength
 Maximum OD
 Minimum ID
 Drift Dimension
8
DESIGN
• Liner Packer Rating
 Running Tool Profile
 Burst and Collapse Pressure
 Tensile Load Capacity
 Maximum Torque Strength
 Maximum OD
 Minimum ID
 Drift Dimension
 Pressure and Temperature Strength
9
DESIGN
• Setting Tool Rating
 Tool Profile
 Burst Pressure
 Tensile Load Capacity
 Maximum Torque Strength
 Maximum OD
 Minimum ID
10
DESIGN
• Other Equipment Rating
 All equipment must have at least liner
hanger strength values
 For all rating parameters (collapse, burst,
tensile load etc.) the weakest point in
design should be determined
 There should not be an ID constriction
affecting the operation
11
DESIGN
• Hook Up Drawing
12
DESIGN
• Lift Nipple
13
Running Tools
Lift Nipple with Junk Bonnet Lift Nipple with Junk Cover
 Junk Bonnet:
• It serves as a filter for the
Extension
 Junk Cover:
• It serves as a filter for the
Extension
• Provide shear pin to carry
drill string load so enable
full casing rotation with
2RH setting tool
 Provides the transition to
the Running Tool with DP
• Lift Nipple with
Junk Cover
14
Running Tools
Applied Set Down Weight
Shear Pin
PBR
• Packer Setting Dog Sub
15
Running Tools
Packer Setting Dog Sub Rotating Indicating
Packer Setting Dog Sub
Shear Pin
Rolling
Bearing
 Allows set down weight
to the packer for swelling
 Provides the transition to
the Setting Tool with Lift
Nipple
 Rotating and Indicating:
• Indicates that the weight
required for packer swelling
is applied to the extension
• Enables rotation during
weight application
• Setting Tools
16
Running Tools
Mechanic -Non Rotating Mechanic- Rotating Hydraulic- Rotating
 Provides the transition to
the Setting Dog Sub with
Cementing Pack off
 Carries all liner string
weight prior to liner
hanger set
• Mechanic Non Rotating Setting Tool
17
Running Tools
Setting Tool with
Packer Setting Dogs
 Disconnected by right
turn after hanger set
 Connect setting nut with
setting sleeve to carry
liner string weight
 Allows set down weight
to the packer for swelling
• Mechanic Rotating Setting Tool
18
Running Tools
Mechanical Rotating Setting Tool
 Disconnected by right
turn after hanger set
 Connect setting nut with
setting sleeve to carry
liner string weight
 Enable liner string to
rotate
19
Running Tools
Setting Tool and Setting Sleeve In
Connection Position
Setting Tool With Compression+Left Turn Connect
Setting Nut to Setting Sleeve
Connected
Nut-Sleeve
• Hydraulic Rotating Setting Tool
20
Running Tools
Hydraulic Rotating Setting Tool
 Disconnected by
hydraulic pressure or
right turn after hanger set
 Connect setting tool to the
setting sleeve with special
engagement to carry liner
string weight
 Enable liner string to
rotate
• Hydraulic Rotating Setting Tool
21
Running Tools
Hydraulic Release Shear Pins
• Hydraulic Rotating Setting Tool
22
Running Tools
Rotation Shear Pins
Slack Off Shear Pins
Indication Shear Pin
• Hydraulic Rotating Setting Tool
23
Running Tools
• Hydraulic Activation Ball Seat
24
Running Tools
• Cementing Packoff Assemblies
25
Running Tools
RS Seal AssemblySwab Cup Seal System PBR Packoff
 Packoff assemblies provides
seal in the liner for the purpose
of hydraulic equipment
activation and enabling cement
operation
• Cementing Packoff Assemblies
26
Running Tools
RS Seal Assembly
with Stinger
Swab Cup
Seal System
PBR Packoff
RS Seal Assembly
• Setting Sleeves with Extension
27
Setting Sleeves
Mechanic Non
Rotating
Mechanic
Rotating
Hydraulic Rotating
 It is the place where the liner
string and drill string connection
are provided.
 Each sleeve is connected with
the appropriate setting tool
• Liner Top Packer
28
Packer
 They are used to provide
annular seal
• Liner Top Packer
29
Packer
FluidTransitionArea
Prior to Packer Set
• Liner Top Packer
30
Packer
After Packer Set
SealBetweenCasingandHanger
• Liner Hanger
31
Liner Hanger
