Contract
For
The Erection Work for Wood Chip Mill Equipment at __________________________
Between
PT. ______________________
Address at
..............................................................................................
..............................................................................................
And
PT. ______________________
Address at
....................................................................................................
(Hereinafter called "Sub-Contractor" or "PT. ____________")
DD/MM/YYYY
2 / 17
Table of Contents
1. Background
2. Definitions
3. The Scope of Contract
4. Work Schedule
5. Contract Price, Terms of Payment and Advance Payment Bond
6. Warranty
7. Change / Modification / Alteration of the Work
8. Progress Report
9. Delay in Delivery / Extension of Time
10. Force Majeure
11. Taxes and Duties
11. Effectiveness of Contract
12. Termination
13. Notices
14. Governing Law and Arbitration
15. Miscellaneous
Annex A : Extent of Scope of Supply and Work, Equipment List
3 / 17
This Contract for the Erection Work for Wood Chip Mill Equipment at .....................................................................
(hereinafter referred to as the “Contract”) is made on ................, ............. of ................... two thousand
and ............... (DD-MM-YYYY), by and between :
1. PT. ______________________, a limited liability company duly established and existing under the laws of
the Republic of Indonesia, having its address at ................................................................ (hereinafter referred
to as the “Contractor”);
2. PT. ______________________, a limited liability company duly established and existing under the laws of
the Republic of Indonesia, having its address at .................................................................................. (hereinafter
referred to as the “Sub-Contractor”).
The Contractor and the Sub-Contractor are collectively herein referred to as the “Parties” and
separately as the “Party”.
1. Background
The Contractor wishes that certain Work (as defined below) be provided and executed by the Sub-
Contractor under the terms and conditions in this Contract, and the Sub-Contractor wishes to
provide and execute the Sub-Contractor's Scope of Supply and Work to the satisfaction of the
Contractor for Contract Price as set forth hereunder.
2. Definitions
Unless otherwise specified in Contract, the following expressions shall have the meanings hereby
assigned to them;
1. "Equipment" means the goods to be supplied and erected by the Sub-Contractor under this
Contract including equipments as stipulated in Equipment List as attached as Annex A of this
Contract.
2. "Contract" means this Contract and the appendixes constituting an integral part of this
Contract.
3. "Work" means and includes all works and services to be provided to this Contract including
the Equipment and/or the Scope of Supply and Work.
4. "Contract Document" means Contract specifications and appendixes as agreed between the
Parties.
5. "Site" means the area where the Equipment is to be located and/or erected.
6. "Advance Payment Bond" to be requested in favor of the Contractor means first class
4 / 17
international bank's bond(s) and/or other equivalent(s) which is acceptable to the Contractor
for performance and warranty issued by the Sub-Contractor.
7. "Certificate of Mechanical Completion" means the Contractor certifies in writing that the Sub­
Contractor's Equipment has been fully erected and proven as satisfactory in all respects of the
Contract Document and specification unless otherwise mutually agreed on.
8. "Client" is PT. ________________, a limited liability company duly established and
existing under the laws of the Republic of Indonesia, having its address
at ..................................................................................................
9. “Scope of Supply and Work” means the scope and supply as stipulated in Annex A of this
Contract.
10. “Government” means the Government of the Republic of Indonesia.
3. The Scope of Contract
The Contractor hereby agree to appoints the Sub-Contractor to provide and execute the Work
under the terms and conditions as stipulated in this Contract and the Sub-Contractor hereby agree
to accept the appointment from the Contractor to provide and execute the Work.
4. Work Schedule
1. The Contractor undertakes to perform Work to achieve Certificate of Mechanical Completion
within five (5) months from the commencement of erection work to be fixed scheduled
on ......................... until Jan ............................ (hereinafter referred to as the “Work Schedule”).
2. Except if the delay is caused by the Force Majeure (as defined below) as stipulated in Article 10
of this Contract, in the event the Certificate of Mechanical Completion cannot be achieved
within the Work Schedule, due to reasons attributable to the Sub-Contractor, the Sub-
Contractor shall pay delay penalties at the rate of zero point three percent (0.3%) per a day of
delay (hereinafter referred to as the “Penalty”). The maximum delay Penalty shall be ten
percent (10%) of the Contract Price. The Contractor shall retain the right to terminate this
Contract in the event that the Work has not been completed and/or the Certificate of
Mechanical Completion has not been achieved until the Penalty has reached its maximum
amount.
3. Without prejudice to any other rights and remedies which the Contractor may has under the
applicable law, any breach to this provision that conducted by the Sub-Contractor shall gives
the Contractor the right to claims, demands, suits, actions, proceeds and/or prosecutes the
5 / 17
Sub-Contractor for any damages, losses, costs and/or expenses which incurred by the
Contractor, and/or to claim indemnity instead of performance to the Sub-Contractor, as the
result of or in connection with such breach.
5. Contract Price, Terms of Payment and Advance Payment Bond
1. Lump sum and fixed price in this Contract shall be USD .................
(......................................................................... United States Dollars) (hereinafter referred to as
the “Contract Price”). The Contract Price is excluded from Value Added Tax 10% of the
Contract Price.
2. The payments of the Contract Price shall be made against the Sub-Contractor’s invoice with the
following schedule:
a. 30% (USD ................ excluded VAT) as down payment shall be paid within 3 (three)
weeks after the provision of Sub-Contract's invoice as the advance payment.
b. 65% (USD ................ excluded VAT) payment shall be paid on a monthly progress of Work
basis against invoice approved by the Contractor within 3 (three) weeks of the Contractor's
approval date.
c. 5% (USD ............... excluded VAT) payment as retention shall be paid within 2 (two)
months after submitted MDR to the Contractor.
3. The payments of the Contract Price as stipulated in Article 5 paragraph 2 shall be made by the
Contractor to the Sub-Contractor by way of Telegraphic Transfer into the Sub-Contractor’s bank
account as follow:
Bank Name : ...............................................
Branch : ...............................................
Account Number : ...............................................
Account Owner : ...............................................
Account Type : US Dollar
4. All the bank charges incurred from the transfer process of the Contract Price shall be borne by
the Contractor and all the bank charges of incurred from receiving shall be borne by the Sub-
Contractor.
5. At the same time with the signing date of this Contract, the Sub-Contractor shall submit and
provide to the Contractor an Advance Payment Bond, on the favour of the Contractor, in the
6 / 17
amount of 30% of the Contract Price (included VAT) (hereinafter referred to as the “Advance
Payment Bond”). The period of validity of the Advance Payment Bond shall have the same
period as Work Schedule. The Advance Payment Bond shall be issued by the respectable
financial institution which approved by the Contractor. The Advance Payment Bond shall be
unconditional, unlimited, irrevocable and directly-liable, not unconditional “on first demand”;
the Advance Payment Bond must be subject to substantive laws in the Republic of Indonesia.
The Advance Payment Bond shall be returned when the Certificate of Mechanical Completion
has been achieved by the Sub-Contractor. If until 7 (seven) business days prior to the expiration
date of the Advance Payment Bond period the Certificate of Mechanical Completion still has
not been achieved, then the Sub-Contractor shall extend the validity of the Advance Payment
Bond until and to the date that the Certificate of Mechanical Completion has been achieved. In
the event the Advance Payment Bond period has been expired and the Certificate of
Mechanical Completion has not been achieved by the Sub-Contractor and the Sub-Contractor
failed to extend the validity of the Advance Payment Bond pursuant to this Article 5 paragraph
5, then the Sub-Contractor shall provide to the Contractor a replacement or additional advance
payment bond which has the same amount as the previous Advance Payment Bond and shall
be valid for such period until the achievement of the Certificate of Mechanical Completion, not
later than 7 (seven) Business Days since the expiration date of the Advance Payment Bond.
6. The Parties agree that the Contractor shall be entitled to automatically call and request
liquidation of the Advance Payment Bond in the event the Sub-Contractor breaches and/or fails
to meet its obligations under this Contract.
6. Warranty
1. The Sub-Contractor hereby declare and warrants that all Equipment erected by the Sub-
Contractor under this Contract will be new and state-of-the-art quality, not used, rebuilt or
refurbished material unless approved in writing by the Contractor and free from any defects in
design, workmanship and material when the Equipment is used under normal operation and
proper maintenance conditions. The Sub-Contractor shall repair or replace any parts
determined by faults of the Sub-Contractor during the Warranty Period.
2. The Sub-Contractor shall submit and provide to the Contractor a Warranty Bond in the amount
