SlideShare a Scribd company logo
1 of 6
Bangun Tonggo Raja Manurung
Profile
More than 5 Years working in Oil and Gas Industry in Electrical and Instrument
Department and Less than 5 years experience in Manufacture Industry as Test
Engineer(3years),Testing Department. I am a dedicated, fast learner, smart worker and
reliable employee, committed to offering my best in professional, management, and
administration. Having some experiences in instrumentation and industrial engineering. I am
equally open to serve in other capacities as needed.
Personal Information
Name : Bangun Tonggo Raja Manurung
Place/Date of birth : Medan/17 March 1978
Address :Marbella Residence C2.41 Batam centre
Sex : Male
Religion : Christian Protestant
Nationality : Indonesia
Hobbies : Sport and Games
HP : 081277071313/081266249975
E-mail : banguntrm@gmail.com
Educations
1997 – 2000 Diploma III Teknik Elektro Program Studi Teknik Electronics
1994 – 1997 SMUN 1 Magelang, Jawa Tengah
1991 – 1994 SLTP Methodist Pematang siantar, Sumatera Utara
1985 – 1991 SD Hangtuah Belawan, Sumatera Utara
ADUCATION
Polytechnic degree, majoring in Electrical Engineering of Polytechnic ITB Bandung,
Indonesia
My GPA is 2.55 of 4.00
Qualifications
Languages:
English and Indonesian.
OBJECTIVE
To advance and secure a career in Oil and Gas Industry in a reputed organization, which appreciates
professional approach and hard work, where I can utilize my knowledge, various skills & experience in
contribution towards fulfilling the company’s growth objectives, develop my career and excel in the related field
of Inspection, QA/QC Instrument and Electrical roles.
SUMMARY OF EXPERIENCE
1. Less than 5 years working experience in Manufacture Industry as Test Engineer (3 years), Testing
Department
2. More than 5 years working experience in Oil and Gas Industry in Instrument Department
4. Electrical and Instrument inspection
5. Experience on developing ITP accordance to International code and comply with rules and regulations and
customer specification
6. Surveillance check/inspection to make sure Installation Electrical and Instrument are carry out in accordance
to approved ITP and comply to standard practices
7. Review RFI reports and Pre com report and furnishing with comprehensive reports
8. Capable to lead in multinational workforce to achieve optimum result and support company growth
9. Work experience with Six Sigma tools and applications, Lean Manufacturing to maintain continuous
improvement culture to enhance customer satisfaction
KEY RESULT AREAS
1. Accountable for developing ITP in accordance to International Standards, Rules and company objectives
2. Ensure inspection are carried out accordance to codes and standard practices
3. Strict adherence to SAFETY rules and regulations
4. Generate comprehensive reports of progress, results, actions taken to monitor performance achievements
5. Open minded and accept constructive ideas
6. Preventive mindset to mitigate risk at earlier stage
PT. Labmaster Asia
March 2015 – Present (5 month) Batam
• Accountable for developing new ITP and proposing new ITP for customer review and approval
• Responsible for formulation and testing of Calibration procedures
• Make report RFI for ITP performance related to Quality
• Conduct and witness for Hydro test and Calibrations equipment and Inspection installation electrical and
Instrument
• Interpret customer requirements on beginning stage
PT. WIJAYA KARYA
Supervisor QA/QC Instrument
September 2014 – July 2015 (1 year) Pomala Sulawesi Tenggara
• Accountable for developing new ITP and proposing new ITP for customer review and approval
• Responsible for formulation and testing of Calibration procedures
• Monitor existing ITP and Status Index performance related to Quality
• Advise and implemented new method for installation to improve productivity
• Interpret customer requirements on beginning stage
• Support customer interface on Installation related problems
• Involved in material selection in relation to product and customer specification
• Work closely with HSE/other departments in order to ensure work being performed in a safely manner and
within stipulated time by promoting pro-active approach
PT. ACI Batam
QA/QC Electrical and Instrument
June 2015 – September 2015 (3 Month) Batam Proyek Tan Burrup(Australia) at Nippon steel Batam
• Internal Inspection Installation Cable tray and pulling Cable
• Merger and continuity cable due to cable schedule
• Calibration Control Valve and loop test
Supervisor Construction Instrument
PT. WIJAYA KARYA
May 2012 – June 2014 (1 year 1 months) Tayan Kalimantan Barat
• Prepare Tools and equipment for assigned project
• Review Construction Drawing base on site Situation
• Perform routine surveillance to ensure working carried out compliance with ITP and all applicable codes,
standards, specifications and drawing
• Review subcontractors Installation progress as per applicable codes and standards
• Regularly attend QA/QC meeting to review project progress and giving solution to rectified quality issues
• Work closely with HSE/other departments in order to ensure work being performed in a safely manner and
within stipulated time by promoting pro-active approach
• Conduct analysis on Installation related defects, machine utilization and efficiency related issues with
recommendations of alternative solutions
March 2011 – May 2012 (1 year 2 month)
PT. DRYDOCK
Position : Foreman Electrical
Department : New Ship Building Department
