SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB1514 – Construction Technology 1
Singapore Gold Sand Marina Bay Hotel
April Semester 2013
Group Assignment: Group 4
Submission Date: 26th June 2013
Name Student ID Marks
Yam Yih Hwan 0305861
Tan Jia Jia 0307766
Yo Kai Sen 0310563
Teoh Tze Yoong 0314756
Background Information of Singapore Gold Sand Marina Bay Hotel
Singapore Gold Sand Marina Bay Hotel (MBS) is an Integrated Resort fronting Marina Bay
in Singapore, which operated under Las Vegas Sands Corp. (Chua, 2011)MBS is designed by
Canadian Architect named Moshe Safdie with Local Executive Architects Aedas, Pte, Ltd. In
additional, Arup Group Limited is selected as the Structural Engineering for this project whereas
the landscape of this building is designed by Peter Walker & Partners. The entire project area
used is 845,000m2
and the site area used is 154,938m2
. The estimated budget on this project is
USD $5.7 billion. (Safdie Architects, 2010)
MBS began operations on 27 April 2010, and officially opened on 23 June. MBS
comprises of three towers with 55-storey high topped by a 12,400m2
SkyPark. As for the Art
Science Museum, it is shaped like a lotus flower. (Chua, 2011) On top of its three towers, the
Marina Bay Sands was designed as a curious boat-shape and it is placed at the gateway to
Singapore's harbor with strong and highly iconic structure. (Apavisa, n.d.)
(Layout of Singapore Gold Sand Marina Bay Hotel)
Furthermore, MBS offers luxury hotel, casino, retail mall, convention facilities and
entertainment venues including theatres, nightclubs and a museum. It has 2,560 luxury rooms
across three 55-storey hotel towers, totaling 265,683 m2
. (Safdie Architects, 2010) As we know,
Marina Bay Sands is one of the biggest hotelslocated in Singapore; it’s covering 12,400 m2
, and is
over 200 meters altitude. It has a 150 meters infinity-edged swimming pool at 250 meters high
which overlook the view of Singapore skyline. There is a botanical garden which linked on top of
the three 200m high hotels of marina bays where you can find 250 types of tree and 650 species
of plants. (Apavisa, n.d.)
MBS is one of the most complex designs ever built; it is a slopping tower which its angle
as steep as 26 degrees and connecting legs at Level 23 to form a single building. The “Hanging
Gardens” provides a magnificent backdrop which the visitors can overlook the upcoming Gardens
by the Bay. (YourSingapore, 2012)
Structure & Materials used on Singapore Gold Sand Marina Bay Hotel
Shear walls are used as primary vertical and transverse structural system for all three
towers. (McCafferty, 2011) Additional of concrete core walls located within both legs of each
towers restrain the hotel in the longitudinal direction and help prevent out-of-plane buckling of the
narrow shear walls within both legs of the towers. (McCafferty, 2011) Post-tensioned 8-inch Flat
slabs span directly between the shear walls. (McCafferty, 2011) The flat slab scheme also
provides flexibility in the hotel room layout, to hold a relatively tight 9-foot 10-inch typical floor-to-
floor height, and accommodates flexibility of building services distribution and coordination
throughout each floor. (McCafferty, 2011)
(Diagram of Hotel Components)
At level 23, where the story-height steel trusses are located, mechanical floors connected
the legs of the towerto withstand the large shear forces that occur where these meet above the
central atrium. (McCafferty, 2011) The base slab at ground floor level is post-tensioned to resist
the horizontal thrusts produced by the inclined legs. (McCafferty, 2011) Each tower slab form is
also slightly changed in relation to its pair, to increase the slenderness of the buildings, resulting
in the appearance of six towers, instead of three. (Safdie, 2011) There is an energy efficient
double-glazed unit suspended at the edge of the slab and is resting on a frame. (Safdie, 2011)
Perpendicular to the façade, glass fins were installed to provide shading. (Safdie, 2011) In
order to allow it to radiate out in elevation, the glass fins are suspended out of the horizontal stack
