SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB1514 – Construction Technology 1
Petronas Twin Tower (KLCC)
April Semester 2013
Group Assignment
Submission Date: 26/06/2013
Name Student ID Marks
Wong Choong Ling 0314504
Wong Ha Shiong 0309640
Yap Zhi Xin 0314542
A. Provide background information of the Petronas Twin Towers (not
more than 300 words).
The Petronas Twin Towers is twin skyscrapers in Kuala Lumpur, Malaysia. According
to the CTBUH's official definition and ranking, they were the tallest buildings in the
world from 1998 to 2004 until surpassed by Taipei 101, but they remain the tallest
twin building in the world. An Argentine American architect, César Pelli, along with
Deejay Cerico, J.C. Guinto and Dominic Saibo designed it
(http://www.emporis.com/complex/petronas-towers-kuala-lumpur-malaysia). Consist
of 88 levels with the height of 452m above street level
(http://www.petronastwintowers.com.my) .The project started on January 1992 and it
tooks 6 years in order to finish both of the towers. The towers cost about US$1.6
billion. (http://www.mir.com.my/leofoo/KLCC/indexprelude.htm)
The aim to build the Petronas Twin Towers was to buld a landmark for Malaysia and
built up the confidence in every Malaysian. It represents Malaysia‟s increasing wealth
and the nation‟s desire to feature more prominently on the international stage.
(http://www.mir.com.my/leofoo/KLCC/indexprelude.htm)
"As an internationally recognised landmark, the PETRONAS Twin Towers symbolise
the courage, ingenuity, initiative, and determination, energy, confidence, optimism,
advancement and zest of a nation." Stated by Tun Dr. Mahathir Mohamad, Former
Prime Minister of Malaysia (1981-2003). (http://www.petronastwintowers.com.my)
Even though Malaysia is free to practise any various religion and custom, still, Islam
remains as the official religion for the largely Malay community.
(http://www.mir.com.my/leofoo/KLCC/indexprelude.htm). Therefore, the inspiration of
the design was from the tradition of the culture and the Islamic sysmbols, a geometric
eight-pointed star floor design. (http://www.akdn.org/architecture/pdf/1969_Mal.pdf)
Other than that, this building is unique with the skybridge that falls on 41st
and 42nd
floors; it helps to balance both the towers from the Monson Wind that happens in
Malaysia‟s weather. (Frankham, Steve (2008). Malaysia and Singapore. Bath:
Footprint Travel Guides). It was built not attaching to the main towers to prevent
breaking. The skybridge is situated 170m heights above the ground with 58m long
and weighing 750 tons. (Chang, Fu-Kuo (2005). Structural health monitoring, 2005:
advancements and challenges for implementation. Lancaster, PA: DEStech
Publications).
(289 words)
B. The type of structure and main materials used for the towers construction (not
more than 500 words).
KLCC foundation system consists of a 4.5 metre thick piled raft supported on rectangular
friction piles called barrettes varying in depth from 40 metres to 105 metres to control
predicted settlement under different thicknesses of Kenny Hill formation underlain by
limestone. The concrete (contain admixtures) used is of grade M80, which means the
concrete can support up to 80 Newtons per square millimeter after it has been left to
cure for 28 days.
Figure 1: 4.5 metres thick piled raft used.
(www.allaboutskyscrapers.com)
Figure 2: Barrettes used in foundation system.
(http://civil-engg-world.blogspot.com)
The structure main materials are concrete as it is most cost effective. High-strength concrete
was used in the central core, perimeter columns, perimeter ring beams and outrigger beams
permitting vertical core and column elements. Concrete construction requires relatively light,
simple connections in joints of difficult geometry and providing fire-rated shaft walls in the
core which can reduces the building response to gusts of wind.
Figure 3: High strength concrete was used to reduces building response to wind.
The tower superstructure is supported by cylindrical columns linked by slightly arched
structural concrete ring beams of high-strength reinforced concrete. At the centre of each
tower is an approximately 23x23 metre concrete core with outrigger beams tie the perimeter
columns to the cores at the thirty-eighth and fortieth levels. The core and cylindrical tube
frame system is constructed entirely of in-situ high-strength concrete. Structural steel was
used for typical longspan floor beams supporting concrete-filled metal deck slabs. This
system is chosen for fast and flexible construction to meet an client ambitious schedule and
flexibility to accommodate special openings or loading requirement requested by the tenants.
Due to the innovative light weight steel framing system non-crane erection methods permits
while the decking provided required fire ratings without the usage of fire spray or thick or
lightweight concrete fill.
The towers and their base are clad with stainless steel extrusions and custom made 20.38
millimetre laminated light-green glass. The curtain wall of each of the triangular corners of
the towers is flat 90° corner at its extremity, while the curtain wall of the semicircular
protrusions is faceted. Each panel rises one floor and spans from sill to sill, with vision glass
below a stainless steel spandrel with a grey glass sprandel at the top. Horizontal „bullnose;
and „teardrop‟ sunscreen brackets provide shading which each sunscreen is the same width
as one of the curtain wall panels and together they give the appearance of a continous silver
ribbon around the building. Each of the sunscreen has cast aluminium end caps and are
fixed on brackets made of extruded aluminium and finished with oven-cured PVF2
flurocarbon paint.
Figure 4: Clad with steel extrusions and custom made laminated light green glass.
Local wood and Terengganu granite and marble were extensively used in finishing materials
It is using a double decker elevator system to accommodate the thousands of employees
housed within it with a sky lobby point situated at the 41st
floor.
Figure 5: Double decker elevator system.
(499 words)
C. Industrialized building systems (IBS) implemented during the construction of the
towers (not more than 300 words).
IndustrialisedBulding System (IBS) is a building which Junid (1986), defined it as a
process by which the parts of buiding are conceived, planned and fabricated, and then
they are transported and erected at the site. The IBS was used in the construction of the
Petronas Twin Tower as it saves times which was important as the construction was to
be finished in a tight schedule.
In the Petronas Twin Towers, the steel beams of the floor are made in steel plants in
Malaysia and then installed into each of the floors. The building used steel framing as it
is easy to fabricate and install. Most of the framing were fabricated by local steel plants.
Steel were used in beams between the core and the ring beams.
Another part of the building which has implemented the IBS is the skybridge. The
skybridge linking the 2 towers were fabricatedby Samsung Heavy Industries of South
Korea, as Malaysia does not have steel plants big enough to build the components. The
bridge was disassembled into 493 pieces and shipped to Malaysia. To put the pieces
into space more easily, the bridge was pre-assembled into 5 components. They were
built on the ground and then lifted into place.
The pinnacles on top of the building, which included a spire ball, the mast and a ring ball,
were also fabricated and then brought to site in pieces. The pieces were lifted and install
into place piece by piece.
D. Discuss on how IBS helped the construction of those buildings/ structures (not
more than 300 words).
First of all, the industrialized building system provides high quality products as the parts
can are fabricated in a factory, and this allows the product to be controlled easily and to
high degree of precision. The quality of the components can be maintained at a
consistent level. Overall, IBS ensures that the end product will be of high quality.
IBS also saves time and costs. With components fabricated off-site, less on site workers
are needed which reduces labor cost. Installing the components is simplified and fewer
workers are needed to complete the construction. There is also less wastage as parts
needed are created in factory to the size required. There will also be no need for timber
formworks as parts are pre-casted in the factory, another point that reduces cost.
Time is saved as preparations are done in advance and putting the pieces into place is
simple. For example, when a site is carrying on the earthwork, the pieces that the
construction needs can start its production. Weather will not be an issue during casting
as the components are casted in controlled environment in the factory. IBS allows faster
completion time for the construction to be achieved.
The construction will also be clean and neat as there will be less wetworks going on on
the site. With fewer unused materials on sites, such as timber, nails and steel, the site
will be neater and safety of the site is also improved.
References
1. Abada G.,(2004), “Petronas Office Towers”
(http://www.akdn.org/architecture/pdf/1969_Mal.pdf)
2. Barrette Piles in Foundation System of Petronas Twin Tower, http://civil-engg-
world.blogspot.com/2013/03/Barrette-Piles-Foundation-System-Petronas-
Twin-Tower-Part-1.html
3. Chang, Fu-Kuo (2005). Structural health monitoring, 2005: advancements
and challenges for implementation. Lancaster, PA: DEStech Publications.
4. Frankham, Steve (2008). Malaysia and Singapore. Bath: Footprint Travel
Guides.
5. Junid,S.M.S (1986) Industrialised building system. Proceedings of a
UNESCO/FEISEAP Regional workshop, UPM Serdang.
6. Merchant C. (09 January, 2013), “The History and Construction of the
Petronas Twin Towers” (http://www.expatgomalaysia.com/article/878/the-
history-and-construction-of-the-petronas-twin-towers)
7. Petronas Twin Towers,
http://www.allaboutskyscrapers.com/property/petronas-twin-towers
8. Petronas Twin Towers, KLCC,
http://www.propwall.my/klcc/petronas_twin_towers
9. Thornton C.H., Hungspuke U., Joseph L.M., (1997) The Structural Design of
Tall Buildings, Vol.6, 245±262

