Innovatie in engineering
bij Fokker
Engineering & Supply Chain kunnen slimmer
samenwerken – Workshop
Martijn van Rij 21 oktober 2015
Manager Design Engineering
Fokker Aerostructures BV
FOKKER UNCLASSIFIED
Contents
Innovatie in engineering bij Fokker2
• Company overview
• Innovation
– Product
– Process
• Product development process
– Past, Present, Future
– Front loading strategy
• Front loading
– High level architecture
– Impact on way of working & organizational set-up
• Rudder-in-a-Month
– Ambition / objectives
– Challenges required elements
– Developments
• Conclusions
FOKKER UNCLASSIFIED
Fokker Aerostructures – Company overview
Innovatie in engineering bij Fokker3
• Fokker Aerostructures is a Tier 1 Aerostructures
supplier for all the main aeronautical OEM’s
• Fokker will become part of GKN
F35 in flight opening doors, flaperon
Dassault F5X empennage
Gulfstream G650 empennage
AW169 Thermoplastic horizontal
A350 outboard flap
Hondajet empennage
A380, GLARE® fuselage panels
Thermoplastic leading edge
FOKKER UNCLASSIFIED
Key Technology FML is applied A380 fuselage panels
GLAss REinforced aluminum
A sandwich material constructed from alternating layers of aluminum and
glass fiber with bond film.
• Weight reduction: 15 to 30%
• Excellent Fatigue Resistance
• Improved Impact Resistance
• Excellent Fire Resistance Behavior
27 GLARE® fuselage panels
total area ± 500 m2
Thermoplastic
leading edge
Innovation
Fokker is well known through by its product innovation
4 Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED5 Innovatie in engineering bij Fokker
Key Technology Thermoplastics is applied on rudder
and elevators (Gulfstream G650, Dassault F5X)
Induction welded, carbon, thermoplastic torsion box:
• 20% cost reduction
• 10% weight reduction
• JEC innovation award 2010
Innovation
Fokker is well known through by its product innovation
FOKKER UNCLASSIFIED
Innovation
Opportunities
6
• OEM’s balance their innovation initiatives between
incremental and disruptive innovation.
• Opportunities can only be realized when Non
Recurring execution (hours & lead time) is competitive.
• This is especially true for incremental innovation:
– Incremental innovation provides opportunities for early spin offs.
– Incremental innovation can only be successful with low Non
Recurring Cost and short time-to-market.
• Besides product excellence, we need process
excellence that addresses the market needs of today:
– Complexity management (incl. requirements & change management)
– Organizational learning (transfer and re-use of domain knowledge)
– Transformative innovation & growth (e.g. high volume aspects)
Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
Sequential product development process
Project setup
Requirements
Design
Manufacturing
7
start
TomorrowsLT
Project
setup
requirements
design
manufacturing
InitialLeadtime
Knowledge
libraries
Front
Loading
Today’sLT
Concurrent product development process
Front loaded product development process
1st ss delivery
Product development process
Past, Present, Future
Innovatie in engineering bij Fokker
Project setup
Requirements
Design
Manufacturing
continuous integration of changes
FOKKER UNCLASSIFIED
Product development process
Front loading
• Front loading is a strategy to accelerate and improve
the overall product development execution (reduce
NRC hours & lead time) and performance (quality):
– Shift identification and solving of design problems to earlier phase
of the product development process.
– Maturity of the design is achieved more quickly.
– Knowledge is re-used and a standardized, predictable design
process is used by created and validated standard solutions.
– Sensitivity and robustness of a standardized design is evaluated
upfront by design space exploration and driving design
parameters.
– New concepts, knowledge and methodology generation and
adaption of the software tool suite is done in the Front Loading
phase. The Full Scale Development phase is executed with known,
existing concepts, methods, tools and standards.
Innovatie in engineering bij Fokker8
FOKKER UNCLASSIFIED9
Design
Maturity
Time
100%
Improved overall maturity
Novel design solutions
Traditional
(labor driven)
Information
driven
Product development process
Fast design maturity
Improved overall maturity, compliancy, change integration and controllability
Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
New Design - Build
Incremental
design
Product development process
Product recurring cost
• During the product development process, more and
more decisions are being made, resulting in a higher
maturity and decreasing influence on recurring cost.
Innovatie in engineering bij Fokker10
RC Cost
fixed
Time
Information
driven
100%
100%
Traditional