joint. (Safdie, 2011) The glass fins are supported by a 3-sided aluminium frame, with the exposed
forward edge, the sun light is been catch, as well as reflections of the façade, to create a specials
effect. (Safdie, 2011) A 30%-reflective glass is used as the fins and to provide shading for the
façade up to 20% of all solar gain. (Safdie, 2011) The belly of the SkyPark is made of more than
9,000 silver-painted metal-composite panels, the panels encloses the mega trusses which bridge
the buildings at level 55, as well as a multitude of back of house spaces. (Safdie, 2011) Material
that mainly used to build Marina Bay Hotel are aluminium and steels as the structural frame and
reinforcement and as well as for the design. (Safdie, 2011)
The material to build the façade of the hotel was carefully chosen to ensure that the
building has a higher Envelope Thermal Transfer Value than the standard. (Mike, 2012)
Whenever possible during the hotel’s construction, the engineers try to use green materials
utilizing recycled products under Singapore’s Green Labeling Scheme – such as drainage cells,
timber decking, drywall partitions and fire-rated doors. (Mike, 2012)
Industrialized Building Systems (IBS) implemented in Singapore Gold Sand Marina Bay Hotel
Industrialized Building Systems, generally known as IBS throughout Malaysia. In
worldwide, IBS is also known as Pre-fabricated/Pre-fab Construction, Modern Method of
Construction (MMC) and Off-site Construction.Industrialized Building Systems is a method of
construction which uses techniques such as mass production of industrial components in a
controlled environment, and latertransported to construction site for further assembly onto specific
buildings. Each and every one of the pre-cast concrete and pre-fabricated timber/steel structures
are customized and standardized making it more efficient and able to maintain it’s persistent in
quality and quantity. Such pre-cast concrete and pre-fabricated timber/steel structures are
particularly useful for high rise buildings or mass housing estates whereas similar structure can be
replicated.
In the construction of MBS, the foundations system used for the three towers was barrette
piles with a number of bored piles for lighter loaded elements of the structures.Piles are driven
into the soil for transferring loads and prevent deformation. Concrete piles are also used as pre-
cast beams to be placed in the structure of the building for the purpose on supporting the building
loadings.
(Foundation of Singapore Gold Sand Marina Bay Hotel)
Furthermore,pre-cast reinforced concrete shear walls, vary from thickness of 28 inches at
the base of the tower to 20 inches of higher floor levels, and are located within 33-foor centres for
each of the three towers. Shear walls are used as primary vertical and transverse structural
system for all three towers.
(Shear walls of three towers)
On top of the MBS is where the SkyPark located. Steel structure for the SkyParkwas pre-
fabricated off-site in 14 primary segments. Then, truck the pre-fabricated steel structure to site
and lift them into place for assembly onto the top of the tower. The bridging sections extending
between adjacent towers each consist of three 400-ton bridge trusses that were pre-assembled at
grade. Totalof 7,000 tons steelwork was erected into the SkyPark to maintain and support its
weight.
(Primary Pre-Fabricated steelsegments)
Advantages of Industrialized Building Systems (IBS)
During the construction, Industrialized Building Systems (IBS) able to increase the
construction speed of MBS by providing pre-cast and pre-fabricatedcomponents. As compared to
normal build, it is much fasteras it doesn’t required labours to construct it step by step. There are
factories that provide pre-cast/pre-fabricated components, saving up time andspeed up the
process of construction. Industrialized Building Systems componentsonly work at the site,
therefore pre-cast/pre-fabricated components must be brought over to site for further assembly. It
also provides flexibility in the design of pre-cast element so that different systems
