SlideShare a Scribd company logo
1 of 33
Download to read offline
DP380
UP
102313141516171819202122
132456798
1112
DRYKITCHEN
(DAPUH)
GROUND FLOOR PLAN
SCALE 1 : 50
33
9
1 : 50
CALVIN SUAH, EUNICE CHAN
GROUND FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
WITH TILES FINISH
PARQUET MOSAICMOSAIC
CLAY TILES
0 52.5
METERS
0.5 1 1.5 2
OFFICE
DP
1223
WC
LIBRARY
WC
CORRIDOR
OFFICE
1314151617181920212210
987654321
STAIR
DP50
DP50
DP50
DP50
WC
DP20DP20
DP20DP20
(CHIWAN)(CHIWAN)
(CHIWAN)
WC
(CHIWAN)
MEETINGROOM
PEDIMENT
FIRST FLOOR PLAN
SCALE 1 : 50
MOSAIC TIMBER FLOORINGCLAY TILES
33
10
1 : 50
CALVIN SUAH, EUNICE CHAN
FIRST FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
WITH TILES FINISH
0 52.5
METERS
0.5 1 1.5 2
1A 3A 4A 5A 6A 6B 7A 7B1B
B
C
D
E
F
A
G
H
I
J
K
L
E
D
C
F
E'
A
F'
C'
D'
B
A' B'
1 42 3 6 7 8
ROOF FRAMING PLAN
SCALE 1 : 100
33
11
1 : 100
LANCELOT TING
ROOF FRAMING PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
0 5 101 2 3 4
METERS
GROUND LINE
CEILING LEVEL
GROUND FLOOR FINISH
BOUNDARY WALL
RIDGE
GRILLE OF PATIO
WET KITCHENDRY KITCHEN
RESTAURANT
RIDGE
DIAMOND SHAPED AIR VENT
FIRST FLOOR FINISH
ROOF LEVEL
B.L
PATIO
RESTAURANT CANOPY
V-SHAPED TILESTIMBER LOUVERSPEDIMENT
346437063599
1234678 5
MAIN BUILDING EXTENSION
FRONT ELEVATION
SCALE 1 : 75
33
12
1 : 75
JIA HUI SIM
FRONT ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
BACK DOOR
BOUNDARY WALL
STORAGE AIR VENTPASSAGE TO THE FRONT YARD
VOID
380
GROUND LINE
3464
CEILING LEVEL
3620
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
3599
B.L
1A 3A 4A 5A 6A 6B 7A 7B1B
EXTENSION MAIN BUILDING
BACK ELEVATION
SCALE 1 : 75
33
13
1 : 75
JIA HUI SIM
BACK ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
C D E FA G H I
PEDIMENT RIDGE
FLORA PATTERN AIR VENT
V-SHAPED TILES
CEILING LEVEL
3464
GROUND LINE
3620
ROOF LEVEL
380
GROUND FLOOR FINISH
FIRST FLOOR FINISH
3599
METAL FASCIA
JKLB
DAPUH
(DRY KITCHEN)
MAIN BUILDING EXTENSION
LEFT ELEVATION
SCALE 1 : 75
33
14
1 : 75
JIA HUI SIM
LEFT ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
BCDEF AGHI
RIDGE V-SHAPED TILES
FLORA PATTERN AIR VENTDIAMOND SHAPED AIR VENTINTER COURTYARD
PEDIMENT
CURVE WALL
3599
GROUND LINE
34643620
ROUND TRANSOM
METAL FASCIA
CEILING LEVEL
GROUND FLOOR FINISH
ROOF LEVEL
FIRST FLOOR FINISH
J K L
MAIN BUILDING
RIGHT ELEVATION
SCALE 1 : 75
33
15
1 : 75
JIA HUI SIM
RIGHT ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 7.5
METERS
3.75
SECTION A - A'
33
16
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SECTION A - A'
0 7.5
METERS
3.75
33
17
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SECTION B - B'
0 7.5
METERS
3.75
SECTION B - B'
SCALE 1 : 75
(TIA)
MAIN HALL
(TIA)
MAIN HALL
LIBRARY MEETING ROOM
CORRIDOR
380
346437063599
1234678 5
VERANDAH VERANDAH
CHIWAN
(WC) CHIWAN
(WC)
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
COLLAR TIE
GYPSUM CEILING PANELS
KING POST
TILE BATTEN
ROOF FLASHING
UNDER PURLIN
RAFTER
GROUND LINE
SECTION C - C'
33
18
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SECTION C - C'
0 7.5
METERS
3.75
COLLAR TIE
GYPSUM CEILING PANELS
KING POST
TILE BATTEN
380
346437063599
8765321 4
ROOF FLASHING
UNDER PURLIN
RAFTER
ANCESTOR ALTAR
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
GROUND LINE
VERANDAH
MAIN HALL
CORRIDOR
CHI WAN
MEETING ROOM
LIBRARY
CHI WAN
VERANDAH
SECTION D - D'
33
19
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SECTION D - D'
0 7.5
METERS
3.75
380346437063599
1234678 5
COLLAR TIE
GYPSUM CEILING PANELS
KING POST
TILE BATTEN
ROOF FLASHING
UNDER PURLIN
RAFTER
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
GROUND LINE
CORRIDORVERANDAH
CORRIDORSECRETARY ROOM
33
20
1 : 75
PEI KEI TANG, KHAI JHUNG LOH
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SECTION E - E'
0 7.5
METERS
3.75
SECTION E - E'
SCALE 1 : 75
RIDGE
PATIO
ACTIVITY ROOM
INTERIOR COURTYARD
338436173599
3A 4A 5A 6A 6B 7A 7B
TIMBER LOUVERS
TOP PLATES
TILE BATTEN
DOUBLE HOWE TRUSS
GYPSUM CEILING PANELS
CEILING LEVEL
GROUND FLOOR FINISH
FIRST FLOOR FINISH
ROOF LEVEL
GROUND LINE
(CHIM CHAE)
SECTION F - F'
33
21
SCALE 1 : 75
1 : 75
PEI KEI TANG
SECTION DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SECTION F - F'
0 7.5
METERS
3.75
D9
GLASS
BLOCK
W2
W2
WASHROOM INTERIOR ELEVATION
SCALE 1 : 25
BALCONY INTERIOR ELEVATION
SCALE 1 : 25
ACTIVITY ROOM INTERIOR ELEVATION
SCALE 1 : 25
33
22
1 : 25
KHAI JHUNG LOH, NICHOLAS LEE, EUNICE CHAN
INTERIOR ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 2.5
METERS
1.25
1067
2928
1067
924
2928
1067
109615401250560
2140
1029
919
1029
919
2140
919
2916
1520
1520
1390
1390
1520
2916
105017201152560
