1. CURRICULUM VITAE
1. PROPOSED POSITION : IRATA L II /PCN MT Level II /ASNT
UT/PT/CP/PMI
Level II
2. NAME : Zamroni
3. DATE OF BIRTH : Padang, 13 Mei 1983
4. NATIONALITY : Indonesian
5. EDUCATION : Senior High School
6. PHONE NO : 08136442824/082221222207
7. EMAIL : zamronikide@yahoo.co.id
8. OTHER QUALIFICATION/TRAININGS
• Attended POSITIVE MATERIAL IDENTIFICATION (PMI) at INCORAY NITRAMA
PT on December 2015
• PCN MT Level II NDT course in INTEC on July 2015 and Pass with
PCN No.329630
• CATHODIC PROTECTION Drop-Cell Survey Course on February 2015
• HEALTH ASSESMENT (UKOOA) on Nvember 2015
At MP MEDIKA CENTER
• ROPE ACCESS training level II No 2/44318 (IRATA)
at GLOBALLINK on december 2013
• TBOSIET training cert no: 939255020412133391
Attended tropical basic offshore safety induction & emergency and travel safely
by boat on december 2013
• IIF COMMITMENT CERTIFICATE
at Mc DERMOT GORGON PROJECT on mey 2012
• ROPE ACCESS training level I (IRATA)
at GLOBALLINK on july 2011.
• NDT Trainning UT Level II (ASNT) at DB school
Industrial attachment at bixindo utama on agustus 2011
• NDT Trainning MT/PT level II (ASNT) at DB school
2. Industrial attachment at lekommaras on july 2010
Industrial attachment at bixindo utama on agustus 2011
• ELECTRICAL COMPLEX LEVEL III
Training on Panasonic October 2008 until Januari 2009
9. LANGUAGES AND PROFICIENCY IN EACH:
Language Speaking Writing
Indonesia : Excellent Excellent
English : Fluent Fluent
10. COUNTRIES OF WORK EXPERIENCE:
11. EMPLOYMENT RECORD
DATE: JANUARY 2016 TO PRESENT
• EMPLOYER: PT. SPEKTRA MEGAH SEMESTA
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT UT/MT/PT Level II & RAT Lev. II
• LOCATION : PHE ONWJ LTD-JAVA SEA
• Project : On Stream Inspection (OSI) & RBI,NUI REALIBILITY,RISER
INSPECTION & AWPI
• RESPONSIBILITIES :
Work with company procedure at all times
Ensure that all equipment is servicable and calibrated prior to use
Ensure that all documents up to date (P&ID,NDT Procedure,etc)
Conduct Corrosion Mapping
Conduct Visual Inspection
Conduct Ultra sonic Inspection
Ensure that all hazards are identified and assessed to mitigate risk
exposure.
3. Prepare and submit reports on timely basis
DATE: February 2015 to December 2015
• EMPLOYER: PT. INCORAY NITRAMA
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT UT/MT/PT/CP Level II & RAT Lev. II
• LOCATION : PHE ONWJ LTD-JAVA SEA / PHE WMO / BP TANGGUH
• Project : RBI / On Stream Inspection (OSI) & NUI REALIBILITY,RISER
INSPECTION , AWPI & CERTIFICATION VESSEL
• RESPONSIBILITIES :
Work with company procedure at all times
Ensure that all equipment is servicable and calibrated prior to use
Ensure that all documents up to date (P&ID,NDT Procedure,etc)
Conduct Corrosion Mapping
Conduct Visual Inspection
Conduct Ultra sonic Inspection
Ensure that all hazards are identified and assessed to mitigate risk
exposure.
Prepare and submit reports on timely basis.
DATE: AGUSTUS 2014 TO JANUARY 2015
• EMPLOYER: PT. SPEKTRA MEGAH SEMESTA
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT UT/MT/PT Level II & RAT Lev. II
• LOCATION : PHE ONWJ LTD-JAVA SEA
4. • Project : On Stream Inspection (OSI) & RBI,NUI REALIBILITY,RISER
INSPECTION & AWPI
• RESPONSIBILITIES :
Work with company procedure at all times
Ensure that all equipment is servicable and calibrated prior to use
Ensure that all documents up to date (P&ID,NDT Procedure,etc)
Conduct Corrosion Mapping
Conduct Visual Inspection
Conduct Ultra sonic Inspection
Ensure that all hazards are identified and assessed to mitigate risk
exposure.
