EARTHWORK
Usual forms of cross-sections:
 The naturally occurring soil is known as the
subgrade and when it is prepared to receive the
ballast and track, it is called the formation.
 When the formation is raised on bank of earth, it
is called an embankment.
2
EARTHWORK
 When it is made after cutting the ground below
ground level, it is called in cutting.
 In case of cutting, the line is laid below ground
level and hence, the required portion is to be
excavated.
3
EARTHWORK
 A railway line may be constructed either in
embankment or in cutting or in a combined
section.
 It should be noted that angles α and β are not
necessarily the same.
4
EARTHWORK
Features of railroad bed level:
When the formation is to be made on
embankment or cutting, various features should
be carefully considered.
1. Width of formation:
 The width of formation will depend on:
 the number of tracks,
 gauge of tracks,
 centre to centre distance between the tracks,
5
EARTHWORK
 Width of ballast layer
 Width of trenches to drain off water, if necessary.
The width of formation is normally kept sloping
from the centre for drainage purposes.
6
EARTHWORK
The minimum widths of formation recommended
for different gauges are shown in table:
Gauge
Minimum width of
embankment
Minimum width of
cutting Remarks
Single Double Single Double
Broad Gauge (B.G) 610 cm 1082 cm 549 cm 1021 cm
122 cm extra width
is to be provided in
case of the
formation in
cutting for the side
drains.
Metre Gauge (M.G) 488 cm 884 cm 427 cm 827 cm
Narrow Gauge
(N.G) 370 cm 732 cm 335 cm 701 cm
7
EARTHWORK
2. Slopes of sides:
 The stability of the earthwork depends mainly on
two factors, namely, cohesion and friction.
 For temporary stability, cohesion is useful and
reliable,
 But permanent stability is achieved only by friction
which keeps the slopes at the natural angle of
repose of the material.
 The slopes to be provided to the sides of the
formation should be slightly flatter than the angle of
repose of the material.
8
EARTHWORK
The slopes in cuttings vary from nearly vertical to
1.5 to 1 or steeper.
3. Drains:
 The accumulation of water reduces the friction in
all sorts of soils.
 In case of embankments, the rain water is easily
drained off. But in case of cuttings, drains are to
be provided.
 The side drains are constructed along the track
at a depth of about 1200 mm from the rail level.
9
EARTHWORK
The size of drains will depend on the quantity of
water to be drained.
Sometimes, pipes of stoneware or concrete are
laid in a trench with open or half open joints and
covered with porous material.
10
EARTHWORK
Stabilization of track on poor soil:
Following are four usual methods of stabilization
of track on poor soil:
i. Layer of moorum
ii. Cement grouting
iii. Sand piles
iv. Use of chemicals
11
EARTHWORK
i. Layer Of Moorum:
• In very poor soil such as black cotton soil which
swells and shrinks considerably by contact with
moisture and by the loss of moisture to the
extent of 20% to 30% of its volume, a layer of
moorum is provided under the ballast, as shown:
12
EARTHWORK
• The thickness of this layer varies from 300 mm to
600 mm.
• This layer distributes the pressure and it also
prevents the ballast from being lost in the cracks
of the soil.
• Instead of moorum, ashes, rubble, slabs of
concrete, unserviceable sleepers, etc. are also
used and they are found to be quite satisfactory.
13
EARTHWORK
ii. Cement Grouting:
• In this method, the steel tubes about 30 mm
diameter are driven into the formation at every
alternate sleeper.
• They are driven near the ends of the sleepers as
shown:
14
EARTHWORK
• The steel tubes are generally 150 cm long and
driven at an angle so that the end of the tube is
nearly under the rail.
• Then the cement grout is forced under a pressure
of about 0.7 N/mm2 through these tubes.
• The cement grout spreads through the poor soil
and consolidates it.
• The steel tubes are then gradually taken out.
15
EARTHWORK
iii. Sand Piles:
• In this method, a vertical bore of about 300 mm
diameter is made in the ground by driving
wooden pile;
• The wooden pile is then withdrawn and the
space is filled with sand and is well-rammed;
• The functions performed by the sand piles are as
follows:
a. They can function as timber piles.
b. They provide an arrangement of vertical drainage.
c. They provide good mechanical support. 16
EARTHWORK
17
EARTHWORK
iv. Use Of Chemicals:
• In this method, the chemicals are used in place
of cement grout to consolidate the soil;
• The silicate of soda followed by calcium chloride
is effective for sandy soils containing less than
25% clay and silt.
18