may produce their own unique pre-fabrication construction methods.
(Fabrication The podium roofs)(Fabrication Sand SkyPark)
Besides that, Industrialized Building Systems also helped to save up costs on the
construction of MBS. WithinIndustrialized Building Systems, there is aluminum, steel, timber and
other materials of formwork that can be reused while pouring the concrete. By using these
systems, itcan reduce the numbers of labours. For examples, the needs for skilled workers, bar-
benders and carpenters can be reduced.
Furthermore, Industrialized Building Systems allowed the construction of MBSto build in a
moreeco-friendly environment. The usagesof timber formwork will be lesser down andwastage of
construction materials can be reducedwhile usingIndustrialized Building Systems in the
construction. The system helps to increase the safety and neatness conditionof site. The systems
also help to avoid the delay on construction works affected by weather. Due to the components of
Industrialized Building Systems, the effects of weather on construction operation became lesser.
In conclusion, Industrialized Building Systems able to save up time, cost, and provide a
more eco-friendly environment during the construction of MBS.
References:
Background Information of Singapore Gold Sand Marina Bay Hotel
1. Chua, A. (2011). Marina Bay Sands. SingaporeInfopedia. Retrieved from
http://infopedia.nl.sg/articles/SIP_1607_2011-11-01.html
2. “Marina Bay Sands / Safdie Architects” (2010, 26 July). ArchDaily. Accessed 23 June2013.
Retrieved fromhttp://www.archdaily.com/70186
3. YourSingapore. (2012). Marina Bay Sands® Hotel and Sands SkyPark®. Retrieved from
http://www.yoursingapore.com/content/traveller/en/browse/see-and-do/arts-and-
entertainment/architecture/sky-park.html
4. Apavisa. (n.d.). SKYPARK, MARINA BAY SANDS – SINGAPORE. Retrieved from
http://www.apavisa.com/en/proyecto-skypark-marina-bay-sands-singapore/
References:
Structure & Materials used on Singapore Gold Sand Marina Bay Hotel
1. Safdie, M. (2011, March). "Marina Bay Sand, Singapore." Council on Tall Building and
Urban Habitat.Retrieved June 22, 2013, from
http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/MarinaBaySands
/tabid/1766/language/en-US/Default.aspx
2. McCafferty, P. S. & Brodkin, D. & Farnsworth, D. & Scott, D. (2011). Engineering an Icon –
The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June
22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
3. Mike, W. (2012, March 13). In Marina Bay Sands: Singapore’s Top Eco-Friendly
Hotel.Argophilia Travel News. Retrieved June 25, 2013, from
http://www.argophilia.com/news/marina-bay-sands-ecological-moves/25349/
References:
Industrialized Building Systems (IBS) implemented inSingapore Gold Sand Marina Bay Hotel
1. Industrialised Building System (IBS). (n.d.). Retrieved June 22, 2013, from Wikipedia:
http://en.wikipedia.org/wiki/Industrialised_Building_System_(IBS)
2. Copyright © Kimlun Corporation Berhad (867077-X). (n.d.). Industrialised Building
Systems (IBS). Retrieved June 22, 2013, from
http://www.kimlun.com/industrial_building_systems.html
3. Soletanche-Bachy Group. (2007). Marina bay sands.Retrieved June 22, 2013,
fromhttp://www.bachy-soletanche.com/SBF/sitev4_uk.nsf/technique/marina-bay-sands
4. McCafferty, P.S.&Brodkin, D.&Farnsworth, D. & Scott, D. (2011). Engineering an Icon–
The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June
22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
References:
Advantages of Industrialized Building Systems (IBS)
1. Incik. Mohd Nazli. (2011, March 28). Engineer Thinking..; Advantages of industrialised
building system (IBS). Retrieved from http://inginiur.blogspot.com/2011/03/advantages-of-
industrialised-building.html
2. Yong, E. (2011, May 7). Eric Yong’s Blog;The Advantages & Disadvantages of the
Industrialized Building Systems (IBS). Retrieved from
http://eforericyong.blogspot.com/2011/07/advantages-disadvantages-of.html
3. Juan Maier, B. M. (2012). The Marina Bay Sands Special Issue; the Arup Journal.
Retrieved from www.arup.com/Publications/~/media/Files/.../Arup_Journal_1_2012.ashx

