2. Client:
Roads and Highways Department (RHD)
Joint Venture of
Oriental Consultants Global Co. Ltd- Lead,
Oriental Consultants co. Ltd
PADECO Co. Ltd
BCL Associates Ltd.
Main Project Feature:
Reconstruction of 8 numbers 2-lane PC-I Girder Bridges and 7 numbers Box Culverts along with the approach roads
on Baraiyarhat-Heako-Ramgarh road including installation of axle load control station at Ramgarh
In Association with
SMEC International Pty. Ltd.,
Japan Bridge and Structure Institute Inc.,
ACE Consultants Ltd.,
Development Design Consultants,
BCL Associates Ltd.
Consultants:
Contractor:
4. Brief Presentation on Bridge
Construction Under CBRNIP,
Package-B
Part-1
Presented By: Md. Zakirul Islam
Quality Control Manager, CPCL
Prepared By: Sk Mosaddek Haque Reyad
Planning Engineer, CPCL
5. 1. Sub-Structure Work
a) Sub-Soil investigation
b) Pile Construction
c) Pile Cap
d) Abutment wall/Pier Column
e) Abutment Head/Pier Head
2. Super-Structure Work
a) Girder/Beam
b) Deck Slab
c) Kerb, Parapet & Footway slab
3. Misc. Work
a) Approach Slab
b) Slope Protection
Step of Bridge Construction Work:
8. Test on Pile
Pile Construction
• Temporary Casing Setting for Boring
• Wash Boring of Pile by Percussion Method
• Wash With Bentonite Slurry
• Drilling Pipe Pulling-out
• Rebar Cage Lowering
• Tremie Pipe Lowering
• Concreting of Pile Through Tremie Pipe
• Static Load Test on Pile
• Dynamic Load Test on Pile
• Pile Integrity Test
• Cross Hole Sonic Logging Test
12. Pile Cap
• Temporary Protection Work for Pile Cap e.g. Sheet Pile/Timber Pile/Steel Pile
• Structural Excavation
• Pile Head Breaking
• Bottom Seal by Lean Concrete
• Rebar Fabrication Work
• Form Work for Pile Cap
• Concreting Work
• Form Work Removing
• Abutment Wall/Pier Shaft Casting Above Present Water Level
• Dismantling All Temporary Protective Work
• Backfilling of Structure By Suitable Material
30. Brief Presentation on Road
Construction Work Under CBRNIP,
Package-B
Part-2
Prepared By: Sk Mosaddek Haque Reyad
Planning Engineer, CPCL
Presented By: Md. Zakirul Islam
Quality Control Manager, CPCL
31. 1. Embankment Work
a) Clearing Grubbing
b) Soft Soil Treatment
c) Excavation
d) Embankment Filling with sand/soil
e) Sub-Grade
f) Improved Sub-Grade
2. Pavement Work
a) Sub-Base
b) Base-(II)
c) Base-(I)
d) Prime Coat
e) Binder Course
f) Tack Coat
g) Wearing Course
3. Misc. Work
a) Thermoplastic Road Marking
b) W Beam Guard Rail
c) Drainage Work
Step of Flexible Road Construction Work: