MOHAN SINGH
E-Mail: mohan_civil29@rediffmail.com ≈ Mobile: +91 9407921200, 8827338002,
Senior level positions in Civil / Construction Project Management with reputed organisations
(Preferably with Manufacturing, Power sectors)
PROFESSIONAL PROFILE
− A dynamic professional with over 19 years of rich experience in Project Execution & Construction
Management for Thermal, Captive Power Plant, Work in renewal energy like Solar Power, Polysilicon Plant,
Wafer plant, PV module plant, Metro Rail, Flyover, High rise Building, Airport terminal, Logistic park, Real
estate etc.
− Currently with Triveni Turbine Limited as an EPC contractor for the site of Bhilai Steel Plant, Project Work
of 7 MTPA expansion work for the construction of 25MW STG and 4MW BPTG Building, Bhilai,
Chhattisgarh. Proficient in Micro Planning for execution of civil work and material procurement for
construction area. PMG with experience in Project budgeting, Cost-control and Value Engineering.
− Hold the distinction of managing diverse projects for construction, erection and commissioning activities of
Turbine, Generator, Gear box, Deaerator, PRDS, Condenser, 36 MVA transformer, Reactor, Breaker, High-rise
Buildings, RCC pavements, Piling, Flyover bridge, Subway, culvert, industrial structures like turbine building,
CVD Reactor Building, TCS Plant, Vent and Oil Gas Recovery Structure, Reservoir, H2 Generation and
Purification, Compressed Dry Air, Nitrogen Storage, Boiler Foundation, 132 KV Sub Station, LDO and HFO
Tanks, Dematerialized Water Generation, Plant Water System, Caustic Storage, Vent Scrubber System, Vent
Treatment Plant, HCL Unit, West Water Treatment Plant, Recovery Water Pump House, Clarifier Tank, Paving
work, Settling, Surge Tank, CW pump house, 10 Cell Cooling Tower, switch yard, transformer yard, ESP
control building, PA and FD fan foundation, Installation of HVAC system, Firefighting system, Construction
of RCC Chimney by slip form, Erection of flue can segment by stand jack, Infrastructure Development and so
on.
− Extensive experience in Civil Engineering Works with specialisation in Executing, Contracts Management,
Planning and Coordination.
− Astute professional with a flair for adopting modern management methodologies/ systems in compliance with
prevailing standards.
− Expertise in swiftly wrapping up projects with competent cross-functional skills on time within specified
budget parameters.
− Ensuring safety guidelines in construction area by Hazard Identification and Risk Analysis (HIRA), Tool box
talking, Near miss reporting etc.
− Strong relationship management, communication skills with the ability to network with Project team,
Consultants, Contractors with consummate ease.
− Taking input from store site, Reconciliation of material.
− Making protocol/ Joint records after completion of work for raise the invoice.
AREAS OF EXPERTISE
Project Planning
− Conceptualising detailed project reports and project execution plans after thorough discussion with
management, architects and consultants. Establishing time span of project execution as per client
specifications.
− Listing the resources needed for projects, preparing resource deployment & mobilisation schedule after
considering the lead time, set time frame and budgetary parameters.
− Evaluating designs, coordinating with Architects and Consultants in the preparation of tenders, float tenders
and award contracts after consulting with top management.
− Supervising project costing by estimating and updating it based on Execution Drawings and taking
appropriate measures.
− Monitoring the Project Progress, proceeding for orders to be placed at different stages of the project for various
packages and assessing the resource requirements for various packages.
− Inspecting project status during the course of periodic project review meetings.
− Developing MIS and ensuring relevant reports are generated and sent to the concerned at identified intervals.
Co-ordination
− Liaising with Consultants, Contractors, vendors and all other parties involved ensuring smooth progress of
work and timely clearances like drawings, technical specifications and construction related issues.
− Coordinating with Architects and consultants for design reviews and value addition.
− Leading Contracts Team and coordinate with all the departments, consultants and contractors from the
concept to completion of the project.
− Monitoring the Project Progress, following-up for orders to be placed at different stages of the project for
various packages, assessing the resource requirements for various packages and coordinate between all the
agencies involved in the Project.
− Settling all techno commercial differences / clarifications during execution of project.
− Coordinating all construction activities including providing technical inputs for methodologies of construction
& coordination with site based personal.
EMPLOYMENT DETAIL
Since April’12 with Triveni Turbine Limited, EPC Division Bhilai, Chhattisgarh as Manager Projects