More Related Content

What's hot

High rise building
High rise buildingHigh rise building
High rise buildingTousif Ahmad
 
Shanghai World Financial Center
Shanghai World Financial CenterShanghai World Financial Center
Shanghai World Financial CenterDeb Bee
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Local authority of lumut, perak
Local authority of lumut, perakLocal authority of lumut, perak
Local authority of lumut, perakEraz
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrainDishant Rautela
 
Arches - Form Active Structure System
Arches - Form Active Structure SystemArches - Form Active Structure System
Arches - Form Active Structure SystemArchistudent Portal
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
London aquatic center Case study
London aquatic center Case studyLondon aquatic center Case study
London aquatic center Case studyrohan joshi
 
Undergraduate Architectural Portfolio
Undergraduate Architectural PortfolioUndergraduate Architectural Portfolio
Undergraduate Architectural PortfolioArchitecture
 

What's hot (20)

High rise building
High rise buildingHigh rise building
High rise building
 
Shanghai World Financial Center
Shanghai World Financial CenterShanghai World Financial Center
Shanghai World Financial Center
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Local authority of lumut, perak
Local authority of lumut, perakLocal authority of lumut, perak
Local authority of lumut, perak
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Turning torso
Turning torsoTurning torso
Turning torso
 
Bulk active
Bulk activeBulk active
Bulk active
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
World trade centre,bahrain
World trade centre,bahrainWorld trade centre,bahrain
World trade centre,bahrain
 
Highrise structure
Highrise structureHighrise structure
Highrise structure
 
Podium
PodiumPodium
Podium
 
Marina bay sands
Marina bay sandsMarina bay sands
Marina bay sands
 
Arches - Form Active Structure System
Arches - Form Active Structure SystemArches - Form Active Structure System
Arches - Form Active Structure System
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Structural System in High Rise building
Structural System in High Rise buildingStructural System in High Rise building
Structural System in High Rise building
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
London aquatic center Case study
London aquatic center Case studyLondon aquatic center Case study
London aquatic center Case study
 
Undergraduate Architectural Portfolio
Undergraduate Architectural PortfolioUndergraduate Architectural Portfolio
Undergraduate Architectural Portfolio
 
kkr 2
kkr 2kkr 2
kkr 2
 

Similar to Singapore's Iconic Marina Bay Sands Hotel

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingAnupama Krishnan
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Ramin Vaghei
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsJing Fan Koh
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...IRJET Journal
 
Seismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication TowersSeismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication TowersIJERA Editor
 
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...IRJET Journal
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherifBian Bian
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherifhlksd
 

Similar to Singapore's Iconic Marina Bay Sands Hotel (20)

CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Internship report
Internship reportInternship report
Internship report
 
Btech
BtechBtech
Btech
 
Chhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal BuildingChhatrapati Shivaji International Airport—Integrated Terminal Building
Chhatrapati Shivaji International Airport—Integrated Terminal Building
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Table formwork
Table formwork Table formwork
Table formwork
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
Building Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction SolutionsBuilding Technology I : Project 2 : Construction Solutions
Building Technology I : Project 2 : Construction Solutions
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...Application of Advanced formwork system for High rise buildings in Chennai, I...
Application of Advanced formwork system for High rise buildings in Chennai, I...
 
Seismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication TowersSeismic Study of Building with Roof Top Telecommunication Towers
Seismic Study of Building with Roof Top Telecommunication Towers
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...IRJET-  	  A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
IRJET- A Review of Seismic Analysis of Shear Wall Optimization for Multi-...
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Site report
Site reportSite report
Site report
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
2010 structural designconcrete_sherif
2010 structural designconcrete_sherif2010 structural designconcrete_sherif
2010 structural designconcrete_sherif
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Building Technology II Project 1
Building Technology II Project 1Building Technology II Project 1
Building Technology II Project 1
 

More from 마 이환

Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)마 이환
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)마 이환
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development마 이환
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)마 이환
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer마 이환
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides마 이환
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations마 이환
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet마 이환
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report마 이환
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 