More Related Content

What's hot

Hcm721 fms railway station in ipoh&kl awatif 300615
Hcm721 fms railway station in ipoh&kl awatif 300615Hcm721 fms railway station in ipoh&kl awatif 300615
Hcm721 fms railway station in ipoh&kl awatif 300615
Umairah Alias
 

What's hot (20)

Btech report final
Btech report finalBtech report final
Btech report final
 
Ct1 assignment
Ct1 assignmentCt1 assignment
Ct1 assignment
 
Chapter 4 case studies characteristics
Chapter 4   case studies characteristicsChapter 4   case studies characteristics
Chapter 4 case studies characteristics
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
 
Petronas twin towers malaysia
Petronas twin towers malaysiaPetronas twin towers malaysia
Petronas twin towers malaysia
 
Research Report on Menara Maybank
Research Report on Menara MaybankResearch Report on Menara Maybank
Research Report on Menara Maybank
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
A brief background & development history on klcc
A brief background & development history on klccA brief background & development history on klcc
A brief background & development history on klcc
 
Building service project2
Building service project2Building service project2
Building service project2
 
DOCUMENTATION OF STADIUM NEGARA
DOCUMENTATION OF STADIUM NEGARADOCUMENTATION OF STADIUM NEGARA
DOCUMENTATION OF STADIUM NEGARA
 
Hcm721 fms railway station in ipoh&kl awatif 300615
Hcm721 fms railway station in ipoh&kl awatif 300615Hcm721 fms railway station in ipoh&kl awatif 300615
Hcm721 fms railway station in ipoh&kl awatif 300615
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYADEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
DEWAN TUNKU CANSELOR, UNIVERSITI MALAYA
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Studio 6 site analysis
Studio 6 site analysisStudio 6 site analysis
Studio 6 site analysis
 
Sultan abdul samad building
Sultan abdul samad buildingSultan abdul samad building
Sultan abdul samad building
 

Viewers also liked

Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3
Panji Krisnamurti
 
Kuala lumpur presentation
Kuala lumpur presentationKuala lumpur presentation
Kuala lumpur presentation
isaack muja
 
Foundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj KhalifaFoundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj Khalifa
astoria104
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Ar. Md Shahroz Alam
 

Viewers also liked (13)

Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3
 
Petronas twin tower
Petronas twin towerPetronas twin tower
Petronas twin tower
 
ICIM 2016 at UTM, Malaysia
ICIM 2016 at UTM, MalaysiaICIM 2016 at UTM, Malaysia
ICIM 2016 at UTM, Malaysia
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)
 