Main job Description & Responsibility
• Support installation, Cable tray Installation, Cable pulling, cable gland, cable testing, cable termination,
Equipment Installation, grounding.
• Merger and continuity cable due to cable schedule
Test Engineer
PT. PCI Electronic International
September 2008 – March 2011(3 years) Batam
Role & Responsibility:
• ICT and FCT Tester Controlling and monitoring
• Yield report and Preventive action and continuity record by monthly base for Tester performance check
• Perform Technicians qualification under code requirement
• Technicians performance record
• Control the expiration and renew of qualified Tools and Equipment
• Preparation Testing Procedure for all job
• Develop Testing process to improve productivity)
• Study new product knowledge, technical drawing, assembly method and applicable standard for the product
and processes
• Ensure steady flow of production activities, produce the right product, in the right quality, quantity & at the
right time
• Perform cross training for line balancing to achieve cell optimization
• Liaise with production on planning output requirements
• Define working standard and procedure; provide the document and training for the operators and technicians
• Resolve any technical problem in production line to meet production/quality target
• Initiate, recommend, investigate, trouble-shoot & provide solutions & actions to prevent the occurrence of any
nonconformities relating to the products, process & quality system
• Maintain an environment of continuous improvement through the application of Six Sigma tools, Lean
Manufacturing Methodology
September 2008 – March 2011
PT. DRYDOCK
Position : Electrician
Department : New Ship Building Department
Main job Description & Responsibility
• Support installation, Cable tray Installation, Cable pulling, cable gland, cable testing, cable termination,
Equipment Installation, grounding.
• Merger and continuity cable due to cable schedule
Augustus 2005 – Augustus 2008
Flextronic.Sdn.Bhd Johor Bahru (Malaysia)
Position : Senior Test Technician
Department : Test Department
Main job Description & Responsibility
• Working on tester design based on Client test spec
• Working on software design and programming as tester was created
• Creating work instruction or testing procedure of the tester
• Brief technician and operator for the tester
• Troubleshooting on tester trouble/PCBA
• Troubleshooting on Machine Gen Rad and Agilent
• Interfacing with client for anything tester related
July 2004 – July 2005
Company : PT. Sanmina-SCI
Address : Jl. Beringin Lot 312 Muka Kuning Batam
Position : Senior Test Technician
Department : Test Department
Main job Description & Responsibility:
• Working on tester design based on Client test spec
• Working on software design and programming as tester was created
• Creating work instruction or testing procedure of the tester
• Brief technician and operator for the tester
• Troubleshooting on tester trouble/PCBA
• Troubleshooting on Machine Gen Rad and Agilent
• Interfacing with client for anything tester related
Jan 2003 – July 2004
Company : PT. Solectron Technology Indonesia
Position : Test Technician
Main job Description & Responsibility :
Service & Troubleshooting PCBA if Failed at Tester ICT
Certification
Trainings - Vocational School and Training of Maritime & Offshore Engineering,
Certified Oil and Gas Instrument Inspector( COGII)
at IKBAL M Yos,
Specific on Electrical & Instrument Inspector.
Certificate No.292/Inst.-XVIII/II/2013
Subject
Electrical for Oil and Gas Industries Inspection in Association with MIGAS,
APITINDO and DISNAKER (Electrical Construction :Support installation,
Cable tray Installation, Cable pulling, cable gland, cable testing, cable
termination, Equipment Installation, grounding /earthing, heat tracing.
Electrical Inspection : Vendor Package / Incoming, preservation, Mechanical
Completion, Hazardous Area, Punch List and , Mobile Offshore Drilling Unit
Instruments for Oil and Gas Industries Inspection in Association with
MIGAS, APITINDO and DISNAKER (P&ID, Install Hook-Up Instrument,
Instrument calibration & Function Test, etc.
• Creating work instruction or testing procedure of the tester
• Brief technician and operator for the tester
• Troubleshooting on tester trouble/PCBA
• Troubleshooting on Machine Gen Rad and Agilent
• Interfacing with client for anything tester related
Jan 2003 – July 2004
Company : PT. Solectron Technology Indonesia
Position : Test Technician
Main job Description & Responsibility :
Service & Troubleshooting PCBA if Failed at Tester ICT
Certification
Trainings - Vocational School and Training of Maritime & Offshore Engineering,
Certified Oil and Gas Instrument Inspector( COGII)
at IKBAL M Yos,
Specific on Electrical & Instrument Inspector.
Certificate No.292/Inst.-XVIII/II/2013
Subject
Electrical for Oil and Gas Industries Inspection in Association with MIGAS,
APITINDO and DISNAKER (Electrical Construction :Support installation,
Cable tray Installation, Cable pulling, cable gland, cable testing, cable
termination, Equipment Installation, grounding /earthing, heat tracing.
Electrical Inspection : Vendor Package / Incoming, preservation, Mechanical
Completion, Hazardous Area, Punch List and , Mobile Offshore Drilling Unit
Instruments for Oil and Gas Industries Inspection in Association with
MIGAS, APITINDO and DISNAKER (P&ID, Install Hook-Up Instrument,
Instrument calibration & Function Test, etc.

