SOUVIK M ON DAL D.C.E. :-62
 For exchange of passengers and goods.
 For control of train movements.
 For taking fuels and water for locomotives.
 For changing engines and running staff.
 To allow trains to cross from opposite directions on a single
track.
 For attaching and removing wagons and compartments.
1. Drainage
2. Water Supply
3. Future Allowances
4. Gradient
5. Location or Horizontal Alignment
6. Vertical Alignment
7. Accessibility
8. Visibility
9. Facilities
Public Requirements
(i) Booking office
(ii) Platform
(iii) Waiting room
(iv) Arrangements for drinking water
(v) Retiring Room
(vi) Replacement Room
(vii)Sanitary arrangement
(viii)Lighting Arrangement
(ix) Enquiry office
(x) Public telephone
(xi) Name boards of station
(xii)Clock room
Traffic Requirements
(i) Machines for dating tickets
(ii) Weighing machine
(iii) Controlling and recording arrangement
for movement of trains
(iv) Sufficient number of sidings
(v) Suitable platform for loading, unloading
and storing of goods
Requirement of Locomotive
(i) Arrangement for supplying fuel,
water to engines
(ii) Arrangement for clearing and
examining the locomotives
(iii) Arrangement for inspecting vehicles
(iv) Turn table
(v) Residential accommodation
waiting room for loco staff
General Requirements
(i) Suitable approach road to the station
(ii) Provision of clocks showing correct time
(iii) Availability of coolies on the platform
Classification Based on
Operational Characteristics
Classification Based on
Functional Characteristics
(a) Block stations
(b) Non block stations
(c) Special class stations
(a) Wayside stations
(b) Junction Stations
(c) Terminal Stations
Block Stations
Class ‘A’ Station
Class ‘B’ StationClass ‘C’ Station
Non-Block Stations
Special Class Stations
Wayside Stations
Halt Station
Flag StationCrossing Station
Layout of a Wayside Station on Single LineLayout of a Wayside Station on Double Line TrackLayout of a Wayside Station on Triple Line Track
Junction Stations
At junction station, special arrangements are made to fulfill the
following requirements:
(a) To facilitate the interchange of traffic between main and
branch lines.
(b) To change the direction of engines.
(c) To reair and clean the train.
Terminal Stations
At terminal station following facilitates are provided:
(a) Turn-table or triangle for changing the direction of the engine.
(b) Fueling, watering and cleaning of engine.
(c) For dealing with good traffic.
Station yards systems of tracks laid within limits for
various purposes like receiving, storing, making up
trains etc. over which movement of trains is
controlled by prescribed rules, regulations and
signals.
Passenger Yards
Following are the main requirements of a passenger yard:
(i) Ticket booking office, enquire office, cloak room and luggage booking room.
(ii) Signals for receiving both up and down trains.
(iii) Space for parking all kinds of vehicles outside the station.
(iv) Signals for departure of trains.
(v) Facilities for passing a through-train at full speed without any interference.
(vi) Sufficient numbers of passenger platforms.
(vii) Sufficient number of siding with platforms.
(viii) Sufficient number of washing lines, sick lines and stabling lines.
(ix) Facilities for charging of train batteries.
Goods Yards
Following are the main requirements of a goods yard:
(i) Goods platforms for loading and unloading of goods.
(ii) Approach roads to each platform for movement of trucks.
(iii) Sufficient number of godowns for storing goods.
(iv) Cranes for loading and unloading of heavy goods.
(v) Weighing machine for weighing of goods.
(vi) Loading gauge to check the height and width of loaded wagon.
(vii) Booking office for booking of goods.
(viii) Gathering line taking off the main line or loop line with number of parallel
dead end sidings with buffer stops.
Marshalling Yards
The following are the drawbacks of marshaling yard:
(i) Traffic congestion at approaches to the yard due of continuous
shunting work in the yard.
(ii) Delay in transit of wagons.
(iii)Damage of wagons while shunting.
Flat YardsGravitational YardsHump Yards
Locomotive Yards
The following are the main requirement of a locomotive yard:
(i) It should be located near passenger yard and goods yard.
(ii) It should have sick siding for engines.
(iii) It should have facilities like ash pits, inspection pits, turn table, engine shed,
hydraulic jack etc.
(iv) It should have space and equipments for loading fuel in engines.
(v) It should have overhead tank for supply of water.
(vi) It should have space for future expansion.
Stations and Yards of Railway
Stations and Yards of Railway

More Related Content

What's hot

Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutSunil Kumar Meena
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway TrackArbaz Kazi
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway addavidson
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlockingsrinivas2036
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepRAMPRASAD KUMAWAT
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracksGowtham G
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingssrinivas2036
 

What's hot (20)

Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Different Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station LayoutDifferent Cross sections of Rail Tracks and Railway Station Layout
Different Cross sections of Rail Tracks and Railway Station Layout
 
Construction of a New Railway Track
Construction of a New  Railway TrackConstruction of a New  Railway Track
Construction of a New Railway Track
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Left hand turnout
Left hand turnoutLeft hand turnout
Left hand turnout
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 

Viewers also liked

Railway engineering
Railway engineeringRailway engineering
Railway engineeringhiranrathva
 
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...Hossam Shafiq II
 
Geometric desing of railway track
Geometric desing of railway trackGeometric desing of railway track
Geometric desing of railway trackmohitjain123
 
Introduction to ground water hydrology
Introduction to ground water hydrologyIntroduction to ground water hydrology
Introduction to ground water hydrologyMohsin Siddique
 
2 handouts-lecture-7
2  handouts-lecture-72  handouts-lecture-7
2 handouts-lecture-7Saleem Malik
 
Precipitation and its estimation
Precipitation and its estimationPrecipitation and its estimation
Precipitation and its estimationMohsin Siddique
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurementMOHIT MAYOOR
 
Water cycle and water budget
Water cycle and water budgetWater cycle and water budget
Water cycle and water budgetMohsin Siddique
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )hiranrathva
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Topic%20 compression
Topic%20 compressionTopic%20 compression
Topic%20 compressionSaleem Malik
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesMohsin Siddique
 
steel structural basics
steel structural basicssteel structural basics
steel structural basicsAsan Ibrahim
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girdersSaleem Malik
 

Viewers also liked (20)

Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
Ch5 Plate Girder Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr. Me...
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
Geometric desing of railway track
Geometric desing of railway trackGeometric desing of railway track
Geometric desing of railway track
 
Introduction to ground water hydrology
Introduction to ground water hydrologyIntroduction to ground water hydrology
Introduction to ground water hydrology
 
Floods
FloodsFloods
Floods
 
2 handouts-lecture-7
2  handouts-lecture-72  handouts-lecture-7
2 handouts-lecture-7
 
Station yards
Station yardsStation yards
Station yards
 
Precipitation and its estimation
Precipitation and its estimationPrecipitation and its estimation
Precipitation and its estimation
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurement
 
Water cycle and water budget
Water cycle and water budgetWater cycle and water budget
Water cycle and water budget
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Topic%20 compression
Topic%20 compressionTopic%20 compression
Topic%20 compression
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examples
 
Bolted connections
Bolted connectionsBolted connections
Bolted connections
 
steel structural basics
steel structural basicssteel structural basics
steel structural basics
 
52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders52436966 lecture-13-plate-girders
52436966 lecture-13-plate-girders
 

Similar to Stations and Yards of Railway

Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminalKapilLamba6
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...Hossam Shafiq I
 
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...Rohit894
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdfRaj Bakhtani
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptxBalpreetSingh47890
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptxashish502848
 
Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016Jayanta "Jay" Debnath
 
Automated Container Terminal Planning
Automated Container Terminal Planning Automated Container Terminal Planning
Automated Container Terminal Planning Larry Samson
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringAditya Mistry
 
1. railway track gauge
1. railway track gauge1. railway track gauge
1. railway track gaugeGaurav Jagad
 
chapter-4 Railway Station.pptx
chapter-4   Railway Station.pptxchapter-4   Railway Station.pptx
chapter-4 Railway Station.pptxMamushLeta
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway ConstructionHafizullah Sadat
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyAkshey Sharma
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottJumpingJaq
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUTRONAK SUTARIYA
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 

Similar to Stations and Yards of Railway (20)

Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminal
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
unit-iii-station-yards-railway-signalling-interlocking-railway-track-construc...
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016Thesis Presentation - Rev JD 17July2016
Thesis Presentation - Rev JD 17July2016
 
Automated Container Terminal Planning
Automated Container Terminal Planning Automated Container Terminal Planning
Automated Container Terminal Planning
 
Container terminals (1)
Container terminals (1)Container terminals (1)
Container terminals (1)
 
Railway Bridge and Tunnel Engineering
Railway Bridge and Tunnel EngineeringRailway Bridge and Tunnel Engineering
Railway Bridge and Tunnel Engineering
 
Geog 80 Topic 4.ppt
Geog 80 Topic 4.pptGeog 80 Topic 4.ppt
Geog 80 Topic 4.ppt
 
1. railway track gauge
1. railway track gauge1. railway track gauge
1. railway track gauge
 
chapter-4 Railway Station.pptx
chapter-4   Railway Station.pptxchapter-4   Railway Station.pptx
chapter-4 Railway Station.pptx
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway Construction
 