1065
950
950
1065
2860
1065
2860
1180815815815815
DOOR 2
SCALE 1 : 50
33
23
1 : 50
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DOORS SCHEDULE
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
DOOR 1
SCALE 1 : 50
DOOR 4
SCALE 1 : 50
DOOR 5
SCALE 1 : 50
D
1
D
D
2
D D
5
D
D
4
D
0 5
METERS
2.51.50.5 1 2
3273
877
877
767
3273
877
200617901220620
1065
950
2860
950
1065
1065
2860
11804300
611
1131
STATED IN GROUND FLOOR PLAN
1292
1292
611
8401345
3565
2770
2770
2630
2770
3565
33
24
1 : 50
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DOORS SCHEDULE
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
DOOR 9
SCALE 1 : 50
DOOR 6
SCALE 1 : 50
DOOR 10
SCALE 1 : 50
DOOR 3
SCALE 1 : 50
D
9
D
D
3
D
D
10
D
0 5
METERS
2.51.50.5 1 2
D
6
D
3040
3037
3037
2847
3037
3040
1540
340
340
340
2790
2820
2720
2450
2720
2820
2820
2450
500
500
500
9601520
2420
3270
STATED IN GROUND FLOOR PLAN
548861861
383
STATED IN GROUND FLOOR PLAN
2075
1020
1020
2075
2306
1533
2306
1533
33
25
1 : 50
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DOORS SCHEDULE
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
DOOR 7
SCALE 1 : 50
DOOR 8
SCALE 1 : 50
GRILLE 1
SCALE 1 : 50
GRILLE 2
SCALE 1 : 50
D
7
D
D
8 0 5
METERS
2.51.50.5 1 2
820
685
1925
820
1369
820
1925
10802450
1215
1055
1904
2430
2110
1215
1904
11102428
1215
1055
1974
2430
2110
1215
1974
11102428
898
898
898
828
898
898
4090
3933
2030
8180
3933
11592380
4090
2030
WINDOW 4
33
26
1 : 50
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN JIA YI LAI
WINDOWS SCHEDULE
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
WINDOW 2
WINDOW 1 WINDOW 3
WINDOW 5
SCALE 1 : 50SCALE 1 : 50
SCALE 1 : 50 SCALE 1 : 50
SCALE 1 : 50
0 5
METERS
2.51.50.5 1 2
IRONY CARVING
2770
3565
3565
2770
DOOR HEAD JAMB
WHEEL
ALUMINUM TRACK
PIVOT
OVERALL
WALL
THICKNESS
TRACK MOUNTING
TRIM
BOTTOM PIVOT
FLOOR
FINISH
DOOR THICKNESS
SCALE 1:20
SCALE 1:20
3273
877
HEAD JAMB
PANEL
MIDDLE RAIL
DOOR KNOBS
3273
2250
1247
40
50
154
SHANK
KNOB
ROSE
15
64" DIAMETER MOUNTING HOLES
64.5
35
877
ADJUSTMENT SET SCREW
FACES UP FOR TOP HINGE,
DOWN FOR BOTTOM HINGE
TRIM
STOP
FRAME
DOOR 7
DOOR 7 DETAILSDOOR 4 DETAILS
DOOR 4
1 : 40
CALVIN SUAH, CHI MUN LAI, JIA HUI SIM
DETAILED DRAWINGS
( DOORS )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
33
27
SCALE 1 : 40
SCALE 1 : 40
SCALE 1 : 40
SCALE 1 : 40
D
7
D
4
D
7
D
4
0 4
METERS
2
SCALE 1 : 1
SCALE 1 : 1
SCALE 1 : 1
SCALE 1 : 1
1215
1904
1215
FRAME
FACING BOARD
LINTEL
INTERIOR SILL
PLASTER BOARD
GLASS DIVIDER
GLASS
1904
GLASS PATTERN
4090
2030
4090
2030
COVER SLEEVES
LOUVERS
DIVIDER
BOLT
GLASS WINDOW
WINDOW 5
WINDOW 5 DETAILSWINDOW 3 DETAILS
WINDOW 3
33
28
1 : 40
CALVIN SUAH, CHI MUN LAI, EUNICE CHAN
DETAILED DRAWINGS
( WINDOWS )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
SCALE 1 : 40
SCALE 1 : 40SCALE 1 : 40
SCALE 1 : 40
0 4
METERS
2
500
2551
7507
430
194
526383
57
1385
269
33
29
AS STATED
JIA HUI SIM, JIA YI LAI
DETAILED DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
( PEDIMENT )
PEDIMENT SECTIONPEDIMENT ELEVATION
SCALE 1 : 20SCALE 1 : 20
PEDIMENT PLAN
SCALE 1 : 20
CORNICE
FRIEZE
ARCHITRAVE
CAPITAL
CORNICE
FLORA AIR VENT
PEDIMENT AXONOMETRIC
SCALE 1 : 30
0 2
METERS
10 3
METERS
1.5
200
200
200
200
200
200
200
200
157
158
53
53
157
158
33
30
AS STATED
LOH KHAI JHUNG, EUNICE CHAN
DETAILED DRAWINGS
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
( TILES AND GLASS )
SCALE 1 : 5
SCALE 1 : 5
SCALE 1 : 1
SCALE 1 : 5
SCALE 1 : 5
SCALE 1 : 5
CORRIDOR FLOOR TILES
CHIWAN WALL TILES
WINDOWS' GLASS PATTERN
0 0.5
METERS
0.25
TREAD
STRINGER
RISER
NEWEL
SMALL COLUMNS
TREAD
STORAGE
LANDING
JOISTS
FIRST FLOOR SLAB
GRILLE WORK
SECURITY DOOR
3795
13312464
14142365
3587
2468
11101108
STRINGER
WEDGE
RISER
TREAD
195180460240
STAIRCASE SECTION
SCALE 1 : 20
NEWEL DETAILS
SCALE 1 : 10
33
31
AS STATED
KHAI JHUNG LOH, CHI MUN LAI
CONSTRUCTION DETAILS
( STAIRCASE )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
STAIRCASE PLAN
SCALE 1 : 20
STAIRCASE DETAIL
SCALE 1 : 10
0 1
METERS
0.50 2
METERS
1
FLASHING
PURLINS
RIDGE BOARD
ROOF TILES
RAFTER
FLASHING
WOODEN PURLINS
ROOF TILES
WOODEN RAFTER
RIDGE BOARD
COLLAR TIE
UNDER PURLINS
HANGER
UNDER PURLINS
KING POST
COLLAR TIE
HANGER
STRUT
EXTERNAL WALL PANEL
PURLINS
RAFTER
WALL PLATE
STUD
SILL PLATE
BRICK WALL
NOGGIN
EXTERNAL WALL PANEL
STUD
WOODEN WALL PLATE
WOODEN PURLINS
WOODEN RAFTER
WOODEN SILL PLATE
BRICK WALL
CEILING JOIST
ROOF STRUCTURES
WALLS TO ROOF CONNECTIONS
33
32
1 : 20
KHAI JHUNG LOH, FARAH AKMAL
CONSTRUCTION DETAILS
( ROOF )
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
SCALE 1 : 20
SCALE 1 : 20
