Air barrier paper is a covering over a building interior during construction that keeps air from flowing into many parts of the building.  Keeps overwhelming moisture and the elements from entering the building not during construction only, but during the life time of the building as well. Air Barrier Paper
Attic Ventilation pg.1 Building used for ventilation Soffit vent- a vent under the roof that allows air to flow into the attic and upper space in a building Ridge vent- a vent on the roof that allowed moist and humid air to flow out of the attic or upper level area
Attic Ventilation pg.2 Roof turbine- pulls air out of the attic or upper area that the vents cant handle or get to Gabel vent- a covered vent that allows warm dry air to escape the attic or upper area of a building
Backhoe A backhoe is piece of machinery in the field that is used to dig up trenches and holes with its bucket.  Can be attacked to a front end loader, but can be separate as well.  Bucket in picture is 2’ wide.
Batter Boards Batter Boards were pieces of wood that were used to mark the outer areas of the building so the trenches and areas could be dug within the limits of the building.
Brick Arches pg.1 Roman Brick Arch Segmental Brick arch
Brick Arches pg.2 Centering an arch Brick arch with keystone
Brick Bonds pg.1 Common pattern- basic striation of brick pattern.  Brick above or below is set ½ off the other. Monk pattern- every other brick is turned inside
Brick Bonds pg.2 Rowlocks Header Brick
Brick Bonds pg.3 Sailors Soldiers Stretcher
Brick Sizes Modular 3 ½ ’ x 7 ½’’ Standard 3 ½’’ x 8’
Bulldozer The bulldozer is another piece of machinery in the field.  Is used to push large piles of dirt and rubble around, moving stuff around the construction site.
Cladding pg.1 Brick cladding on building EIFS cladding on building
Cladding pg. 2 Wood cladding on building Stone cladding on building.  Random rubble pattern Wood shingle cladding on building.  Wood shingling is a pattern of wood shingles on the building
Window in my room is a double window and the opening is 22” x 28” and 6” net opening.  Sill is 2’6” off the floor.  Codes state that sill must be below 44” and above 24”.  The opening must be above 20”x24”.  My window meets IBC requirements. Code Requirements pg.1
These are rubber covered stairs in the dorm.  Rise measures at 7” and tread measures at 10 1/8”.  Code states that the rise must be between 7 ¾” and 7 3/8”, and tread must be between 10 3/8” and 10”.  The stairs meet these requirements.  Code Requirements pg.2
Concrete Joints pg.1 Control joint is a joint set into concrete to control where cracking happens.  However, does not always work, as shown above.
Concrete Joints pg.2 Isolation joint is a joint that separates two things, such as a column and the floor.  In this photo, the joint is keeping the concrete and the brick separate.
Concrete Masonry Unit (CMU) CMU is a concrete block, usually in dimensions of around 8”x8”x16”.  They are used in foundation walls mostly, but many buildings are made solely from them.  Not all CMU’s are those dimensions, but some are even 6”x6”x16”, much like the ones on the right.
Decorative CMU Split CMU block Ribbed CMU block
Doors pg.1 Sidelight-A strip of vertical glass running alongside a door. Exterior Flush Door Top rail Bottom rail Panel Stile
Doors pg.2 Transom- a window above a door that is usually hinged to a horizontal crosspiece over the door
Electrical Components pg.1  Power pole with transformer. It is an electrical device by which alternating current of one voltage is changed to another voltage.  Service meter.  A device that measures the amount of electricity consumed daily.
Electrical Components pg.2 Duplex receptacle.  A dual plug in the wall for plugging in electrical devices. Service panel.  Controls where the electricity goes and if it is on or off
Framing Elements pg.1 #1: Anchor Bolt
Framing Elements pg.2 #2:Sill plate #3: Floor joist #4: Subflooring #5: Sole plate  #6: Stud #7: Top plate #8: Unfinished stringer #9: Ceiling joist #10: Rafter #11: Roof decking #12: Sheathing
Front end loader is a piece of machinery that is used to move rubble, dirt, and even equipment around a construction sight.  Difference between the front end loader and a bulldozer is the front end loader can lift things while a bulldozer can only push. Front End Loader
Known also as dry wall, it is the main wall material used in construction. Gypsum Board
Heat Pump pg.1 One advantage of a heat pump is that they produce low-density heat which is safer for children and elderly, unlike fires, oil filled or electric fan heaters. One disadvantage of a heat pump is they are expensive and are used a lot in cold weather. Condenser systems typically has a heat exchanger section to cool down and condense incoming refrigerant vapor into liquid, a compressor to raise the pressure of the refrigerant and move it along, and a fan for blowing outside air through the heat exchanger section to cool the refrigerant inside.
Air handling unit is a device used to condition and circulate air Heat Pump pg.2
A lintel is a horizontal beam used in the construction of buildings that usually supports the masonry above a window or door opening Lintel
Mortar pg.1 Concave mortar joint, troweled, 1/3”, dormitory, N type mortar
Mortar pg.2 Racked joint, tooled, 1/3”, O type mortar
OSB is a type of wood board that is constructed from the shards of left over boards made at a factory.  They are a nonveneered panel product and are commonly used in residential construction. Oriented Strand Board
Plumbing pg.1  VTR: allows sewer gases to escape the piping Lavatory 1 ½” pipe
Flush mount sink Plumbing pg.2
Diameter 1”, #6 rebar.  Deformations there so soil and concrete can grip it.   Rebar
Steep Roof Drainage A down spout is a vertical pipe that moves the water from the gutter down to the ground. A gutter is a device that catches rain fall and funnels it towards the down spouts.
Steep Roof Terms pg.1 Eave- The overhanging lower edge of your roof No fascia Ridge- The peak of your roofline along its top Valley- The portion of your roof where two slopes intersect
Steep Roof Terms pg.2 Rake- The side of your roof's slope Fascia-describes any horizontal surface which spans across the top of columns or across the top of a wall Soffit- underside of the eave
Stone Random rubble Coursed ashlar
Weep Hole Weep hole- small openings left in the outer wall of masonry construction as an outlet for water inside a building to move outside the wall and evaporate.
Windows Double hung window- two windows stacked on top of each other