Hydraulic Set- InlineMechanical Set Hydraulic Set
 Hydraulic Inline
• Activated by hydraulic pressure
• Used in ID restriction and
deviated wells
 Hydraulic
• Activated by hydraulic pressure
• Generally used in horizontal
wells
 Mechanical
• Activated by left or right turn
• Generally used in vertical and
conventional wells
• Mechanic Liner Hanger
32
Liner Hanger
Mechanical Set
Centralizer
with “J” for
Setting
Slips & Cones
SupportedSlip
Area
FULLYSUPPORTED
Casing
• Hydraulic Liner Hanger
33
Liner Hanger
Hydraulic Set
Hydraulic Cylinder
Slips & Cones
SupportedSlip
Area
FULLYSUPPORTED
During Running Pressurized Set
Casing
• Inline Liner Hanger
34
Liner Hanger
Hiydraulic Set Inline Liner Hanger
• Liner Cement Plugs
35
Cementing Equipment
Conventional
PumpDownPlug(“PDP”)LinerWiperPlug(“LWP”)
 LWP; Sweeps inside Casing
 PDP; Sweeps inside Drill pipe
 Allows the separation of cement
and tail fluid
• Liner Cement Plugs (Conventional)
36
Cementing Equipment
Cement
Mud
• Liner Cement Plugs
37
Cementing Equipment
Cement
Mud
• Landing Collar
38
Floating Equipment
Type II
Type I
Type III
 Might provide seating surface
for wiper plug and catcher place
for setting ball
• Float Collar
39
Floating Equipment
Single and Double Valve
Cement Filled Float Collar
 Prevents drilling fluid or cement
return into liner string from
annulus
• Float Shoe
40
Floating Equipment
Single and Double Valve
Cement Filled Float Shoe
 Hosts the liner string running
into open well
 Side ports allow circulation
when liner string touches on the
bottom
 Prevents drilling fluid or cement
return into liner string from
annulus
• TD Cementing Head
41
Surface Cementing Equipment
Swivel
Plug Dropping Head f/ 2 Plugs
Flag Sub & Ball Dropping Sub
Cement Line Connection
Pump Down Plug
Ball
42
Tieback Equipment
Tieback
Extension
• Tieback
 Provides connection of
casing string from surface to
the previous liner hanger
Tieback Seal Assembly
43
General Liner Hanger Equipment
 Drill String (DP or HWDP)
 Setting Sleeve w/Extension f/Seals
 Setting Tool
 Pack-Off
 Liner Hanger and Packer
 Liner Cementing Plugs
 Casing
 Shoe Track (Float Shoe, Float Collar, Landing Collar)
 Surface Cementing Equipment
 Equipment that will drop cementing plugs or balls, and
facilitates key operations at surface
44
General Checklist and Liner Hanger Mounting
• General Control
 Complete the equipment
checklist
 Complete the NDT
inspection sheets
 Complete Dimensional
inspection sheets
• Liner Hanger Mounting
 Follow the liner hanger
mounting procedure
 Record applied make up
torque/
 Conduct pressure and pull
line test. Record test data.
45
Liner Hanger Operation
• General Instruction of Liner Hanger Operation
 Make sure the well is ready for liner running
 Make up floating equipment as liner design required
and continue to casing running
 Make up liner hanger and last casing connection
 Continue with drill pipe to running
 Perform circulation before entering open hole
 Perform circulation when reaching the bottop
 Set the liner hanger when everything is in place
 Release setting tool
 Perform cement operation and drop the plugs
 Swell the packer and test if required.
 Pull out of hole the drill string.
46
Liner Hanger Operation
47
Liner Hanger Application
• Plot and Drop – Drop Off – Puddle Liner
48
Liner Hanger Application
• Slotted/Screen Liner System
49
Liner Hanger Application
• Cemented Liner System
50
Liner Hanger Application
• Cemented Liner System with Integral
Packer
51
Liner Hanger Application
• Tapered Cemented Liner System with
Integral Packer
52
Liner Hanger Application
• Stage Cemented Liner System with Integral
Packer
53
Reference
1. Liner Hanger System, Baker Hughes 2011
2. Liner Hanger Selection, Weatherford 2006
3. Liner Hanger Applications, Weatherford 2002
4. Liner Hanger System Technical Units, Baker Hughes, 2003