0 2
METERS
1
33
33
1 : 150
LAI JIA YI , LAI CHI MUNDRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERSAXONOMETRIC DRAWING
AXONOMETRIC DRAWING
SCALE 1 : 150
KAMPUNG
MAKAM
TAMAN
JESSELTON
HEIGHT
TAMAN
LUMBA
KUDA
TAMAN
RAMPAS
TAMAN
BERJAYA
GEORGE
TOWN
JELUTONG KAMPUNG
RAWA
TAMAN
LALULINTAS
LITTLE
INDIA
GURNEY SEA
PROPOSED SITE
ISLAND HOSPITAL
PUSAT KECEMERLANGAN
SUKAN WESTLAND
CHINESE RECREATION
CLUB PENANG
KOAY TENG HAI
SERVICE CENTRE
MEDICAL CENTER
CRC FIELD
PROPOSED SITE
CHINESERECREA
JALAN PERAK
PARKING
PATIO
PARKING
SITE PLAN
33
1
SCALE 1 : 150
LOCATION PLAN
SCALE 1 : 2500
KEY PLAN
SCALE 1 : 20000
AS STATED
LOH KHAI JHUNG
KEY PLAN, LOCATION PLAN,
SITE PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
G.L.
33
2
1 : 100
JIA HUI SIM
SITE ELEVATION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 5 101 2 3 4
METERS
SITE ELEVATION
SCALE 1 : 100
C D E FA G H I
FENGSHUI BAMBOOS
J KL
PORTE COCHERE
(PORCH)
BALCONY KAKI LIMA
(CORRIDOR)
(MAIN HALL)
TIA (WC)
CHI WAN BOUNDRY WALL
(INTERIOR COURTYARD)
CHIM CHAE
B
33
3
1 : 100
JIA HUI SIM
SITE SECTION
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 5 101 2 3 4
METERS
SITE SECTION
SCALE 1 : 100
VERANDAH
A
C
D
E
G
F
H
1 2 3 4 6 7 85
B
A' B'
C
D
E E'
F F'
CH
DP 380
DP 380
DP 380
SFL = +0.15
C'
D'
FFL = +0.38
-TF
3205mm
132 sqm
MF -
3205mmCH
5.3 sqm
FFL = +0.38
VERANDAH
-
REST
ROOM
CH 3205mm
MF
6.1 sqm
FFL = +0.38
SFL = +0.15
-
STAIR
UP
10
GL = +0.065GL = +0.065
23 13141516171819202122
1 32 4 5 6 7 98
1112
FFL = +0.38
SFL = +0.15
CH
MF -
27.4 sqm
3205mm
D
1
D
D
5
D
1
D
5
D
1
D
4
RESTAURANT
(WET KITCHEN)
D
12
TIA
GL = +0.075
PORTE COCHERE
(MAIN HALL)
(CORRIDOR)
KAKI LIMA
D
10
A
B
DP 380
DP 380
DP 380 DP 380
DP 380 DP 380
DP 380
CH
SFL = +0.15
FFL = +0.38
-CF
3205mm
31.2 sqm
CHI WANCHI WAN
D
2
D
2
I
J
K
L
78 sqm
CF -
3560mmCH
GL = +0.055
-
PATIO
DP 50 DP 50
THIA GELAP
(ACTIVITY ROOM)
CH
SFL = +0.15
FFL = +0.38
-MZ
3205mm
66.2 sqm
RESTRICTED
AREA
(DAPUH)
CHIM CHAE
FFL = -0.015
CFMF
CH 3074mm
58.4 sqm
-
(COURTYARD)
1A 3A 4A 5A 6A 6B 7A 7B1B
(WC) (WC)
(PORCH)
DP 380
D
1
D
1
D
2
D
2
D
2
D
2
D
2
D
2
D
2
D
2
D
3
D
3
DAPUH
(DRY KITCHEN)
DAPUH
GL = +0.0
GROUND FLOOR PLAN
SCALE 1 : 100
33
4
1 : 100
LANCELOT TING
GROUND FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
0 5 101 2 3 4
METERS
1 2 3 4 6 7 8
OFFICE
DP
1223
A B
A' B'
C
D
E E'
F
C'
D'
TF -
3120 mmCH
30 sqm
FFL = +3.38
SFL = +0.15
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
LIBRARY
(WC)
TF -
3120 mmCH
FFL = +3.38
SFL = +0.15
44.4 sqm
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
TF -
3120 mmCH
FFL = +3.38
-
OFFICE
28.5 sqm
TF -
3120 mmCH
FFL = +3.38
12 sqm
SFL = +0.15
13141516171819202122 10
987654321
STAIR
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
MF -
3120 mmCH
FFL = +3.38
6.2 sqm
-
D
9
D
9
D
9
WC
B
C
D
E
F
A
(CHI WAN)
WC
(CHI WAN)
D
11
G
H
MEETING ROOM
TF -
3120 mmCH
FFL = +3.38
55 sqm
SFL = +0.15
BALCONY
MF -
3621mmCH
26.7 sqm
FFL = +3.38
SFL = +0.15
D
9
I
J
K
L
1A 3A 4A 5A 6A 6B 7A 7B1B
CHI WAN
(WC)
CHI WAN
D
6
D
6
D
6 D
7
D
6
D
6
D
7
D
8
DP 50
DP 50 DP 50
DP 50
(CORRIDOR)
KAKI LIMA
F
DP 20
DP 20
DP 20
DP 20
33
5
1 : 100
LANCELOT TING
FIRST FLOOR PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
0 5 101 2 3 4
METERS
FIRST FLOOR PLAN
SCALE 1 : 100
1 42 3 6 7 8
B
C
D
E
F
A
C'
J
H
G
E
C
F'
E'
A
D'D
F
B
I
L
K
A' B'
1A 3A 4A 5A 6A 6B 7A 7B1B
ROOF PLAN
SCALE 1 : 100
33
6
1 : 100
LANCELOT TING
ROOF PLAN
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
STATE CHINESE PENANG GROUP
0 5 101 2 3 4
METERS
1 2 3 4 6 7 8
A B
C
D
E E'
F F'
C'
D'
B
C
D
E
F
A
G
H
I
J
K
L
2' X 4' FLUORESCENT LIGHT FIXTURES
1' X 4' FLUORESCENT LIGHT FIXTURES
CEILING FAN
DISCO BALL
MOUNTED INCANDESCENT FIXTURES
CEILING PLAN LEGEND
EMERGENCY CEILING LIGHT
A' B'
1A 4A 5A 6A 6B 7A 7B FIRST FLOOR CEILING PLAN
SCALE 1 : 100
33
8
1 : 100
PEI KEI TANG
FIRST FLOOR
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
CEILING PLAN
0 5 101 2 3 4
METERS
A
C
D
E
G
F
H
1 2 3 4 6 7 85
B
A' B'
C
D
E E'
F F'
C'
D'
A
B
I
J
K
L
NO PERMISSION GRANTED
TO ACCESS THE INTERIOR
SPACE
2' X 4' FLUORESCENT LIGHT FIXTURES
1' X 4' FLUORESCENT LIGHT FIXTURES
CEILING FAN
DISCO BALL
MOUNTED INCANDESCENT FIXTURES
CEILING PLAN LEGEND
EMERGENCY CEILING LIGHT
1A 3A 4A 5A 6A 6B 7A 7B1B GROUND FLOOR CEILING PLAN
SCALE 1 : 100
33
7
1 : 100
PEI KEI TANG
GROUND FLOOR
DRAWN:
DATE:
TUTOR:SCALE:
3 MARCH 2016
MEASURED BY:
PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO:
MEASUREMENT DRAWINGS OF
STATE CHINESE PENANG ASSOCIATION
13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP
ALL GROUP 10 MEMBERS
CEILING PLAN
0 5 101 2 3 4
METERS

