David Margetts Resume - Piping Engineer with 40+ Years Experience
1. RESUME
DAVID MARGETTS. Nationality, British. D.O.B. 23/11/60
E-MAIL: davidmargetts@southernphone.com.au
E-MAIL: davidmargetts@outlook.com
Australia Mobile No: 0412 113 073
Home No : 03 59985034
PIPING ENGINEER /LEAD PIPING, CHECKER, DRAFTSPERSON.
PIPING CONSTRUCTION, SUPERVISOR / COMMISSIONING.
AUTOCAD RELEASE 11, 12, 13 & 14, 2000, 2002 & PROISO, (REBIS) AUTOPLANT 3D,
CADWORX 3D, MICROSTATION- 2D
HISTORY
2014 - 2015 CALTEX KURNELL SYDNEY N.S.W.
Working on Conversion of Kurnell Refinery to an Import
Terminal.
Workpacks, NDT Reports, Piping Checking, Wharf upgrade
Piping, Weld Maps, BOM's
2011 to 2013 AUSENCO Brisbane QLD
Lead Piping Draftsperson/Lead Piping Checker
CONSTANCIA GOLD PROJECT HUDBAY PERU (Checking)
Autoplant 3D on OK TEDI MINING Ltd.
KESTREL MINE Eextension-CHPP UPGRADE (Checking)
OAKY CREEK COAL P/L (Checking)
MONTO COAL P/L (Checking)
ALPHA COAL PROJECT (HANCOCK COAL P/L) Checking.
2010 BLACK AND VEATCH
Senior Piping Checker
Victorian Desalination Project
2010 ORICA
Senior Piping/Mechanical Designer
Deer Park
2. 2009 AUG UNITED PETROLEUM
Senior Piping Designer
Hasting Terminal Upgrade
Ethanol Injection Design & details Piping Plans, P.I. & D.
2008 JULY TO 2009 APRIL BECHTEL P/L QLD
Senior Piping Checker
RIO TINTO Alumina YARWUN 2 Expansion
2005 NOV TO 2008 JUNE FOSTER WHEELER P/L PHILIPPINES
FOSTER WHEELER P/L QLDS
Piping Engineer. Foster Wheeler
Answering technical & design queries from
Construction team.
At the AG&P and EEI Module Yards Batangas Philippines.
Design Work on MP Steam Generator Power
Plant at Oracle Engineering P/L Sydney NSW.
On Goro Nickel Project.
2005 SEPT-OCT 2005 ROCHE MINING (JR) P/L
BRISBANE. QUEENSLAND, AUSTRALIA
Senior Piping/Mechanical Designer
Upgrade on Coal Preparation Plant.
2004 MAY-AUG 2005 CALTEX REFINERY P/L
BRISBANE. QUEENSLAND, AUSTRALIA
Senior Piping Designer. Rebis Autoplant 3D
2003 SEPT-APRIL 2004 Alcan Gove Pty Limited.
NORTHERN TERRITORY, AUSTRALIA.
Senior Piping/Mechanical Designer.
Design & detail work on Third stage expansion at Alcan
Alumina refinery.
3. 2001 OCT-MAY 2003 BERRI GAS PLANT ARAMCO, SAUDI ARABIA
Piping Engineer. AMEC BKW
Ethane Recovery Plant Project.
Answering technical & design queries from the Client, Construction team
Or Subcontractors and undertaking necessary site surveys.
Raising site instructions.
Carrying out formal correspondence both written and verbal with client,
Sub contractor and vendor/fabricators.
Undertaking daily comments, queries and questions being raised internally
With the AMEC Berri project team.
Design & Detail work as required
2001APRIL-OCT2001 BP GRANGEMOUTH, SCOTLAND SITE
Design & Detail work for AMEC. Piping tie-ins on Ethanol 4
Project & piping changes on BP Mvrp platform.
