A
Summer Training Presentation on
Road Modification and Construction
submitted for partial fulfillment for the award of the degree
of
BACHELOR OF TECHNOLOGY
in
CIVIL ENGINEERING
Submitted to :- submitted by :-
Mr. Mohd Shariq mohammad danish anwar
Assistant professor 1571900025
Department of civil engineering 4th year (7th sem)
axis institute of technology and management(719),Kanpur
APJ ABDUL KALAM TECHNICAL UNIVERSITY, Lucknow
(Formerly Uttar Pradesh Technical University, Lucknow)
Session:2018-2019
Contents
 Introduction
 Road
 Earth work
 Pavements
 Types of pavements
 Road types
 Roadway construction
 Equipment
INTRODUCTION
 Development of a country depends on the connectivity of various
place with adequate road network.
 Roads constitute the most important made of communication in areas
where railways have not developed much.
 India has one of the largest roads network in world ( over 3 million
km at present).
 For the purpose of management and administration , road in India are
divided into the following categories :
I. National Highways (NH)
II. State Highways (SH)
III. Major District Roads (MDR)
IV. Other District Roads (ODR)
V. Village roads (VR)
Project Detail
S. NO PROJECT DETAILS DESCRIPTION
1. Project Name Fazilnagar road to kushinagar (NH-28)
2. Site Location kushinagar link road (NH28)
3. Area conveyed by project 8 km
4. Road type Village road
5. Road Width 3.75 meter (signal lane )
Road
 Roads are defined as routes or path begin at one destination and lead
to another.
 Road is an open , generally public way for the passage of vehicles,
people, and animals.
Earth work
The sub – grade soil is prepared by bringing it to desire grad.
 Soil filing
 Spreading and Levelling
 compaction
PAVEMENTS
Pavement is finished with a hard smooth surface. It helped make them
durable and able to withstand traffic and environment. They have a life
span between 20-30year.
 Types of pavement
a) Flexible pavement
b) Rigid pavement
Flexible pavement
 Flexible pavements are those
which are surface with
bituminous or asphalt
materials. it’s flexible since
the total pavement structure
bends or deflects due to the
traffic loads. Generally this
type of pavement requires
some sort of maintenance or
restoration every 10 to 15
years.
Rigid pavement
A rigid pavement structure
is composed of a hydraulic
cement concrete surface
course and concealed base
and sub base courses. The
surface course is the rigid
layer and provides the
majority of strength.
Types of roads
a) Earth road and gavel road b) Water bound macadam (WBM)
c) Bituminous road d) Cement concrete road
ROADWAY CONSTRUCTION
a) Carriageway b) Pavement
c) Kerb
• A line of stone or concrete
forming an edge between a
pavement and a roadway, so that
the pavement is some 15 cm
above the level of the road.
d) Shoulder
• It is the side of the road.
Sometimes it is paved. Sometimes
it is gravel. Sometimes it is dirt
or grass.
e) Sidewalks/Footpath
Equipment
• Compacting material ( vibratory roller)
• Dozer and scraper
• Power shover, shovels
• Concrete mixer
• Watering devices
• Mild steel section and blocks
• Barricading
• Signage board
Equipment fig.
Compacting material (vibratory roller) shovels
Concrete mixer Barricading
Thank you

More Related Content

What's hot

CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road constructionAnitha Jacob
 
Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road constructionManavSinghal8
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement Awinash Tiwari
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementNIWASHISH VISWAS
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road constructionritwizkumar1
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)Ratnesh Kushwaha
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSreemajadwani
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPTKavin Raval
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report Vikas Sukhwal
 

What's hot (20)

CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
Training report of road construction
Training report of road constructionTraining report of road construction
Training report of road construction
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Bituminous Road
 Bituminous Road Bituminous Road
Bituminous Road
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
Pavement design
Pavement designPavement design
Pavement design
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road construction
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
REPORT ON SUMMER TRAINING AT PWD(FLEXIBLE PAVEMENTS CONSTRUCTION)
 
CONSTRUCTION OF ROADS
CONSTRUCTION OF ROADSCONSTRUCTION OF ROADS
CONSTRUCTION OF ROADS
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWDSUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
 
Road construction
Road constructionRoad construction
Road construction
 

Similar to Road construction ppt

Similar to Road construction ppt (20)

Road construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentationRoad construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentation
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
BCE-UNIT-II Highway Engineering.pdf
BCE-UNIT-II Highway Engineering.pdfBCE-UNIT-II Highway Engineering.pdf
BCE-UNIT-II Highway Engineering.pdf
 
