DATE: JUNE 2013 - CURRENT
DESIGNATION: ENGINEERINGDESIGN ENGINEER
DEPARTMENT: CIVILS- WATER
JOB DESCRIPTION: To supportthe departmentoncivil engineeringprojectsthroughdesign,drafting,co-
ordination,constructionsupervision,contractdocumentationandtenderdocumentation.
JOB ROLE: My jobrole isto carry out tasks indesign,drafting,administration,resource management,
constructionmanagementandfinance.
- Design: to obtainrelevantinformationfrommunicipalities,client,architects,surveyors
whichwill allowtoundertake anengineeringdesign. Adhere toMunicipal guidelines.
ObtainClearance certificatesfromrelevantUtilities.
- Drafting : To produce a readable drawingstobe usedforconstruction,prepare AsBuilt
drawings.
- Administration: To prepare detailedBillsof Quantities, performall quantity
calculationsforBillsof Quantities, Tenderdocumentation,tenderadjudicationand
contract documentation andWayleave Applications.
- Resource Management: to co-ordinate meetings,tocompile correspondence,to
attendprogressmeetings,toattendsite meetingsandattendtosite queries.
- ConstructionManagement : To performsite inspections,monitoringandsupervision,
to tendto site queries.
- Finance : To provide fee allocationsasperECSA guidelines,tomonitorbudgetary
constraintsonprojects,checkcontractors claimcertificatesforpayment,verify
quantities,preparePaymentCertificatesforClienttopaycontractor.
PROJECTS: (Projectslistedfromcurrenttobeginning)
MAROELADAL THORNTREE DEVELOPMENT – Design and Construction(FOURWAYS,JHB)
PHASE1
PHASE2
CSIR – Roads and Stormwater Upgrades - Designand Construction (PRETORIA, GP)
TRANSNET PIPELINES – SewerOutfall (BOKSBURG, JHB)
COLENSO COAL FIRED POWERSTATION - Feasibilitystudy& Costing(COLENSO,KZN)
FERNRIVER ESTATE – SEWER RE-LOCATION – Construction(RANDBURG,JHB)
MASSINGIRSUGARFACTORY – Tender(MOZAMBIQUE)
BLOEMHOF INDUSTRIAL PARK – FeasibilityStudy& Costing (BLOEMHOF, NW )
RAPIDWALL – FOSKOR FACTORY – Feasibilitystudyand Cost estimate (RICHARDS BAY, KZN)
GA - RANKUWAFLOOD RISK ASSESSMENT – (PRETORIA)
My dutiesandresponsibilitiesforeachof the above projectsisas follows,respectively.
1. MAROELADAL – THORNTREE DEVELOPMENT (phase 2)
ThisprojectentailsaresidentialdevelopmentforSable Homesdevelopers.Sivestwasappointedasthe
consultingcivil engineerstodesignservicesandprovide constructionsupervision. Priortothis,the first
phase of the developmentwasdesignedandconstructedsuccessfully.DuringJune 2014, SiVESTwas
officiallyappointedtocontinue withthe secondphaseof the development.The projectconstructioncost –
R3.8 million
Summaryof duties:
- Designbulkearthworkplatforms,roads,sewerreticulation,stormwaterreticulationandwater
reticulation.Sincethiswasasecondphase to the project,I wasrequiredtodesignthisphase totie into
the existingfirstphase. IusedPipemate,Roadmate andSurfmate todesignthe civil services.
- Spreadsheetcalculationsforthe sewerpipe todetermine the hydraulicpropertiesof the systemto
adhere tomunicipal guidelines.
- Produce constructiondrawings,thatislayouts,longsections,sectionsanddetailsandtypical municipal
details.
- PreparingadetailedBill of Quantities.
- Calculatingthe quantitiesforBOQfortenderphase.
- Site supervisionduringconstruction
- Site inspectionsduringconstruction
- Preparingthe AsBuiltdrawingsforJohannesburgWatersubmission,toobtainaclearance letters.
- Attendingprogress meetingswiththe variousotherdisciplines.
- Verifyingcontractorsclaimcertificate.
- Confirmingthe contractorsPaymentCertificate forthe clientona monthlybasis.
- Performingsite inspectionspriortothe backfillingof pipe trenches.
- Monitoringwork on site
- Assistingwithcontractor’squeries
- Prepare andsubmitAs-builtdrawings,breakdowncostsandcompletioncertificatestothe relevant
utilities
- Inspectsite inorderto prepare a snag listforcontractor.
- Inspectingworkdone aftersnaggingiscompleted.
(Otherprojectsinvolvedin, relatingtoasimilarscope are LoftusPark BulkSewer,thisprojectwasrecently