More Related Content

What's hot

Building Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallBuilding Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallAh Jun
 
Shanghai World Finance Center Structure System
Shanghai World Finance Center Structure System Shanghai World Finance Center Structure System
Shanghai World Finance Center Structure System kalpitarchitecture
 
Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts penangshophouse
 
TNB Esah v3.1
TNB Esah v3.1TNB Esah v3.1
TNB Esah v3.1KL Loo
 
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHMEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHYen Min Khor
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)Nikunj Rathod
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-listJeanne Hoo
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Istana Bandar Jugrah Plans
Istana Bandar Jugrah PlansIstana Bandar Jugrah Plans
Istana Bandar Jugrah PlansClaire Zhuangg
 
Elite residence, Dubai Marina Presentation
Elite residence, Dubai Marina PresentationElite residence, Dubai Marina Presentation
Elite residence, Dubai Marina PresentationLoai Al Fakir
 
Measured Drawings Report
Measured Drawings ReportMeasured Drawings Report
Measured Drawings ReportSheau Hui Tan
 
PENANG SHOPHOUSES - ( LORONG IKAN LOT 3,5,7)
PENANG SHOPHOUSES -  ( LORONG IKAN LOT 3,5,7)PENANG SHOPHOUSES -  ( LORONG IKAN LOT 3,5,7)
PENANG SHOPHOUSES - ( LORONG IKAN LOT 3,5,7)Ong Seng Peng Jeff
 
B.services case-study
B.services case-studyB.services case-study
B.services case-studyClement Seong
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
MITEC : Building Service System
MITEC : Building Service System MITEC : Building Service System
MITEC : Building Service System chiwunloi
 
432 Park Avenue, New York City
432 Park Avenue, New York City 432 Park Avenue, New York City
432 Park Avenue, New York City Madhura Dhamdhere
 

What's hot (20)

Building Services Project 1 - Summit Mall
Building Services Project 1 - Summit MallBuilding Services Project 1 - Summit Mall
Building Services Project 1 - Summit Mall
 
Shanghai World Finance Center Structure System
Shanghai World Finance Center Structure System Shanghai World Finance Center Structure System
Shanghai World Finance Center Structure System
 
Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts
 
TNB Esah v3.1
TNB Esah v3.1TNB Esah v3.1
TNB Esah v3.1
 
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHMEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
 
World one (Lodha Tower)
World one (Lodha Tower)World one (Lodha Tower)
World one (Lodha Tower)
 
10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list10) int floor-finishes-1-query-list
10) int floor-finishes-1-query-list
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Istana Bandar Jugrah Plans
Istana Bandar Jugrah PlansIstana Bandar Jugrah Plans
Istana Bandar Jugrah Plans
 
Elite residence, Dubai Marina Presentation
Elite residence, Dubai Marina PresentationElite residence, Dubai Marina Presentation
Elite residence, Dubai Marina Presentation
 
Measured Drawings Report
Measured Drawings ReportMeasured Drawings Report
Measured Drawings Report
 
PENANG SHOPHOUSES - ( LORONG IKAN LOT 3,5,7)
PENANG SHOPHOUSES -  ( LORONG IKAN LOT 3,5,7)PENANG SHOPHOUSES -  ( LORONG IKAN LOT 3,5,7)
PENANG SHOPHOUSES - ( LORONG IKAN LOT 3,5,7)
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
Bq floor
Bq floorBq floor
Bq floor
 
B.services case-study
B.services case-studyB.services case-study
B.services case-study
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
MITEC : Building Service System
MITEC : Building Service System MITEC : Building Service System
MITEC : Building Service System
 
432 Park Avenue, New York City
432 Park Avenue, New York City 432 Park Avenue, New York City
432 Park Avenue, New York City
 

Similar to State Chinese Penang Association - Measured Drawings

MEASURED DRAWINGS
MEASURED DRAWINGSMEASURED DRAWINGS
MEASURED DRAWINGSAndrew Law
 
Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015JoyeeLee0131
 
Architectural design, designing university library
Architectural design, designing university libraryArchitectural design, designing university library
Architectural design, designing university libraryVaishnavi R
 
Resort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawnResort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawnKrushnaDhokale
 
Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718mrstore
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdfQuote5
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setarshacjhow
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawingsjiuaN59
 
Final drawing
Final drawingFinal drawing
Final drawingBennyTS
 
Highway Maintenance مشروع الصيانة
Highway Maintenance مشروع الصيانة Highway Maintenance مشروع الصيانة
Highway Maintenance مشروع الصيانة Akram Suleiman
 

Similar to State Chinese Penang Association - Measured Drawings (12)

MEASURED DRAWINGS
MEASURED DRAWINGSMEASURED DRAWINGS
MEASURED DRAWINGS
 
Am ltwn hseleft (1)
Am ltwn hseleft (1)Am ltwn hseleft (1)
Am ltwn hseleft (1)
 
Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015Measure Drawings Penang Lian Huat Company JAN 2015
Measure Drawings Penang Lian Huat Company JAN 2015
 
Architectural design, designing university library
Architectural design, designing university libraryArchitectural design, designing university library
Architectural design, designing university library
 