of 5% (five percent) of Contract Price (hereinafter referred to as the “Warranty Bond”). The
period of validity of the Warranty Bond shall have the same period as Warranty Period. The
Warranty Bond shall be issued by the respectable financial institution which approved by the
7 / 17
Contractor. The Warranty Bond shall be unconditional, unlimited, irrevocable and directly-liable,
not unconditional “on first demand”, the Warranty Bond must be subject to substantive laws in
the Republic of Indonesia. The Warranty Bond shall be returned at the same time with the
expiration date of Warranty Period. The Parties agree that the Contractor shall be entitled to
automatically call and request liquidation of the Warranty Bond in the event the Sub-Contractor
breaches and/or fails to meet its obligations under this Contract during the Warranty Period.
3. Warranty period shall be 12 (twelve) months from the date of the achievement of Certificate of
Mechanical Completion (“Warranty Period”).
4. The Contractor may correct the defects at the Contractor's own expenses under the Sub-
Contractor's prior consent. In such a case, the Sub-Contractor shall reimburse to the Contractor
for the cost incurred by the rectification of the results.
7. Change / Modification / Alteration of the Work
In case of any requests of changes, modifications or alterations by the Contractor, the Sub-
Contractor shall submit in writing of the additional cost if any and/or the delivery impact.
8. Progress Report
The Sub-Contractor shall furnish the Client with daily, weekly and monthly progress report on the
status of Work and Equipment during the erection. In the meantime, the Contractor shall have the
right to review any internal work progress reports or other documentation of the Sub-Contractor to
assure that actual progress confirm to the said report.
9. Delay in Delivery / Extension of Time
Without prejudice to the provision of Article 4 paragraph 2 herein, the Sub-Contractor shall without
delay notify the Contractor in writing of any events causing delay in delivery and shall include
detailed descriptions of the causes and duration thereof.
10. Force Majeure
1. The Parties hereto shall not be responsible to each other for any failure or delay in
performance of all or part of their respective obligations under this Contract, which directly
owing to cause of circumstances beyond their reasonable control, which causes including but
limited to war, serious fire, strike, labor dispute, flood, typhoon, earthquake, embargo or other
substantially serious events beyond the control of other Party (“Force Majeure”), or as agreed
8 / 17
upon between the Parties.
2. In the event the Force Majeure occurs, the time for performance under Contract shall be
extended by a period equal to the effect of such cases, and the obligations and rights of the
Parties under this Contract shall be postponed by a period equal to the effect of such cases ,
provided that the Parties shall take all reasonable measures to permit it to resume performance
hereunder within the shortest practicable time, and shall keep the other Party fully informed of
its’ plan to overcome and / or mitigate the Force Majeure circumstances.
3. The prevented Party shall notify the other Party within 7 (seven) days of the occurrence of the
Force Majeure. Failure by the prevented Party to comply with this Article 10 paragraph 3 shall
result in it losing its right to rely upon (or to continue to rely upon) the event of Force Majeure
to which the failure relates and such Party shall conducts its obligations as if the Force Majeure
condition has been passed and/or never occurs.
4. Those obligations of the Parties which are provided for in this Contract and which are not
affected by the event of Force Majeure shall continue unabated; and
5. Should the Force Majeure circumstances and/or the effect of a Force Majeure continue for
more than 30 (thirty) consecutive days, the Parties shall settle the further execution of the Sub-
Contractor through friendly negotiations. If the Contractor believes that such negotiation is
impracticable or that it will not result in a satisfactory resolution, the Contractor shall have the
right to terminate the Contract and settle accordingly.
11. Taxes and Duties
Except as otherwise specifically provided in Contract, the Sub-Contractor shall bear and pay all
taxes, duties, levies and charges assessed on the Sub-Contractor, its sub-contractors or their
employees by all local, state or national government authorities in connection with the Sub-
Contractor's Work.
12. Effectiveness of Contract
This Contract shall become effective on the date of when the following conditions have been
fulfilled:
1. The Down payment as stipulated in Article 5 paragraph 2 point a has been made by the
Contractor to the Sub-Contractor; and
9 / 17
2. The Advance Payment Bond has been provided and submitted by the Sub-Contractor to the
Contractor.
13. Termination
1. This Contract shall be expired or terminated, only because of the following event:
a. Automatically expired if the Work as stipulated under this Contract has been fulfilled in full
by the Sub-Contractor; or
b. Terminated by the Contractor pursuant to the Article 10 paragraph 5 of the Contract, in the
event of Force Majeure has been occurs; or
c. Terminated by the Contractor pursuant to the Article 4 paragraph 2 of the Contract, in the
event the delay of the completion of the Work was occurs and the Penalty has reached its
maximum amount; or
c. Terminated by mutual written agreement of the Parties.
2. In the event of the termination of Contract which conducted in pursuant with the Article 13 of
this Contract:
a. the Contractor shall pays to the Sub-Contractor the amount outstanding for Work that the
Sub-Contractor has accomplished or completed so far under this Contract, (if any)
deducted by the Penalty amount;
b. The Parties shall formally submit in writing record as agreed, to indicate the process, the
reasons and (if any) the settlements for the termination;
c. The Contractor will instruct any other sub-contractor(s) to continue the Work as described
in this Contract.
3. In case of termination of this Contract, the Parties hereby agree to waive the provisions as set
forth in Article 1266 of the Indonesian Civil Code with regard to the requirement of court
pronouncement, decision or decree for the termination of an agreement.
14. Notices
1. Any notice, request, and other correspondence under and in connection with the Contract shall
be sent by courier or registered air mail or by facsimile to the following addresses:
To the Contractor:
PT. ______________________
...............................................
...............................................
To the Sub-Contractor:
PT. ______________________
...............................................,
...............................................
10 / 17
Telephone: .............................
Facsimile: .............................
E-mail : .............................
Attn.: .............................
Telephone: .............................
Facsimile: .............................
E-mail : .............................
Attn.: .............................
2. Any Party hereto may at any time change its address by notifying the other Party of the
change in writing.
15. Governing Law and Arbitration
1. This Contract shall be governed by and interpreted in accordance with the laws of the Republic
of Indonesia.
2. All disputes, controversies or differences which may arise between the Contractor and the Sub­
Contractor out of or in relation to or in connection with this Contract, or for the breach thereof,
shall be finally settled by arbitration in Badan Arbitrase Nasional Indonesia (BANI) in
accordance with the Law No. 30 Year 1999 regarding the Arbitration and Alternative Dispute
Resolution and BANI Rules. The place of arbitration shall be in Jakarta, Indonesia. The
arbitration proceedings shall be conducted in the English language and shall be conducted
before 3 (three) arbitrators which consisting of 1 (one) arbitrator which appointed by the
Contractor, 1 (one) arbitrator which appointed by the Sub-Contractor and 1 (one) of whom
shall be appointed by the said 2 (two) appointed arbitrators. The expense of arbitration shall be
borne in accordance with the determination of the board of arbitration. The award rendered by
the arbitrators shall be final binding upon the Parties to the Contract. For the avoidance of
doubt, neither Party shall be entitled to commence or maintain any action in a court of law
upon any matter in dispute arising from and/or in relation to this Contract and/or the
transactions contemplated herein.
3. The Parties must continue to perform their obligations herein until the arbitrators give their
award.
16. Miscellaneous
1. The Contractor shall provide the technical data, drawings and manuals for operating and
maintaining the Equipment.
2. Confidential Information
11 / 17
2.1. Unless required otherwise by law and/or court and/or arbitration order and/or decision
and/or any Government authority, the Sub-Contractor shall treat all information as
confidential concerning the Client’s and/or the Contractor’s business and the
performance of the Work (hereinafter referred to as the “Confidential Information”) and
shall not divulge such Confidential Information to any party other than the persons
designated by the Contractor or Contractor representative. In the event the Sub-
Contractor is required to furnish such Confidential Information to court and/or arbitration
and/or any Government authority and/or as required by law, the Contractor shall be
notified of the disclosure of such Confidential Information as soon as possible.
2.2. The Sub-Contractor is obliged to hold confidential information and shall do so until the
termination or expiration of this Contract. The Sub-Contractor shall return to the Client
and/or the Contractor all information made available for the Sub-Contractor to carry out
the Work. All information, data and / or products shall remain the property of the Client
and/or the Contractor.
2.3. The obligation of confidentiality under this Contract is a continuing obligation and shall
remain in force during the term of the Contract and shall remains survive after the