(labor driven)
Information
driven
80%
20%
FOKKER UNCLASSIFIED
High level architecture of Front Loading
Focus on both complexity and lead time reduction
11
complexity transfer /reduction
lead time gain due to simplicity
Innovatie in engineering bij Fokker
1
2
3
4
FOKKER UNCLASSIFIED
Impact on way of working & organizational set-up
Technical and social impact
12
• New design process requires additional capabilities:
– IT & software specialists (architectures, programmers)
– Knowledge engineers
– Engineers (design, stress, ME, specialists)
•
• Impact on career development:
– A career will be a continuous learning experience.
– Focus will be on deviations of the proposed design solution.
– Working in a holistic design environment:
– Technical and business parameters are integrated
– Multidisciplinary included in design review groups
– Knowledge development and innovation as core capability.
CURRENT STATE FUTURE STATE
Rudder design lead time 18 months Rudder design in a month
Every solution is unique Standardized solutions
Design on the spot Frontloading; Prepare upfront
Use KBE only for know repetitive knowledge Use KBE to develop new knowledge
Expert creates results Experts evaluates results
Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
Rudder-in-a-Month
Ambition / objectives
• Operational excellence and lead time reduction in non-
recurring phase by product and process standardization,
in order to stay competitive:
– Standardized design process. Workflow with integrated design logic and MDO.
– Design process innovation.
– Capture and re-use of knowledge. Formalizing tacit knowledge and best practices.
– Real-time connection between knowledge and solution / geometry.
– Automation of business process and tasks where possible and helpful.
• In order to:
– Accelerate the execution of tasks on the critical path.
– Reduce non-recurring cost of the total program by more than 50%.
– React quicker to customer requests and changes.
– Improve and expand available knowledge by front loading process and virtual rapid
prototyping, in order to aid and intensify the creative process.
– Improve quality of the product and process by having a predictable design process,
performing more iterations and having automated requirements compliance checks.
• Show feasibility of integrated, complete, automated workflow.
13 Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
Technologies, tools & way of working
Challenges required elements
• Elements required to apply the Fokker vision of the
future development process:
– Workflow managers and Framework integrating processes
and tools within a professional environment
– Mature KBE system
– Mature MDO software and strategies
– Simulation data management
– Standards data management
– Knowledge Management system
– Design rationale tracking & traceability
– Virtual laboratory
– Bridge between structures engineering and software
engineering
– Culture change of aircraft component engineers
14 Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
Rudder-in-a-Month development
Initial scope (2014) – Hinge definition
Current scope (2015) – Torsion box
15 Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
RiaM 2014 – Project description
Innovatie in engineering bij Fokker16
FOKKER UNCLASSIFIED
RiaM 2014 – Use case 1
Evaluate a hinge connection design
• Start with chosen standard solution with fixed parameter values
and set of requirements based on current G650 hinge 3 design.
Compute the behavioral properties of the design and evaluate
whether the design complies to the requirements.
17 Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
RiaM 2014 – Use case 1
Evaluate a hinge connection design
18 Innovatie in engineering bij Fokker
FOKKER UNCLASSIFIED
Conclusions
19 Innovatie in engineering bij Fokker
• Fokker vision to introduce front loading through
design automation tools and techniques in the aircraft
component development process is essential to
remain competitive, but is also ambitious:
– Problem is often more complex than anticipated:
– Many parameters, many interdependencies, specific knowledge required
– Process definition, workflow and tools have large influence on flexibility
– User interface to support concurrent engineering and maintain connection
to the product
– Level of modularity has big influence on the project:
– High modularity: Flexible model, but highly complex interfaces
– Lower modularity: Less flexibility, but interfaces better manageable
– Speed can become a limiting aspect for optimization
• For realization of this vision partners such as software
developers and knowledge institutes are required
• Biggest challenge will be for the engineers to work
efficiently in the new development environment