More Related Content

What's hot

Visual Dictionary Day 3
Visual Dictionary Day 3Visual Dictionary Day 3
Visual Dictionary Day 3Sp10tyvex
 
Visual Dictionary 2 of 2
Visual Dictionary 2 of 2Visual Dictionary 2 of 2
Visual Dictionary 2 of 2spandrel
 
Visual Dictionary final
Visual Dictionary finalVisual Dictionary final
Visual Dictionary finalplasterboard
 
Plasterboard's Visual Dictionary
Plasterboard's Visual DictionaryPlasterboard's Visual Dictionary
Plasterboard's Visual Dictionaryplasterboard
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 
Visual Dictionary That Is Finished.
Visual Dictionary That Is Finished.Visual Dictionary That Is Finished.
Visual Dictionary That Is Finished.Subfloor
 
Visual Dictionary - Scaffold
Visual Dictionary - ScaffoldVisual Dictionary - Scaffold
Visual Dictionary - ScaffoldScaffold
 
Air Barrier Paper
Air Barrier PaperAir Barrier Paper
Air Barrier Papercody davis
 
Visual Dictionary Terrazzo
Visual Dictionary TerrazzoVisual Dictionary Terrazzo
Visual Dictionary Terrazzoterrazzo
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionaryconduit1
 
Visual Dictionary - LVL
Visual Dictionary - LVLVisual Dictionary - LVL
Visual Dictionary - LVLLVL
 
Visual Dictionary Limestone
Visual Dictionary LimestoneVisual Dictionary Limestone
Visual Dictionary Limestonelimestone
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionarymasonry
 
sp10weldedwirefabric
sp10weldedwirefabricsp10weldedwirefabric
sp10weldedwirefabricauburn
 
Visual Dictionary- Bark1
Visual Dictionary- Bark1Visual Dictionary- Bark1
Visual Dictionary- Bark1bark1
 
Visual dictionary Sp10stain
Visual dictionary  Sp10stainVisual dictionary  Sp10stain
Visual dictionary Sp10stainSp10stain
 
Visual dictionary-Vault
Visual dictionary-VaultVisual dictionary-Vault
Visual dictionary-VaultVault
 

What's hot (20)

Visual Dictionary Day 3
Visual Dictionary Day 3Visual Dictionary Day 3
Visual Dictionary Day 3
 
Visual Dictionary 2 of 2
Visual Dictionary 2 of 2Visual Dictionary 2 of 2
Visual Dictionary 2 of 2
 
Visual Dictionary final
Visual Dictionary finalVisual Dictionary final
Visual Dictionary final
 
Plasterboard's Visual Dictionary
Plasterboard's Visual DictionaryPlasterboard's Visual Dictionary
Plasterboard's Visual Dictionary
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Visual Dictionary That Is Finished.
Visual Dictionary That Is Finished.Visual Dictionary That Is Finished.
Visual Dictionary That Is Finished.
 