termination and/or the expiration of the Contract and afterwards for a period of 1 (one)
years.
2.4. Without prejudice to any other rights and remedies which the Contractor may has under
the applicable law, any breach to this provision that conducted by the Sub-Contractor
shall gives the Contractor the right to claims, demands, suits, actions, proceeds and/or
prosecutes the Sub-Contractor for any damages, losses, costs and/or expenses which
incurred by the Contractor as the result of or in connection with such breach.
3. Any and all attachments, appendixes, addendum, and/or amendment to the Contract shall be
regarded as an integral and inseparable part of this Contract.
4. Matters that have not been regulated or insufficiently provided in this Contract, will be
discussed in good faith by the Parties and will be set out in a written document that will be
signed by the Parties.
5. The Sub-Contractor shall not assign the Contract with any third party for the performance of all
or any portion of Work without the Contractor's prior written approval. However, such approval
shall not be revised or modified except in a writing signed by the Parties.
12 / 17
6. Subcontractor
The Sub-Contractor shall not sublet any of the Work as described in this Contract without the full
written approval from the Contractor, provided however:
6.1. The Sub-Contractor shall be responsible for all of its subcontractors (if any) with regards
to insurance, and any other responsibility; and
6.2 The subcontractor(s), in all matters but not be limited to its actions and behavior under
the guidance of the Sub-Contractor, shall be responsible to the Contractor immediately;
and
6.3. The Contractor shall hold the Sub-Contractor fully responsible of all the matters
regarding the subcontractors that are engaged by the Sub-Contractor in carrying out the
Work; and
6.4. The Contractor shall not be responsible for any costs, expenses, effort or anything with
regards to everything that relate to the issue of subcontractors of the Sub-Contractor;
and
6.5. The Contractor shall notify letters of dissatisfaction with regards to the subcontractor’s
actions and/or behavior in the Site when the Contractor considers that the subcontractor
is not in compliance to the Contractor and/or the Government regulation and/or rules
applicable in this Contract.
7. This Contract constitutes the entire agreement between the Parties with respect to the subject
matter hereof and cancels and supersedes any prior understandings and agreement between
the Parties with respect thereto.
8. In the event that any provision or part of a provision in this Contract shall for any reason be
determined by any court or arbitral tribunal to be illegal, invalid or unenforceable, then
Contract shall not be affected and/or the remaining provisions and other parts of the provision
shall not be affected, impaired or invalidated and shall remain in full force and effect and shall
continue to be binding upon the Parties. The Parties shall, in any such event, agree on new
provision(s) that would replace such provision(s).
IN WITNESS WHEREOF, the undersigned have caused this Contract to be executed by their respective
representatives as of the date first above written.
13 / 17
The Contractor The Sub-Contractor
PT. ______________________ PT. ______________________
__________________________ _____________________________
Vice President Director Vice President Director
14 / 17
ANNEX A
Scope of Supply & Work
NO
.
DESCRIPTION
SUPPLIED BY
REMARKS
‘ X ‘ ‘ Y ‘
A Scope of Supply
1 Special tools and jigs for site assembling
2 Blind flanges together with bolts, nuts and proper gaskets for hydrostatic
test3 Painting material for equipment proper & platform & stairway for touch-
up4 Heavy equipment for erection
5 Vehicle for construction
6 Temporary housing, Site office & warehouse
7 Power for construction from diesel generator
8 Welding consumables
9 Welding rod
10 Consumables for erection
11 Jigs and tools for construction
12 equipment for construction
13 Corrosion inhibitor for hydrostatic test (if required)
B Scope of Work
14 Necessary documentations including liP, etc. ( ITP )
15 Material procurement for temporary jig and others
16 Provision for documents
17 Site construction
18 Supervising for construction at site
19 WPS with PQR and production test (if necessary)
20 Inspection at site, water drainage and drying work
21 External preparation, painting and coating
22 Surface preparation and painting as per painting
23 specification prime coat
24 Surface preparation and painting as per painting
25 spec. intermediate & finishing paint for Top coat
26 Inland transportation (from port to site) & Unloading
27 Temporary work of utility for construction and test
28 Dimensional check and acceptance of foundation
29 including minor adjustment work
30 Hydrostatic test at site and water drainage as per specification
31 Insurance and taxes for workers
32 Safety control
33 Unit & running Test
34 Custody of equipment supplied by KHI
C Out of Scope
35 Civil and foundation
36 Insulation material & work
37 Cabling and wiring materials for permanent
38 Blind flanges with bolts, nuts and gaskets for test
39 Hydro-test water
15 / 17
Equipment List
No Process Tag No Equipment Name Supplier Specification
Conveyor
Length(m)
Unit Q'ty Weight (ton) Remarks
1 Debarking 101 Log Infeed Conveyor Chain W6,500×31,800L×9.56m/min×6 row×75kw
2 Debarking 102 Debarker module 1 Φ900 × 8,000 110KW
3 Debarking 102 Debarker module 2 Φ900 × 11,500 132KW
4 Debarking 102 Debarker module 3 Φ900 × 11,500 132KW
5 Debarking 102 Debarker module 4 Φ900 × 11,500 110KW
6 Debarking 102 Debarker module 5 Φ900 × 11,500 110KW
7 Debarking 102-1 Outfeed gate 2.2kw geared motor
8 Debarking 102-2 Automatic Central Lubrication system 75W × 110V
9 Debarking S-101 Log Infeed hopper, log debarking Chamber, bark chute & Bases
10 Debarking S-101-1 Platform, Stair & Handrail, Walkway
11 Chipping 103 Unloading Belt conveyor w/ Loading chute Belt Width 54" × 30KW
12 Chipping 105 Roller conveyor & Washing Station 42" × 12.5m × 7.5 kw / 5.5kw
13 Chipping 104 Metal Detector
14 Chipping S-104 Support for Metal Detector
15 Chipping 107 Chipper infeed (Unloading ) Belt conveyor Belt width 54"×6,000L, 11kw
16 Chipping 108 Roller conveyor W950×3,000L, 7.5kw
17 Chipping S-103~ Walk way
18 Chipping CH-105 Bark Collecting Chute @ 1
19 Chipping 111 Chipper infeed (Unloading ) conveyor W1,350×8,000L, 11kw
20 Chipping 112 Roller conveyor W950×3,000L, 7.5kw
21 Chipping CH-108/112 Bark Collecting Chute @ 2
22 Chipping CH-501~3 Bark Collecting Chute @ 3
23 Chipping 106 Roller Conveyor w/Flow Deviator 42" × 12.5m × 15kw
24 Chipping 109 Disc chipper (DPDH 2800) Disc diameter Φ2,800 w/Driving bases
25 Chipping 113 Disc chipper (DPDH 2800) Disc diameter Φ2,800 w/Driving bases
26 Chipping CH-109 Discharge Chute from Chipper
27 Chipping CH-113 Discharge Chute from Chipper
28 Chipping 110 Equalizing Bin with metering screw OD 1,000×8,000, 90kw
29 Chipping 114 Equalizing Bin with metering screw OD 1,000×8,000, 90kw
16 / 17
No Process Tag No Equipment Name Supplier Specification
Conveyor
Length(m)
Unit Q'ty
Weight
(ton)
Remarks
30 Chipping CH-110 Discharge Chute from Eq. Bin
31 Chipping CH-114 Discharge Chute from Eq. Bin
32 Chipping 401 Chip conveyor-1 BC W1,200×11,800L, 5.5kw chain drive
33 Chipping 402 Chip conveyor-2 BC W1,200×39,800L, 15kw chain drive
34 Chipping 403 Chip screen (DPO 600) 600 ㎥ loose/hr, 11kw w/supporting column
35 Chipping CH-403-1 Discharge Chute for 1st stage
36 Chipping CH-403-2 Discharge Chute for 2nd stage
37 Chipping CH-403-3 Discharge Chute for 3rd stage
38 Chipping 404 Re-chipper (DRPF 400/800) Φ800 × 38 ㎥ l/hr × 750 rpm × 90kw
39 Chipping CH-404 Discharge Chute for Re-Chipper
40 Chipping 405 Chip conveyor for Fines BC W600×20,000L, 1.5kw chain drive
41 Chipping 406 Chip conveyor for Accepts BC W1,200×143,000L, 55kw coupling drive
42 Chipping 407 Tripper conveyor BC W1,200×230,000L, 37kw coupling drive
43 Chipping 601 Dewatering Conveyor W2,916 × 8,032L × 7.5kw
44 Chipping 602 Grit Scraper Chain conveyor 7.5kw
45 Chipping 103 Concrete slab for counter weight for Tag103
46 Bark 501 Bark Collecting Conveyor BC W1,200×92,000L, 5.5kw chain drive
47 Bark 502 Bark Collecting Conveyor BC W600×11,500L, 1.5kw chain drive
48 Bark 503 Bark Collecting Conveyor BC W600×9,500L, 1.5kw chain drive
49 Bark 504/505 Bark Conveyor w/ magnetic pulley BC W900×28,000L, 5.5kw chain drive
50 Bark 506 Infeed Belt Conveyor with Non Metallic Segment 85.5 m/min × 5.5kw/9.2kw
51 Bark 507 Metal Detector
52 Bark S-507 Support for Metal Detector
53 Bark 508 Bark Chipper (DPC 500/1000) Φ1,000 × 715 rpm × 300kw
54 Bark CH-508 Discharge Chute for Bark Chipper
55 Bark 509 Bark Pile Conveyor BC W900×23,500L, 3.7kw chain drive
56 Bark 510 Bark Pile Conveyor BC W900×30,000L, 2.2kw chain drive
57 Chip Loading 410 Chain Conveyor for Loading to Barge CC W3,000×50,000L, 22kw@2 chain drive
58 Chip Loading 411 Chain Conveyor for Loading to Barge CC W3,000×50,000L, 22kw@2 chain drive
59 Chip Loading S-410/411 Sliding chute & wall support for chain conveyor H-Beam Channel, Angle & Steel Plate
60 Chip Loading 412 Belt Conveyor for Loading to Barge BC W2,000×10,000L, 15kw chain drive
17 / 17
No Process Tag No Equipment Name Supplier Specification
Conveyor
Length(m)
Unit Q'ty
Weight
(ton)
Remarks
61 Chip Loading 413 Belt Conveyor for Loading to Barge BC W2,000×10,000L, 15kw chain drive
62 Chip Loading 414 Belt Conveyor for Loading to Barge BC W2,000×145,000L, 75kw coupling drive
63 Chip Loading 415 Belt Conveyor for Loading to Barge BC W2,000×135,000L, 75kw drive w/telecsope chute
64 Steel Structure S-109/113 Steel Structure for Chipper platform
65 Steel Structure S-403 Steel Structure for Chip Screen / Re-chipper platform
66 Steel Structure S-508 Steel Structure for Bark Chipper platform
67 Steel Structure H-403 Hoist & Rail (?) for screen & Re-chipper
68 Steel Structure H-508 Hoist & Rail for Bark Chipper
69 Steel Structure H-109/113 Hoist & Rail for Disc Chipper A & B
70 Steel Structure ALL Anchor bolt & Embedded Bases
71 Maintenance M-001 Grinding Machine (DAF 2/40) 7.5kw
72 Ut'y 602 WASHING STATION PUMP @ 2 sets 130 ㎥/hr × 5 ㎏/㎠
74 Ut'y Air compressor & Air Dryer unit RCH-10 7.5KW
75 Ut'y Piping of Water / Compressing Air SGP Φ4", 2", 1"
GRAND TOTAL