More from 마 이환 (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Recently uploaded

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Recently uploaded (20)

0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Singapore's Iconic Marina Bay Sands Hotel

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB1514 – Construction Technology 1 Singapore Gold Sand Marina Bay Hotel April Semester 2013 Group Assignment: Group 4 Submission Date: 26th June 2013 Name Student ID Marks Yam Yih Hwan 0305861 Tan Jia Jia 0307766 Yo Kai Sen 0310563 Teoh Tze Yoong 0314756
  • 2. Background Information of Singapore Gold Sand Marina Bay Hotel Singapore Gold Sand Marina Bay Hotel (MBS) is an Integrated Resort fronting Marina Bay in Singapore, which operated under Las Vegas Sands Corp. (Chua, 2011)MBS is designed by Canadian Architect named Moshe Safdie with Local Executive Architects Aedas, Pte, Ltd. In additional, Arup Group Limited is selected as the Structural Engineering for this project whereas the landscape of this building is designed by Peter Walker & Partners. The entire project area used is 845,000m2 and the site area used is 154,938m2 . The estimated budget on this project is USD $5.7 billion. (Safdie Architects, 2010) MBS began operations on 27 April 2010, and officially opened on 23 June. MBS comprises of three towers with 55-storey high topped by a 12,400m2 SkyPark. As for the Art Science Museum, it is shaped like a lotus flower. (Chua, 2011) On top of its three towers, the Marina Bay Sands was designed as a curious boat-shape and it is placed at the gateway to Singapore's harbor with strong and highly iconic structure. (Apavisa, n.d.) (Layout of Singapore Gold Sand Marina Bay Hotel)
  • 3. Furthermore, MBS offers luxury hotel, casino, retail mall, convention facilities and entertainment venues including theatres, nightclubs and a museum. It has 2,560 luxury rooms across three 55-storey hotel towers, totaling 265,683 m2 . (Safdie Architects, 2010) As we know, Marina Bay Sands is one of the biggest hotelslocated in Singapore; it’s covering 12,400 m2 , and is over 200 meters altitude. It has a 150 meters infinity-edged swimming pool at 250 meters high which overlook the view of Singapore skyline. There is a botanical garden which linked on top of the three 200m high hotels of marina bays where you can find 250 types of tree and 650 species of plants. (Apavisa, n.d.) MBS is one of the most complex designs ever built; it is a slopping tower which its angle as steep as 26 degrees and connecting legs at Level 23 to form a single building. The “Hanging Gardens” provides a magnificent backdrop which the visitors can overlook the upcoming Gardens by the Bay. (YourSingapore, 2012) Structure & Materials used on Singapore Gold Sand Marina Bay Hotel Shear walls are used as primary vertical and transverse structural system for all three towers. (McCafferty, 2011) Additional of concrete core walls located within both legs of each towers restrain the hotel in the longitudinal direction and help prevent out-of-plane buckling of the narrow shear walls within both legs of the towers. (McCafferty, 2011) Post-tensioned 8-inch Flat slabs span directly between the shear walls. (McCafferty, 2011) The flat slab scheme also provides flexibility in the hotel room layout, to hold a relatively tight 9-foot 10-inch typical floor-to- floor height, and accommodates flexibility of building services distribution and coordination throughout each floor. (McCafferty, 2011) (Diagram of Hotel Components)
  • 4. At level 23, where the story-height steel trusses are located, mechanical floors connected the legs of the towerto withstand the large shear forces that occur where these meet above the central atrium. (McCafferty, 2011) The base slab at ground floor level is post-tensioned to resist the horizontal thrusts produced by the inclined legs. (McCafferty, 2011) Each tower slab form is also slightly changed in relation to its pair, to increase the slenderness of the buildings, resulting in the appearance of six towers, instead of three. (Safdie, 2011) There is an energy efficient double-glazed unit suspended at the edge of the slab and is resting on a frame. (Safdie, 2011) Perpendicular to the façade, glass