Visual Dictionary - Scaffold
Visual Dictionary - ScaffoldVisual Dictionary - Scaffold
Visual Dictionary - Scaffold
 
Air Barrier Paper
Air Barrier PaperAir Barrier Paper
Air Barrier Paper
 
Visual Dictionary Terrazzo
Visual Dictionary TerrazzoVisual Dictionary Terrazzo
Visual Dictionary Terrazzo
 
Rod Visual
Rod VisualRod Visual
Rod Visual
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary - LVL
Visual Dictionary - LVLVisual Dictionary - LVL
Visual Dictionary - LVL
 
Sp10Lumber
Sp10LumberSp10Lumber
Sp10Lumber
 
Final bsci ppt
Final bsci pptFinal bsci ppt
Final bsci ppt
 
Visual Dictionary Limestone
Visual Dictionary LimestoneVisual Dictionary Limestone
Visual Dictionary Limestone
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
sp10weldedwirefabric
sp10weldedwirefabricsp10weldedwirefabric
sp10weldedwirefabric
 
Visual Dictionary- Bark1
Visual Dictionary- Bark1Visual Dictionary- Bark1
Visual Dictionary- Bark1
 
Visual dictionary Sp10stain
Visual dictionary  Sp10stainVisual dictionary  Sp10stain
Visual dictionary Sp10stain
 
Visual dictionary-Vault
Visual dictionary-VaultVisual dictionary-Vault
Visual dictionary-Vault
 

Similar to Visual dictionary- Sp10door

visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final projectAuburn University
 
Visual Dictionary-sp10joinery
Visual Dictionary-sp10joineryVisual Dictionary-sp10joinery
Visual Dictionary-sp10joinerysp10joinery
 
Visual Dictionary-curing
Visual Dictionary-curingVisual Dictionary-curing
Visual Dictionary-curingcuring
 
Visual Dictionary 2- Conrete
Visual Dictionary 2- ConreteVisual Dictionary 2- Conrete
Visual Dictionary 2- Conreteconcrete
 
Bsci2300 Visual Dictionary New
Bsci2300 Visual Dictionary NewBsci2300 Visual Dictionary New
Bsci2300 Visual Dictionary NewSteelBeam
 
Visual Dictionary- Baluster
Visual Dictionary- BalusterVisual Dictionary- Baluster
Visual Dictionary- BalusterBaluster
 
(OLD DON'T USE) Visual Dictionary
(OLD DON'T USE) Visual Dictionary(OLD DON'T USE) Visual Dictionary
(OLD DON'T USE) Visual DictionarySp10sill
 
Visual dictionary FINAL COMPLETE REAL
Visual dictionary FINAL COMPLETE REALVisual dictionary FINAL COMPLETE REAL
Visual dictionary FINAL COMPLETE REALSp10Downspout
 
Visual dictionary COMPLETE
Visual dictionary COMPLETEVisual dictionary COMPLETE
Visual dictionary COMPLETESp10Downspout
 
Visual Dictionary- Cement1
Visual Dictionary- Cement1Visual Dictionary- Cement1
Visual Dictionary- Cement1cement1
 
Visual Dictionary- Zoning
Visual Dictionary- ZoningVisual Dictionary- Zoning
Visual Dictionary- ZoningZoning
 
Visual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeVisual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeSp10knothole
 
visual dictionary- cavitywall
visual dictionary- cavitywallvisual dictionary- cavitywall
visual dictionary- cavitywallcavitywall
 
Visual Dictionary- Travertine
Visual Dictionary- TravertineVisual Dictionary- Travertine
Visual Dictionary- TravertineTravertine
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionaryJosh Jordan
 
Visual dictionary 2
Visual dictionary 2Visual dictionary 2
Visual dictionary 2Josh Jordan
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionaryJosh Jordan
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionaryJosh Jordan
 

Similar to Visual dictionary- Sp10door (20)

visual dictionary
visual dictionaryvisual dictionary
visual dictionary
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final project
 
Visual Dictionary-sp10joinery
Visual Dictionary-sp10joineryVisual Dictionary-sp10joinery
Visual Dictionary-sp10joinery
 