submittedtocouncil forapproval.Iperformedall the designcalculationsandproducingapprovaldrawings
to be submittedtothe council)
2. CSIR – Roads andStormwaterUpgrades
Thisprojectwas forthe CSIRin Pretoria.The CSIRrequiredaRoadsand Stormwaterupgrade tobe done for
one of theirbuildings.Sivestwasappointedasthe consultingengineerstodesignandprovide construction
supervision.The projectconstructioncost –R1.0 million
Summaryof duties:
- Designa pavedaccessroad and surface stormwaterreticulation.IusedRoadmate torunthe longsection
of the road.
- Designthe road layerworksasperthe Guidelinesforthe Provisionof EngineeringServicesinResidential
Townships.(foran8 ton truck)
- Providingasolutionforpondingwateraroundthe site.Detailingthe drainage solutioninaconstruction
drawingusingAutoCAD.Providingsectionsanddetailsforconstruction.
- Produce constructiondrawings,thatislayouts,longsectionsandsectionsanddetails.
- PreparingadetailedBill of Quantities.
- Calculatingthe quantitiesforBOQfortenderphase.
- Site supervisionduringconstruction
- Site inspectionsduring construction
- Attendingprogressmeetingswiththe variousotherdisciplines.
- Verifyingcontractorsclaimcertificate.
- Confirmingthe contractorsPaymentCertificate forthe clientona monthlybasis.
- Performingsite inspectionspriortothe backfillingof pipe trenches.
- Monitoringworkon site
- Assistingwithcontractor’squeries
- Prepare andsubmitAs-builtdrawings,breakdowncostsandcompletioncertificatestothe relevant
utilities
- Inspectsite inorderto prepare a snag listforcontractor.
- Inspectingworkdone aftersnaggingiscompleted.
- Attendingprogressmeetingswiththe variousotherdisciplines.
3. TransnetPipeline Depot
Thisprojectwas forTransnetPipelines.Aspartof a National upgrade forthe TransnetPipeline depots,
Sivestwasappointed toprovide aconsultingservice withregardstoStructural andCivil works.
The works includedanewguardhouse,new electricfencingalongthe perimeterof the depotyard,
additional parkingareasandgeneral civil worksaroundthe depot.The depotused aseptictanksystemto
discharge of waste butwas requiredtoremove the tankandinstall a new outfall sewerline.
TransnetPipeline requiresanewoutfall sewerforthe depotbasedinBartlett,Boksburg.Thisareais
currentlymanagedbythe Ekurhuleni MetropolitanMunicipality.Iwasgiventhe responsibilityof
undertakingthisprojectsrequirements.
Summaryof duties:
- Site investigationtoassessexistinginfrastructure.
- Surveyingof site,creatingadigital terrainmodelforuse inthe design.
- Creatingan excel spreadsheettoperformhydrauliccalculationstoensure designiswithinmunicipal
standards.
- Run the SewerlongsectionusingPipemate.
- Prepare AutoCADdrawingstosubmitforapproval tothe relevantmunicipality.
- Go throughproceduresforthe applicationof a Wayleave.
- Prepare a detailedBillof Quantities
- Attendprogressmeetingsforthe project.
- Make weeklyvisitstoprovide the contractorwithassistance onsite.
- Monitorwork on site andprovide updatestoclient.
4. Ga – RANKUWA FLOOD RISKASSESSMENT
Thisprojectwas forEskom Holdings,whoproposedan11kV powerline fromthe Ga – RankuwaSubstation
inthe townof Ga - Rankuwa.The proposedpowerline wouldcrossthe SandRiveranda hydrological
assessmentof the contributingcatchmentwasrequired.
I was alsoresponsible forcompletingthe reporttodescribe how the analysiswasperformedtodetermine
if the projectwill be affectedbyaflood.The reportgave detail of where informationwastakenfrom,which
programswere usedforthe analysis,the outcome of the analysisandfinallythe recommendations.I
drafteda layoutdrawinginAutoCADtosupportour findingsinthe analysis.
5. RAPIDWALL– FOSKOR
Thisprojectwas fora companyinAustraliathatwantedto utilise awaste productfroma companyin
RichardsBay. The scope of the projectwasto builda factory for the Australiancompany,Rapidwall.
The projectwas made up of two independentsites,forthe twoindependentcompanies.Foskorrequireda
factoryof theirownand Rapidwall requiredtheirownfactory.ForRapidwall’sprocesses,Rapidwallwould