JUNE 2000-DEC 2000 SOUTHERN CENTRAL ENGINEERING P/L
Design & Detail work for Rice Growers CO-OP LTD
Augers, Aspirators, Screw Conveyors, Spouting, steelwork’
Feed Bins,Headspouts,Ducting,Platforms,ETC.
1999 – 2000 ORICA ENGINEER PLASTICS
PRIVATE CONTRACTING (FORMALLY I.C.I. AUSTRALIA)
EPP.Laverton. Design work for feeding existing extruder,
also layout of new extruder, piping |& ducting for plastics
supplied to automotive industry, Ford, Toyota & G.M.
BARRO GROUP PTY. LTD.AUSTRALIA.
New batching plant. Conveyors, hoppers, chutes, dryer drum,
bin frame, dispatching cones, storage bins, clam sheels,
diverter chutes, bagging hoppers, platforms ladder details &
Services piping layout.
4. AUG 1998 - MAR1999 BHP- HBI. SITE, PORT HEDLAND, WA.
Senior piping design draftsperson & commissioning supervisor
involved in pneumatic pressure testing of reactors.
Site supervision of removal of incorrectly
installed piping, valves & equipment to rectify
construction. new drawings to correct piping
configurations & hydro testing new piping spools
prior to installation of new piping, valves and equipment
SEPT1997 - AUG 1998 BP OIL–SITE, KWINANA, WA, AUSTRALIA.
Senior piping design draftsperson / site supervisor
Involved in site supervision & construction
of project piping design on steam generation
area, sulphur recovery, jet merox unit, pipe
supports, and GA’s pump layouts and footing
details. Pro-iso ,Auto CAD.
New oil separation tank farm, pumping
arrangements & piping.
Supervision of installation of racks for new
diesel generator, supplying firefighting mains.
JUNE 1996 - SEPT 1997 KEMCOR AUSTRALIA - SITE:
MELBOURNE VIC. (EXXON - MOBIL).
Design draftsperson.
Designing and supervising the installation of
new project pipework prior to hydro testing
& commissioning of Olefins plant and
Elastomer plant, using Autoplant software
for designing
FEB 1996 - MAY 1996 LEIGHTON CONTRACTORS ASIA
LTD. HONG KONG.SITE.
Senior design draftsperson site construction
supervising off loading jetty for aviation fuel.
Checking iso piping against GA drawings, changing
drawings of pig launchers prior to fabrication
& installation for the new Hong Kong Airport.
5. SEPT1995 - FEB1996 SHEDDEN UHED PTY LTD. AUSTRALIA.
Mobil Adelaide, lube plant Debottlenecking,
preparation of piping plans, preparation of
isometrics, and preparation of demolition isometrics.
MAR 1994 - AUG 1995 ICI ENGINEERING DEER PARK VIC.
SITE. AUSTRALIA.
Design draftsperson / construction supervision.
Design plant & piping layouts for new FY
resins, Bund area, pipe bridges, hot, cold
water and steam services. Cooling systems,
platform designs staircases and supervised
construction.
Supervised installation of lagging to pipes,
tanks, also loading bays for tankers, drainage
for tanker spillage & piping effluent to
effluent pits.
JAN 1992 - FEB 1994 WOODSIDE KARATHA WA - SITE.
Draftsperson , checker.
Site inspection ie .Hydro testing, X rays,
prior to piping spools going offshore.
Working on piping layouts for
Woodside North Rankin ‘A ’(NRA) offshore
gas platform, turbine vents, chiller, pipes etc.
P & ID changes
MAR 1992 - JUN 1992 DON’S MELBOURNE – SITE
Site supervising crew for plant
equipment layout & extensions to existing
building.
Layout of ammonia piping & modifications
to cold storage rooms.
SEPT 1991 - MAR 1992 AUSTRALIAN CONSTRUCTION
SERVICES MELBOURNE - SITE.
Draftsperson,
Equipment layout & services piping -
stainless steel tubing for new plasma plant in
Broadmeadows.