Resort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawnResort design , architectural projects, Hand drawn
Resort design , architectural projects, Hand drawn
 
Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718Sichu2 rev3 hq 190718
Sichu2 rev3 hq 190718
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdf
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawings
 
372 Blue Bonnet web packet
372 Blue Bonnet web packet372 Blue Bonnet web packet
372 Blue Bonnet web packet
 
Final drawing
Final drawingFinal drawing
Final drawing
 
Highway Maintenance مشروع الصيانة
Highway Maintenance مشروع الصيانة Highway Maintenance مشروع الصيانة
Highway Maintenance مشروع الصيانة
 

More from Yvonne Chin

Internship Report
Internship Report Internship Report
Internship Report Yvonne Chin
 
Comparative analysis essay
Comparative analysis essayComparative analysis essay
Comparative analysis essayYvonne Chin
 
Compiled synopsis
Compiled synopsisCompiled synopsis
Compiled synopsisYvonne Chin
 
BUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTBUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTYvonne Chin
 
BIM Project 2B Documentation
BIM Project 2B DocumentationBIM Project 2B Documentation
BIM Project 2B DocumentationYvonne Chin
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge ReportYvonne Chin
 
Abstract & Table Contents
Abstract & Table ContentsAbstract & Table Contents
Abstract & Table ContentsYvonne Chin
 
Paper presentation
Paper presentationPaper presentation
Paper presentationYvonne Chin
 
Topic issue proposal 2016
Topic issue proposal 2016Topic issue proposal 2016
Topic issue proposal 2016Yvonne Chin
 
Case study paper 1
Case study paper 1Case study paper 1
Case study paper 1Yvonne Chin
 
KLPAC Building Service Report
KLPAC Building Service ReportKLPAC Building Service Report
KLPAC Building Service ReportYvonne Chin
 
State Chinese Penang Association - Report
State Chinese Penang Association - ReportState Chinese Penang Association - Report
State Chinese Penang Association - ReportYvonne Chin
 
Reflective essay on Soil Erosion
Reflective essay on Soil ErosionReflective essay on Soil Erosion
Reflective essay on Soil ErosionYvonne Chin
 
Project 2 report
Project 2 reportProject 2 report
Project 2 reportYvonne Chin
 
Yvonne chin yun miin
Yvonne chin yun miinYvonne chin yun miin
Yvonne chin yun miinYvonne Chin
 
Individual yvonne chin yun miin
Individual yvonne chin yun miinIndividual yvonne chin yun miin
Individual yvonne chin yun miinYvonne Chin
 
Math statistic report pdf
Math statistic report  pdfMath statistic report  pdf
Math statistic report pdfYvonne Chin
 

More from Yvonne Chin (20)

Internship Report
Internship Report Internship Report
Internship Report
 
Comparative analysis essay
Comparative analysis essayComparative analysis essay
Comparative analysis essay
 
Compiled synopsis
Compiled synopsisCompiled synopsis
Compiled synopsis
 
BUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTBUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORT
 
BIM Project 2B Documentation
BIM Project 2B DocumentationBIM Project 2B Documentation
BIM Project 2B Documentation
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
Abstract & Table Contents
Abstract & Table ContentsAbstract & Table Contents
Abstract & Table Contents
 
Paper presentation
Paper presentationPaper presentation
Paper presentation
 
Topic issue proposal 2016
Topic issue proposal 2016Topic issue proposal 2016
Topic issue proposal 2016
 
Case study paper 1
Case study paper 1Case study paper 1
Case study paper 1
 
Proposal
ProposalProposal
Proposal
 
KLPAC Building Service Report
KLPAC Building Service ReportKLPAC Building Service Report
KLPAC Building Service Report
 
State Chinese Penang Association - Report
State Chinese Penang Association - ReportState Chinese Penang Association - Report
State Chinese Penang Association - Report
 
Reflective essay on Soil Erosion
Reflective essay on Soil ErosionReflective essay on Soil Erosion
Reflective essay on Soil Erosion
 
Postcard report
Postcard reportPostcard report
Postcard report
 
Project 2 report
Project 2 reportProject 2 report
Project 2 report
 
Yvonne chin yun miin
Yvonne chin yun miinYvonne chin yun miin
Yvonne chin yun miin
 
Cc group work
Cc group workCc group work
Cc group work
 
Individual yvonne chin yun miin
Individual yvonne chin yun miinIndividual yvonne chin yun miin
Individual yvonne chin yun miin
 
Math statistic report pdf
Math statistic report  pdfMath statistic report  pdf
Math statistic report pdf
 

Recently uploaded

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Recently uploaded (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