More Related Content

What's hot

Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Divyanshu Dayal
 
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...GLC
 
Sub contract agreement draft
Sub contract agreement draftSub contract agreement draft
Sub contract agreement draftShaun Menon
 
Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silverWeero Koster
 
Contrat de bail
Contrat de bailContrat de bail
Contrat de bailsmemanager
 
Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...
Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...
Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...GLC
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceFrancis Ho
 
Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))GLC
 
Contrato de Agente Comercial en Ingles – Commercial Agency Contract
Contrato de Agente Comercial en Ingles – Commercial Agency ContractContrato de Agente Comercial en Ingles – Commercial Agency Contract
Contrato de Agente Comercial en Ingles – Commercial Agency ContractGlobal Negotiator
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC ContractKai Yun Pang
 
Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE SUBSCRIPTION AGREE...
Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE  SUBSCRIPTION AGREE...Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE  SUBSCRIPTION AGREE...
Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE SUBSCRIPTION AGREE...GLC
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN PanigrahiSN Panigrahi, PMP
 
Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))
Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))
Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))GLC
 
Eskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj Vertrag
Eskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj VertragEskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj Vertrag
Eskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj VertragTolnai László
 
Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...
Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...
Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...GLC
 
Vallalkozasi szerzodes fotozashoz 2017 Tonyphoto
Vallalkozasi szerzodes fotozashoz 2017 TonyphotoVallalkozasi szerzodes fotozashoz 2017 Tonyphoto
Vallalkozasi szerzodes fotozashoz 2017 TonyphotoTolnai László
 
time bar clauses
time bar clausestime bar clauses
time bar clausesAMILA GAYAN
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanAdrias TAN
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts fritzlejarso
 
Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...
Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...
Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...GLC
 

What's hot (20)

Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
 
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Monitoring Service Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
 
Sub contract agreement draft
Sub contract agreement draftSub contract agreement draft
Sub contract agreement draft
 
Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silver
 
Contrat de bail
Contrat de bailContrat de bail
Contrat de bail
 
Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...
Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...
Contoh Perjanjian Pembuatan Karoseri Terbaru (Beli Perjanjian, Hub: 081188872...
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
 
Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Warehouse Contract Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
 
Contrato de Agente Comercial en Ingles – Commercial Agency Contract
Contrato de Agente Comercial en Ingles – Commercial Agency ContractContrato de Agente Comercial en Ingles – Commercial Agency Contract
Contrato de Agente Comercial en Ingles – Commercial Agency Contract
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE SUBSCRIPTION AGREE...
Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE  SUBSCRIPTION AGREE...Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE  SUBSCRIPTION AGREE...
Perjanjian Penyertaan Saham Bersyarat / CONDITIONAL SHARE SUBSCRIPTION AGREE...
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
 
Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))
Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))
Employment agreement perjanjian kerja (Beli Perjanjian, Hub: 08118887270 (WA))
 
Eskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj Vertrag
Eskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj VertragEskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj Vertrag
Eskuvoi dj szerzodes - Wedding dj contract - Hochzeit dj Vertrag
 
Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...
Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...
Hardwood Chips Sale and Purchase Agreement Sample (Purchase this doc, Text: 0...
 
Vallalkozasi szerzodes fotozashoz 2017 Tonyphoto
Vallalkozasi szerzodes fotozashoz 2017 TonyphotoVallalkozasi szerzodes fotozashoz 2017 Tonyphoto
Vallalkozasi szerzodes fotozashoz 2017 Tonyphoto
 
time bar clauses
time bar clausestime bar clauses
time bar clauses
 
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias TanFIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
FIDIC 2016 Day01-1450 Managing Claims Under FIDIC, PPT Adrias Tan
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...
Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...
Turbine Generator Overhaul Contract Sample (Purchase this doc, Text: 08118887...
 

Similar to Contract Agreement for The Erection Work for Wood Chip Mill Equipment (Purchase this doc, Text: 08118887270 (Whatsapp))

AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER AND BARK COLLECTING CONVEYOR F...
AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER  AND BARK COLLECTING CONVEYOR F...AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER  AND BARK COLLECTING CONVEYOR F...
AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER AND BARK COLLECTING CONVEYOR F...GLC
 
Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...
Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...
Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...GLC
 
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...GLC
 
Subcontract Agreement Konstruksi- CLEAN DRAFT.doc
Subcontract Agreement Konstruksi- CLEAN DRAFT.docSubcontract Agreement Konstruksi- CLEAN DRAFT.doc
Subcontract Agreement Konstruksi- CLEAN DRAFT.docMeneerGultom
 
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docxCONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docxMeneerGultom
 
Contrato de Servicios en Inglés – Service Provider Contract
Contrato de Servicios en Inglés – Service Provider ContractContrato de Servicios en Inglés – Service Provider Contract
Contrato de Servicios en Inglés – Service Provider ContractGlobal Negotiator
 
Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))
Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))
Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))GLC
 
Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...
Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...
Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...GLC
 
Turbine Generator Overhaul Contract- CLEAN DRAFT.doc
Turbine Generator Overhaul Contract- CLEAN DRAFT.docTurbine Generator Overhaul Contract- CLEAN DRAFT.doc
Turbine Generator Overhaul Contract- CLEAN DRAFT.docMeneerGultom
 
Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...
Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...
Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...GLC
 
Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...
Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...
Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...GLC
 
Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...
Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...
Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...GLC
 
Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))GLC
 
Kenneth combs ecks
Kenneth combs   ecksKenneth combs   ecks
Kenneth combs ecksKenney Combs
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxGLC
 
SAMPLES_OF_iS._F._CONTRACTS.pdf
SAMPLES_OF_iS._F._CONTRACTS.pdfSAMPLES_OF_iS._F._CONTRACTS.pdf
SAMPLES_OF_iS._F._CONTRACTS.pdfccccccccdddddd
 
Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...
Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...
Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...GLC
 
Working Agreement - CLEAN DRAFT(2).docx
Working Agreement - CLEAN DRAFT(2).docxWorking Agreement - CLEAN DRAFT(2).docx
Working Agreement - CLEAN DRAFT(2).docxMeneerGultom
 
Contract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.docContract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.docMeneerGultom
 

Similar to Contract Agreement for The Erection Work for Wood Chip Mill Equipment (Purchase this doc, Text: 08118887270 (Whatsapp)) (20)

AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER AND BARK COLLECTING CONVEYOR F...
AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER  AND BARK COLLECTING CONVEYOR F...AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER  AND BARK COLLECTING CONVEYOR F...
AGREEMENT OF CHAMBER, CHUTE, ETC FOR DEBARKER AND BARK COLLECTING CONVEYOR F...
 
Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...
Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...
Contract Agreement of Log Infeed Conveyor Fabrication (Purchase this doc, Tex...
 
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...
Subcontract Agreement to Perform Building Work (Purchase this doc, Text: 0811...
 
Subcontract Agreement Konstruksi- CLEAN DRAFT.doc
Subcontract Agreement Konstruksi- CLEAN DRAFT.docSubcontract Agreement Konstruksi- CLEAN DRAFT.doc
Subcontract Agreement Konstruksi- CLEAN DRAFT.doc
 
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docxCONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
 
Contrato de Servicios en Inglés – Service Provider Contract
Contrato de Servicios en Inglés – Service Provider ContractContrato de Servicios en Inglés – Service Provider Contract
Contrato de Servicios en Inglés – Service Provider Contract
 
Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))
Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))
Form of Lease Agreement (Purchase this doc, Text: 08118887270 (Whatsapp))
 
Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...
Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...
Service Contract for Feasibility Study (Purchase this doc, Text: 08118887270 ...
 
Turbine Generator Overhaul Contract- CLEAN DRAFT.doc
Turbine Generator Overhaul Contract- CLEAN DRAFT.docTurbine Generator Overhaul Contract- CLEAN DRAFT.doc
Turbine Generator Overhaul Contract- CLEAN DRAFT.doc
 
Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...
Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...
Subcontract Agreement of Concrete/Earth Works (Purchase this doc, Text: 08118...
 
Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...
Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...
Sales and Purchase Agreement for Supply Contract (Purchase this doc, Text: 08...
 
Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...
Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...
Conditional Sale and Purchase Agreement / Contract (Purchase this doc, Text: ...
 
Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
Performance Guarantee Sample (Purchase this doc, Text: 08118887270 (Whatsapp))
 
Cocpg
CocpgCocpg
Cocpg
 
Kenneth combs ecks
Kenneth combs   ecksKenneth combs   ecks
Kenneth combs ecks
 
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docxCONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
CONTRACT FOR SOIL INVESTIGATION_CLEAN DRAFT.docx
 
SAMPLES_OF_iS._F._CONTRACTS.pdf
SAMPLES_OF_iS._F._CONTRACTS.pdfSAMPLES_OF_iS._F._CONTRACTS.pdf
SAMPLES_OF_iS._F._CONTRACTS.pdf
 
Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...
Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...
Working Agreement of FEASIBILITY STUDY FOR INDUSTRIAL TIMBER PLANTATION AND D...
 