6. JUN 1991 - JUL 1991 ICI MELBOURNE
Draftsperson, updating Engineering Line
Diagrams (ELD’s) update and supply to
Melbourne Fire Brigade (MFB)
Site checking ELD’s for ICI Deer Park
Complex.
MAR 1991 - JUN 1991 STONE & WEBSTER, MILTON KEYNES
ENGLAND.
Draftsperson for BP refinery Scotland,
crosschecking isometrics, with GA’s
before going on site.
OCT 1990 - MAR 1991 DAVY McKee LONDON.
Draftsperson naptha minus complex for Shell
UK -oil, isometrics checking before site visiting refinery.
JUL 1989 - SEP 1990 MINECO (CRA) MELBOURNE, VIC.
Draftsperson, piping
layouts, piping drafting and AutoCAD work.
During this contract I attended Box Hill Tafe,
engaged in mechanical engineering studies,
subjects including AutoCAD, drafting,
math’s, physics and material handling.
JUL 1988 - JUL 1989 DAVY McKee PTY LTD.
Shell Cat Cracker Refinery, Geelong.
Autocad work on P & ID ‘s.
AMPOL Refinery, Brisbane, isometrics
checking & mto piping.
JUL 1987 - JUL 1988 ICI MELBOURNE.
Mayfield NSW site.
Assistant constructor supervisor, Ephedrine
plant for Mayfield NSW.
Running & co-ordinating sodium cyanide
plant for Gladstone QLD.
7. 1987 SHEDDEN PACIFIC MELBOURNE
Site and draftsperson.
AGR, WA. sodium cyanide plant for
gold recovery, isometric checking & GA
updates.
1986 - 1987 BECHTEL MELBOURNE FOR BP KWINANA
WA - SITE & MELB. OFFICE.
Catalytic project – piping layouts, isometrics & mtos.
SEP 1985 - APR 1986 APPM BURNIE TASMANIA.
Draftsperson.
Soda recovery plant, piping & equipment
layouts study.
JUN 1985 - AUG 1985 SHEDDEN PACIFIC MELBOURNE.
Piping design draftsperson, updating Shell Refinery Geelong.
Layout and design on refinery upgrade, isometrics, MTO,
flow diagrams.
JUL 1983 - MAY 1985 OWN BUSINESS & PART TIME
STUDIES AT BOX HILL TAFE.
JUN 1983 - JUL 1983 BP REFINERY HASTINGS VIC.
Draftsperson, revamping the oil refinery - checking old
and new piping for changes.
FEB 1983 - MAY 1983 DAVY McKee MELBOURNE.
Draftsperson worked on a section of the Brown Coal
Complex.
SEP 1982 - JAN 1983 LURGI AUSTRALIA, GLADSTONE, QLD.
Draftsperson calination plant, Gladstone,
Piping studies and isometrics etc.
8. JAN 1982 - AUG 1982 DAVY McKee PACIFIC MELBOURNE
Jetty head and fractionating plant for Santos, Stony Point
facilities
1980 - 1981 McDermott, ENGLAND
Draftsperson, Gas rigs, oil rigs, jackets and platform
for the North Sea.
1981 HOFFMAN LETOCHE, WEST GERMANY.
Draftsperson
Piping and MTO work for new drug complex in Scotland.
1980-1981 JACOBS INTERNATIONAL LTD, IRELAND.
Draftsperson.
Various work inc. isometrics, checking and MTO.
1980 LURGI, WEST GERMANY.
Draftsperson.
Chemical plant for China.
1980 LODERS AND NUCOLINE, ENGLAND.
Draftsperson,
Bulk loading for road tankers. Refinery for edible vegetable
Oil. Design and drafting of plant layout and piping.
1979 MESTERON ENGINEERING, HOLLAND.
Draftsperson.
Mars Ltd. Rubber Factory for Dutch State Mines (DSM)
Production line.
1976 - 1979 FROST - WINYARD, ENGLAND.
Trainee Engineering & Draftsperson, Model Making
Medway College,
.
(Day-Release Course).