State Chinese Penang Association - Measured Drawings

  • 1. DP380 UP 102313141516171819202122 132456798 1112 DRYKITCHEN (DAPUH) GROUND FLOOR PLAN SCALE 1 : 50 33 9 1 : 50 CALVIN SUAH, EUNICE CHAN GROUND FLOOR PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP WITH TILES FINISH PARQUET MOSAICMOSAIC CLAY TILES 0 52.5 METERS 0.5 1 1.5 2
  • 2. OFFICE DP 1223 WC LIBRARY WC CORRIDOR OFFICE 1314151617181920212210 987654321 STAIR DP50 DP50 DP50 DP50 WC DP20DP20 DP20DP20 (CHIWAN)(CHIWAN) (CHIWAN) WC (CHIWAN) MEETINGROOM PEDIMENT FIRST FLOOR PLAN SCALE 1 : 50 MOSAIC TIMBER FLOORINGCLAY TILES 33 10 1 : 50 CALVIN SUAH, EUNICE CHAN FIRST FLOOR PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP WITH TILES FINISH 0 52.5 METERS 0.5 1 1.5 2
  • 3. 1A 3A 4A 5A 6A 6B 7A 7B1B B C D E F A G H I J K L E D C F E' A F' C' D' B A' B' 1 42 3 6 7 8 ROOF FRAMING PLAN SCALE 1 : 100 33 11 1 : 100 LANCELOT TING ROOF FRAMING PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP 0 5 101 2 3 4 METERS
  • 4. GROUND LINE CEILING LEVEL GROUND FLOOR FINISH BOUNDARY WALL RIDGE GRILLE OF PATIO WET KITCHENDRY KITCHEN RESTAURANT RIDGE DIAMOND SHAPED AIR VENT FIRST FLOOR FINISH ROOF LEVEL B.L PATIO RESTAURANT CANOPY V-SHAPED TILESTIMBER LOUVERSPEDIMENT 346437063599 1234678 5 MAIN BUILDING EXTENSION FRONT ELEVATION SCALE 1 : 75 33 12 1 : 75 JIA HUI SIM FRONT ELEVATION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 7.5 METERS 3.75
  • 5. BACK DOOR BOUNDARY WALL STORAGE AIR VENTPASSAGE TO THE FRONT YARD VOID 380 GROUND LINE 3464 CEILING LEVEL 3620 GROUND FLOOR FINISH FIRST FLOOR FINISH ROOF LEVEL 3599 B.L 1A 3A 4A 5A 6A 6B 7A 7B1B EXTENSION MAIN BUILDING BACK ELEVATION SCALE 1 : 75 33 13 1 : 75 JIA HUI SIM BACK ELEVATION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 7.5 METERS 3.75
  • 6. C D E FA G H I PEDIMENT RIDGE FLORA PATTERN AIR VENT V-SHAPED TILES CEILING LEVEL 3464 GROUND LINE 3620 ROOF LEVEL 380 GROUND FLOOR FINISH FIRST FLOOR FINISH 3599 METAL FASCIA JKLB DAPUH (DRY KITCHEN) MAIN BUILDING EXTENSION LEFT ELEVATION SCALE 1 : 75 33 14 1 : 75 JIA HUI SIM LEFT ELEVATION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 7.5 METERS 3.75
  • 7. BCDEF AGHI RIDGE V-SHAPED TILES FLORA PATTERN AIR VENTDIAMOND SHAPED AIR VENTINTER COURTYARD PEDIMENT CURVE WALL 3599 GROUND LINE 34643620 ROUND TRANSOM METAL FASCIA CEILING LEVEL GROUND FLOOR FINISH ROOF LEVEL FIRST FLOOR FINISH J K L MAIN BUILDING RIGHT ELEVATION SCALE 1 : 75 33 15 1 : 75 JIA HUI SIM RIGHT ELEVATION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 7.5 METERS 3.75
  • 8. SECTION A - A' 33 16 SCALE 1 : 75 1 : 75 PEI KEI TANG SECTION DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP SECTION A - A' 0 7.5 METERS 3.75
  • 9. 33 17 1 : 75 PEI KEI TANG SECTION DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS SECTION B - B' 0 7.5 METERS 3.75 SECTION B - B' SCALE 1 : 75
  • 10. (TIA) MAIN HALL (TIA) MAIN HALL LIBRARY MEETING ROOM CORRIDOR 380 346437063599 1234678 5 VERANDAH VERANDAH CHIWAN (WC) CHIWAN (WC) CEILING LEVEL GROUND FLOOR FINISH FIRST FLOOR FINISH ROOF LEVEL COLLAR TIE GYPSUM CEILING PANELS KING POST TILE BATTEN ROOF FLASHING UNDER PURLIN RAFTER GROUND LINE SECTION C - C' 33 18 SCALE 1 : 75 1 : 75 PEI KEI TANG SECTION DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP SECTION C - C' 0 7.5 METERS 3.75
  • 11. COLLAR TIE GYPSUM CEILING PANELS KING POST TILE BATTEN 380 346437063599 8765321 4 ROOF FLASHING UNDER PURLIN RAFTER ANCESTOR ALTAR CEILING LEVEL GROUND FLOOR FINISH FIRST FLOOR FINISH ROOF LEVEL GROUND LINE VERANDAH MAIN HALL CORRIDOR CHI WAN MEETING ROOM LIBRARY CHI WAN VERANDAH SECTION D - D' 33 19 SCALE 1 : 75 1 : 75 PEI KEI TANG SECTION DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS SECTION D - D' 0 7.5 METERS 3.75
  • 12. 380346437063599 1234678 5 COLLAR TIE GYPSUM CEILING PANELS KING POST TILE BATTEN ROOF FLASHING UNDER PURLIN RAFTER CEILING LEVEL GROUND FLOOR FINISH FIRST FLOOR FINISH ROOF LEVEL GROUND LINE CORRIDORVERANDAH CORRIDORSECRETARY ROOM 33 20 1 : 75 PEI KEI TANG, KHAI JHUNG LOH SECTION DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS SECTION E - E' 0 7.5 METERS 3.75 SECTION E - E' SCALE 1 : 75
  • 13. RIDGE PATIO ACTIVITY ROOM INTERIOR COURTYARD 338436173599 3A 4A 5A 6A 6B 7A 7B TIMBER LOUVERS TOP PLATES TILE BATTEN DOUBLE HOWE TRUSS GYPSUM CEILING PANELS CEILING LEVEL GROUND FLOOR FINISH FIRST FLOOR FINISH ROOF LEVEL GROUND LINE (CHIM CHAE) SECTION F - F' 33 21 SCALE 1 : 75 1 : 75 PEI KEI TANG SECTION DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP SECTION F - F' 0 7.5 METERS 3.75
  • 14. D9 GLASS BLOCK W2 W2 WASHROOM INTERIOR ELEVATION SCALE 1 : 25 BALCONY INTERIOR ELEVATION SCALE 1 : 25 ACTIVITY ROOM INTERIOR ELEVATION SCALE 1 : 25 33 22 1 : 25 KHAI JHUNG LOH, NICHOLAS LEE, EUNICE CHAN INTERIOR ELEVATION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 2.5 METERS 1.25