Heat of Hydration in Mass Concrete
Heat of Hydration in Mass ConcreteHeat of Hydration in Mass Concrete
Heat of Hydration in Mass Concrete
 
Kuala lumpur presentation
Kuala lumpur presentationKuala lumpur presentation
Kuala lumpur presentation
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
Foundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj KhalifaFoundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj Khalifa
 
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, DubaiDesign, Structure, Construction and Analysis of Burj Al Arab, Dubai
Design, Structure, Construction and Analysis of Burj Al Arab, Dubai
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
3 pma salehuddin - resource and project management
3   pma salehuddin - resource and project management3   pma salehuddin - resource and project management
3 pma salehuddin - resource and project management
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 

Similar to CT Assignment Written Report

Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
Quinn Liew
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roof
MELVIN tan
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
ashleyyeap
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
Yo Ksen
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
마 이환
 

Similar to CT Assignment Written Report (20)

Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Internship report
Internship reportInternship report
Internship report
 
Building Construction 2 Project 2 Report
Building Construction 2 Project 2 ReportBuilding Construction 2 Project 2 Report
Building Construction 2 Project 2 Report
 
Skyscraper
SkyscraperSkyscraper
Skyscraper
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
Btech report
Btech reportBtech report
Btech report
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal Building
 
Ct3 steel space frame roof
Ct3 steel space frame roofCt3 steel space frame roof
Ct3 steel space frame roof
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 

More from Yap Xin

Building services report subang parade
Building services report  subang paradeBuilding services report  subang parade
Building services report subang parade
Yap Xin
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang parade
Yap Xin
 
Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consruction
Yap Xin
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
Yap Xin
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
Yap Xin
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignment
Yap Xin
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1
Yap Xin
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
Yap Xin
 
CT Part 2
CT Part 2CT Part 2
CT Part 2
Yap Xin
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slide
Yap Xin
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
Yap Xin
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
Yap Xin
 

More from Yap Xin (12)

Building services report subang parade
Building services report  subang paradeBuilding services report  subang parade
Building services report subang parade
 
Building services presentation subang parade
Building services presentation subang paradeBuilding services presentation subang parade
Building services presentation subang parade
 
Compile version communication in consruction
Compile version communication in consructionCompile version communication in consruction
Compile version communication in consruction
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
 
SMART tunnel report
SMART tunnel reportSMART tunnel report
SMART tunnel report
 
BS Stormwater management assignment
BS Stormwater management assignmentBS Stormwater management assignment
BS Stormwater management assignment
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
CT Part 2
CT Part 2CT Part 2
CT Part 2
 
Rubber presentation slide
Rubber presentation slideRubber presentation slide
Rubber presentation slide
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site research report bm (steel) corrected
Site research report bm (steel) correctedSite research report bm (steel) corrected
Site research report bm (steel) corrected
 

Recently uploaded

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Recently uploaded (20)