More Related Content

What's hot

Stage gate innovation process powerpoint presentation templates
Stage gate innovation process powerpoint presentation templatesStage gate innovation process powerpoint presentation templates
Stage gate innovation process powerpoint presentation templates
SlideTeam.net
 
PDMA Process StageGate
PDMA Process StageGatePDMA Process StageGate
PDMA Process StageGate
DeepSmarts
 
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Tim Kasse
 
Nahum_Macallan_Resume_2016
Nahum_Macallan_Resume_2016Nahum_Macallan_Resume_2016
Nahum_Macallan_Resume_2016
Nahum Macallan
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 

What's hot (20)

Stage gate innovation process powerpoint presentation templates
Stage gate innovation process powerpoint presentation templatesStage gate innovation process powerpoint presentation templates
Stage gate innovation process powerpoint presentation templates
 
PDMA Process StageGate
PDMA Process StageGatePDMA Process StageGate
PDMA Process StageGate
 
APQP Application
APQP ApplicationAPQP Application
APQP Application
 
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
Integrating Stage Gate with Product Development Models and the CMMI WB v2.2
 
Stage gate process in IT product development
Stage gate process in IT product developmentStage gate process in IT product development
Stage gate process in IT product development
 
Nahum_Macallan_Resume_2016
Nahum_Macallan_Resume_2016Nahum_Macallan_Resume_2016
Nahum_Macallan_Resume_2016
 
Agile and Stage-Gate - Getting it Right
Agile and Stage-Gate - Getting it RightAgile and Stage-Gate - Getting it Right
Agile and Stage-Gate - Getting it Right
 
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
Principal Financial Group: Stretching CRM Capabilities with Pivotal 6.0
 
Lean Construction 101 - Being Agile Post COVID
Lean Construction 101 - Being Agile Post COVIDLean Construction 101 - Being Agile Post COVID
Lean Construction 101 - Being Agile Post COVID
 
Pros & cons of phase gate by akhilesh nawade
Pros & cons of phase gate   by akhilesh nawadePros & cons of phase gate   by akhilesh nawade
Pros & cons of phase gate by akhilesh nawade
 
Innovation Team Plan
Innovation Team PlanInnovation Team Plan
Innovation Team Plan
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Rovi bit dashboard
Rovi bit dashboard Rovi bit dashboard
Rovi bit dashboard
 
JD_CV_15
JD_CV_15JD_CV_15
JD_CV_15
 
Howard Danzyger
Howard DanzygerHoward Danzyger
Howard Danzyger
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
Vincenzo Grassia CV
Vincenzo Grassia CVVincenzo Grassia CV
Vincenzo Grassia CV
 
Etm551 lecture02
Etm551 lecture02Etm551 lecture02
Etm551 lecture02
 
Stage gate framework
Stage gate frameworkStage gate framework
Stage gate framework
 

Viewers also liked

Viewers also liked (9)

Supply Chain Sauna - Jack van der Veen - TradeCloud / Nyenrode
Supply Chain Sauna - Jack van der Veen - TradeCloud / NyenrodeSupply Chain Sauna - Jack van der Veen - TradeCloud / Nyenrode
Supply Chain Sauna - Jack van der Veen - TradeCloud / Nyenrode
 
Supply Chain Sauna - Stoppen met inkopen - Agrifac / TradeCloud
Supply Chain Sauna - Stoppen met inkopen - Agrifac / TradeCloudSupply Chain Sauna - Stoppen met inkopen - Agrifac / TradeCloud
Supply Chain Sauna - Stoppen met inkopen - Agrifac / TradeCloud
 
Engineering meets supply chain > SMART Industry
Engineering meets supply chain > SMART IndustryEngineering meets supply chain > SMART Industry
Engineering meets supply chain > SMART Industry
 
Engineering meets supply chain > KE-works
Engineering meets supply chain > KE-worksEngineering meets supply chain > KE-works
Engineering meets supply chain > KE-works
 
Engineering meets supply chain > TradeCloud
Engineering meets supply chain > TradeCloudEngineering meets supply chain > TradeCloud
Engineering meets supply chain > TradeCloud
 
Engineering meets supply chain > Introductie
Engineering meets supply chain > IntroductieEngineering meets supply chain > Introductie
Engineering meets supply chain > Introductie
 
Engineering meets supply chain > BPA flexolutions
Engineering meets supply chain > BPA flexolutionsEngineering meets supply chain > BPA flexolutions
Engineering meets supply chain > BPA flexolutions
 