  • 15. 1067 2928 1067 924 2928 1067 109615401250560 2140 1029 919 1029 919 2140 919 2916 1520 1520 1390 1390 1520 2916 105017201152560 1065 950 950 1065 2860 1065 2860 1180815815815815 DOOR 2 SCALE 1 : 50 33 23 1 : 50 CALVIN SUAH, CHI MUN LAI, EUNICE CHAN DOORS SCHEDULE DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS DOOR 1 SCALE 1 : 50 DOOR 4 SCALE 1 : 50 DOOR 5 SCALE 1 : 50 D 1 D D 2 D D 5 D D 4 D 0 5 METERS 2.51.50.5 1 2
  • 16. 3273 877 877 767 3273 877 200617901220620 1065 950 2860 950 1065 1065 2860 11804300 611 1131 STATED IN GROUND FLOOR PLAN 1292 1292 611 8401345 3565 2770 2770 2630 2770 3565 33 24 1 : 50 CALVIN SUAH, CHI MUN LAI, EUNICE CHAN DOORS SCHEDULE DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS DOOR 9 SCALE 1 : 50 DOOR 6 SCALE 1 : 50 DOOR 10 SCALE 1 : 50 DOOR 3 SCALE 1 : 50 D 9 D D 3 D D 10 D 0 5 METERS 2.51.50.5 1 2 D 6 D
  • 17. 3040 3037 3037 2847 3037 3040 1540 340 340 340 2790 2820 2720 2450 2720 2820 2820 2450 500 500 500 9601520 2420 3270 STATED IN GROUND FLOOR PLAN 548861861 383 STATED IN GROUND FLOOR PLAN 2075 1020 1020 2075 2306 1533 2306 1533 33 25 1 : 50 CALVIN SUAH, CHI MUN LAI, EUNICE CHAN DOORS SCHEDULE DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP DOOR 7 SCALE 1 : 50 DOOR 8 SCALE 1 : 50 GRILLE 1 SCALE 1 : 50 GRILLE 2 SCALE 1 : 50 D 7 D D 8 0 5 METERS 2.51.50.5 1 2
  • 18. 820 685 1925 820 1369 820 1925 10802450 1215 1055 1904 2430 2110 1215 1904 11102428 1215 1055 1974 2430 2110 1215 1974 11102428 898 898 898 828 898 898 4090 3933 2030 8180 3933 11592380 4090 2030 WINDOW 4 33 26 1 : 50 CALVIN SUAH, CHI MUN LAI, EUNICE CHAN JIA YI LAI WINDOWS SCHEDULE DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP WINDOW 2 WINDOW 1 WINDOW 3 WINDOW 5 SCALE 1 : 50SCALE 1 : 50 SCALE 1 : 50 SCALE 1 : 50 SCALE 1 : 50 0 5 METERS 2.51.50.5 1 2
  • 19. IRONY CARVING 2770 3565 3565 2770 DOOR HEAD JAMB WHEEL ALUMINUM TRACK PIVOT OVERALL WALL THICKNESS TRACK MOUNTING TRIM BOTTOM PIVOT FLOOR FINISH DOOR THICKNESS SCALE 1:20 SCALE 1:20 3273 877 HEAD JAMB PANEL MIDDLE RAIL DOOR KNOBS 3273 2250 1247 40 50 154 SHANK KNOB ROSE 15 64" DIAMETER MOUNTING HOLES 64.5 35 877 ADJUSTMENT SET SCREW FACES UP FOR TOP HINGE, DOWN FOR BOTTOM HINGE TRIM STOP FRAME DOOR 7 DOOR 7 DETAILSDOOR 4 DETAILS DOOR 4 1 : 40 CALVIN SUAH, CHI MUN LAI, JIA HUI SIM DETAILED DRAWINGS ( DOORS ) DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP 33 27 SCALE 1 : 40 SCALE 1 : 40 SCALE 1 : 40 SCALE 1 : 40 D 7 D 4 D 7 D 4 0 4 METERS 2 SCALE 1 : 1 SCALE 1 : 1 SCALE 1 : 1 SCALE 1 : 1
  • 20. 1215 1904 1215 FRAME FACING BOARD LINTEL INTERIOR SILL PLASTER BOARD GLASS DIVIDER GLASS 1904 GLASS PATTERN 4090 2030 4090 2030 COVER SLEEVES LOUVERS DIVIDER BOLT GLASS WINDOW WINDOW 5 WINDOW 5 DETAILSWINDOW 3 DETAILS WINDOW 3 33 28 1 : 40 CALVIN SUAH, CHI MUN LAI, EUNICE CHAN DETAILED DRAWINGS ( WINDOWS ) DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP SCALE 1 : 40 SCALE 1 : 40SCALE 1 : 40 SCALE 1 : 40 0 4 METERS 2
  • 21. 500 2551 7507 430 194 526383 57 1385 269 33 29 AS STATED JIA HUI SIM, JIA YI LAI DETAILED DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP ( PEDIMENT ) PEDIMENT SECTIONPEDIMENT ELEVATION SCALE 1 : 20SCALE 1 : 20 PEDIMENT PLAN SCALE 1 : 20 CORNICE FRIEZE ARCHITRAVE CAPITAL CORNICE FLORA AIR VENT PEDIMENT AXONOMETRIC SCALE 1 : 30 0 2 METERS 10 3 METERS 1.5
  • 22. 200 200 200 200 200 200 200 200 157 158 53 53 157 158 33 30 AS STATED LOH KHAI JHUNG, EUNICE CHAN DETAILED DRAWINGS DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS ( TILES AND GLASS ) SCALE 1 : 5 SCALE 1 : 5 SCALE 1 : 1 SCALE 1 : 5 SCALE 1 : 5 SCALE 1 : 5 CORRIDOR FLOOR TILES CHIWAN WALL TILES WINDOWS' GLASS PATTERN 0 0.5 METERS 0.25
  • 23. TREAD STRINGER RISER NEWEL SMALL COLUMNS TREAD STORAGE LANDING JOISTS FIRST FLOOR SLAB GRILLE WORK SECURITY DOOR 3795 13312464 14142365 3587 2468 11101108 STRINGER WEDGE RISER TREAD 195180460240 STAIRCASE SECTION SCALE 1 : 20 NEWEL DETAILS SCALE 1 : 10 33 31 AS STATED KHAI JHUNG LOH, CHI MUN LAI CONSTRUCTION DETAILS ( STAIRCASE ) DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP STAIRCASE PLAN SCALE 1 : 20 STAIRCASE DETAIL SCALE 1 : 10 0 1 METERS 0.50 2 METERS 1
  • 24. FLASHING PURLINS RIDGE BOARD ROOF TILES RAFTER FLASHING WOODEN PURLINS ROOF TILES WOODEN RAFTER RIDGE BOARD COLLAR TIE UNDER PURLINS HANGER UNDER PURLINS KING POST COLLAR TIE HANGER STRUT EXTERNAL WALL PANEL PURLINS RAFTER WALL PLATE STUD SILL PLATE BRICK WALL NOGGIN EXTERNAL WALL PANEL STUD WOODEN WALL PLATE WOODEN PURLINS WOODEN RAFTER WOODEN SILL PLATE BRICK WALL CEILING JOIST ROOF STRUCTURES WALLS TO ROOF CONNECTIONS 33 32 1 : 20 KHAI JHUNG LOH, FARAH AKMAL CONSTRUCTION DETAILS ( ROOF ) DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS SCALE 1 : 20 SCALE 1 : 20 0 2 METERS 1