Working Agreement - CLEAN DRAFT(2).docx
Working Agreement - CLEAN DRAFT(2).docxWorking Agreement - CLEAN DRAFT(2).docx
Working Agreement - CLEAN DRAFT(2).docx
 
Contract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.docContract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.doc
 

More from GLC

Draft Perjanjian Ganti Kerugian - Indemnity Agreement- Billingual
Draft Perjanjian Ganti Kerugian - Indemnity Agreement- BillingualDraft Perjanjian Ganti Kerugian - Indemnity Agreement- Billingual
Draft Perjanjian Ganti Kerugian - Indemnity Agreement- BillingualGLC
 
248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc
248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc
248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.docGLC
 
Perjanjian-Pemberian-Cessie.doc
Perjanjian-Pemberian-Cessie.docPerjanjian-Pemberian-Cessie.doc
Perjanjian-Pemberian-Cessie.docGLC
 
Draft_Subkontraktor_ CLEAN.DOCX
Draft_Subkontraktor_ CLEAN.DOCXDraft_Subkontraktor_ CLEAN.DOCX
Draft_Subkontraktor_ CLEAN.DOCXGLC
 
TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...
TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...
TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...GLC
 
Perjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docx
Perjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docxPerjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docx
Perjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docxGLC
 
Draft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docxDraft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docxGLC
 
Consultancy Agreement_Billingual-IndoEng.docx
Consultancy Agreement_Billingual-IndoEng.docxConsultancy Agreement_Billingual-IndoEng.docx
Consultancy Agreement_Billingual-IndoEng.docxGLC
 
Pertamina_Sustainability_Report_2021.pdf
Pertamina_Sustainability_Report_2021.pdfPertamina_Sustainability_Report_2021.pdf
Pertamina_Sustainability_Report_2021.pdfGLC
 
Perjanjian Pialang Broker Asuransi.doc
Perjanjian Pialang Broker Asuransi.docPerjanjian Pialang Broker Asuransi.doc
Perjanjian Pialang Broker Asuransi.docGLC
 
NOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docx
NOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docxNOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docx
NOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docxGLC
 
SPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docx
SPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docxSPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docx
SPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docxGLC
 
Draft perjanjian jual beli aset billingual clean
Draft perjanjian jual beli aset  billingual  cleanDraft perjanjian jual beli aset  billingual  clean
Draft perjanjian jual beli aset billingual cleanGLC
 
Perjanjian pemberian hutang dan pengakuan hutang simple
Perjanjian pemberian hutang dan pengakuan hutang simplePerjanjian pemberian hutang dan pengakuan hutang simple
Perjanjian pemberian hutang dan pengakuan hutang simpleGLC
 
Perjanjian pinjam meminjam glc
Perjanjian pinjam meminjam  glcPerjanjian pinjam meminjam  glc
Perjanjian pinjam meminjam glcGLC
 
Perjanjian restrukturisasi hutang glc
Perjanjian restrukturisasi hutang  glcPerjanjian restrukturisasi hutang  glc
Perjanjian restrukturisasi hutang glcGLC
 
Contoh Perjanjian Penunjukan Distributor
Contoh Perjanjian Penunjukan DistributorContoh Perjanjian Penunjukan Distributor
Contoh Perjanjian Penunjukan DistributorGLC
 
5b english poa-to_sell_shares-
5b english poa-to_sell_shares-5b english poa-to_sell_shares-
5b english poa-to_sell_shares-GLC
 
5a indonesian-poa to-sell_shares
5a indonesian-poa to-sell_shares5a indonesian-poa to-sell_shares
5a indonesian-poa to-sell_sharesGLC
 
4 notice instruction-final
4 notice instruction-final4 notice instruction-final
4 notice instruction-finalGLC
 

More from GLC (20)

Draft Perjanjian Ganti Kerugian - Indemnity Agreement- Billingual
Draft Perjanjian Ganti Kerugian - Indemnity Agreement- BillingualDraft Perjanjian Ganti Kerugian - Indemnity Agreement- Billingual
Draft Perjanjian Ganti Kerugian - Indemnity Agreement- Billingual
 
248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc
248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc
248889449-Contoh-Keputusan-Sirkuler-Pemegang-Saham.doc
 
Perjanjian-Pemberian-Cessie.doc
Perjanjian-Pemberian-Cessie.docPerjanjian-Pemberian-Cessie.doc
Perjanjian-Pemberian-Cessie.doc
 
Draft_Subkontraktor_ CLEAN.DOCX
Draft_Subkontraktor_ CLEAN.DOCXDraft_Subkontraktor_ CLEAN.DOCX
Draft_Subkontraktor_ CLEAN.DOCX
 
TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...
TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...
TEMPLATE PERJANJIAN KERJASAMA PENGEMBANGAN TEKNOLOGI DAN LAYANAN APLIKASI DIG...
 
Perjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docx
Perjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docxPerjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docx
Perjanjian Kerjasama Ekslusif Penanaman Modal dan Pendirian PT.docx
 
Draft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docxDraft_Perjanjian Jual Beli Batubara Terbaru.docx
Draft_Perjanjian Jual Beli Batubara Terbaru.docx
 
Consultancy Agreement_Billingual-IndoEng.docx
Consultancy Agreement_Billingual-IndoEng.docxConsultancy Agreement_Billingual-IndoEng.docx
Consultancy Agreement_Billingual-IndoEng.docx
 
Pertamina_Sustainability_Report_2021.pdf
Pertamina_Sustainability_Report_2021.pdfPertamina_Sustainability_Report_2021.pdf
Pertamina_Sustainability_Report_2021.pdf
 
Perjanjian Pialang Broker Asuransi.doc
Perjanjian Pialang Broker Asuransi.docPerjanjian Pialang Broker Asuransi.doc
Perjanjian Pialang Broker Asuransi.doc
 
NOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docx
NOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docxNOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docx
NOTA KESEPAHAMAN PENGAMBILALIHAN SAHAM-CLEAN DRAFT.docx
 
SPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docx
SPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docxSPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docx
SPK-Pra survei-Kelapa Sawit-CLEAN DRAFT.docx
 
Draft perjanjian jual beli aset billingual clean
Draft perjanjian jual beli aset  billingual  cleanDraft perjanjian jual beli aset  billingual  clean
Draft perjanjian jual beli aset billingual clean
 
Perjanjian pemberian hutang dan pengakuan hutang simple
Perjanjian pemberian hutang dan pengakuan hutang simplePerjanjian pemberian hutang dan pengakuan hutang simple
Perjanjian pemberian hutang dan pengakuan hutang simple
 
Perjanjian pinjam meminjam glc
Perjanjian pinjam meminjam  glcPerjanjian pinjam meminjam  glc
Perjanjian pinjam meminjam glc
 
Perjanjian restrukturisasi hutang glc
Perjanjian restrukturisasi hutang  glcPerjanjian restrukturisasi hutang  glc
Perjanjian restrukturisasi hutang glc
 
Contoh Perjanjian Penunjukan Distributor
Contoh Perjanjian Penunjukan DistributorContoh Perjanjian Penunjukan Distributor
Contoh Perjanjian Penunjukan Distributor
 
5b english poa-to_sell_shares-
5b english poa-to_sell_shares-5b english poa-to_sell_shares-
5b english poa-to_sell_shares-
 
5a indonesian-poa to-sell_shares
5a indonesian-poa to-sell_shares5a indonesian-poa to-sell_shares
5a indonesian-poa to-sell_shares
 
4 notice instruction-final
4 notice instruction-final4 notice instruction-final
4 notice instruction-final
 

Recently uploaded

Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝soniya singh
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A HistoryJohn Hustaix
 
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书SD DS
 
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书Sir Lt
 
如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书SD DS
 
一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书E LSS
 
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一st Las
 
POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxAbhishekchatterjee248859
 
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书Fs Las
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptjudeplata
 
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书SD DS
 
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一jr6r07mb
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书Fir L
 
Key Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesKey Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesHome Tax Saver
 
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书Fir L
 
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书Fir L
 
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书SD DS
 

Recently uploaded (20)

Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Haqiqat Nagar Delhi reach out to us at 🔝8264348440🔝
 
John Hustaix - The Legal Profession: A History
John Hustaix - The Legal Profession:  A HistoryJohn Hustaix - The Legal Profession:  A History
John Hustaix - The Legal Profession: A History
 
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
如何办理(uOttawa毕业证书)渥太华大学毕业证学位证书
 
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书 如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
如何办理(MSU文凭证书)密歇根州立大学毕业证学位证书
 
如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书如何办理(Rice毕业证书)莱斯大学毕业证学位证书
如何办理(Rice毕业证书)莱斯大学毕业证学位证书
 
一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书一比一原版利兹大学毕业证学位证书
一比一原版利兹大学毕业证学位证书
 
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
定制(BU文凭证书)美国波士顿大学毕业证成绩单原版一比一
 
POLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptxPOLICE ACT, 1861 the details about police system.pptx
POLICE ACT, 1861 the details about police system.pptx
 
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
 
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
如何办理(UCD毕业证书)加州大学戴维斯分校毕业证学位证书
 
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
定制(WMU毕业证书)美国西密歇根大学毕业证成绩单原版一比一
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
 
Key Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax RatesKey Factors That Influence Property Tax Rates
Key Factors That Influence Property Tax Rates
 
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
 
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
 
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
如何办理(GWU毕业证书)乔治华盛顿大学毕业证学位证书
 
Sensual Moments: +91 9999965857 Independent Call Girls Vasundhara Delhi {{ Mo...
Sensual Moments: +91 9999965857 Independent Call Girls Vasundhara Delhi {{ Mo...Sensual Moments: +91 9999965857 Independent Call Girls Vasundhara Delhi {{ Mo...
Sensual Moments: +91 9999965857 Independent Call Girls Vasundhara Delhi {{ Mo...
 