transportthe productfromFoskor.Thisproduct formFoskoris a waste productthat Rapidwall requiredfor
theirprocesses.
SiVESTwasappointedasthe Civil engineersonthisprojecttoprovide the engineeringservices(civil,
structural,electrical andmechanical).The aimof the project wasto produce a highlevel costestimate for
the constructionof civil relevantservicesrequired.
Summaryof duties:
- Site investigationtoassessexistinginfrastructure.
- DesignBulkEarthworksplatforms.
- Designinternal road,usingAutoturn.
- Prepare AutoCADdrawings.
- Calculate all quantities.
- Prepare a detailedBillof Quantities
- Attendprogressmeetingsforthe project.
6. BLOEMHOF INDUSTRIAL PARK
Thiswas a projectdone inthe North – West province,foradevelopmentcompany.The companyrequired
the engineeringservicesforafeasibilitystudybeingdone foranew Industrial Parkinthe townof
Bloemhof.Alongwithapreliminarydesignof civilinfrastructure services,ahighlevel costestimate was
required.The engineeringservicestobe renderedwastoprovide aServicesReportforthe proposed
Industrial Park.The servicesreportcoveredthe internal andexternal servicesforthe IndustrialPark.
My role wasto produce a conceptual designof the office parkonAutoCADdrawinglayouts,produce the
cost estimate asa Bill of Quantitiesandproduce the ServicesReports.
I prepareda Bill of Quantities,inwhichIquantifiedearthworks,roads,sanitation,watersupplyandstorm
water.I thencalculatedall quantitiesforthe above servicesinthe formof a Bill of Quantities,inwhichI
appliedrates fromourinternal database.
I preparedthe ServicesReport,inwhichall relative aspectsandservicesrequired,were discussed.
7. MASSINGIRSUGAR FACTORY
Thisprojectwas done forthe constructionof a sugarfactory inMozambique.The engineeringservicesto
be provided forwasStorm waterdrainage,Sanitation,watersupply.
Summaryof duties:
- Co-ordinate surveydrawingsforthe use inAutoCADdrawings
- Draft proposal forcivil services (stormwater,sewer,waterandroads)
- Designanddetail bulkearthworksplatforms
- Designthe road layerworksasperthe Guidelinesforthe Provisionof EngineeringServicesin
Residential Townships.
- Prepare drawingsincludingsectionsanddetails
- Prepare Billsof Quantities
- Calculationof the PeakStormwaterRunoff asperthe Drainage Manual and the ModifiedHershfield
Formula(due tothe small catchmentareas)
8. FERNRIVERESTATE – SEWER RE-LOCATION
Thisprojectwas fora residential complex inRandburg,Johannesburg.The existingsewerline requiredto
be relocateddue toconstruction purposes.Myresponsibilitywastoprepare the designfor the re-location
of the sewer.
Summaryof duties:
- Prepare AutoCADdrawingsfordesignpurposes,usingsurveydrawings,architecturallayoutsand
images.
- Designthe sewerpipe usingPipemate.
- SubmittingdrawingstoMunicipalityfordesignapproval.
- Draftingconstructiondrawingsforthe contractor.
- Site supervisionduringconstruction
- Site inspectionsduringconstruction
- Preparingthe AsBuiltdrawingsforJohannesburgWatersubmission,toobtainaclearance letters.
9. COLENSO– COALFIRED POWERSTATION
Thisprojectis based inColenso,Kwa-ZuluNatal.The projectconsistsof anew Mine and a new Power
Station.The engineeringservicestobe providedwasforthe designof civil infrastructure,forWatersupply,
SewerandEffluentdisposal,WatersupplyandRoadaccess.Requirementsforthisprojectwastoproduce
drawinglayouts,costestimates(Bill of Quantities) andanengineeringreporttosubmitforan
Environmental ImpactAssessmentstudy.
Thisprojectis still inthe environmental stage,wherethree site alternativesare beingassessed.The
outcome of the EIA will be a suitable site fromthe three options.
Summaryof duties:
- Site investigationtodeterminepossiblecivil servicesroutespersite andassessexistinginfrastructure.
- PreparingaBill of Quantities schedule inexcel,foracost estimate,peroptionpersite.
- Preparingdrawingsrepresenting the possibleoptionspersite.
- Prepare a detailedengineeringreport, whichoutlinedall the possible optionsforall the required
services,persite,tobe usedinthe EIA process.