More Related Content

What's hot

Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN Elsayed Amer
 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingJames Craig
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsKamel Elsayed
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputGaurav Singh Rajput
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA DesignM.T.H Group
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 
Tubing Hangers, Tubing Hangers Oilfield Equipment - WOM Group
Tubing Hangers, Tubing Hangers Oilfield Equipment - WOM GroupTubing Hangers, Tubing Hangers Oilfield Equipment - WOM Group
Tubing Hangers, Tubing Hangers Oilfield Equipment - WOM Groupwomgroup
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234Afsal Ameen c
 
WELLHEAD FOR OIL AND GAS WELL.pptx
WELLHEAD FOR OIL AND GAS WELL.pptxWELLHEAD FOR OIL AND GAS WELL.pptx
WELLHEAD FOR OIL AND GAS WELL.pptxHandaBinAdi
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluidsAAPG SU SC
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completionAkshaya Mishra
 

What's hot (20)

Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary Cementing
 
02 wireline
02 wireline02 wireline
02 wireline
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
 
Tubing string
Tubing stringTubing string
Tubing string
 
blow out preventer system
blow out preventer systemblow out preventer system
blow out preventer system
 
Packers
PackersPackers
Packers
 
Wellhead
WellheadWellhead
Wellhead
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Squeeze cementing
Squeeze cementingSqueeze cementing
Squeeze cementing
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Casing design
Casing designCasing design
Casing design
 
Tubing Hangers, Tubing Hangers Oilfield Equipment - WOM Group
Tubing Hangers, Tubing Hangers Oilfield Equipment - WOM GroupTubing Hangers, Tubing Hangers Oilfield Equipment - WOM Group
Tubing Hangers, Tubing Hangers Oilfield Equipment - WOM Group
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234
 
WELLHEAD FOR OIL AND GAS WELL.pptx
WELLHEAD FOR OIL AND GAS WELL.pptxWELLHEAD FOR OIL AND GAS WELL.pptx
WELLHEAD FOR OIL AND GAS WELL.pptx
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 

Similar to Liner hanger design and operations

Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.pptSafarulhaqueKp
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.pptSafarulhaqueKp
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApollo Techno Industries Pvt Ltd
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideApollo Techno Industries Pvt Ltd
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Mohamed _el_shora
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007yudi05
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptxTuralEmirli
 
ManufacturingTechnology-II , Unit 3
ManufacturingTechnology-II , Unit 3ManufacturingTechnology-II , Unit 3
ManufacturingTechnology-II , Unit 3Ravi Sankar
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER) Arez Luqman
 

Similar to Liner hanger design and operations (20)

Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016
 
6 day.pptx
6 day.pptx6 day.pptx
6 day.pptx
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptx
 
Maclog - JAN15
Maclog - JAN15Maclog - JAN15
Maclog - JAN15
 
Sils Brochure
Sils BrochureSils Brochure
Sils Brochure
 
Kiln training
Kiln trainingKiln training
Kiln training
 
PROJECT PPT. (1)
PROJECT PPT. (1)PROJECT PPT. (1)
PROJECT PPT. (1)
 
ManufacturingTechnology-II , Unit 3
ManufacturingTechnology-II , Unit 3ManufacturingTechnology-II , Unit 3
ManufacturingTechnology-II , Unit 3
 
Dk well control
Dk well controlDk well control
Dk well control
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Dam focus
Dam focusDam focus
Dam focus
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
Pump_IOM_N1.pptx
Pump_IOM_N1.pptxPump_IOM_N1.pptx
Pump_IOM_N1.pptx
 

Recently uploaded

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 

Recently uploaded (20)

UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 

Liner hanger design and operations

  • 1. LINER HANGER DESIGN AND OPERATIONS Abdulkadir TEKİN Instructor
  • 2. • Why Liner Hanger • Design  Running Tools  Setting Sleeves  Packer  Liner Hanger  Cementing Equipment  Surface Cementing Equipment  Tieback Equipment  Others • General Checklist and Liner Hanger Mounting • Liner Hanger Operations • Liner Hanger Applications 2 OUTLINE
  • 3. • Casing  Prevents the demolition of the well during drilling  Enables covering some problematic formations  Provides direct access of drilling or production liquid from surface 3 WHY LINER HANGER
  • 4. • Casing Running Methods  Surface  Liner  Tie Back 4 WHY LINER HANGER Long String Liner Tieback
  • 5. • Liner is used when casing can not run from the surface.  Technical Reasons  Operational Requirements  Cost Advantage  Time Restriction 5 WHY LINER HANGER
  • 6. • How to run Liner Hanger? 6 DESIGN Setting Tool Setting Sleeve  Drill Pipe • How to connect drill pipe to hanger?
  • 7. • Information required for Liner Hanger Assembly selection  Well Condition  Well Type and Specifications  Rig Type and Specifications  Casing and DP Information  Liner Equipment and Other Accessories Rating. 7 DESIGN
  • 8. • Liner Hanger Rating  Hanging Capacity  Burst and Collapse Pressure  Tensile Load Capacity  Maximum Torque Strength  Maximum OD  Minimum ID  Drift Dimension 8 DESIGN
  • 9. • Liner Packer Rating  Running Tool Profile  Burst and Collapse Pressure  Tensile Load Capacity  Maximum Torque Strength  Maximum OD  Minimum ID  Drift Dimension  Pressure and Temperature Strength 9 DESIGN
  • 10. • Setting Tool Rating  Tool Profile  Burst Pressure  Tensile Load Capacity  Maximum Torque Strength  Maximum OD  Minimum ID 10 DESIGN
  • 11. • Other Equipment Rating  All equipment must have at least liner hanger strength values  For all rating parameters (collapse, burst, tensile load etc.) the weakest point in design should be determined  There should not be an ID constriction affecting the operation 11 DESIGN
  • 12. • Hook Up Drawing 12 DESIGN
  • 13. • Lift Nipple 13 Running Tools Lift Nipple with Junk Bonnet Lift Nipple with Junk Cover  Junk Bonnet: • It serves as a filter for the Extension  Junk Cover: • It serves as a filter for the Extension • Provide shear pin to carry drill string load so enable full casing rotation with 2RH setting tool  Provides the transition to the Running Tool with DP
  • 14. • Lift Nipple with Junk Cover 14 Running Tools Applied Set Down Weight Shear Pin PBR
  • 15. • Packer Setting Dog Sub 15 Running Tools Packer Setting Dog Sub Rotating Indicating Packer Setting Dog Sub Shear Pin Rolling Bearing  Allows set down weight to the packer for swelling  Provides the transition to the Setting Tool with Lift Nipple  Rotating and Indicating: • Indicates that the weight required for packer swelling is applied to the extension • Enables rotation during weight application
  • 16. • Setting Tools 16 Running Tools Mechanic -Non Rotating Mechanic- Rotating Hydraulic- Rotating  Provides the transition to the Setting Dog Sub with Cementing Pack off  Carries all liner string weight prior to liner hanger set
  • 17. • Mechanic Non Rotating Setting Tool 17 Running Tools Setting Tool with Packer Setting Dogs  Disconnected by right turn after hanger set  Connect setting nut with setting sleeve to carry liner string weight  Allows set down weight to the packer for swelling
  • 18. • Mechanic Rotating Setting Tool 18 Running Tools Mechanical Rotating Setting Tool  Disconnected by right turn after hanger set  Connect setting nut with setting sleeve to carry liner string weight  Enable liner string to rotate
  • 19. 19 Running Tools Setting Tool and Setting Sleeve In Connection Position Setting Tool With Compression+Left Turn Connect Setting Nut to Setting Sleeve Connected Nut-Sleeve
  • 20. • Hydraulic Rotating Setting Tool 20 Running Tools Hydraulic Rotating Setting Tool  Disconnected by hydraulic pressure or right turn after hanger set  Connect setting tool to the setting sleeve with special engagement to carry liner string weight  Enable liner string to rotate
  • 21. • Hydraulic Rotating Setting Tool 21 Running Tools Hydraulic Release Shear Pins
  • 22. • Hydraulic Rotating Setting Tool 22 Running Tools Rotation Shear Pins Slack Off Shear Pins Indication Shear Pin
  • 23. • Hydraulic Rotating Setting Tool 23 Running Tools
  • 24. • Hydraulic Activation Ball Seat 24 Running Tools
  • 25. • Cementing Packoff Assemblies 25 Running Tools RS Seal AssemblySwab Cup Seal System PBR Packoff  Packoff assemblies provides seal in the liner for the purpose of hydraulic equipment activation and enabling cement operation