Vip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 

Contract Agreement for The Erection Work for Wood Chip Mill Equipment (Purchase this doc, Text: 08118887270 (Whatsapp))

  • 1. 1 / 17 Contract For The Erection Work for Wood Chip Mill Equipment at __________________________ Between PT. ______________________ Address at .............................................................................................. .............................................................................................. And PT. ______________________ Address at .................................................................................................... (Hereinafter called "Sub-Contractor" or "PT. ____________") DD/MM/YYYY
  • 2. 2 / 17 Table of Contents 1. Background 2. Definitions 3. The Scope of Contract 4. Work Schedule 5. Contract Price, Terms of Payment and Advance Payment Bond 6. Warranty 7. Change / Modification / Alteration of the Work 8. Progress Report 9. Delay in Delivery / Extension of Time 10. Force Majeure 11. Taxes and Duties 11. Effectiveness of Contract 12. Termination 13. Notices 14. Governing Law and Arbitration 15. Miscellaneous Annex A : Extent of Scope of Supply and Work, Equipment List
  • 3. 3 / 17 This Contract for the Erection Work for Wood Chip Mill Equipment at ..................................................................... (hereinafter referred to as the “Contract”) is made on ................, ............. of ................... two thousand and ............... (DD-MM-YYYY), by and between : 1. PT. ______________________, a limited liability company duly established and existing under the laws of the Republic of Indonesia, having its address at ................................................................ (hereinafter referred to as the “Contractor”); 2. PT. ______________________, a limited liability company duly established and existing under the laws of the Republic of Indonesia, having its address at .................................................................................. (hereinafter referred to as the “Sub-Contractor”). The Contractor and the Sub-Contractor are collectively herein referred to as the “Parties” and separately as the “Party”. 1. Background The Contractor wishes that certain Work (as defined below) be provided and executed by the Sub- Contractor under the terms and conditions in this Contract, and the Sub-Contractor wishes to provide and execute the Sub-Contractor's Scope of Supply and Work to the satisfaction of the Contractor for Contract Price as set forth hereunder. 2. Definitions Unless otherwise specified in Contract, the following expressions shall have the meanings hereby assigned to them; 1. "Equipment" means the goods to be supplied and erected by the Sub-Contractor under this Contract including equipments as stipulated in Equipment List as attached as Annex A of this Contract. 2. "Contract" means this Contract and the appendixes constituting an integral part of this Contract. 3. "Work" means and includes all works and services to be provided to this Contract including the Equipment and/or the Scope of Supply and Work. 4. "Contract Document" means Contract specifications and appendixes as agreed between the Parties. 5. "Site" means the area where the Equipment is to be located and/or erected. 6. "Advance Payment Bond" to be requested in favor of the Contractor means first class
  • 4. 4 / 17 international bank's bond(s) and/or other equivalent(s) which is acceptable to the Contractor for performance and warranty issued by the Sub-Contractor. 7. "Certificate of Mechanical Completion" means the Contractor certifies in writing that the Sub­ Contractor's Equipment has been fully erected and proven as satisfactory in all respects of the Contract Document and specification unless otherwise mutually agreed on. 8. "Client" is PT. ________________, a limited liability company duly established and existing under the laws of the Republic of Indonesia, having its address at .................................................................................................. 9. “Scope of Supply and Work” means the scope and supply as stipulated in Annex A of this Contract. 10. “Government” means the Government of the Republic of Indonesia. 3. The Scope of Contract The Contractor hereby agree to appoints the Sub-Contractor to provide and execute the Work under the terms and conditions as stipulated in this Contract and the Sub-Contractor hereby agree to accept the appointment from the Contractor to provide and execute the Work. 4. Work Schedule 1. The Contractor undertakes to perform Work to achieve Certificate of Mechanical Completion within five (5) months from the commencement of erection work to be fixed scheduled on ......................... until Jan ............................ (hereinafter referred to as the “Work Schedule”). 2. Except if the delay is caused by the Force Majeure (as defined below) as stipulated in Article 10 of this Contract, in the event the Certificate of Mechanical Completion cannot be achieved within the Work Schedule, due to reasons attributable to the Sub-Contractor, the Sub- Contractor shall pay delay penalties at the rate of zero point three percent (0.3%) per a day of delay (hereinafter referred to as the “Penalty”). The maximum delay Penalty shall be ten percent (10%) of the Contract Price. The Contractor shall retain the right to terminate this Contract in the event that the Work has not been completed and/or the Certificate of Mechanical Completion has not been achieved until the Penalty has reached its maximum amount. 3. Without prejudice to any other rights and remedies which the Contractor may has under the applicable law, any breach to this provision that conducted by the Sub-Contractor shall gives the Contractor the right to claims, demands, suits, actions, proceeds and/or prosecutes the
  • 5. 5 / 17 Sub-Contractor for any damages, losses, costs and/or expenses which incurred by the Contractor, and/or to claim indemnity instead of performance to the Sub-Contractor, as the result of or in connection with such breach. 5. Contract Price, Terms of Payment and Advance Payment Bond 1. Lump sum and fixed price in this Contract shall be USD ................. (......................................................................... United States Dollars) (hereinafter referred to as the “Contract Price”). The Contract Price is excluded from Value Added Tax 10% of the Contract Price. 2. The payments of the Contract Price shall be made against the Sub-Contractor’s invoice with the following schedule: a. 30% (USD ................ excluded VAT) as down payment shall be paid within 3 (three) weeks after the provision of Sub-Contract's invoice as the advance payment. b. 65% (USD ................ excluded VAT) payment shall be paid on a monthly progress of Work basis against invoice approved by the Contractor within 3 (three) weeks of the Contractor's approval date. c. 5% (USD ............... excluded VAT) payment as retention shall be paid within 2 (two) months after submitted MDR to the Contractor. 3. The payments of the Contract Price as stipulated in Article 5 paragraph 2 shall be made by the Contractor to the Sub-Contractor by way of Telegraphic Transfer into the Sub-Contractor’s bank account as follow: Bank Name : ............................................... Branch : ............................................... Account Number : ............................................... Account Owner : ............................................... Account Type : US Dollar 4. All the bank charges incurred from the transfer process of the Contract Price shall be borne by the Contractor and all the bank charges of incurred from receiving shall be borne by the Sub- Contractor. 5. At the same time with the signing date of this Contract, the Sub-Contractor shall submit and provide to the Contractor an Advance Payment Bond, on the favour of the Contractor, in the
  • 6. 6 / 17 amount of 30% of the Contract Price (included VAT) (hereinafter referred to as the “Advance Payment Bond”). The period of validity of the Advance Payment Bond shall have the same period as Work Schedule. The Advance Payment Bond shall be issued by the respectable financial institution which approved by the Contractor. The Advance Payment Bond shall be unconditional, unlimited, irrevocable and directly-liable, not unconditional “on first demand”; the Advance Payment Bond must be subject to substantive laws in the Republic of Indonesia. The Advance Payment Bond shall be returned when the Certificate of Mechanical Completion has been achieved by the Sub-Contractor. If until 7 (seven) business days prior to the expiration date of the Advance Payment Bond period the Certificate of Mechanical Completion still has not been achieved, then the Sub-Contractor shall extend the validity of the Advance Payment Bond until and to the date that the Certificate of Mechanical Completion has been achieved. In the event the Advance Payment Bond period has been expired and the Certificate of Mechanical Completion has not been achieved by the Sub-Contractor and the Sub-Contractor failed to extend the validity of the Advance Payment Bond pursuant to this Article 5 paragraph 5, then the Sub-Contractor shall provide to the Contractor a replacement or additional advance payment bond which has the same amount as the previous Advance Payment Bond and shall be valid for such period until the achievement of the Certificate of Mechanical Completion, not later than 7 (seven) Business Days since the expiration date of the Advance Payment Bond. 6. The Parties agree that the Contractor shall be entitled to automatically call and request liquidation of the Advance Payment Bond in the event the Sub-Contractor breaches and/or fails to meet its obligations under this Contract. 6. Warranty 1. The Sub-Contractor hereby declare and warrants that all Equipment erected by the Sub- Contractor under this Contract will be new and state-of-the-art quality, not used, rebuilt or refurbished material unless approved in writing by the Contractor and free from any defects in design, workmanship and material when the Equipment is used under normal operation and proper maintenance conditions. The Sub-Contractor shall repair or replace any parts determined by faults of the Sub-Contractor during the Warranty Period. 2. The Sub-Contractor shall submit and provide to the Contractor a Warranty Bond in the amount of 5% (five percent) of Contract Price (hereinafter referred to as the “Warranty Bond”). The period of validity of the Warranty Bond shall have the same period as Warranty Period. The Warranty Bond shall be issued by the respectable financial institution which approved by the