More Related Content

What's hot (20)

Henry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality ProfessionalHenry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality Professional
 
Resume_Shakti Patra
Resume_Shakti PatraResume_Shakti Patra
Resume_Shakti Patra
 
CV1
CV1CV1
CV1
 
Vinoth Kumar _Resume
Vinoth Kumar _ResumeVinoth Kumar _Resume
Vinoth Kumar _Resume
 
(632208982) lokesh_new_res
(632208982) lokesh_new_res(632208982) lokesh_new_res
(632208982) lokesh_new_res
 
JD PKG
JD PKGJD PKG
JD PKG
 
Labview & Test stand Development Engineer
Labview & Test stand Development EngineerLabview & Test stand Development Engineer
Labview & Test stand Development Engineer
 
CV
CVCV
CV
 
CV-Chinmoy
CV-ChinmoyCV-Chinmoy
CV-Chinmoy
 
Resume_Mayank
Resume_MayankResume_Mayank
Resume_Mayank
 
ilyas_MEP new
ilyas_MEP newilyas_MEP new
ilyas_MEP new
 
HARI
HARIHARI
HARI
 
Pankaj-prajapati
Pankaj-prajapatiPankaj-prajapati
Pankaj-prajapati
 
Mitesh Chauhan CV
Mitesh Chauhan CVMitesh Chauhan CV
Mitesh Chauhan CV
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Resume_Laxmikant
Resume_LaxmikantResume_Laxmikant
Resume_Laxmikant
 
Sunaryo Vardamean Manalu CV
Sunaryo Vardamean Manalu CVSunaryo Vardamean Manalu CV
Sunaryo Vardamean Manalu CV
 
Carlos Espino - Resume
Carlos Espino - ResumeCarlos Espino - Resume
Carlos Espino - Resume
 
new Resume_santosh
new Resume_santoshnew Resume_santosh
new Resume_santosh
 
Eds Resume 063015
Eds Resume 063015Eds Resume 063015
Eds Resume 063015
 

Viewers also liked

Viewers also liked (17)

B
BB
B
 
Generational Differences and Your Total Rewards Strategy
Generational Differences and Your Total Rewards StrategyGenerational Differences and Your Total Rewards Strategy
Generational Differences and Your Total Rewards Strategy
 
Test
TestTest
Test
 
Calle falsa 123
Calle falsa 123Calle falsa 123
Calle falsa 123
 
Aeped alimentacion parenteral, liquidos y electrolitos
Aeped alimentacion parenteral, liquidos y electrolitosAeped alimentacion parenteral, liquidos y electrolitos
Aeped alimentacion parenteral, liquidos y electrolitos
 
Gab 6 ab
Gab 6 abGab 6 ab
Gab 6 ab
 
Link matematica
Link matematicaLink matematica
Link matematica
 
Igneous rocks!
Igneous rocks!Igneous rocks!
Igneous rocks!
 