Highway construction or Road work
Highway construction or Road work Highway construction or Road work
Highway construction or Road work
 
MD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptxMD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptx
 
EM-203 Final MTE PPT 141-152.pptx
EM-203 Final MTE PPT 141-152.pptxEM-203 Final MTE PPT 141-152.pptx
EM-203 Final MTE PPT 141-152.pptx
 
History of pavement
History of pavementHistory of pavement
History of pavement
 
Pavement and Types of pavement
Pavement and Types of pavementPavement and Types of pavement
Pavement and Types of pavement
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
M1303078488
M1303078488M1303078488
M1303078488
 
PRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx forPRESENTATION ON RIGID PAVEMExNT.pptx for
PRESENTATION ON RIGID PAVEMExNT.pptx for
 
railway
railwayrailway
railway
 
Roads
RoadsRoads
Roads
 
Study of causes of failures and remedies on road
Study of causes of failures and remedies on roadStudy of causes of failures and remedies on road
Study of causes of failures and remedies on road
 
Highway report
Highway reportHighway report
Highway report
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
DESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENTDESIGN OF FLEXIBLE PEVEMENT
DESIGN OF FLEXIBLE PEVEMENT
 
Chapter 1 - Introduction (1).pptx
Chapter 1 - Introduction (1).pptxChapter 1 - Introduction (1).pptx
Chapter 1 - Introduction (1).pptx
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Road construction ppt

  • 1. A Summer Training Presentation on Road Modification and Construction submitted for partial fulfillment for the award of the degree of BACHELOR OF TECHNOLOGY in CIVIL ENGINEERING Submitted to :- submitted by :- Mr. Mohd Shariq mohammad danish anwar Assistant professor 1571900025 Department of civil engineering 4th year (7th sem) axis institute of technology and management(719),Kanpur APJ ABDUL KALAM TECHNICAL UNIVERSITY, Lucknow (Formerly Uttar Pradesh Technical University, Lucknow) Session:2018-2019
  • 2. Contents  Introduction  Road  Earth work  Pavements  Types of pavements  Road types  Roadway construction  Equipment
  • 3. INTRODUCTION  Development of a country depends on the connectivity of various place with adequate road network.  Roads constitute the most important made of communication in areas where railways have not developed much.  India has one of the largest roads network in world ( over 3 million km at present).  For the purpose of management and administration , road in India are divided into the following categories : I. National Highways (NH) II. State Highways (SH) III. Major District Roads (MDR) IV. Other District Roads (ODR) V. Village roads (VR)
  • 4. Project Detail S. NO PROJECT DETAILS DESCRIPTION 1. Project Name Fazilnagar road to kushinagar (NH-28) 2. Site Location kushinagar link road (NH28) 3. Area conveyed by project 8 km 4. Road type Village road 5. Road Width 3.75 meter (signal lane )
  • 5. Road  Roads are defined as routes or path begin at one destination and lead to another.  Road is an open , generally public way for the passage of vehicles, people, and animals.
  • 6. Earth work The sub – grade soil is prepared by bringing it to desire grad.  Soil filing  Spreading and Levelling  compaction
  • 7. PAVEMENTS Pavement is finished with a hard smooth surface. It helped make them durable and able to withstand traffic and environment. They have a life span between 20-30year.  Types of pavement a) Flexible pavement b) Rigid pavement
  • 8. Flexible pavement  Flexible pavements are those which are surface with bituminous or asphalt materials. it’s flexible since the total pavement structure bends or deflects due to the traffic loads. Generally this type of pavement requires some sort of maintenance or restoration every 10 to 15 years.
  • 9. Rigid pavement A rigid pavement structure is composed of a hydraulic cement concrete surface course and concealed base and sub base courses. The surface course is the rigid layer and provides the majority of strength.
  • 10. Types of roads a) Earth road and gavel road b) Water bound macadam (WBM)
  • 11. c) Bituminous road d) Cement concrete road
  • 13. c) Kerb • A line of stone or concrete forming an edge between a pavement and a roadway, so that the pavement is some 15 cm above the level of the road. d) Shoulder • It is the side of the road. Sometimes it is paved. Sometimes it is gravel. Sometimes it is dirt or grass.
  • 15. Equipment • Compacting material ( vibratory roller) • Dozer and scraper • Power shover, shovels • Concrete mixer • Watering devices • Mild steel section and blocks • Barricading • Signage board
  • 16. Equipment fig. Compacting material (vibratory roller) shovels Concrete mixer Barricading