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 

CT Assignment Written Report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB1514 – Construction Technology 1 Petronas Twin Tower (KLCC) April Semester 2013 Group Assignment Submission Date: 26/06/2013 Name Student ID Marks Wong Choong Ling 0314504 Wong Ha Shiong 0309640 Yap Zhi Xin 0314542
  • 2. A. Provide background information of the Petronas Twin Towers (not more than 300 words). The Petronas Twin Towers is twin skyscrapers in Kuala Lumpur, Malaysia. According to the CTBUH's official definition and ranking, they were the tallest buildings in the world from 1998 to 2004 until surpassed by Taipei 101, but they remain the tallest twin building in the world. An Argentine American architect, César Pelli, along with Deejay Cerico, J.C. Guinto and Dominic Saibo designed it (http://www.emporis.com/complex/petronas-towers-kuala-lumpur-malaysia). Consist of 88 levels with the height of 452m above street level (http://www.petronastwintowers.com.my) .The project started on January 1992 and it tooks 6 years in order to finish both of the towers. The towers cost about US$1.6 billion. (http://www.mir.com.my/leofoo/KLCC/indexprelude.htm) The aim to build the Petronas Twin Towers was to buld a landmark for Malaysia and built up the confidence in every Malaysian. It represents Malaysia‟s increasing wealth and the nation‟s desire to feature more prominently on the international stage. (http://www.mir.com.my/leofoo/KLCC/indexprelude.htm) "As an internationally recognised landmark, the PETRONAS Twin Towers symbolise the courage, ingenuity, initiative, and determination, energy, confidence, optimism, advancement and zest of a nation." Stated by Tun Dr. Mahathir Mohamad, Former Prime Minister of Malaysia (1981-2003). (http://www.petronastwintowers.com.my) Even though Malaysia is free to practise any various religion and custom, still, Islam remains as the official religion for the largely Malay community. (http://www.mir.com.my/leofoo/KLCC/indexprelude.htm). Therefore, the inspiration of the design was from the tradition of the culture and the Islamic sysmbols, a geometric eight-pointed star floor design. (http://www.akdn.org/architecture/pdf/1969_Mal.pdf) Other than that, this building is unique with the skybridge that falls on 41st and 42nd floors; it helps to balance both the towers from the Monson Wind that happens in
  • 3. Malaysia‟s weather. (Frankham, Steve (2008). Malaysia and Singapore. Bath: Footprint Travel Guides). It was built not attaching to the main towers to prevent breaking. The skybridge is situated 170m heights above the ground with 58m long and weighing 750 tons. (Chang, Fu-Kuo (2005). Structural health monitoring, 2005: advancements and challenges for implementation. Lancaster, PA: DEStech Publications). (289 words)
  • 4. B. The type of structure and main materials used for the towers construction (not more than 500 words). KLCC foundation system consists of a 4.5 metre thick piled raft supported on rectangular friction piles called barrettes varying in depth from 40 metres to 105 metres to control predicted settlement under different thicknesses of Kenny Hill formation underlain by limestone. The concrete (contain admixtures) used is of grade M80, which means the concrete can support up to 80 Newtons per square millimeter after it has been left to cure for 28 days. Figure 1: 4.5 metres thick piled raft used. (www.allaboutskyscrapers.com) Figure 2: Barrettes used in foundation system. (http://civil-engg-world.blogspot.com) The structure main materials are concrete as it is most cost effective. High-strength concrete was used in the central core, perimeter columns, perimeter ring beams and outrigger beams permitting vertical core and column elements. Concrete construction requires relatively light, simple connections in joints of difficult geometry and providing fire-rated shaft walls in the core which can reduces the building response to gusts of wind.
  • 5. Figure 3: High strength concrete was used to reduces building response to wind. The tower superstructure is supported by cylindrical columns linked by slightly arched structural concrete ring beams of high-strength reinforced concrete. At the centre of each tower is an approximately 23x23 metre concrete core with outrigger beams tie the perimeter columns to the cores at the thirty-eighth and fortieth levels. The core and cylindrical tube frame system is constructed entirely of in-situ high-strength concrete. Structural steel was used for typical longspan floor beams supporting concrete-filled metal deck slabs. This system is chosen for fast and flexible construction to meet an client ambitious schedule and flexibility to accommodate special openings or loading requirement requested by the tenants. Due to the innovative light weight steel framing system non-crane erection methods permits while the decking provided required fire ratings without the usage of fire spray or thick or lightweight concrete fill. The towers and their base are clad with stainless steel extrusions and custom made 20.38 millimetre laminated light-green glass. The curtain wall of each of the triangular corners of the towers is flat 90° corner at its extremity, while the curtain wall of the semicircular protrusions is faceted. Each panel rises one floor and spans from sill to sill, with vision glass below a stainless steel spandrel with a grey glass sprandel at the top. Horizontal „bullnose; and „teardrop‟ sunscreen brackets provide shading which each sunscreen is the same width as one of the curtain wall panels and together they give the appearance of a continous silver ribbon around the building. Each of the sunscreen has cast aluminium end caps and are fixed on brackets made of extruded aluminium and finished with oven-cured PVF2 flurocarbon paint.