Project : 7 MTPA, Steel Plant, Bhilai, Chhattisgarh.
Responsibilities:
− Overseeing the construction and installation work of 25MW Steam turbine Generator Power House Building, 4
MW Back Pressure Turbine generator Power House Building, Cooling Water Pump House, 10 cell Cooling
Tower, CW Control Building, Side Stream filtration Plant, 600 RM Pipe Trestle, Extended Switch gear Building,
25 Meter High Overhead Tank, Warehouse, Railway cross country pipe line, Bridge, drain, Paving work and
Power evacuation system.
− Erection and commissioning activities of Turbine, Generator, Gear box, Condenser, 36 MVA transformer,
Reactor, Breaker,
− Ensuring work activities as per time schedule with safety management plan.
− Liaising with client and contractors.
− Handling the execution of industrial RCC Structures with high vibrating machine foundations, Reactors and
Breaker Building, RCC pavements, finishing works, etc.
Aug’10 – March 12 with Lanco Infratech Ltd., EPC Division Rajnandgaon, Chhattisgarh Deputy Manager
Project : Lanco Solar Pvt. Limited 1500 TPA, Poly Silicon Plant, Rajnandgaon, Chhattisgarh.
Responsibilities:
− Overseeing the construction work of CVD Building, TCS Plant, VGR Structure Area, Wafer plant, 50 MW PV
module plant, Reservoir, H2 Building, Nitrogen Storage, Boiler Foundation, 132 KV Sub Station, LDO and
HFO Tanks, Plant Water System, Caustic Storage, Vent Scrubber System, Vent Treatment Plant, HCL Storage,
West Water Treatment Plant, Recovery Water Pump House, Clarifier Tank, Paving work, Settling and Surge
Tank.
− Experience in Delhi Metro rail and Airport terminal.
− Ensuring work activities as per time schedule with safety management plan.
− Liaising with client and contractors.
− Handling the execution of industrial RCC Structures with high vibrating machine foundations, Reactors
Building, RCC pavements, finishing works, etc.
Feb’09 – July’ 10 with Simplex Infra. Ltd., Mundra, Kutch, Gujarat as Dy. Manager (Construction)
Project : ADANI Power Ltd. 5x 660 MW TPP, Mundra, Kutch, Gujarat.
Responsibilities:
− Overseeing the construction work of RCC Silos, Fly Ash Water Pump House, Using of slip form in
construction of RCC Chimney, Erection of flue can segment by stand jack, Bottom Ash Water Pump House,
Recovery Water Pump House, Clarifier Tank, Paving work, Settling and Surge Tank.
− Ensuring work activities as per time schedule with safety management plan.
− Liaising with clients and contractors.
− Handling the execution of industrial RCC structures with piling, high vibrating machine foundations,
multistoried buildings, RCC pavements, slip form shuttering system, finishing works, etc., with optimum
utilisation of manpower & machinery.
Mar’07 – Jan’09 with Tata Projects Ltd., (at 1 x 80 MW CPP Hindustan Zinc Ltd., Chanderia, Chittorgarh) Rajasthan
as Engineer Construction
Responsibilities:
Executing the task of ID Fan foundation, FD fan, PA fan Foundation, Bowl Mill foundation, Bunker slab, ESP
control room, TG Building, MCC room, Installation of HVAC system, Firefighting system, CEP Foundation, Switch
yard, Transformer yard, GT foundation, Road and Drain, Ash handling system and Coal stock yard.
May’05 – Feb’07 with BHEL PSER at 2x250 MW TPP CSEB, Korba (East), Chatishgarh as Jr. Engineer
Responsibilities
Constructing 220 meter high RCC Chimney by using of slip form and erection of flue can by using of stand jack
(Twin steel flue liner chimney), raw water pump house, CW pump house, pipe rack foundation, Warehouse, LDO,
HFO tank, ESP control building, Administration Building and ID System foundation.
Sept’04 – Mar’05 with Govt. Polytechnic Korba, (C.G.) as a Project Officer (Planning)
Responsibilities
− Overseeing the construction of percolation tank, dyke wall, extra room, etc.
Jun’96 - Aug’04 with B. B. Verma Co. Engineers & Contractors Pvt. Ltd., Korba as a Site Engineer (4 x 135 MW,
CPP Balco Plant)
Responsibilities
− Executing and supervising the activities in the electrical distribution room, cable trench, duct bank, CW canal,
Piling, Flyover Bridge, Subway, culvert, road and drain work, construction of hollow blocks at Mahamaya
Bricks Industries Bilaspur, construction of high-rise Buildings, Real estate.
− Monitoring the work under PMGSY, SADA colony, bridge, culvert, etc.
EDUCATION
Graduation in Civil Engineering AIMES Mehsana, Gujarat, 2010
ANNA UNIVERSITY (UGC Approved)
Management BABA AMTEY SPS Dewas, MP 2000
Diploma in Civil Engineering Govt. Polytechnic Raigarh, CG 1996
MP Technical Education Board, Bhopal.
HS (PCM) MP, Board, Bhopal 1992
IT SKILLS
Well versed with MS Office, MS Projects, Auto CAD, POL and SAP software
Training:
Training in Computer proficiency from SCERT, Bhopal, MP 6 months
Training of Certificate in Project Management from PMA-India 6 days
Training in Logical framework approach from UNDP, Hyderabad 5 days
PERSONAL DOSSIER
Date of Birth : 23rd March, 1975
Address : B-44, Street No. 11, Smriti Nagar, Bhilai,
Dist. - Durg - 490021, Chhatishgarh
Languages known : English and Hindi

More Related Content

What's hot (20)

CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
CV Shukla
CV ShuklaCV Shukla
CV Shukla
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensed
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016Ghassan Hamati CV April 2016
Ghassan Hamati CV April 2016
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
cv1
cv1cv1
cv1
 
Phillips Howard
Phillips HowardPhillips Howard
Phillips Howard
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
Cv mohamed al-jabri - 2018
Cv   mohamed al-jabri - 2018Cv   mohamed al-jabri - 2018
Cv mohamed al-jabri - 2018
 
TJ Dickey Resume.docx complete
TJ Dickey Resume.docx completeTJ Dickey Resume.docx complete
TJ Dickey Resume.docx complete
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 

Similar to Resume 2015 (20)

satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
Murali procurement
Murali procurementMurali procurement
Murali procurement
 
RESUME
RESUMERESUME
RESUME
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)BISWAS-CV_(2) (1) (2) (1)
BISWAS-CV_(2) (1) (2) (1)
 
Ashok Upadhyay Resume
Ashok Upadhyay ResumeAshok Upadhyay Resume
Ashok Upadhyay Resume
 
CV Riaz Khan
CV Riaz KhanCV Riaz Khan
CV Riaz Khan
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Resume
ResumeResume
Resume
 
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projectsNavaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
 
Resume_-_Sourav_Sengupta
Resume_-_Sourav_SenguptaResume_-_Sourav_Sengupta
Resume_-_Sourav_Sengupta
 
Resume
ResumeResume
Resume
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
Curriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project ManagerCurriculum Vitae Dermawan LG - Project Manager
Curriculum Vitae Dermawan LG - Project Manager
 
Resume_mahim
Resume_mahimResume_mahim
Resume_mahim
 

Recently uploaded

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Recently uploaded (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Resume 2015