Supply Chain Sauna - B2B e-commerce - Vacu Vin / TradeCloud
Supply Chain Sauna - B2B e-commerce - Vacu Vin / TradeCloudSupply Chain Sauna - B2B e-commerce - Vacu Vin / TradeCloud
Supply Chain Sauna - B2B e-commerce - Vacu Vin / TradeCloud
 
PLM의 이해와 동향
PLM의 이해와 동향PLM의 이해와 동향
PLM의 이해와 동향
 

Similar to Engineering meets supply chain > Fokker

Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier
 
Resume Mm Brach Chronological 8.0
Resume   Mm Brach Chronological 8.0Resume   Mm Brach Chronological 8.0
Resume Mm Brach Chronological 8.0
mbrach
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
Paresh Gawade
 
CV Jochen Krick 2015_1
CV Jochen Krick 2015_1CV Jochen Krick 2015_1
CV Jochen Krick 2015_1
Jochen Krick
 
CV Jochen Krick 2015_1
CV Jochen Krick 2015_1CV Jochen Krick 2015_1
CV Jochen Krick 2015_1
Jochen Krick
 

Similar to Engineering meets supply chain > Fokker (20)

Apqp la
Apqp laApqp la
Apqp la
 
Concurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silosConcurrent Engineering – Breaking down the silos
Concurrent Engineering – Breaking down the silos
 
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...Concept to Commercialization – Navigating Process Development and Scale Up Ch...
Concept to Commercialization – Navigating Process Development and Scale Up Ch...
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_Aerospace
 
Embedded development life cycle
Embedded development life cycleEmbedded development life cycle
Embedded development life cycle
 
Ed Lee
Ed LeeEd Lee
Ed Lee
 
Togaf course content
Togaf course contentTogaf course content
Togaf course content
 
Resume Mm Brach Chronological 8.0
Resume   Mm Brach Chronological 8.0Resume   Mm Brach Chronological 8.0
Resume Mm Brach Chronological 8.0
 
Jason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CV
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
 
CV Jochen Krick 2015_1
CV Jochen Krick 2015_1CV Jochen Krick 2015_1
CV Jochen Krick 2015_1
 
CV Jochen Krick 2015_1
CV Jochen Krick 2015_1CV Jochen Krick 2015_1
CV Jochen Krick 2015_1
 
Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...Formal Project Management and Lean Manufacturing as tools to solve some today...
Formal Project Management and Lean Manufacturing as tools to solve some today...
 
Advanced Work Packaging (AWP): Benefits
Advanced Work Packaging (AWP): BenefitsAdvanced Work Packaging (AWP): Benefits
Advanced Work Packaging (AWP): Benefits
 
Systems Engineering
Systems EngineeringSystems Engineering
Systems Engineering
 
No grip no glory also valid in agile projects
No grip no glory also valid in agile projectsNo grip no glory also valid in agile projects
No grip no glory also valid in agile projects
 
Thomson CV
Thomson CVThomson CV
Thomson CV
 
Ce seminar
Ce seminarCe seminar
Ce seminar
 
Michael Olinski Resume
Michael Olinski ResumeMichael Olinski Resume
Michael Olinski Resume
 

More from Tradecloud supply chain platform

More from Tradecloud supply chain platform (20)

Tradecloud voor leveranciers - Slimmer samenwerken met klanten
Tradecloud voor leveranciers - Slimmer samenwerken met klantenTradecloud voor leveranciers - Slimmer samenwerken met klanten
Tradecloud voor leveranciers - Slimmer samenwerken met klanten
 
Tradecloud voor Exact Globe buyers
Tradecloud voor Exact Globe buyersTradecloud voor Exact Globe buyers
Tradecloud voor Exact Globe buyers
 
Moba case study - Tradecloud webinar
Moba case study - Tradecloud webinarMoba case study - Tradecloud webinar
Moba case study - Tradecloud webinar
 
Post corona - Slimmer samenwerken met leveranciers - Tradecloud webinar
Post corona - Slimmer samenwerken met leveranciers - Tradecloud webinarPost corona - Slimmer samenwerken met leveranciers - Tradecloud webinar
Post corona - Slimmer samenwerken met leveranciers - Tradecloud webinar
 