More Related Content

What's hot

Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering IntroductionT.Naga Anusha
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric designVijai Krishnan V
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: TurnoutsVijai Krishnan V
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdfWhUllahWa
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsSagar Kaptan
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2RAMPRASAD KUMAWAT
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanencekrishnacp
 
Dowel bars, tie bars and their design
Dowel bars, tie bars and their designDowel bars, tie bars and their design
Dowel bars, tie bars and their designBhavya Jaiswal
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport EngineeringFirasath Ali
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layoutsMani Vel
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 

What's hot (20)

Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway Engineering Introduction
Railway Engineering IntroductionRailway Engineering Introduction
Railway Engineering Introduction
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 
Railway Engineering: Turnouts
Railway Engineering: TurnoutsRailway Engineering: Turnouts
Railway Engineering: Turnouts
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Wind Rose.pdf
Wind Rose.pdfWind Rose.pdf
Wind Rose.pdf
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in rails
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Dowel bars, tie bars and their design
Dowel bars, tie bars and their designDowel bars, tie bars and their design
Dowel bars, tie bars and their design
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
11.track junctions and layouts
11.track junctions and layouts11.track junctions and layouts
11.track junctions and layouts
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 

Viewers also liked

railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.ashrafdgrt
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineeringnkocet
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)sharda university
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackMani Vel
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation PptSachin Singh
 
Meter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gaugeMeter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gaugeParv Garg
 
Highway & Railway Engineering
Highway & Railway EngineeringHighway & Railway Engineering
Highway & Railway EngineeringGAURAV. H .TANDON
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringjmaghade99
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringLatif Hyder Wadho
 

Viewers also liked (20)

railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
Sub grade preperation
Sub grade preperationSub grade preperation
Sub grade preperation
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Meter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gaugeMeter gauge, broad gauge and narrow gauge
Meter gauge, broad gauge and narrow gauge
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Highway & Railway Engineering
Highway & Railway EngineeringHighway & Railway Engineering
Highway & Railway Engineering
 
P.way
P.wayP.way
P.way
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 

Similar to Earthwork & track formation Railway Engineering

Similar to Earthwork & track formation Railway Engineering (20)

Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
caissons and cofferdam in substructure construction
caissons and cofferdam in substructure constructioncaissons and cofferdam in substructure construction
caissons and cofferdam in substructure construction
 
Types of-cofferdams
Types of-cofferdamsTypes of-cofferdams
Types of-cofferdams
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
any
anyany
any
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cuts
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Piles and drilled shaft - Deep Foundations
Piles and drilled shaft - Deep FoundationsPiles and drilled shaft - Deep Foundations
Piles and drilled shaft - Deep Foundations
 
Well foundation
Well foundationWell foundation
Well foundation
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Shaft sinking
Shaft sinking Shaft sinking
Shaft sinking
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their composition
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Chapter 4.2 coffer dam, well foundation-final1
Chapter 4.2   coffer dam, well foundation-final1Chapter 4.2   coffer dam, well foundation-final1
Chapter 4.2 coffer dam, well foundation-final1
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 

More from Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRWLatif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWLatif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papersLatif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testLatif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global languageLatif Hyder Wadho
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical EngineeringLatif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of pilesLatif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation EngineeringLatif Hyder Wadho
 

More from Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Earthwork & track formation Railway Engineering