Mi carrera profesional
Mi  carrera profesionalMi  carrera profesional
Mi carrera profesional
 
Week 15
Week 15Week 15
Week 15
 
Sometimes One Size Does Fit All! (Creating a Community with students)
Sometimes One Size Does Fit All! (Creating a Community with students)Sometimes One Size Does Fit All! (Creating a Community with students)
Sometimes One Size Does Fit All! (Creating a Community with students)
 
Passatempi...
Passatempi...Passatempi...
Passatempi...
 
237 sicurezza cucine
237   sicurezza cucine237   sicurezza cucine
237 sicurezza cucine
 
Opener 6 bonk-the world is open
 Opener 6 bonk-the world is open Opener 6 bonk-the world is open
Opener 6 bonk-the world is open
 
Big data - teams not technology
Big data - teams not technologyBig data - teams not technology
Big data - teams not technology
 
Polymer Science For Pharmaceuticals-MANIK
Polymer Science For Pharmaceuticals-MANIKPolymer Science For Pharmaceuticals-MANIK
Polymer Science For Pharmaceuticals-MANIK
 
2016年疾管署疫情監測週報(第16週)
2016年疾管署疫情監測週報(第16週)2016年疾管署疫情監測週報(第16週)
2016年疾管署疫情監測週報(第16週)
 

Similar to Bangun CV (20)

Raghu New Resume
Raghu New ResumeRaghu New Resume
Raghu New Resume
 
Mohd Ali Imran bin Jamaludin
Mohd Ali Imran bin JamaludinMohd Ali Imran bin Jamaludin
Mohd Ali Imran bin Jamaludin
 
resume paramatt
resume paramattresume paramatt
resume paramatt
 
muru_resume_Oct 2016
muru_resume_Oct 2016muru_resume_Oct 2016
muru_resume_Oct 2016
 
muru_resume_Oct 2016
muru_resume_Oct 2016muru_resume_Oct 2016
muru_resume_Oct 2016
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
CV
CVCV
CV
 
Narongrit RSM-G
Narongrit RSM-GNarongrit RSM-G
Narongrit RSM-G
 
devakumar ressume updated
devakumar ressume updateddevakumar ressume updated
devakumar ressume updated
 
resume paramatt1
resume paramatt1resume paramatt1
resume paramatt1
 
Resume - Nanda New
Resume - Nanda NewResume - Nanda New
Resume - Nanda New
 
QA QC Engineer CV
QA QC Engineer CVQA QC Engineer CV
QA QC Engineer CV
 
Dave Jones Bermejo Resume 2016 Updated
Dave Jones Bermejo Resume 2016 Updated Dave Jones Bermejo Resume 2016 Updated
Dave Jones Bermejo Resume 2016 Updated
 
Nikhil Resume
Nikhil ResumeNikhil Resume
Nikhil Resume
 
Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416Lenin- WSHO - CV -Updated-200416
Lenin- WSHO - CV -Updated-200416
 
Po Po Ygn Resume 2016
Po Po Ygn Resume 2016Po Po Ygn Resume 2016
Po Po Ygn Resume 2016
 
carlo_resume
carlo_resumecarlo_resume
carlo_resume
 
Mari's CV
Mari's CVMari's CV
Mari's CV
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 
Murali Raveendran_Resume
Murali Raveendran_ResumeMurali Raveendran_Resume
Murali Raveendran_Resume
 