  • 26. • Cementing Packoff Assemblies 26 Running Tools RS Seal Assembly with Stinger Swab Cup Seal System PBR Packoff RS Seal Assembly
  • 27. • Setting Sleeves with Extension 27 Setting Sleeves Mechanic Non Rotating Mechanic Rotating Hydraulic Rotating  It is the place where the liner string and drill string connection are provided.  Each sleeve is connected with the appropriate setting tool
  • 28. • Liner Top Packer 28 Packer  They are used to provide annular seal
  • 29. • Liner Top Packer 29 Packer FluidTransitionArea Prior to Packer Set
  • 30. • Liner Top Packer 30 Packer After Packer Set SealBetweenCasingandHanger
  • 31. • Liner Hanger 31 Liner Hanger Hydraulic Set- InlineMechanical Set Hydraulic Set  Hydraulic Inline • Activated by hydraulic pressure • Used in ID restriction and deviated wells  Hydraulic • Activated by hydraulic pressure • Generally used in horizontal wells  Mechanical • Activated by left or right turn • Generally used in vertical and conventional wells
  • 32. • Mechanic Liner Hanger 32 Liner Hanger Mechanical Set Centralizer with “J” for Setting Slips & Cones SupportedSlip Area FULLYSUPPORTED Casing
  • 33. • Hydraulic Liner Hanger 33 Liner Hanger Hydraulic Set Hydraulic Cylinder Slips & Cones SupportedSlip Area FULLYSUPPORTED During Running Pressurized Set Casing
  • 34. • Inline Liner Hanger 34 Liner Hanger Hiydraulic Set Inline Liner Hanger
  • 35. • Liner Cement Plugs 35 Cementing Equipment Conventional PumpDownPlug(“PDP”)LinerWiperPlug(“LWP”)  LWP; Sweeps inside Casing  PDP; Sweeps inside Drill pipe  Allows the separation of cement and tail fluid
  • 36. • Liner Cement Plugs (Conventional) 36 Cementing Equipment Cement Mud
  • 37. • Liner Cement Plugs 37 Cementing Equipment Cement Mud
  • 38. • Landing Collar 38 Floating Equipment Type II Type I Type III  Might provide seating surface for wiper plug and catcher place for setting ball
  • 39. • Float Collar 39 Floating Equipment Single and Double Valve Cement Filled Float Collar  Prevents drilling fluid or cement return into liner string from annulus
  • 40. • Float Shoe 40 Floating Equipment Single and Double Valve Cement Filled Float Shoe  Hosts the liner string running into open well  Side ports allow circulation when liner string touches on the bottom  Prevents drilling fluid or cement return into liner string from annulus
  • 41. • TD Cementing Head 41 Surface Cementing Equipment Swivel Plug Dropping Head f/ 2 Plugs Flag Sub & Ball Dropping Sub Cement Line Connection Pump Down Plug Ball
  • 42. 42 Tieback Equipment Tieback Extension • Tieback  Provides connection of casing string from surface to the previous liner hanger Tieback Seal Assembly
  • 43. 43 General Liner Hanger Equipment  Drill String (DP or HWDP)  Setting Sleeve w/Extension f/Seals  Setting Tool  Pack-Off  Liner Hanger and Packer  Liner Cementing Plugs  Casing  Shoe Track (Float Shoe, Float Collar, Landing Collar)  Surface Cementing Equipment  Equipment that will drop cementing plugs or balls, and facilitates key operations at surface
  • 44. 44 General Checklist and Liner Hanger Mounting • General Control  Complete the equipment checklist  Complete the NDT inspection sheets  Complete Dimensional inspection sheets • Liner Hanger Mounting  Follow the liner hanger mounting procedure  Record applied make up torque/  Conduct pressure and pull line test. Record test data.
  • 45. 45 Liner Hanger Operation • General Instruction of Liner Hanger Operation  Make sure the well is ready for liner running  Make up floating equipment as liner design required and continue to casing running  Make up liner hanger and last casing connection  Continue with drill pipe to running  Perform circulation before entering open hole  Perform circulation when reaching the bottop  Set the liner hanger when everything is in place  Release setting tool  Perform cement operation and drop the plugs  Swell the packer and test if required.  Pull out of hole the drill string.
  • 47. 47 Liner Hanger Application • Plot and Drop – Drop Off – Puddle Liner
  • 48. 48 Liner Hanger Application • Slotted/Screen Liner System
  • 49. 49 Liner Hanger Application • Cemented Liner System
  • 50. 50 Liner Hanger Application • Cemented Liner System with Integral Packer
  • 51. 51 Liner Hanger Application • Tapered Cemented Liner System with Integral Packer
  • 52. 52 Liner Hanger Application • Stage Cemented Liner System with Integral Packer
  • 53. 53 Reference 1. Liner Hanger System, Baker Hughes 2011 2. Liner Hanger Selection, Weatherford 2006 3. Liner Hanger Applications, Weatherford 2002 4. Liner Hanger System Technical Units, Baker Hughes, 2003