Prepare and submit reports on timely basis
DATE: ON JULY 2014
• FREELANCE: PT.SPEKTRA MEGAH SEMESTA
• LOCATION : PETROCHINA INTERNATIONAL JABUNG
LTD(JAMBI/INDONESIA)
• POSITION HELD & DESCRIPTION OF DUTIES : ROPE ACCESS LEVEL II
Measurements of Platform for installation bressing
• RESPONSIBILTIES:
Work with company procedure at all times
Ensure that all equipment is servicable and calibrated prior to use
Ensure that all documents up to date
5. Ensure that all hazards are identified and assessed to mitigate risk
exposure.
Prepare and submit reports on timely basis
DATE: July 2012 – JUNI 2014
• EMPLOYER: PT. SPEKTRA MEGAH SEMESTA
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT UT/MT/PT Level II & RAT Lev. I - II
• LOCATION : PHE ONWJ LTD-JAVA SEA
• Project : On Stream Inspection (OSI) & RBI,NUI REALIBILITY,RISER
INSPECTION & AWPI
• RESPONSIBILITIES :
Work with company procedure at all times
Ensure that all equipment is servicable and calibrated prior to use
Ensure that all documents up to date (P&ID,NDT Procedure,etc)
Conduct Corrosion Mapping
Conduct Visual Inspection
Conduct Ultra sonic Inspection
Ensure that all hazards are identified and assessed to mitigate risk
exposure.
Prepare and submit reports on timely basis
DATE: may 2012
• EMPLOYER: PT. Mc DERMOTT INDONESIA
• POSITION HELD & DESCRIPTION OF DUTIES:
6. RAT Lev. I
• PROJECT : CLEANING MODULE GORGON PROJECT
• RESPONSIBILITIES:
Work with company procedure at all times
Ensure that all equipment is servicable and calibrated prior to use
Ensure that all documents up to date
Ensure that all hazards are identified and assessed to mitigate risk
exposure.
Prepare and submit reports on timely basis
DATE: December 2011 to April 2012
• EMPLOYER:PT. WDS
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT INSPECTOR LEVEL II
Responsibilities:
• Review NDT procedures and assist in approval
• Ensure UT operators are qualified , certified and competent to do the job
• Perform UT & MT Crosschecks of completed welds and weld repair on piles
Spirals welds
• Monitoring and witnessed UT activities and reviewed UT reports
• Prepare and submit reports on timely basis.
7. DATE: April 2011 to Ocktober 2011
• EMPLOYER: Pro-Specs Indopratama
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT INSPECTOR LEVEL II
Responsibilities:
• Review NDT procedures and assist in approval
• Ensure UT operators are qualified , certified and competent to do the job
• Perform UT & MT Crosschecks of completed welds and weld repair on
piles Spirals welds
• Monitoring and witnessed UT activities and reviewed UT reports
• Prepare and submit reports on timely basis.
DATE: August 2010 to March 2011
• EMPLOYER: PT. Lekom Maras
• POSITION HELD & DESCRIPTION OF DUTIES:
NDT INSPECTOR LEVEL II
Responsibilities:
• Perform MT/PT Inspection of Piping System , Structure , Pressure Vessel
• Work with company procedure at all times
• Ensure that all equipment is servicable and calibrated prior to use
• Prepare and submit reports on timely basis
DATE: August 2006 – Jan 2010
8. • EMPLOYER: PT. PANASONIC ELECTRONIC DEVICES BATAM
POSITION HELD & DESCRIPTION OF DUTIES:
Production Engineering on Maintenance Group in Coil Department (Circuit
Component Bussines Group.
• RESPONSIBILITIES:
- Programming Janome Robot JR 2200
- Troubleshooting and analyzing faulty assemblies and feedback to
auxiliary department for action.
- Anticipated the probable deviation and taking appropriate action towards
solving the problem.
- Set up new machine, involve on new machine Approval (AQ0) and
sampling checking activities.
- Improvement of the machine utilization and productivity.
- Lease with supplier for further improvement.
- Training and assigned job / task to subordinate
DATE: May 2005- May 2006
• EMPLOYER: PT. Harapan Srijaya.
• POSITION HELD & DESCRIPTION OF DUTIES: Operator
Personnel must submit as a separate document, but attached to their respective CV
is a certification that the information contained in the CV is accurate, The certificats
will be prepared as follows:
I, the undersigned, certify that to the best of my knowledge and belief, the biodata
contained in this CV correctly describes myself, my qualifications and expertise. I,
hereby agree and commit to be assigned during the contract period to perform the
Work within specified time frame as defined in each Work Order.