Visual Dictionary-curing
Visual Dictionary-curingVisual Dictionary-curing
Visual Dictionary-curing
 
Visual Dictionary 2- Conrete
Visual Dictionary 2- ConreteVisual Dictionary 2- Conrete
Visual Dictionary 2- Conrete
 
Bsci2300 Visual Dictionary New
Bsci2300 Visual Dictionary NewBsci2300 Visual Dictionary New
Bsci2300 Visual Dictionary New
 
Visual Dictionary- Baluster
Visual Dictionary- BalusterVisual Dictionary- Baluster
Visual Dictionary- Baluster
 
(OLD DON'T USE) Visual Dictionary
(OLD DON'T USE) Visual Dictionary(OLD DON'T USE) Visual Dictionary
(OLD DON'T USE) Visual Dictionary
 
Visual dictionary FINAL COMPLETE REAL
Visual dictionary FINAL COMPLETE REALVisual dictionary FINAL COMPLETE REAL
Visual dictionary FINAL COMPLETE REAL
 
Visual dictionary COMPLETE
Visual dictionary COMPLETEVisual dictionary COMPLETE
Visual dictionary COMPLETE
 
Visual Dictionary- Cement1
Visual Dictionary- Cement1Visual Dictionary- Cement1
Visual Dictionary- Cement1
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionary
 
Visual Dictionary- Zoning
Visual Dictionary- ZoningVisual Dictionary- Zoning
Visual Dictionary- Zoning
 
Visual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeVisual dictionary - Sp10knothole
Visual dictionary - Sp10knothole
 
visual dictionary- cavitywall
visual dictionary- cavitywallvisual dictionary- cavitywall
visual dictionary- cavitywall
 
Visual Dictionary- Travertine
Visual Dictionary- TravertineVisual Dictionary- Travertine
Visual Dictionary- Travertine
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionary
 
Visual dictionary 2
Visual dictionary 2Visual dictionary 2
Visual dictionary 2
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionary
 