Product Demo voor Inkopers - Tradecloud Webinar
Product Demo voor Inkopers - Tradecloud WebinarProduct Demo voor Inkopers - Tradecloud Webinar
Product Demo voor Inkopers - Tradecloud Webinar
 
Wat is SCSN (Smart Connected Supplier Network) - Tradecloud webinar
Wat is SCSN (Smart Connected Supplier Network) - Tradecloud webinarWat is SCSN (Smart Connected Supplier Network) - Tradecloud webinar
Wat is SCSN (Smart Connected Supplier Network) - Tradecloud webinar
 
Voor leveranciers - slimmer samenwerken met klanten - Tradecloud webinar
Voor leveranciers - slimmer samenwerken met klanten - Tradecloud webinarVoor leveranciers - slimmer samenwerken met klanten - Tradecloud webinar
Voor leveranciers - slimmer samenwerken met klanten - Tradecloud webinar
 
Tradecloud live (product demo) - Tradecloud webinar
Tradecloud live (product demo) - Tradecloud webinarTradecloud live (product demo) - Tradecloud webinar
Tradecloud live (product demo) - Tradecloud webinar
 
Slimmer samenwerken met leveranciers - Tradecloud Webinar
Slimmer samenwerken met leveranciers - Tradecloud WebinarSlimmer samenwerken met leveranciers - Tradecloud Webinar
Slimmer samenwerken met leveranciers - Tradecloud Webinar
 
Webinar - Wat is SCSN? - smart connected supplier network
Webinar - Wat is SCSN? - smart connected supplier networkWebinar - Wat is SCSN? - smart connected supplier network
Webinar - Wat is SCSN? - smart connected supplier network
 
Tradecloud REST API intro for Buyers
Tradecloud REST API intro for BuyersTradecloud REST API intro for Buyers
Tradecloud REST API intro for Buyers
 
Tradecloud introduction for Suppliers
Tradecloud introduction for SuppliersTradecloud introduction for Suppliers
Tradecloud introduction for Suppliers
 
Intro Tradecloud Supply Chain Plattform für die Fertigungsindustrie
Intro Tradecloud Supply Chain Plattform für die FertigungsindustrieIntro Tradecloud Supply Chain Plattform für die Fertigungsindustrie
Intro Tradecloud Supply Chain Plattform für die Fertigungsindustrie
 
ICT & Logistiek 2019 - Tradecloud en HAN over de zelfsturende supply chain
ICT & Logistiek 2019 - Tradecloud en HAN over de zelfsturende supply chainICT & Logistiek 2019 - Tradecloud en HAN over de zelfsturende supply chain
ICT & Logistiek 2019 - Tradecloud en HAN over de zelfsturende supply chain
 
Modulair produceren expert sessie - presentaties
Modulair produceren expert sessie - presentatiesModulair produceren expert sessie - presentaties
Modulair produceren expert sessie - presentaties
 
Tradecloud - Introductie voor inkopers
Tradecloud - Introductie voor inkopersTradecloud - Introductie voor inkopers
Tradecloud - Introductie voor inkopers
 
Tradecloud - Introduction for suppliers
Tradecloud - Introduction for suppliersTradecloud - Introduction for suppliers
Tradecloud - Introduction for suppliers
 
Demand driven supply chain - Heering FJ Evers - expert sessie
Demand driven supply chain - Heering FJ Evers - expert sessieDemand driven supply chain - Heering FJ Evers - expert sessie
Demand driven supply chain - Heering FJ Evers - expert sessie
 
Demand driven supply chain - Tradecloud intro - expert sessie
Demand driven supply chain - Tradecloud intro - expert sessieDemand driven supply chain - Tradecloud intro - expert sessie
Demand driven supply chain - Tradecloud intro - expert sessie
 
Demand driven supply chain - Van Egmond - expert sessie
Demand driven supply chain - Van Egmond - expert sessieDemand driven supply chain - Van Egmond - expert sessie
Demand driven supply chain - Van Egmond - expert sessie
 

Recently uploaded

Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Recently uploaded (20)

TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 

Engineering meets supply chain > Fokker

  • 1. Innovatie in engineering bij Fokker Engineering & Supply Chain kunnen slimmer samenwerken – Workshop Martijn van Rij 21 oktober 2015 Manager Design Engineering Fokker Aerostructures BV
  • 2. FOKKER UNCLASSIFIED Contents Innovatie in engineering bij Fokker2 • Company overview • Innovation – Product – Process • Product development process – Past, Present, Future – Front loading strategy • Front loading – High level architecture – Impact on way of working & organizational set-up • Rudder-in-a-Month – Ambition / objectives – Challenges required elements – Developments • Conclusions
  • 3. FOKKER UNCLASSIFIED Fokker Aerostructures – Company overview Innovatie in engineering bij Fokker3 • Fokker Aerostructures is a Tier 1 Aerostructures supplier for all the main aeronautical OEM’s • Fokker will become part of GKN F35 in flight opening doors, flaperon Dassault F5X empennage Gulfstream G650 empennage AW169 Thermoplastic horizontal A350 outboard flap Hondajet empennage A380, GLARE® fuselage panels Thermoplastic leading edge
  • 4. FOKKER UNCLASSIFIED Key Technology FML is applied A380 fuselage panels GLAss REinforced aluminum A sandwich material constructed from alternating layers of aluminum and glass fiber with bond film. • Weight reduction: 15 to 30% • Excellent Fatigue Resistance • Improved Impact Resistance • Excellent Fire Resistance Behavior 27 GLARE® fuselage panels total area ± 500 m2 Thermoplastic leading edge Innovation Fokker is well known through by its product innovation 4 Innovatie in engineering bij Fokker
  • 5. FOKKER UNCLASSIFIED5 Innovatie in engineering bij Fokker Key Technology Thermoplastics is applied on rudder and elevators (Gulfstream G650, Dassault F5X) Induction welded, carbon, thermoplastic torsion box: • 20% cost reduction • 10% weight reduction • JEC innovation award 2010 Innovation Fokker is well known through by its product innovation
  • 6. FOKKER UNCLASSIFIED Innovation Opportunities 6 • OEM’s balance their innovation initiatives between incremental and disruptive innovation. • Opportunities can only be realized when Non Recurring execution (hours & lead time) is competitive. • This is especially true for incremental innovation: – Incremental innovation provides opportunities for early spin offs. – Incremental innovation can only be successful with low Non Recurring Cost and short time-to-market. • Besides product excellence, we need process excellence that addresses the market needs of today: – Complexity management (incl. requirements & change management) – Organizational learning (transfer and re-use of domain knowledge) – Transformative innovation & growth (e.g. high volume aspects) Innovatie in engineering bij Fokker
  • 7. FOKKER UNCLASSIFIED Sequential product development process Project setup Requirements Design Manufacturing 7 start TomorrowsLT Project setup requirements design manufacturing InitialLeadtime Knowledge libraries Front Loading Today’sLT Concurrent product development process Front loaded product development process 1st ss delivery Product development process Past, Present, Future Innovatie in engineering bij Fokker Project setup Requirements Design Manufacturing continuous integration of changes
  • 8. FOKKER UNCLASSIFIED Product development process Front loading • Front loading is a strategy to accelerate and improve the overall product development execution (reduce NRC hours & lead time) and performance (quality): – Shift identification and solving of design problems to earlier phase of the product development process. – Maturity of the design is achieved more quickly. – Knowledge is re-used and a standardized, predictable design process is used by created and validated standard solutions. – Sensitivity and robustness of a standardized design is evaluated upfront by design space exploration and driving design parameters. – New concepts, knowledge and methodology generation and adaption of the software tool suite is done in the Front Loading phase. The Full Scale Development phase is executed with known, existing concepts, methods, tools and standards. Innovatie in engineering bij Fokker8
  • 9. FOKKER UNCLASSIFIED9 Design Maturity Time 100% Improved overall maturity Novel design solutions Traditional (labor driven) Information driven Product development process Fast design maturity Improved overall maturity, compliancy, change integration and controllability Innovatie in engineering bij Fokker
  • 10. FOKKER UNCLASSIFIED New Design - Build Incremental design Product development process Product recurring cost • During the product development process, more and more decisions are being made, resulting in a higher maturity and decreasing influence on recurring cost. Innovatie in engineering bij Fokker10 RC Cost fixed Time Information driven 100% 100% Traditional (labor driven) Information driven 80% 20%