Bangun CV

  • 1. Bangun Tonggo Raja Manurung Profile More than 5 Years working in Oil and Gas Industry in Electrical and Instrument Department and Less than 5 years experience in Manufacture Industry as Test Engineer(3years),Testing Department. I am a dedicated, fast learner, smart worker and reliable employee, committed to offering my best in professional, management, and administration. Having some experiences in instrumentation and industrial engineering. I am equally open to serve in other capacities as needed. Personal Information Name : Bangun Tonggo Raja Manurung Place/Date of birth : Medan/17 March 1978 Address :Marbella Residence C2.41 Batam centre Sex : Male Religion : Christian Protestant Nationality : Indonesia Hobbies : Sport and Games HP : 081277071313/081266249975 E-mail : banguntrm@gmail.com Educations 1997 – 2000 Diploma III Teknik Elektro Program Studi Teknik Electronics 1994 – 1997 SMUN 1 Magelang, Jawa Tengah 1991 – 1994 SLTP Methodist Pematang siantar, Sumatera Utara 1985 – 1991 SD Hangtuah Belawan, Sumatera Utara ADUCATION Polytechnic degree, majoring in Electrical Engineering of Polytechnic ITB Bandung, Indonesia My GPA is 2.55 of 4.00 Qualifications Languages: English and Indonesian.
  • 2. OBJECTIVE To advance and secure a career in Oil and Gas Industry in a reputed organization, which appreciates professional approach and hard work, where I can utilize my knowledge, various skills & experience in contribution towards fulfilling the company’s growth objectives, develop my career and excel in the related field of Inspection, QA/QC Instrument and Electrical roles. SUMMARY OF EXPERIENCE 1. Less than 5 years working experience in Manufacture Industry as Test Engineer (3 years), Testing Department 2. More than 5 years working experience in Oil and Gas Industry in Instrument Department 4. Electrical and Instrument inspection 5. Experience on developing ITP accordance to International code and comply with rules and regulations and customer specification 6. Surveillance check/inspection to make sure Installation Electrical and Instrument are carry out in accordance to approved ITP and comply to standard practices 7. Review RFI reports and Pre com report and furnishing with comprehensive reports 8. Capable to lead in multinational workforce to achieve optimum result and support company growth 9. Work experience with Six Sigma tools and applications, Lean Manufacturing to maintain continuous improvement culture to enhance customer satisfaction KEY RESULT AREAS 1. Accountable for developing ITP in accordance to International Standards, Rules and company objectives 2. Ensure inspection are carried out accordance to codes and standard practices 3. Strict adherence to SAFETY rules and regulations 4. Generate comprehensive reports of progress, results, actions taken to monitor performance achievements 5. Open minded and accept constructive ideas 6. Preventive mindset to mitigate risk at earlier stage PT. Labmaster Asia March 2015 – Present (5 month) Batam • Accountable for developing new ITP and proposing new ITP for customer review and approval • Responsible for formulation and testing of Calibration procedures • Make report RFI for ITP performance related to Quality • Conduct and witness for Hydro test and Calibrations equipment and Inspection installation electrical and Instrument • Interpret customer requirements on beginning stage PT. WIJAYA KARYA Supervisor QA/QC Instrument September 2014 – July 2015 (1 year) Pomala Sulawesi Tenggara • Accountable for developing new ITP and proposing new ITP for customer review and approval • Responsible for formulation and testing of Calibration procedures • Monitor existing ITP and Status Index performance related to Quality • Advise and implemented new method for installation to improve productivity • Interpret customer requirements on beginning stage • Support customer interface on Installation related problems • Involved in material selection in relation to product and customer specification • Work closely with HSE/other departments in order to ensure work being performed in a safely manner and within stipulated time by promoting pro-active approach
  • 3. PT. ACI Batam QA/QC Electrical and Instrument June 2015 – September 2015 (3 Month) Batam Proyek Tan Burrup(Australia) at Nippon steel Batam • Internal Inspection Installation Cable tray and pulling Cable • Merger and continuity cable due to cable schedule • Calibration Control Valve and loop test Supervisor Construction Instrument PT. WIJAYA KARYA May 2012 – June 2014 (1 year 1 months) Tayan Kalimantan Barat • Prepare Tools and equipment for assigned project • Review Construction Drawing base on site Situation • Perform routine surveillance to ensure working carried out compliance with ITP and all applicable codes, standards, specifications and drawing • Review subcontractors Installation progress as per applicable codes and standards • Regularly attend QA/QC meeting to review project progress and giving solution to rectified quality issues • Work closely with HSE/other departments in order to ensure work being performed in a safely manner and within stipulated time by promoting pro-active approach • Conduct analysis on Installation related defects, machine utilization and efficiency related issues with recommendations of alternative solutions March 2011 – May 2012 (1 year 2 month) PT. DRYDOCK Position : Foreman Electrical Department : New Ship Building Department Main job Description & Responsibility • Support installation, Cable tray Installation, Cable pulling, cable gland, cable testing, cable termination, Equipment Installation, grounding. • Merger and continuity cable due to cable schedule Test Engineer PT. PCI Electronic International September 2008 – March 2011(3 years) Batam Role & Responsibility: • ICT and FCT Tester Controlling and monitoring • Yield report and Preventive action and continuity record by monthly base for Tester performance check • Perform Technicians qualification under code requirement