Visual dictionary
Visual dictionaryVisual dictionary
Visual dictionary
 

Visual dictionary- Sp10door

  • 1. Visual Dictionary BSCI 2300 Materials Methods & Equipment I Sp10door Spring 2010
  • 2. Air barrier paper is a covering over a building interior during construction that keeps air from flowing into many parts of the building. Keeps overwhelming moisture and the elements from entering the building not during construction only, but during the life time of the building as well. Air Barrier Paper
  • 3. Attic Ventilation pg.1 Building used for ventilation Soffit vent- a vent under the roof that allows air to flow into the attic and upper space in a building Ridge vent- a vent on the roof that allowed moist and humid air to flow out of the attic or upper level area
  • 4. Attic Ventilation pg.2 Roof turbine- pulls air out of the attic or upper area that the vents cant handle or get to Gabel vent- a covered vent that allows warm dry air to escape the attic or upper area of a building
  • 5. Backhoe A backhoe is piece of machinery in the field that is used to dig up trenches and holes with its bucket. Can be attacked to a front end loader, but can be separate as well. Bucket in picture is 2’ wide.
  • 6. Batter Boards Batter Boards were pieces of wood that were used to mark the outer areas of the building so the trenches and areas could be dug within the limits of the building.
  • 7. Brick Arches pg.1 Roman Brick Arch Segmental Brick arch
  • 8. Brick Arches pg.2 Centering an arch Brick arch with keystone
  • 9. Brick Bonds pg.1 Common pattern- basic striation of brick pattern. Brick above or below is set ½ off the other. Monk pattern- every other brick is turned inside
  • 10. Brick Bonds pg.2 Rowlocks Header Brick
  • 11. Brick Bonds pg.3 Sailors Soldiers Stretcher
  • 12. Brick Sizes Modular 3 ½ ’ x 7 ½’’ Standard 3 ½’’ x 8’
  • 13. Bulldozer The bulldozer is another piece of machinery in the field. Is used to push large piles of dirt and rubble around, moving stuff around the construction site.
  • 14. Cladding pg.1 Brick cladding on building EIFS cladding on building
  • 15. Cladding pg. 2 Wood cladding on building Stone cladding on building. Random rubble pattern Wood shingle cladding on building. Wood shingling is a pattern of wood shingles on the building
  • 16. Window in my room is a double window and the opening is 22” x 28” and 6” net opening. Sill is 2’6” off the floor. Codes state that sill must be below 44” and above 24”. The opening must be above 20”x24”. My window meets IBC requirements. Code Requirements pg.1
  • 17. These are rubber covered stairs in the dorm. Rise measures at 7” and tread measures at 10 1/8”. Code states that the rise must be between 7 ¾” and 7 3/8”, and tread must be between 10 3/8” and 10”. The stairs meet these requirements. Code Requirements pg.2
  • 18. Concrete Joints pg.1 Control joint is a joint set into concrete to control where cracking happens. However, does not always work, as shown above.
  • 19. Concrete Joints pg.2 Isolation joint is a joint that separates two things, such as a column and the floor. In this photo, the joint is keeping the concrete and the brick separate.
  • 20. Concrete Masonry Unit (CMU) CMU is a concrete block, usually in dimensions of around 8”x8”x16”. They are used in foundation walls mostly, but many buildings are made solely from them. Not all CMU’s are those dimensions, but some are even 6”x6”x16”, much like the ones on the right.
  • 21. Decorative CMU Split CMU block Ribbed CMU block
  • 22. Doors pg.1 Sidelight-A strip of vertical glass running alongside a door. Exterior Flush Door Top rail Bottom rail Panel Stile
  • 23. Doors pg.2 Transom- a window above a door that is usually hinged to a horizontal crosspiece over the door
  • 24. Electrical Components pg.1 Power pole with transformer. It is an electrical device by which alternating current of one voltage is changed to another voltage. Service meter. A device that measures the amount of electricity consumed daily.
  • 25. Electrical Components pg.2 Duplex receptacle. A dual plug in the wall for plugging in electrical devices. Service panel. Controls where the electricity goes and if it is on or off
  • 26. Framing Elements pg.1 #1: Anchor Bolt
  • 27. Framing Elements pg.2 #2:Sill plate #3: Floor joist #4: Subflooring #5: Sole plate #6: Stud #7: Top plate #8: Unfinished stringer #9: Ceiling joist #10: Rafter #11: Roof decking #12: Sheathing
  • 28. Front end loader is a piece of machinery that is used to move rubble, dirt, and even equipment around a construction sight. Difference between the front end loader and a bulldozer is the front end loader can lift things while a bulldozer can only push. Front End Loader
  • 29. Known also as dry wall, it is the main wall material used in construction. Gypsum Board
  • 30. Heat Pump pg.1 One advantage of a heat pump is that they produce low-density heat which is safer for children and elderly, unlike fires, oil filled or electric fan heaters. One disadvantage of a heat pump is they are expensive and are used a lot in cold weather. Condenser systems typically has a heat exchanger section to cool down and condense incoming refrigerant vapor into liquid, a compressor to raise the pressure of the refrigerant and move it along, and a fan for blowing outside air through the heat exchanger section to cool the refrigerant inside.
  • 31. Air handling unit is a device used to condition and circulate air Heat Pump pg.2
  • 32. A lintel is a horizontal beam used in the construction of buildings that usually supports the masonry above a window or door opening Lintel
  • 33. Mortar pg.1 Concave mortar joint, troweled, 1/3”, dormitory, N type mortar
  • 34. Mortar pg.2 Racked joint, tooled, 1/3”, O type mortar
  • 35. OSB is a type of wood board that is constructed from the shards of left over boards made at a factory. They are a nonveneered panel product and are commonly used in residential construction. Oriented Strand Board
  • 36. Plumbing pg.1 VTR: allows sewer gases to escape the piping Lavatory 1 ½” pipe
  • 37. Flush mount sink Plumbing pg.2
  • 38. Diameter 1”, #6 rebar. Deformations there so soil and concrete can grip it. Rebar
  • 39. Steep Roof Drainage A down spout is a vertical pipe that moves the water from the gutter down to the ground. A gutter is a device that catches rain fall and funnels it towards the down spouts.
  • 40. Steep Roof Terms pg.1 Eave- The overhanging lower edge of your roof No fascia Ridge- The peak of your roofline along its top Valley- The portion of your roof where two slopes intersect
  • 41. Steep Roof Terms pg.2 Rake- The side of your roof's slope Fascia-describes any horizontal surface which spans across the top of columns or across the top of a wall Soffit- underside of the eave
  • 42. Stone Random rubble Coursed ashlar
  • 43. Weep Hole Weep hole- small openings left in the outer wall of masonry construction as an outlet for water inside a building to move outside the wall and evaporate.
  • 44. Windows Double hung window- two windows stacked on top of each other