  • 1. RAILWAY ENGINEERING COMPONENTS OF RAILWAY TRACK FORMATION 1
  • 2. EARTHWORK Usual forms of cross-sections:  The naturally occurring soil is known as the subgrade and when it is prepared to receive the ballast and track, it is called the formation.  When the formation is raised on bank of earth, it is called an embankment. 2
  • 3. EARTHWORK  When it is made after cutting the ground below ground level, it is called in cutting.  In case of cutting, the line is laid below ground level and hence, the required portion is to be excavated. 3
  • 4. EARTHWORK  A railway line may be constructed either in embankment or in cutting or in a combined section.  It should be noted that angles α and β are not necessarily the same. 4
  • 5. EARTHWORK Features of railroad bed level: When the formation is to be made on embankment or cutting, various features should be carefully considered. 1. Width of formation:  The width of formation will depend on:  the number of tracks,  gauge of tracks,  centre to centre distance between the tracks, 5
  • 6. EARTHWORK  Width of ballast layer  Width of trenches to drain off water, if necessary. The width of formation is normally kept sloping from the centre for drainage purposes. 6
  • 7. EARTHWORK The minimum widths of formation recommended for different gauges are shown in table: Gauge Minimum width of embankment Minimum width of cutting Remarks Single Double Single Double Broad Gauge (B.G) 610 cm 1082 cm 549 cm 1021 cm 122 cm extra width is to be provided in case of the formation in cutting for the side drains. Metre Gauge (M.G) 488 cm 884 cm 427 cm 827 cm Narrow Gauge (N.G) 370 cm 732 cm 335 cm 701 cm 7
  • 8. EARTHWORK 2. Slopes of sides:  The stability of the earthwork depends mainly on two factors, namely, cohesion and friction.  For temporary stability, cohesion is useful and reliable,  But permanent stability is achieved only by friction which keeps the slopes at the natural angle of repose of the material.  The slopes to be provided to the sides of the formation should be slightly flatter than the angle of repose of the material. 8
  • 9. EARTHWORK The slopes in cuttings vary from nearly vertical to 1.5 to 1 or steeper. 3. Drains:  The accumulation of water reduces the friction in all sorts of soils.  In case of embankments, the rain water is easily drained off. But in case of cuttings, drains are to be provided.  The side drains are constructed along the track at a depth of about 1200 mm from the rail level. 9
  • 10. EARTHWORK The size of drains will depend on the quantity of water to be drained. Sometimes, pipes of stoneware or concrete are laid in a trench with open or half open joints and covered with porous material. 10
  • 11. EARTHWORK Stabilization of track on poor soil: Following are four usual methods of stabilization of track on poor soil: i. Layer of moorum ii. Cement grouting iii. Sand piles iv. Use of chemicals 11
  • 12. EARTHWORK i. Layer Of Moorum: • In very poor soil such as black cotton soil which swells and shrinks considerably by contact with moisture and by the loss of moisture to the extent of 20% to 30% of its volume, a layer of moorum is provided under the ballast, as shown: 12
  • 13. EARTHWORK • The thickness of this layer varies from 300 mm to 600 mm. • This layer distributes the pressure and it also prevents the ballast from being lost in the cracks of the soil. • Instead of moorum, ashes, rubble, slabs of concrete, unserviceable sleepers, etc. are also used and they are found to be quite satisfactory. 13
  • 14. EARTHWORK ii. Cement Grouting: • In this method, the steel tubes about 30 mm diameter are driven into the formation at every alternate sleeper. • They are driven near the ends of the sleepers as shown: 14
  • 15. EARTHWORK • The steel tubes are generally 150 cm long and driven at an angle so that the end of the tube is nearly under the rail. • Then the cement grout is forced under a pressure of about 0.7 N/mm2 through these tubes. • The cement grout spreads through the poor soil and consolidates it. • The steel tubes are then gradually taken out. 15
  • 16. EARTHWORK iii. Sand Piles: • In this method, a vertical bore of about 300 mm diameter is made in the ground by driving wooden pile; • The wooden pile is then withdrawn and the space is filled with sand and is well-rammed; • The functions performed by the sand piles are as follows: a. They can function as timber piles. b. They provide an arrangement of vertical drainage. c. They provide good mechanical support. 16
  • 18. EARTHWORK iv. Use Of Chemicals: • In this method, the chemicals are used in place of cement grout to consolidate the soil; • The silicate of soda followed by calcium chloride is effective for sandy soils containing less than 25% clay and silt. 18