More Related Content

What's hot

Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievementsJoseph Bracic
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16Leonardo Villamil
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEduardo H. Pare
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016ASHRAF GOMAH MOHAMED
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16Sudhakar Vallala
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitaeSALEM MOHAMMED
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15Dave Beveridge
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss ResumeTroy Weiss
 

What's hot (20)

Completion & integrity engineer achievements
Completion & integrity engineer achievementsCompletion & integrity engineer achievements
Completion & integrity engineer achievements
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
EDUARDO H. PARE CV
EDUARDO H. PARE CVEDUARDO H. PARE CV
EDUARDO H. PARE CV
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Resume pritam
Resume  pritamResume  pritam
Resume pritam
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDINGEDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
EDUARDO H. PARE DESIGN CONSIDERATIONS TO AVOID WATER LEAKAGES ON BUILDING
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Eugene Jose
Eugene JoseEugene Jose
Eugene Jose
 
Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016Civil Engineer - Ashraf Gomah Mohamed 2016
Civil Engineer - Ashraf Gomah Mohamed 2016
 
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
 
Resume Daniel A Correa
Resume   Daniel A CorreaResume   Daniel A Correa
Resume Daniel A Correa
 
SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16SVResume -Lead Mch Enginer June16
SVResume -Lead Mch Enginer June16
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss Resume
 

Similar to LinkedIN_24-07-15 (20)

BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Umer CV
Umer CVUmer CV
Umer CV
 
1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf1. Usman Ali CV Project Engineer Electrical.pdf
1. Usman Ali CV Project Engineer Electrical.pdf
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
MUBIN_CV
MUBIN_CVMUBIN_CV
MUBIN_CV
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
AHMAD ELSAYED
AHMAD ELSAYEDAHMAD ELSAYED
AHMAD ELSAYED
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Gerry_Garciano_resume
Gerry_Garciano_resumeGerry_Garciano_resume
Gerry_Garciano_resume
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
 
resume16 - Copy
resume16 - Copyresume16 - Copy
resume16 - Copy
 
Resume 2016 nadeem siddiqui
Resume   2016 nadeem siddiquiResume   2016 nadeem siddiqui
Resume 2016 nadeem siddiqui
 
eng.ramy
eng.ramy eng.ramy
eng.ramy
 
Mantena Neeladri varma_original
Mantena Neeladri varma_originalMantena Neeladri varma_original
Mantena Neeladri varma_original
 
CV of CCEquibal
CV of CCEquibalCV of CCEquibal
CV of CCEquibal
 
En c.v
En c.v En c.v
En c.v
 

LinkedIN_24-07-15

  • 1. DATE: JUNE 2013 - CURRENT DESIGNATION: ENGINEERINGDESIGN ENGINEER DEPARTMENT: CIVILS- WATER JOB DESCRIPTION: To supportthe departmentoncivil engineeringprojectsthroughdesign,drafting,co- ordination,constructionsupervision,contractdocumentationandtenderdocumentation. JOB ROLE: My jobrole isto carry out tasks indesign,drafting,administration,resource management, constructionmanagementandfinance. - Design: to obtainrelevantinformationfrommunicipalities,client,architects,surveyors whichwill allowtoundertake anengineeringdesign. Adhere toMunicipal guidelines. ObtainClearance certificatesfromrelevantUtilities. - Drafting : To produce a readable drawingstobe usedforconstruction,prepare AsBuilt drawings. - Administration: To prepare detailedBillsof Quantities, performall quantity calculationsforBillsof Quantities, Tenderdocumentation,tenderadjudicationand contract documentation andWayleave Applications. - Resource Management: to co-ordinate meetings,tocompile correspondence,to attendprogressmeetings,toattendsite meetingsandattendtosite queries. - ConstructionManagement : To performsite inspections,monitoringandsupervision, to tendto site queries. - Finance : To provide fee allocationsasperECSA guidelines,tomonitorbudgetary constraintsonprojects,checkcontractors claimcertificatesforpayment,verify quantities,preparePaymentCertificatesforClienttopaycontractor. PROJECTS: (Projectslistedfromcurrenttobeginning) MAROELADAL THORNTREE DEVELOPMENT – Design and Construction(FOURWAYS,JHB) PHASE1 PHASE2 CSIR – Roads and Stormwater Upgrades - Designand Construction (PRETORIA, GP) TRANSNET PIPELINES – SewerOutfall (BOKSBURG, JHB) COLENSO COAL FIRED POWERSTATION - Feasibilitystudy& Costing(COLENSO,KZN) FERNRIVER ESTATE – SEWER RE-LOCATION – Construction(RANDBURG,JHB) MASSINGIRSUGARFACTORY – Tender(MOZAMBIQUE) BLOEMHOF INDUSTRIAL PARK – FeasibilityStudy& Costing (BLOEMHOF, NW ) RAPIDWALL – FOSKOR FACTORY – Feasibilitystudyand Cost estimate (RICHARDS BAY, KZN) GA - RANKUWAFLOOD RISK ASSESSMENT – (PRETORIA) My dutiesandresponsibilitiesforeachof the above projectsisas follows,respectively. 1. MAROELADAL – THORNTREE DEVELOPMENT (phase 2) ThisprojectentailsaresidentialdevelopmentforSable Homesdevelopers.Sivestwasappointedasthe consultingcivil engineerstodesignservicesandprovide constructionsupervision. Priortothis,the first phase of the developmentwasdesignedandconstructedsuccessfully.DuringJune 2014, SiVESTwas officiallyappointedtocontinue withthe secondphaseof the development.The projectconstructioncost – R3.8 million Summaryof duties: - Designbulkearthworkplatforms,roads,sewerreticulation,stormwaterreticulationandwater reticulation.Sincethiswasasecondphase to the project,I wasrequiredtodesignthisphase totie into the existingfirstphase. IusedPipemate,Roadmate andSurfmate todesignthe civil services.
  • 2. - Spreadsheetcalculationsforthe sewerpipe todetermine the hydraulicpropertiesof the systemto adhere tomunicipal guidelines. - Produce constructiondrawings,thatislayouts,longsections,sectionsanddetailsandtypical municipal details. - PreparingadetailedBill of Quantities. - Calculatingthe quantitiesforBOQfortenderphase. - Site supervisionduringconstruction - Site inspectionsduringconstruction - Preparingthe AsBuiltdrawingsforJohannesburgWatersubmission,toobtainaclearance letters. - Attendingprogress meetingswiththe variousotherdisciplines. - Verifyingcontractorsclaimcertificate. - Confirmingthe contractorsPaymentCertificate forthe clientona monthlybasis. - Performingsite inspectionspriortothe backfillingof pipe trenches. - Monitoringwork on site - Assistingwithcontractor’squeries - Prepare andsubmitAs-builtdrawings,breakdowncostsandcompletioncertificatestothe relevant utilities - Inspectsite inorderto prepare a snag listforcontractor. - Inspectingworkdone aftersnaggingiscompleted. (Otherprojectsinvolvedin, relatingtoasimilarscope are