  • 1. MOHAN SINGH E-Mail: mohan_civil29@rediffmail.com ≈ Mobile: +91 9407921200, 8827338002, Senior level positions in Civil / Construction Project Management with reputed organisations (Preferably with Manufacturing, Power sectors) PROFESSIONAL PROFILE − A dynamic professional with over 19 years of rich experience in Project Execution & Construction Management for Thermal, Captive Power Plant, Work in renewal energy like Solar Power, Polysilicon Plant, Wafer plant, PV module plant, Metro Rail, Flyover, High rise Building, Airport terminal, Logistic park, Real estate etc. − Currently with Triveni Turbine Limited as an EPC contractor for the site of Bhilai Steel Plant, Project Work of 7 MTPA expansion work for the construction of 25MW STG and 4MW BPTG Building, Bhilai, Chhattisgarh. Proficient in Micro Planning for execution of civil work and material procurement for construction area. PMG with experience in Project budgeting, Cost-control and Value Engineering. − Hold the distinction of managing diverse projects for construction, erection and commissioning activities of Turbine, Generator, Gear box, Deaerator, PRDS, Condenser, 36 MVA transformer, Reactor, Breaker, High-rise Buildings, RCC pavements, Piling, Flyover bridge, Subway, culvert, industrial structures like turbine building, CVD Reactor Building, TCS Plant, Vent and Oil Gas Recovery Structure, Reservoir, H2 Generation and Purification, Compressed Dry Air, Nitrogen Storage, Boiler Foundation, 132 KV Sub Station, LDO and HFO Tanks, Dematerialized Water Generation, Plant Water System, Caustic Storage, Vent Scrubber System, Vent Treatment Plant, HCL Unit, West Water Treatment Plant, Recovery Water Pump House, Clarifier Tank, Paving work, Settling, Surge Tank, CW pump house, 10 Cell Cooling Tower, switch yard, transformer yard, ESP control building, PA and FD fan foundation, Installation of HVAC system, Firefighting system, Construction of RCC Chimney by slip form, Erection of flue can segment by stand jack, Infrastructure Development and so on. − Extensive experience in Civil Engineering Works with specialisation in Executing, Contracts Management, Planning and Coordination. − Astute professional with a flair for adopting modern management methodologies/ systems in compliance with prevailing standards. − Expertise in swiftly wrapping up projects with competent cross-functional skills on time within specified budget parameters. − Ensuring safety guidelines in construction area by Hazard Identification and Risk Analysis (HIRA), Tool box talking, Near miss reporting etc. − Strong relationship management, communication skills with the ability to network with Project team, Consultants, Contractors with consummate ease. − Taking input from store site, Reconciliation of material. − Making protocol/ Joint records after completion of work for raise the invoice. AREAS OF EXPERTISE Project Planning − Conceptualising detailed project reports and project execution plans after thorough discussion with management, architects and consultants. Establishing time span of project execution as per client specifications. − Listing the resources needed for projects, preparing resource deployment & mobilisation schedule after considering the lead time, set time frame and budgetary parameters.
  • 2. − Evaluating designs, coordinating with Architects and Consultants in the preparation of tenders, float tenders and award contracts after consulting with top management. − Supervising project costing by estimating and updating it based on Execution Drawings and taking appropriate measures. − Monitoring the Project Progress, proceeding for orders to be placed at different stages of the project for various packages and assessing the resource requirements for various packages. − Inspecting project status during the course of periodic project review meetings. − Developing MIS and ensuring relevant reports are generated and sent to the concerned at identified intervals. Co-ordination − Liaising with Consultants, Contractors, vendors and all other parties involved ensuring smooth progress of work and timely clearances like drawings, technical specifications and construction related issues. − Coordinating with Architects and consultants for design reviews and value addition. − Leading Contracts Team and coordinate with all the departments, consultants and contractors from the concept to completion of the project. − Monitoring the Project Progress, following-up for orders to be placed at different stages of the project for various packages, assessing the resource requirements for various packages and coordinate between all the agencies involved in the Project. − Settling all techno commercial differences / clarifications during execution of project. − Coordinating all construction activities including providing technical inputs for methodologies of construction & coordination with site based personal. EMPLOYMENT DETAIL Since April’12 with Triveni Turbine Limited, EPC Division Bhilai, Chhattisgarh as Manager Projects