  • 25. 33 33 1 : 150 LAI JIA YI , LAI CHI MUNDRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERSAXONOMETRIC DRAWING AXONOMETRIC DRAWING SCALE 1 : 150
  • 26. KAMPUNG MAKAM TAMAN JESSELTON HEIGHT TAMAN LUMBA KUDA TAMAN RAMPAS TAMAN BERJAYA GEORGE TOWN JELUTONG KAMPUNG RAWA TAMAN LALULINTAS LITTLE INDIA GURNEY SEA PROPOSED SITE ISLAND HOSPITAL PUSAT KECEMERLANGAN SUKAN WESTLAND CHINESE RECREATION CLUB PENANG KOAY TENG HAI SERVICE CENTRE MEDICAL CENTER CRC FIELD PROPOSED SITE CHINESERECREA JALAN PERAK PARKING PATIO PARKING SITE PLAN 33 1 SCALE 1 : 150 LOCATION PLAN SCALE 1 : 2500 KEY PLAN SCALE 1 : 20000 AS STATED LOH KHAI JHUNG KEY PLAN, LOCATION PLAN, SITE PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP
  • 27. G.L. 33 2 1 : 100 JIA HUI SIM SITE ELEVATION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 5 101 2 3 4 METERS SITE ELEVATION SCALE 1 : 100
  • 28. C D E FA G H I FENGSHUI BAMBOOS J KL PORTE COCHERE (PORCH) BALCONY KAKI LIMA (CORRIDOR) (MAIN HALL) TIA (WC) CHI WAN BOUNDRY WALL (INTERIOR COURTYARD) CHIM CHAE B 33 3 1 : 100 JIA HUI SIM SITE SECTION DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 5 101 2 3 4 METERS SITE SECTION SCALE 1 : 100
  • 29. VERANDAH A C D E G F H 1 2 3 4 6 7 85 B A' B' C D E E' F F' CH DP 380 DP 380 DP 380 SFL = +0.15 C' D' FFL = +0.38 -TF 3205mm 132 sqm MF - 3205mmCH 5.3 sqm FFL = +0.38 VERANDAH - REST ROOM CH 3205mm MF 6.1 sqm FFL = +0.38 SFL = +0.15 - STAIR UP 10 GL = +0.065GL = +0.065 23 13141516171819202122 1 32 4 5 6 7 98 1112 FFL = +0.38 SFL = +0.15 CH MF - 27.4 sqm 3205mm D 1 D D 5 D 1 D 5 D 1 D 4 RESTAURANT (WET KITCHEN) D 12 TIA GL = +0.075 PORTE COCHERE (MAIN HALL) (CORRIDOR) KAKI LIMA D 10 A B DP 380 DP 380 DP 380 DP 380 DP 380 DP 380 DP 380 CH SFL = +0.15 FFL = +0.38 -CF 3205mm 31.2 sqm CHI WANCHI WAN D 2 D 2 I J K L 78 sqm CF - 3560mmCH GL = +0.055 - PATIO DP 50 DP 50 THIA GELAP (ACTIVITY ROOM) CH SFL = +0.15 FFL = +0.38 -MZ 3205mm 66.2 sqm RESTRICTED AREA (DAPUH) CHIM CHAE FFL = -0.015 CFMF CH 3074mm 58.4 sqm - (COURTYARD) 1A 3A 4A 5A 6A 6B 7A 7B1B (WC) (WC) (PORCH) DP 380 D 1 D 1 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 3 D 3 DAPUH (DRY KITCHEN) DAPUH GL = +0.0 GROUND FLOOR PLAN SCALE 1 : 100 33 4 1 : 100 LANCELOT TING GROUND FLOOR PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP 0 5 101 2 3 4 METERS
  • 30. 1 2 3 4 6 7 8 OFFICE DP 1223 A B A' B' C D E E' F C' D' TF - 3120 mmCH 30 sqm FFL = +3.38 SFL = +0.15 MF - 3120 mmCH FFL = +3.38 6.2 sqm - LIBRARY (WC) TF - 3120 mmCH FFL = +3.38 SFL = +0.15 44.4 sqm MF - 3120 mmCH FFL = +3.38 6.2 sqm - TF - 3120 mmCH FFL = +3.38 - OFFICE 28.5 sqm TF - 3120 mmCH FFL = +3.38 12 sqm SFL = +0.15 13141516171819202122 10 987654321 STAIR MF - 3120 mmCH FFL = +3.38 6.2 sqm - MF - 3120 mmCH FFL = +3.38 6.2 sqm - D 9 D 9 D 9 WC B C D E F A (CHI WAN) WC (CHI WAN) D 11 G H MEETING ROOM TF - 3120 mmCH FFL = +3.38 55 sqm SFL = +0.15 BALCONY MF - 3621mmCH 26.7 sqm FFL = +3.38 SFL = +0.15 D 9 I J K L 1A 3A 4A 5A 6A 6B 7A 7B1B CHI WAN (WC) CHI WAN D 6 D 6 D 6 D 7 D 6 D 6 D 7 D 8 DP 50 DP 50 DP 50 DP 50 (CORRIDOR) KAKI LIMA F DP 20 DP 20 DP 20 DP 20 33 5 1 : 100 LANCELOT TING FIRST FLOOR PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS 0 5 101 2 3 4 METERS FIRST FLOOR PLAN SCALE 1 : 100
  • 31. 1 42 3 6 7 8 B C D E F A C' J H G E C F' E' A D'D F B I L K A' B' 1A 3A 4A 5A 6A 6B 7A 7B1B ROOF PLAN SCALE 1 : 100 33 6 1 : 100 LANCELOT TING ROOF PLAN DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS STATE CHINESE PENANG GROUP 0 5 101 2 3 4 METERS
  • 32. 1 2 3 4 6 7 8 A B C D E E' F F' C' D' B C D E F A G H I J K L 2' X 4' FLUORESCENT LIGHT FIXTURES 1' X 4' FLUORESCENT LIGHT FIXTURES CEILING FAN DISCO BALL MOUNTED INCANDESCENT FIXTURES CEILING PLAN LEGEND EMERGENCY CEILING LIGHT A' B' 1A 4A 5A 6A 6B 7A 7B FIRST FLOOR CEILING PLAN SCALE 1 : 100 33 8 1 : 100 PEI KEI TANG FIRST FLOOR DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS CEILING PLAN 0 5 101 2 3 4 METERS
  • 33. A C D E G F H 1 2 3 4 6 7 85 B A' B' C D E E' F F' C' D' A B I J K L NO PERMISSION GRANTED TO ACCESS THE INTERIOR SPACE 2' X 4' FLUORESCENT LIGHT FIXTURES 1' X 4' FLUORESCENT LIGHT FIXTURES CEILING FAN DISCO BALL MOUNTED INCANDESCENT FIXTURES CEILING PLAN LEGEND EMERGENCY CEILING LIGHT 1A 3A 4A 5A 6A 6B 7A 7B1B GROUND FLOOR CEILING PLAN SCALE 1 : 100 33 7 1 : 100 PEI KEI TANG GROUND FLOOR DRAWN: DATE: TUTOR:SCALE: 3 MARCH 2016 MEASURED BY: PROJECT TITLE: DRAWN TITLE : COMMENTS: SHEET NO: MEASUREMENT DRAWINGS OF STATE CHINESE PENANG ASSOCIATION 13 JALAN PERAK , GEORGE TOWN Ar. PRINCE FAVIS ISIP ALL GROUP 10 MEMBERS CEILING PLAN 0 5 101 2 3 4 METERS