LoftusPark BulkSewer,thisprojectwasrecently submittedtocouncil forapproval.Iperformedall the designcalculationsandproducingapprovaldrawings to be submittedtothe council) 2. CSIR – Roads andStormwaterUpgrades Thisprojectwas forthe CSIRin Pretoria.The CSIRrequiredaRoadsand Stormwaterupgrade tobe done for one of theirbuildings.Sivestwasappointedasthe consultingengineerstodesignandprovide construction supervision.The projectconstructioncost –R1.0 million Summaryof duties: - Designa pavedaccessroad and surface stormwaterreticulation.IusedRoadmate torunthe longsection of the road. - Designthe road layerworksasperthe Guidelinesforthe Provisionof EngineeringServicesinResidential Townships.(foran8 ton truck) - Providingasolutionforpondingwateraroundthe site.Detailingthe drainage solutioninaconstruction drawingusingAutoCAD.Providingsectionsanddetailsforconstruction. - Produce constructiondrawings,thatislayouts,longsectionsandsectionsanddetails. - PreparingadetailedBill of Quantities. - Calculatingthe quantitiesforBOQfortenderphase. - Site supervisionduringconstruction - Site inspectionsduring construction - Attendingprogressmeetingswiththe variousotherdisciplines. - Verifyingcontractorsclaimcertificate. - Confirmingthe contractorsPaymentCertificate forthe clientona monthlybasis. - Performingsite inspectionspriortothe backfillingof pipe trenches. - Monitoringworkon site - Assistingwithcontractor’squeries
  • 3. - Prepare andsubmitAs-builtdrawings,breakdowncostsandcompletioncertificatestothe relevant utilities - Inspectsite inorderto prepare a snag listforcontractor. - Inspectingworkdone aftersnaggingiscompleted. - Attendingprogressmeetingswiththe variousotherdisciplines. 3. TransnetPipeline Depot Thisprojectwas forTransnetPipelines.Aspartof a National upgrade forthe TransnetPipeline depots, Sivestwasappointed toprovide aconsultingservice withregardstoStructural andCivil works. The works includedanewguardhouse,new electricfencingalongthe perimeterof the depotyard, additional parkingareasandgeneral civil worksaroundthe depot.The depotused aseptictanksystemto discharge of waste butwas requiredtoremove the tankandinstall a new outfall sewerline. TransnetPipeline requiresanewoutfall sewerforthe depotbasedinBartlett,Boksburg.Thisareais currentlymanagedbythe Ekurhuleni MetropolitanMunicipality.Iwasgiventhe responsibilityof undertakingthisprojectsrequirements. Summaryof duties: - Site investigationtoassessexistinginfrastructure. - Surveyingof site,creatingadigital terrainmodelforuse inthe design. - Creatingan excel spreadsheettoperformhydrauliccalculationstoensure designiswithinmunicipal standards. - Run the SewerlongsectionusingPipemate. - Prepare AutoCADdrawingstosubmitforapproval tothe relevantmunicipality. - Go throughproceduresforthe applicationof a Wayleave. - Prepare a detailedBillof Quantities - Attendprogressmeetingsforthe project. - Make weeklyvisitstoprovide the contractorwithassistance onsite. - Monitorwork on site andprovide updatestoclient. 4. Ga – RANKUWA FLOOD RISKASSESSMENT Thisprojectwas forEskom Holdings,whoproposedan11kV powerline fromthe Ga – RankuwaSubstation inthe townof Ga - Rankuwa.The proposedpowerline wouldcrossthe SandRiveranda hydrological assessmentof the contributingcatchmentwasrequired. I was alsoresponsible forcompletingthe reporttodescribe how the analysiswasperformedtodetermine if the projectwill be affectedbyaflood.The reportgave detail of where informationwastakenfrom,which programswere usedforthe analysis,the outcome of the analysisandfinallythe recommendations.I drafteda layoutdrawinginAutoCADtosupportour findingsinthe analysis. 5. RAPIDWALL– FOSKOR Thisprojectwas fora companyinAustraliathatwantedto utilise awaste productfroma companyin RichardsBay. The scope of the projectwasto builda factory for the Australiancompany,Rapidwall.