  • 6. Figure 4: Clad with steel extrusions and custom made laminated light green glass. Local wood and Terengganu granite and marble were extensively used in finishing materials It is using a double decker elevator system to accommodate the thousands of employees housed within it with a sky lobby point situated at the 41st floor. Figure 5: Double decker elevator system. (499 words)
  • 7. C. Industrialized building systems (IBS) implemented during the construction of the towers (not more than 300 words). IndustrialisedBulding System (IBS) is a building which Junid (1986), defined it as a process by which the parts of buiding are conceived, planned and fabricated, and then they are transported and erected at the site. The IBS was used in the construction of the Petronas Twin Tower as it saves times which was important as the construction was to be finished in a tight schedule. In the Petronas Twin Towers, the steel beams of the floor are made in steel plants in Malaysia and then installed into each of the floors. The building used steel framing as it is easy to fabricate and install. Most of the framing were fabricated by local steel plants. Steel were used in beams between the core and the ring beams. Another part of the building which has implemented the IBS is the skybridge. The skybridge linking the 2 towers were fabricatedby Samsung Heavy Industries of South Korea, as Malaysia does not have steel plants big enough to build the components. The bridge was disassembled into 493 pieces and shipped to Malaysia. To put the pieces into space more easily, the bridge was pre-assembled into 5 components. They were built on the ground and then lifted into place. The pinnacles on top of the building, which included a spire ball, the mast and a ring ball, were also fabricated and then brought to site in pieces. The pieces were lifted and install into place piece by piece.
  • 8. D. Discuss on how IBS helped the construction of those buildings/ structures (not more than 300 words). First of all, the industrialized building system provides high quality products as the parts can are fabricated in a factory, and this allows the product to be controlled easily and to high degree of precision. The quality of the components can be maintained at a consistent level. Overall, IBS ensures that the end product will be of high quality. IBS also saves time and costs. With components fabricated off-site, less on site workers are needed which reduces labor cost. Installing the components is simplified and fewer workers are needed to complete the construction. There is also less wastage as parts needed are created in factory to the size required. There will also be no need for timber formworks as parts are pre-casted in the factory, another point that reduces cost. Time is saved as preparations are done in advance and putting the pieces into place is simple. For example, when a site is carrying on the earthwork, the pieces that the construction needs can start its production. Weather will not be an issue during casting as the components are casted in controlled environment in the factory. IBS allows faster completion time for the construction to be achieved. The construction will also be clean and neat as there will be less wetworks going on on the site. With fewer unused materials on sites, such as timber, nails and steel, the site will be neater and safety of the site is also improved.
  • 9. References 1. Abada G.,(2004), “Petronas Office Towers” (http://www.akdn.org/architecture/pdf/1969_Mal.pdf) 2. Barrette Piles in Foundation System of Petronas Twin Tower, http://civil-engg- world.blogspot.com/2013/03/Barrette-Piles-Foundation-System-Petronas- Twin-Tower-Part-1.html 3. Chang, Fu-Kuo (2005). Structural health monitoring, 2005: advancements and challenges for implementation. Lancaster, PA: DEStech Publications. 4. Frankham, Steve (2008). Malaysia and Singapore. Bath: Footprint Travel Guides. 5. Junid,S.M.S (1986) Industrialised building system. Proceedings of a UNESCO/FEISEAP Regional workshop, UPM Serdang. 6. Merchant C. (09 January, 2013), “The History and Construction of the Petronas Twin Towers” (http://www.expatgomalaysia.com/article/878/the- history-and-construction-of-the-petronas-twin-towers) 7. Petronas Twin Towers, http://www.allaboutskyscrapers.com/property/petronas-twin-towers 8. Petronas Twin Towers, KLCC, http://www.propwall.my/klcc/petronas_twin_towers 9. Thornton C.H., Hungspuke U., Joseph L.M., (1997) The Structural Design of Tall Buildings, Vol.6, 245±262