  • 7. 7 / 17 Contractor. The Warranty Bond shall be unconditional, unlimited, irrevocable and directly-liable, not unconditional “on first demand”, the Warranty Bond must be subject to substantive laws in the Republic of Indonesia. The Warranty Bond shall be returned at the same time with the expiration date of Warranty Period. The Parties agree that the Contractor shall be entitled to automatically call and request liquidation of the Warranty Bond in the event the Sub-Contractor breaches and/or fails to meet its obligations under this Contract during the Warranty Period. 3. Warranty period shall be 12 (twelve) months from the date of the achievement of Certificate of Mechanical Completion (“Warranty Period”). 4. The Contractor may correct the defects at the Contractor's own expenses under the Sub- Contractor's prior consent. In such a case, the Sub-Contractor shall reimburse to the Contractor for the cost incurred by the rectification of the results. 7. Change / Modification / Alteration of the Work In case of any requests of changes, modifications or alterations by the Contractor, the Sub- Contractor shall submit in writing of the additional cost if any and/or the delivery impact. 8. Progress Report The Sub-Contractor shall furnish the Client with daily, weekly and monthly progress report on the status of Work and Equipment during the erection. In the meantime, the Contractor shall have the right to review any internal work progress reports or other documentation of the Sub-Contractor to assure that actual progress confirm to the said report. 9. Delay in Delivery / Extension of Time Without prejudice to the provision of Article 4 paragraph 2 herein, the Sub-Contractor shall without delay notify the Contractor in writing of any events causing delay in delivery and shall include detailed descriptions of the causes and duration thereof. 10. Force Majeure 1. The Parties hereto shall not be responsible to each other for any failure or delay in performance of all or part of their respective obligations under this Contract, which directly owing to cause of circumstances beyond their reasonable control, which causes including but limited to war, serious fire, strike, labor dispute, flood, typhoon, earthquake, embargo or other substantially serious events beyond the control of other Party (“Force Majeure”), or as agreed
  • 8. 8 / 17 upon between the Parties. 2. In the event the Force Majeure occurs, the time for performance under Contract shall be extended by a period equal to the effect of such cases, and the obligations and rights of the Parties under this Contract shall be postponed by a period equal to the effect of such cases , provided that the Parties shall take all reasonable measures to permit it to resume performance hereunder within the shortest practicable time, and shall keep the other Party fully informed of its’ plan to overcome and / or mitigate the Force Majeure circumstances. 3. The prevented Party shall notify the other Party within 7 (seven) days of the occurrence of the Force Majeure. Failure by the prevented Party to comply with this Article 10 paragraph 3 shall result in it losing its right to rely upon (or to continue to rely upon) the event of Force Majeure to which the failure relates and such Party shall conducts its obligations as if the Force Majeure condition has been passed and/or never occurs. 4. Those obligations of the Parties which are provided for in this Contract and which are not affected by the event of Force Majeure shall continue unabated; and 5. Should the Force Majeure circumstances and/or the effect of a Force Majeure continue for more than 30 (thirty) consecutive days, the Parties shall settle the further execution of the Sub- Contractor through friendly negotiations. If the Contractor believes that such negotiation is impracticable or that it will not result in a satisfactory resolution, the Contractor shall have the right to terminate the Contract and settle accordingly. 11. Taxes and Duties Except as otherwise specifically provided in Contract, the Sub-Contractor shall bear and pay all taxes, duties, levies and charges assessed on the Sub-Contractor, its sub-contractors or their employees by all local, state or national government authorities in connection with the Sub- Contractor's Work. 12. Effectiveness of Contract This Contract shall become effective on the date of when the following conditions have been fulfilled: 1. The Down payment as stipulated in Article 5 paragraph 2 point a has been made by the Contractor to the Sub-Contractor; and
  • 9. 9 / 17 2. The Advance Payment Bond has been provided and submitted by the Sub-Contractor to the Contractor. 13. Termination 1. This Contract shall be expired or terminated, only because of the following event: a. Automatically expired if the Work as stipulated under this Contract has been fulfilled in full by the Sub-Contractor; or b. Terminated by the Contractor pursuant to the Article 10 paragraph 5 of the Contract, in the event of Force Majeure has been occurs; or c. Terminated by the Contractor pursuant to the Article 4 paragraph 2 of the Contract, in the event the delay of the completion of the Work was occurs and the Penalty has reached its maximum amount; or c. Terminated by mutual written agreement of the Parties. 2. In the event of the termination of Contract which conducted in pursuant with the Article 13 of this Contract: a. the Contractor shall pays to the Sub-Contractor the amount outstanding for Work that the Sub-Contractor has accomplished or completed so far under this Contract, (if any) deducted by the Penalty amount; b. The Parties shall formally submit in writing record as agreed, to indicate the process, the reasons and (if any) the settlements for the termination; c. The Contractor will instruct any other sub-contractor(s) to continue the Work as described in this Contract. 3. In case of termination of this Contract, the Parties hereby agree to waive the provisions as set forth in Article 1266 of the Indonesian Civil Code with regard to the requirement of court pronouncement, decision or decree for the termination of an agreement. 14. Notices 1. Any notice, request, and other correspondence under and in connection with the Contract shall be sent by courier or registered air mail or by facsimile to the following addresses: To the Contractor: PT. ______________________ ............................................... ............................................... To the Sub-Contractor: PT. ______________________ ..............................................., ...............................................
  • 10. 10 / 17 Telephone: ............................. Facsimile: ............................. E-mail : ............................. Attn.: ............................. Telephone: ............................. Facsimile: ............................. E-mail : ............................. Attn.: ............................. 2. Any Party hereto may at any time change its address by notifying the other Party of the change in writing. 15. Governing Law and Arbitration 1. This Contract shall be governed by and interpreted in accordance with the laws of the Republic of Indonesia. 2. All disputes, controversies or differences which may arise between the Contractor and the Sub­ Contractor out of or in relation to or in connection with this Contract, or for the breach thereof, shall be finally settled by arbitration in Badan Arbitrase Nasional Indonesia (BANI) in accordance with the Law No. 30 Year 1999 regarding the Arbitration and Alternative Dispute Resolution and BANI Rules. The place of arbitration shall be in Jakarta, Indonesia. The arbitration proceedings shall be conducted in the English language and shall be conducted before 3 (three) arbitrators which consisting of 1 (one) arbitrator which appointed by the Contractor, 1 (one) arbitrator which appointed by the Sub-Contractor and 1 (one) of whom shall be appointed by the said 2 (two) appointed arbitrators. The expense of arbitration shall be borne in accordance with the determination of the board of arbitration. The award rendered by the arbitrators shall be final binding upon the Parties to the Contract. For the avoidance of doubt, neither Party shall be entitled to commence or maintain any action in a court of law upon any matter in dispute arising from and/or in relation to this Contract and/or the transactions contemplated herein. 3. The Parties must continue to perform their obligations herein until the arbitrators give their award. 16. Miscellaneous 1. The Contractor shall provide the technical data, drawings and manuals for operating and maintaining the Equipment. 2. Confidential Information
  • 11. 11 / 17 2.1. Unless required otherwise by law and/or court and/or arbitration order and/or decision and/or any Government authority, the Sub-Contractor shall treat all information as confidential concerning the Client’s and/or the Contractor’s business and the performance of the Work (hereinafter referred to as the “Confidential Information”) and shall not divulge such Confidential Information to any party other than the persons designated by the Contractor or Contractor representative. In the event the Sub- Contractor is required to furnish such Confidential Information to court and/or arbitration and/or any Government authority and/or as required by law, the Contractor shall be notified of the disclosure of such Confidential Information as soon as possible. 2.2. The Sub-Contractor is obliged to hold confidential information and shall do so until the termination or expiration of this Contract. The Sub-Contractor shall return to the Client and/or the Contractor all information made available for the Sub-Contractor to carry out the Work. All information, data and / or products shall remain the property of the Client and/or the Contractor. 2.3. The obligation of confidentiality under this Contract is a continuing obligation and shall remain in force during the term of the Contract and shall remains survive after the termination and/or the expiration of the Contract and afterwards for a period of 1 (one) years. 2.4. Without prejudice to any other rights and remedies which the Contractor may has under the applicable law, any breach to this provision that conducted by the Sub-Contractor shall gives the Contractor the right to claims, demands, suits, actions, proceeds and/or prosecutes the Sub-Contractor for any damages, losses, costs and/or expenses which incurred by the Contractor as the result of or in connection with such breach. 3. Any and all attachments, appendixes, addendum, and/or amendment to the Contract shall be regarded as an integral and inseparable part of this Contract. 4. Matters that have not been regulated or insufficiently provided in this Contract, will be discussed in good faith by the Parties and will be set out in a written document that will be signed by the Parties. 5. The Sub-Contractor shall not assign the Contract with any third party for the performance of all or any portion of Work without the Contractor's prior written approval. However, such approval shall not be revised or modified except in a writing signed by the Parties.