Inter state bus terminal - Litrature study
Inter state bus terminal - Litrature studyInter state bus terminal - Litrature study
Inter state bus terminal - Litrature study
 
AITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie PiggottAITPM Conference Presentation - Laurie Piggott
AITPM Conference Presentation - Laurie Piggott
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUT
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 

Recently uploaded

Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Stations and Yards of Railway

  • 1. SOUVIK M ON DAL D.C.E. :-62
  • 2.  For exchange of passengers and goods.  For control of train movements.  For taking fuels and water for locomotives.  For changing engines and running staff.  To allow trains to cross from opposite directions on a single track.  For attaching and removing wagons and compartments.
  • 3. 1. Drainage 2. Water Supply 3. Future Allowances 4. Gradient 5. Location or Horizontal Alignment 6. Vertical Alignment 7. Accessibility 8. Visibility 9. Facilities
  • 4. Public Requirements (i) Booking office (ii) Platform (iii) Waiting room (iv) Arrangements for drinking water (v) Retiring Room (vi) Replacement Room (vii)Sanitary arrangement (viii)Lighting Arrangement (ix) Enquiry office (x) Public telephone (xi) Name boards of station (xii)Clock room Traffic Requirements (i) Machines for dating tickets (ii) Weighing machine (iii) Controlling and recording arrangement for movement of trains (iv) Sufficient number of sidings (v) Suitable platform for loading, unloading and storing of goods Requirement of Locomotive (i) Arrangement for supplying fuel, water to engines (ii) Arrangement for clearing and examining the locomotives (iii) Arrangement for inspecting vehicles (iv) Turn table (v) Residential accommodation waiting room for loco staff General Requirements (i) Suitable approach road to the station (ii) Provision of clocks showing correct time (iii) Availability of coolies on the platform
  • 5. Classification Based on Operational Characteristics Classification Based on Functional Characteristics (a) Block stations (b) Non block stations (c) Special class stations (a) Wayside stations (b) Junction Stations (c) Terminal Stations
  • 6. Block Stations Class ‘A’ Station Class ‘B’ StationClass ‘C’ Station
  • 9. Wayside Stations Halt Station Flag StationCrossing Station
  • 10. Layout of a Wayside Station on Single LineLayout of a Wayside Station on Double Line TrackLayout of a Wayside Station on Triple Line Track
  • 11. Junction Stations At junction station, special arrangements are made to fulfill the following requirements: (a) To facilitate the interchange of traffic between main and branch lines. (b) To change the direction of engines. (c) To reair and clean the train.
  • 12. Terminal Stations At terminal station following facilitates are provided: (a) Turn-table or triangle for changing the direction of the engine. (b) Fueling, watering and cleaning of engine. (c) For dealing with good traffic.
  • 13. Station yards systems of tracks laid within limits for various purposes like receiving, storing, making up trains etc. over which movement of trains is controlled by prescribed rules, regulations and signals.
  • 14. Passenger Yards Following are the main requirements of a passenger yard: (i) Ticket booking office, enquire office, cloak room and luggage booking room. (ii) Signals for receiving both up and down trains. (iii) Space for parking all kinds of vehicles outside the station. (iv) Signals for departure of trains. (v) Facilities for passing a through-train at full speed without any interference. (vi) Sufficient numbers of passenger platforms. (vii) Sufficient number of siding with platforms. (viii) Sufficient number of washing lines, sick lines and stabling lines. (ix) Facilities for charging of train batteries.
  • 15. Goods Yards Following are the main requirements of a goods yard: (i) Goods platforms for loading and unloading of goods. (ii) Approach roads to each platform for movement of trucks. (iii) Sufficient number of godowns for storing goods. (iv) Cranes for loading and unloading of heavy goods. (v) Weighing machine for weighing of goods. (vi) Loading gauge to check the height and width of loaded wagon. (vii) Booking office for booking of goods. (viii) Gathering line taking off the main line or loop line with number of parallel dead end sidings with buffer stops.
  • 16. Marshalling Yards The following are the drawbacks of marshaling yard: (i) Traffic congestion at approaches to the yard due of continuous shunting work in the yard. (ii) Delay in transit of wagons. (iii)Damage of wagons while shunting.
  • 18. Locomotive Yards The following are the main requirement of a locomotive yard: (i) It should be located near passenger yard and goods yard. (ii) It should have sick siding for engines. (iii) It should have facilities like ash pits, inspection pits, turn table, engine shed, hydraulic jack etc. (iv) It should have space and equipments for loading fuel in engines. (v) It should have overhead tank for supply of water. (vi) It should have space for future expansion.