  • 4. • Technicians performance record • Control the expiration and renew of qualified Tools and Equipment • Preparation Testing Procedure for all job • Develop Testing process to improve productivity) • Study new product knowledge, technical drawing, assembly method and applicable standard for the product and processes • Ensure steady flow of production activities, produce the right product, in the right quality, quantity & at the right time • Perform cross training for line balancing to achieve cell optimization • Liaise with production on planning output requirements • Define working standard and procedure; provide the document and training for the operators and technicians • Resolve any technical problem in production line to meet production/quality target • Initiate, recommend, investigate, trouble-shoot & provide solutions & actions to prevent the occurrence of any nonconformities relating to the products, process & quality system • Maintain an environment of continuous improvement through the application of Six Sigma tools, Lean Manufacturing Methodology September 2008 – March 2011 PT. DRYDOCK Position : Electrician Department : New Ship Building Department Main job Description & Responsibility • Support installation, Cable tray Installation, Cable pulling, cable gland, cable testing, cable termination, Equipment Installation, grounding. • Merger and continuity cable due to cable schedule Augustus 2005 – Augustus 2008 Flextronic.Sdn.Bhd Johor Bahru (Malaysia) Position : Senior Test Technician Department : Test Department Main job Description & Responsibility • Working on tester design based on Client test spec • Working on software design and programming as tester was created • Creating work instruction or testing procedure of the tester • Brief technician and operator for the tester • Troubleshooting on tester trouble/PCBA • Troubleshooting on Machine Gen Rad and Agilent • Interfacing with client for anything tester related July 2004 – July 2005 Company : PT. Sanmina-SCI Address : Jl. Beringin Lot 312 Muka Kuning Batam Position : Senior Test Technician Department : Test Department Main job Description & Responsibility: • Working on tester design based on Client test spec • Working on software design and programming as tester was created
  • 5. • Creating work instruction or testing procedure of the tester • Brief technician and operator for the tester • Troubleshooting on tester trouble/PCBA • Troubleshooting on Machine Gen Rad and Agilent • Interfacing with client for anything tester related Jan 2003 – July 2004 Company : PT. Solectron Technology Indonesia Position : Test Technician Main job Description & Responsibility : Service & Troubleshooting PCBA if Failed at Tester ICT Certification Trainings - Vocational School and Training of Maritime & Offshore Engineering, Certified Oil and Gas Instrument Inspector( COGII) at IKBAL M Yos, Specific on Electrical & Instrument Inspector. Certificate No.292/Inst.-XVIII/II/2013 Subject Electrical for Oil and Gas Industries Inspection in Association with MIGAS, APITINDO and DISNAKER (Electrical Construction :Support installation, Cable tray Installation, Cable pulling, cable gland, cable testing, cable termination, Equipment Installation, grounding /earthing, heat tracing. Electrical Inspection : Vendor Package / Incoming, preservation, Mechanical Completion, Hazardous Area, Punch List and , Mobile Offshore Drilling Unit Instruments for Oil and Gas Industries Inspection in Association with MIGAS, APITINDO and DISNAKER (P&ID, Install Hook-Up Instrument, Instrument calibration & Function Test, etc.
  • 6. • Creating work instruction or testing procedure of the tester • Brief technician and operator for the tester • Troubleshooting on tester trouble/PCBA • Troubleshooting on Machine Gen Rad and Agilent • Interfacing with client for anything tester related Jan 2003 – July 2004 Company : PT. Solectron Technology Indonesia Position : Test Technician Main job Description & Responsibility : Service & Troubleshooting PCBA if Failed at Tester ICT Certification Trainings - Vocational School and Training of Maritime & Offshore Engineering, Certified Oil and Gas Instrument Inspector( COGII) at IKBAL M Yos, Specific on Electrical & Instrument Inspector. Certificate No.292/Inst.-XVIII/II/2013 Subject Electrical for Oil and Gas Industries Inspection in Association with MIGAS, APITINDO and DISNAKER (Electrical Construction :Support installation, Cable tray Installation, Cable pulling, cable gland, cable testing, cable termination, Equipment Installation, grounding /earthing, heat tracing. Electrical Inspection : Vendor Package / Incoming, preservation, Mechanical Completion, Hazardous Area, Punch List and , Mobile Offshore Drilling Unit Instruments for Oil and Gas Industries Inspection in Association with MIGAS, APITINDO and DISNAKER (P&ID, Install Hook-Up Instrument, Instrument calibration & Function Test, etc.