Project : 7 MTPA, Steel Plant, Bhilai, Chhattisgarh. Responsibilities: − Overseeing the construction and installation work of 25MW Steam turbine Generator Power House Building, 4 MW Back Pressure Turbine generator Power House Building, Cooling Water Pump House, 10 cell Cooling Tower, CW Control Building, Side Stream filtration Plant, 600 RM Pipe Trestle, Extended Switch gear Building, 25 Meter High Overhead Tank, Warehouse, Railway cross country pipe line, Bridge, drain, Paving work and Power evacuation system. − Erection and commissioning activities of Turbine, Generator, Gear box, Condenser, 36 MVA transformer, Reactor, Breaker, − Ensuring work activities as per time schedule with safety management plan. − Liaising with client and contractors. − Handling the execution of industrial RCC Structures with high vibrating machine foundations, Reactors and Breaker Building, RCC pavements, finishing works, etc. Aug’10 – March 12 with Lanco Infratech Ltd., EPC Division Rajnandgaon, Chhattisgarh Deputy Manager Project : Lanco Solar Pvt. Limited 1500 TPA, Poly Silicon Plant, Rajnandgaon, Chhattisgarh. Responsibilities: − Overseeing the construction work of CVD Building, TCS Plant, VGR Structure Area, Wafer plant, 50 MW PV module plant, Reservoir, H2 Building, Nitrogen Storage, Boiler Foundation, 132 KV Sub Station, LDO and HFO Tanks, Plant Water System, Caustic Storage, Vent Scrubber System, Vent Treatment Plant, HCL Storage, West Water Treatment Plant, Recovery Water Pump House, Clarifier Tank, Paving work, Settling and Surge Tank. − Experience in Delhi Metro rail and Airport terminal. − Ensuring work activities as per time schedule with safety management plan. − Liaising with client and contractors. − Handling the execution of industrial RCC Structures with high vibrating machine foundations, Reactors Building, RCC pavements, finishing works, etc.
  • 3. Feb’09 – July’ 10 with Simplex Infra. Ltd., Mundra, Kutch, Gujarat as Dy. Manager (Construction) Project : ADANI Power Ltd. 5x 660 MW TPP, Mundra, Kutch, Gujarat. Responsibilities: − Overseeing the construction work of RCC Silos, Fly Ash Water Pump House, Using of slip form in construction of RCC Chimney, Erection of flue can segment by stand jack, Bottom Ash Water Pump House, Recovery Water Pump House, Clarifier Tank, Paving work, Settling and Surge Tank. − Ensuring work activities as per time schedule with safety management plan. − Liaising with clients and contractors. − Handling the execution of industrial RCC structures with piling, high vibrating machine foundations, multistoried buildings, RCC pavements, slip form shuttering system, finishing works, etc., with optimum utilisation of manpower & machinery. Mar’07 – Jan’09 with Tata Projects Ltd., (at 1 x 80 MW CPP Hindustan Zinc Ltd., Chanderia, Chittorgarh) Rajasthan as Engineer Construction Responsibilities: Executing the task of ID Fan foundation, FD fan, PA fan Foundation, Bowl Mill foundation, Bunker slab, ESP control room, TG Building, MCC room, Installation of HVAC system, Firefighting system, CEP Foundation, Switch yard, Transformer yard, GT foundation, Road and Drain, Ash handling system and Coal stock yard. May’05 – Feb’07 with BHEL PSER at 2x250 MW TPP CSEB, Korba (East), Chatishgarh as Jr. Engineer Responsibilities Constructing 220 meter high RCC Chimney by using of slip form and erection of flue can by using of stand jack (Twin steel flue liner chimney), raw water pump house, CW pump house, pipe rack foundation, Warehouse, LDO, HFO tank, ESP control building, Administration Building and ID System foundation. Sept’04 – Mar’05 with Govt. Polytechnic Korba, (C.G.) as a Project Officer (Planning) Responsibilities − Overseeing the construction of percolation tank, dyke wall, extra room, etc. Jun’96 - Aug’04 with B. B. Verma Co. Engineers & Contractors Pvt. Ltd., Korba as a Site Engineer (4 x 135 MW, CPP Balco Plant) Responsibilities − Executing and supervising the activities in the electrical distribution room, cable trench, duct bank, CW canal, Piling, Flyover Bridge, Subway, culvert, road and drain work, construction of hollow blocks at Mahamaya Bricks Industries Bilaspur, construction of high-rise Buildings, Real estate. − Monitoring the work under PMGSY, SADA colony, bridge, culvert, etc. EDUCATION Graduation in Civil Engineering AIMES Mehsana, Gujarat, 2010 ANNA UNIVERSITY (UGC Approved) Management BABA AMTEY SPS Dewas, MP 2000 Diploma in Civil Engineering Govt. Polytechnic Raigarh, CG 1996 MP Technical Education Board, Bhopal. HS (PCM) MP, Board, Bhopal 1992 IT SKILLS
  • 4. Well versed with MS Office, MS Projects, Auto CAD, POL and SAP software Training: Training in Computer proficiency from SCERT, Bhopal, MP 6 months Training of Certificate in Project Management from PMA-India 6 days Training in Logical framework approach from UNDP, Hyderabad 5 days PERSONAL DOSSIER Date of Birth : 23rd March, 1975 Address : B-44, Street No. 11, Smriti Nagar, Bhilai, Dist. - Durg - 490021, Chhatishgarh Languages known : English and Hindi