  • 12. 12 / 17 6. Subcontractor The Sub-Contractor shall not sublet any of the Work as described in this Contract without the full written approval from the Contractor, provided however: 6.1. The Sub-Contractor shall be responsible for all of its subcontractors (if any) with regards to insurance, and any other responsibility; and 6.2 The subcontractor(s), in all matters but not be limited to its actions and behavior under the guidance of the Sub-Contractor, shall be responsible to the Contractor immediately; and 6.3. The Contractor shall hold the Sub-Contractor fully responsible of all the matters regarding the subcontractors that are engaged by the Sub-Contractor in carrying out the Work; and 6.4. The Contractor shall not be responsible for any costs, expenses, effort or anything with regards to everything that relate to the issue of subcontractors of the Sub-Contractor; and 6.5. The Contractor shall notify letters of dissatisfaction with regards to the subcontractor’s actions and/or behavior in the Site when the Contractor considers that the subcontractor is not in compliance to the Contractor and/or the Government regulation and/or rules applicable in this Contract. 7. This Contract constitutes the entire agreement between the Parties with respect to the subject matter hereof and cancels and supersedes any prior understandings and agreement between the Parties with respect thereto. 8. In the event that any provision or part of a provision in this Contract shall for any reason be determined by any court or arbitral tribunal to be illegal, invalid or unenforceable, then Contract shall not be affected and/or the remaining provisions and other parts of the provision shall not be affected, impaired or invalidated and shall remain in full force and effect and shall continue to be binding upon the Parties. The Parties shall, in any such event, agree on new provision(s) that would replace such provision(s). IN WITNESS WHEREOF, the undersigned have caused this Contract to be executed by their respective representatives as of the date first above written.
  • 13. 13 / 17 The Contractor The Sub-Contractor PT. ______________________ PT. ______________________ __________________________ _____________________________ Vice President Director Vice President Director
  • 14. 14 / 17 ANNEX A Scope of Supply & Work NO . DESCRIPTION SUPPLIED BY REMARKS ‘ X ‘ ‘ Y ‘ A Scope of Supply 1 Special tools and jigs for site assembling 2 Blind flanges together with bolts, nuts and proper gaskets for hydrostatic test3 Painting material for equipment proper & platform & stairway for touch- up4 Heavy equipment for erection 5 Vehicle for construction 6 Temporary housing, Site office & warehouse 7 Power for construction from diesel generator 8 Welding consumables 9 Welding rod 10 Consumables for erection 11 Jigs and tools for construction 12 equipment for construction 13 Corrosion inhibitor for hydrostatic test (if required) B Scope of Work 14 Necessary documentations including liP, etc. ( ITP ) 15 Material procurement for temporary jig and others 16 Provision for documents 17 Site construction 18 Supervising for construction at site 19 WPS with PQR and production test (if necessary) 20 Inspection at site, water drainage and drying work 21 External preparation, painting and coating 22 Surface preparation and painting as per painting 23 specification prime coat 24 Surface preparation and painting as per painting 25 spec. intermediate & finishing paint for Top coat 26 Inland transportation (from port to site) & Unloading 27 Temporary work of utility for construction and test 28 Dimensional check and acceptance of foundation 29 including minor adjustment work 30 Hydrostatic test at site and water drainage as per specification 31 Insurance and taxes for workers 32 Safety control 33 Unit & running Test 34 Custody of equipment supplied by KHI C Out of Scope 35 Civil and foundation 36 Insulation material & work 37 Cabling and wiring materials for permanent 38 Blind flanges with bolts, nuts and gaskets for test 39 Hydro-test water
  • 15. 15 / 17 Equipment List No Process Tag No Equipment Name Supplier Specification Conveyor Length(m) Unit Q'ty Weight (ton) Remarks 1 Debarking 101 Log Infeed Conveyor Chain W6,500×31,800L×9.56m/min×6 row×75kw 2 Debarking 102 Debarker module 1 Φ900 × 8,000 110KW 3 Debarking 102 Debarker module 2 Φ900 × 11,500 132KW 4 Debarking 102 Debarker module 3 Φ900 × 11,500 132KW 5 Debarking 102 Debarker module 4 Φ900 × 11,500 110KW 6 Debarking 102 Debarker module 5 Φ900 × 11,500 110KW 7 Debarking 102-1 Outfeed gate 2.2kw geared motor 8 Debarking 102-2 Automatic Central Lubrication system 75W × 110V 9 Debarking S-101 Log Infeed hopper, log debarking Chamber, bark chute & Bases 10 Debarking S-101-1 Platform, Stair & Handrail, Walkway 11 Chipping 103 Unloading Belt conveyor w/ Loading chute Belt Width 54" × 30KW 12 Chipping 105 Roller conveyor & Washing Station 42" × 12.5m × 7.5 kw / 5.5kw 13 Chipping 104 Metal Detector 14 Chipping S-104 Support for Metal Detector 15 Chipping 107 Chipper infeed (Unloading ) Belt conveyor Belt width 54"×6,000L, 11kw 16 Chipping 108 Roller conveyor W950×3,000L, 7.5kw 17 Chipping S-103~ Walk way 18 Chipping CH-105 Bark Collecting Chute @ 1 19 Chipping 111 Chipper infeed (Unloading ) conveyor W1,350×8,000L, 11kw 20 Chipping 112 Roller conveyor W950×3,000L, 7.5kw 21 Chipping CH-108/112 Bark Collecting Chute @ 2 22 Chipping CH-501~3 Bark Collecting Chute @ 3 23 Chipping 106 Roller Conveyor w/Flow Deviator 42" × 12.5m × 15kw 24 Chipping 109 Disc chipper (DPDH 2800) Disc diameter Φ2,800 w/Driving bases 25 Chipping 113 Disc chipper (DPDH 2800) Disc diameter Φ2,800 w/Driving bases 26 Chipping CH-109 Discharge Chute from Chipper 27 Chipping CH-113 Discharge Chute from Chipper 28 Chipping 110 Equalizing Bin with metering screw OD 1,000×8,000, 90kw 29 Chipping 114 Equalizing Bin with metering screw OD 1,000×8,000, 90kw
  • 16. 16 / 17 No Process Tag No Equipment Name Supplier Specification Conveyor Length(m) Unit Q'ty Weight (ton) Remarks 30 Chipping CH-110 Discharge Chute from Eq. Bin 31 Chipping CH-114 Discharge Chute from Eq. Bin 32 Chipping 401 Chip conveyor-1 BC W1,200×11,800L, 5.5kw chain drive 33 Chipping 402 Chip conveyor-2 BC W1,200×39,800L, 15kw chain drive 34 Chipping 403 Chip screen (DPO 600) 600 ㎥ loose/hr, 11kw w/supporting column 35 Chipping CH-403-1 Discharge Chute for 1st stage 36 Chipping CH-403-2 Discharge Chute for 2nd stage 37 Chipping CH-403-3 Discharge Chute for 3rd stage 38 Chipping 404 Re-chipper (DRPF 400/800) Φ800 × 38 ㎥ l/hr × 750 rpm × 90kw 39 Chipping CH-404 Discharge Chute for Re-Chipper 40 Chipping 405 Chip conveyor for Fines BC W600×20,000L, 1.5kw chain drive 41 Chipping 406 Chip conveyor for Accepts BC W1,200×143,000L, 55kw coupling drive 42 Chipping 407 Tripper conveyor BC W1,200×230,000L, 37kw coupling drive 43 Chipping 601 Dewatering Conveyor W2,916 × 8,032L × 7.5kw 44 Chipping 602 Grit Scraper Chain conveyor 7.5kw 45 Chipping 103 Concrete slab for counter weight for Tag103 46 Bark 501 Bark Collecting Conveyor BC W1,200×92,000L, 5.5kw chain drive 47 Bark 502 Bark Collecting Conveyor BC W600×11,500L, 1.5kw chain drive 48 Bark 503 Bark Collecting Conveyor BC W600×9,500L, 1.5kw chain drive 49 Bark 504/505 Bark Conveyor w/ magnetic pulley BC W900×28,000L, 5.5kw chain drive 50 Bark 506 Infeed Belt Conveyor with Non Metallic Segment 85.5 m/min × 5.5kw/9.2kw 51 Bark 507 Metal Detector 52 Bark S-507 Support for Metal Detector 53 Bark 508 Bark Chipper (DPC 500/1000) Φ1,000 × 715 rpm × 300kw 54 Bark CH-508 Discharge Chute for Bark Chipper 55 Bark 509 Bark Pile Conveyor BC W900×23,500L, 3.7kw chain drive 56 Bark 510 Bark Pile Conveyor BC W900×30,000L, 2.2kw chain drive 57 Chip Loading 410 Chain Conveyor for Loading to Barge CC W3,000×50,000L, 22kw@2 chain drive 58 Chip Loading 411 Chain Conveyor for Loading to Barge CC W3,000×50,000L, 22kw@2 chain drive 59 Chip Loading S-410/411 Sliding chute & wall support for chain conveyor H-Beam Channel, Angle & Steel Plate 60 Chip Loading 412 Belt Conveyor for Loading to Barge BC W2,000×10,000L, 15kw chain drive
  • 17. 17 / 17 No Process Tag No Equipment Name Supplier Specification Conveyor Length(m) Unit Q'ty Weight (ton) Remarks 61 Chip Loading 413 Belt Conveyor for Loading to Barge BC W2,000×10,000L, 15kw chain drive 62 Chip Loading 414 Belt Conveyor for Loading to Barge BC W2,000×145,000L, 75kw coupling drive 63 Chip Loading 415 Belt Conveyor for Loading to Barge BC W2,000×135,000L, 75kw drive w/telecsope chute 64 Steel Structure S-109/113 Steel Structure for Chipper platform 65 Steel Structure S-403 Steel Structure for Chip Screen / Re-chipper platform 66 Steel Structure S-508 Steel Structure for Bark Chipper platform 67 Steel Structure H-403 Hoist & Rail (?) for screen & Re-chipper 68 Steel Structure H-508 Hoist & Rail for Bark Chipper 69 Steel Structure H-109/113 Hoist & Rail for Disc Chipper A & B 70 Steel Structure ALL Anchor bolt & Embedded Bases 71 Maintenance M-001 Grinding Machine (DAF 2/40) 7.5kw 72 Ut'y 602 WASHING STATION PUMP @ 2 sets 130 ㎥/hr × 5 ㎏/㎠ 74 Ut'y Air compressor & Air Dryer unit RCH-10 7.5KW 75 Ut'y Piping of Water / Compressing Air SGP Φ4", 2", 1" GRAND TOTAL