  • 11. FOKKER UNCLASSIFIED High level architecture of Front Loading Focus on both complexity and lead time reduction 11 complexity transfer /reduction lead time gain due to simplicity Innovatie in engineering bij Fokker 1 2 3 4
  • 12. FOKKER UNCLASSIFIED Impact on way of working & organizational set-up Technical and social impact 12 • New design process requires additional capabilities: – IT & software specialists (architectures, programmers) – Knowledge engineers – Engineers (design, stress, ME, specialists) • • Impact on career development: – A career will be a continuous learning experience. – Focus will be on deviations of the proposed design solution. – Working in a holistic design environment: – Technical and business parameters are integrated – Multidisciplinary included in design review groups – Knowledge development and innovation as core capability. CURRENT STATE FUTURE STATE Rudder design lead time 18 months Rudder design in a month Every solution is unique Standardized solutions Design on the spot Frontloading; Prepare upfront Use KBE only for know repetitive knowledge Use KBE to develop new knowledge Expert creates results Experts evaluates results Innovatie in engineering bij Fokker
  • 13. FOKKER UNCLASSIFIED Rudder-in-a-Month Ambition / objectives • Operational excellence and lead time reduction in non- recurring phase by product and process standardization, in order to stay competitive: – Standardized design process. Workflow with integrated design logic and MDO. – Design process innovation. – Capture and re-use of knowledge. Formalizing tacit knowledge and best practices. – Real-time connection between knowledge and solution / geometry. – Automation of business process and tasks where possible and helpful. • In order to: – Accelerate the execution of tasks on the critical path. – Reduce non-recurring cost of the total program by more than 50%. – React quicker to customer requests and changes. – Improve and expand available knowledge by front loading process and virtual rapid prototyping, in order to aid and intensify the creative process. – Improve quality of the product and process by having a predictable design process, performing more iterations and having automated requirements compliance checks. • Show feasibility of integrated, complete, automated workflow. 13 Innovatie in engineering bij Fokker
  • 14. FOKKER UNCLASSIFIED Technologies, tools & way of working Challenges required elements • Elements required to apply the Fokker vision of the future development process: – Workflow managers and Framework integrating processes and tools within a professional environment – Mature KBE system – Mature MDO software and strategies – Simulation data management – Standards data management – Knowledge Management system – Design rationale tracking & traceability – Virtual laboratory – Bridge between structures engineering and software engineering – Culture change of aircraft component engineers 14 Innovatie in engineering bij Fokker
  • 15. FOKKER UNCLASSIFIED Rudder-in-a-Month development Initial scope (2014) – Hinge definition Current scope (2015) – Torsion box 15 Innovatie in engineering bij Fokker
  • 16. FOKKER UNCLASSIFIED RiaM 2014 – Project description Innovatie in engineering bij Fokker16
  • 17. FOKKER UNCLASSIFIED RiaM 2014 – Use case 1 Evaluate a hinge connection design • Start with chosen standard solution with fixed parameter values and set of requirements based on current G650 hinge 3 design. Compute the behavioral properties of the design and evaluate whether the design complies to the requirements. 17 Innovatie in engineering bij Fokker
  • 18. FOKKER UNCLASSIFIED RiaM 2014 – Use case 1 Evaluate a hinge connection design 18 Innovatie in engineering bij Fokker
  • 19. FOKKER UNCLASSIFIED Conclusions 19 Innovatie in engineering bij Fokker • Fokker vision to introduce front loading through design automation tools and techniques in the aircraft component development process is essential to remain competitive, but is also ambitious: – Problem is often more complex than anticipated: – Many parameters, many interdependencies, specific knowledge required – Process definition, workflow and tools have large influence on flexibility – User interface to support concurrent engineering and maintain connection to the product – Level of modularity has big influence on the project: – High modularity: Flexible model, but highly complex interfaces – Lower modularity: Less flexibility, but interfaces better manageable – Speed can become a limiting aspect for optimization • For realization of this vision partners such as software developers and knowledge institutes are required • Biggest challenge will be for the engineers to work efficiently in the new development environment