fins were installed to provide shading. (Safdie, 2011) In order to allow it to radiate out in elevation, the glass fins are suspended out of the horizontal stack joint. (Safdie, 2011) The glass fins are supported by a 3-sided aluminium frame, with the exposed forward edge, the sun light is been catch, as well as reflections of the façade, to create a specials effect. (Safdie, 2011) A 30%-reflective glass is used as the fins and to provide shading for the façade up to 20% of all solar gain. (Safdie, 2011) The belly of the SkyPark is made of more than 9,000 silver-painted metal-composite panels, the panels encloses the mega trusses which bridge the buildings at level 55, as well as a multitude of back of house spaces. (Safdie, 2011) Material that mainly used to build Marina Bay Hotel are aluminium and steels as the structural frame and reinforcement and as well as for the design. (Safdie, 2011) The material to build the façade of the hotel was carefully chosen to ensure that the building has a higher Envelope Thermal Transfer Value than the standard. (Mike, 2012) Whenever possible during the hotel’s construction, the engineers try to use green materials utilizing recycled products under Singapore’s Green Labeling Scheme – such as drainage cells, timber decking, drywall partitions and fire-rated doors. (Mike, 2012) Industrialized Building Systems (IBS) implemented in Singapore Gold Sand Marina Bay Hotel Industrialized Building Systems, generally known as IBS throughout Malaysia. In worldwide, IBS is also known as Pre-fabricated/Pre-fab Construction, Modern Method of Construction (MMC) and Off-site Construction.Industrialized Building Systems is a method of construction which uses techniques such as mass production of industrial components in a controlled environment, and latertransported to construction site for further assembly onto specific buildings. Each and every one of the pre-cast concrete and pre-fabricated timber/steel structures are customized and standardized making it more efficient and able to maintain it’s persistent in quality and quantity. Such pre-cast concrete and pre-fabricated timber/steel structures are particularly useful for high rise buildings or mass housing estates whereas similar structure can be replicated. In the construction of MBS, the foundations system used for the three towers was barrette piles with a number of bored piles for lighter loaded elements of the structures.Piles are driven into the soil for transferring loads and prevent deformation. Concrete piles are also used as pre-
  • 5. cast beams to be placed in the structure of the building for the purpose on supporting the building loadings. (Foundation of Singapore Gold Sand Marina Bay Hotel) Furthermore,pre-cast reinforced concrete shear walls, vary from thickness of 28 inches at the base of the tower to 20 inches of higher floor levels, and are located within 33-foor centres for each of the three towers. Shear walls are used as primary vertical and transverse structural system for all three towers. (Shear walls of three towers)
  • 6. On top of the MBS is where the SkyPark located. Steel structure for the SkyParkwas pre- fabricated off-site in 14 primary segments. Then, truck the pre-fabricated steel structure to site and lift them into place for assembly onto the top of the tower. The bridging sections extending between adjacent towers each consist of three 400-ton bridge trusses that were pre-assembled at grade. Totalof 7,000 tons steelwork was erected into the SkyPark to maintain and support its weight. (Primary Pre-Fabricated steelsegments) Advantages of Industrialized Building Systems (IBS) During the construction, Industrialized Building Systems (IBS) able to increase the construction speed of MBS by providing pre-cast and pre-fabricatedcomponents. As compared to normal build, it is much fasteras it doesn’t required labours to construct it step by step. There are factories that provide pre-cast/pre-fabricated components, saving up time andspeed up the process of construction. Industrialized Building Systems componentsonly work at the site, therefore pre-cast/pre-fabricated components must be brought over to site for further assembly. It also provides flexibility in the design of pre-cast element so that different systems may produce their own unique pre-fabrication construction methods. (Fabrication The podium roofs)(Fabrication Sand SkyPark)