  • 4. The projectwas made up of two independentsites,forthe twoindependentcompanies.Foskorrequireda factoryof theirownand Rapidwall requiredtheirownfactory.ForRapidwall’sprocesses,Rapidwallwould transportthe productfromFoskor.Thisproduct formFoskoris a waste productthat Rapidwall requiredfor theirprocesses. SiVESTwasappointedasthe Civil engineersonthisprojecttoprovide the engineeringservices(civil, structural,electrical andmechanical).The aimof the project wasto produce a highlevel costestimate for the constructionof civil relevantservicesrequired. Summaryof duties: - Site investigationtoassessexistinginfrastructure. - DesignBulkEarthworksplatforms. - Designinternal road,usingAutoturn. - Prepare AutoCADdrawings. - Calculate all quantities. - Prepare a detailedBillof Quantities - Attendprogressmeetingsforthe project. 6. BLOEMHOF INDUSTRIAL PARK Thiswas a projectdone inthe North – West province,foradevelopmentcompany.The companyrequired the engineeringservicesforafeasibilitystudybeingdone foranew Industrial Parkinthe townof Bloemhof.Alongwithapreliminarydesignof civilinfrastructure services,ahighlevel costestimate was required.The engineeringservicestobe renderedwastoprovide aServicesReportforthe proposed Industrial Park.The servicesreportcoveredthe internal andexternal servicesforthe IndustrialPark. My role wasto produce a conceptual designof the office parkonAutoCADdrawinglayouts,produce the cost estimate asa Bill of Quantitiesandproduce the ServicesReports. I prepareda Bill of Quantities,inwhichIquantifiedearthworks,roads,sanitation,watersupplyandstorm water.I thencalculatedall quantitiesforthe above servicesinthe formof a Bill of Quantities,inwhichI appliedrates fromourinternal database. I preparedthe ServicesReport,inwhichall relative aspectsandservicesrequired,were discussed. 7. MASSINGIRSUGAR FACTORY Thisprojectwas done forthe constructionof a sugarfactory inMozambique.The engineeringservicesto be provided forwasStorm waterdrainage,Sanitation,watersupply. Summaryof duties: - Co-ordinate surveydrawingsforthe use inAutoCADdrawings - Draft proposal forcivil services (stormwater,sewer,waterandroads) - Designanddetail bulkearthworksplatforms - Designthe road layerworksasperthe Guidelinesforthe Provisionof EngineeringServicesin Residential Townships. - Prepare drawingsincludingsectionsanddetails - Prepare Billsof Quantities
  • 5. - Calculationof the PeakStormwaterRunoff asperthe Drainage Manual and the ModifiedHershfield Formula(due tothe small catchmentareas) 8. FERNRIVERESTATE – SEWER RE-LOCATION Thisprojectwas fora residential complex inRandburg,Johannesburg.The existingsewerline requiredto be relocateddue toconstruction purposes.Myresponsibilitywastoprepare the designfor the re-location of the sewer. Summaryof duties: - Prepare AutoCADdrawingsfordesignpurposes,usingsurveydrawings,architecturallayoutsand images. - Designthe sewerpipe usingPipemate. - SubmittingdrawingstoMunicipalityfordesignapproval. - Draftingconstructiondrawingsforthe contractor. - Site supervisionduringconstruction - Site inspectionsduringconstruction - Preparingthe AsBuiltdrawingsforJohannesburgWatersubmission,toobtainaclearance letters. 9. COLENSO– COALFIRED POWERSTATION Thisprojectis based inColenso,Kwa-ZuluNatal.The projectconsistsof anew Mine and a new Power Station.The engineeringservicestobe providedwasforthe designof civil infrastructure,forWatersupply, SewerandEffluentdisposal,WatersupplyandRoadaccess.Requirementsforthisprojectwastoproduce drawinglayouts,costestimates(Bill of Quantities) andanengineeringreporttosubmitforan Environmental ImpactAssessmentstudy. Thisprojectis still inthe environmental stage,wherethree site alternativesare beingassessed.The outcome of the EIA will be a suitable site fromthe three options. Summaryof duties: - Site investigationtodeterminepossiblecivil servicesroutespersite andassessexistinginfrastructure. - PreparingaBill of Quantities schedule inexcel,foracost estimate,peroptionpersite. - Preparingdrawingsrepresenting the possibleoptionspersite. - Prepare a detailedengineeringreport, whichoutlinedall the possible optionsforall the required services,persite,tobe usedinthe EIA process.