  • 7. Besides that, Industrialized Building Systems also helped to save up costs on the construction of MBS. WithinIndustrialized Building Systems, there is aluminum, steel, timber and other materials of formwork that can be reused while pouring the concrete. By using these systems, itcan reduce the numbers of labours. For examples, the needs for skilled workers, bar- benders and carpenters can be reduced. Furthermore, Industrialized Building Systems allowed the construction of MBSto build in a moreeco-friendly environment. The usagesof timber formwork will be lesser down andwastage of construction materials can be reducedwhile usingIndustrialized Building Systems in the construction. The system helps to increase the safety and neatness conditionof site. The systems also help to avoid the delay on construction works affected by weather. Due to the components of Industrialized Building Systems, the effects of weather on construction operation became lesser. In conclusion, Industrialized Building Systems able to save up time, cost, and provide a more eco-friendly environment during the construction of MBS.
  • 8. References: Background Information of Singapore Gold Sand Marina Bay Hotel 1. Chua, A. (2011). Marina Bay Sands. SingaporeInfopedia. Retrieved from http://infopedia.nl.sg/articles/SIP_1607_2011-11-01.html 2. “Marina Bay Sands / Safdie Architects” (2010, 26 July). ArchDaily. Accessed 23 June2013. Retrieved fromhttp://www.archdaily.com/70186 3. YourSingapore. (2012). Marina Bay Sands® Hotel and Sands SkyPark®. Retrieved from http://www.yoursingapore.com/content/traveller/en/browse/see-and-do/arts-and- entertainment/architecture/sky-park.html 4. Apavisa. (n.d.). SKYPARK, MARINA BAY SANDS – SINGAPORE. Retrieved from http://www.apavisa.com/en/proyecto-skypark-marina-bay-sands-singapore/ References: Structure & Materials used on Singapore Gold Sand Marina Bay Hotel 1. Safdie, M. (2011, March). "Marina Bay Sand, Singapore." Council on Tall Building and Urban Habitat.Retrieved June 22, 2013, from http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/MarinaBaySands /tabid/1766/language/en-US/Default.aspx 2. McCafferty, P. S. & Brodkin, D. & Farnsworth, D. & Scott, D. (2011). Engineering an Icon – The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June 22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273 3. Mike, W. (2012, March 13). In Marina Bay Sands: Singapore’s Top Eco-Friendly Hotel.Argophilia Travel News. Retrieved June 25, 2013, from http://www.argophilia.com/news/marina-bay-sands-ecological-moves/25349/ References: Industrialized Building Systems (IBS) implemented inSingapore Gold Sand Marina Bay Hotel 1. Industrialised Building System (IBS). (n.d.). Retrieved June 22, 2013, from Wikipedia: http://en.wikipedia.org/wiki/Industrialised_Building_System_(IBS) 2. Copyright © Kimlun Corporation Berhad (867077-X). (n.d.). Industrialised Building Systems (IBS). Retrieved June 22, 2013, from http://www.kimlun.com/industrial_building_systems.html 3. Soletanche-Bachy Group. (2007). Marina bay sands.Retrieved June 22, 2013, fromhttp://www.bachy-soletanche.com/SBF/sitev4_uk.nsf/technique/marina-bay-sands 4. McCafferty, P.S.&Brodkin, D.&Farnsworth, D. & Scott, D. (2011). Engineering an Icon– The Marina Bay Sands ® Integrated Resort [Online exclusive].Structure. Retrieved June 22, 2013, from http://www.structuremag.org/article.aspx?articleid=1273
  • 9. References: Advantages of Industrialized Building Systems (IBS) 1. Incik. Mohd Nazli. (2011, March 28). Engineer Thinking..; Advantages of industrialised building system (IBS). Retrieved from http://inginiur.blogspot.com/2011/03/advantages-of- industrialised-building.html 2. Yong, E. (2011, May 7). Eric Yong’s Blog;The Advantages & Disadvantages of the Industrialized Building Systems (IBS). Retrieved from http://eforericyong.blogspot.com/2011/07/advantages-disadvantages-of.html 3. Juan Maier, B. M. (2012). The Marina Bay Sands Special Issue; the Arup Journal. Retrieved from www.arup.com/Publications/~/media/Files/.../Arup_Journal_1_2012.ashx