Introduction

Discharge (PD), as it's name would suggest, is an electrical discharge that occurs
across a portion of the insulation between two conducting electrodes, without
completely bridging the gap. Partial Discharges can occur in voids in solid insulation
(paper, polymer etc), gas bubbles in liquid insulation or around an electrode in a gas
(corona). Once PD occurs, insulation will degrade and eventually lead to equipment
breakdown.


Partial Discharge testing is a predictive maintenance tool for any high voltage
equipment. It is the only on-line electrical test recommended by IEEE that correctly
identifies and warns of insulation defects such as contamination, thermal
deterioration, poor manufacture, and more!


Why test for Partial Discharge?

Failure of High Voltage insulation is the No. 1 cause of High voltage
system failures with IEEE statistics indicating that electrical insulation
deterioration causes up to 90% of electrical failures of certain high
voltage equipment. On-line PD testing of HV plant gives advance
warning of pending insulation failure thus allowing the plant owner to
take remedial action during planned outages. Unlike off-line testing, on-
line PD testing and monitoring gives an accurate picture of the plants
health and performance under service conditions.
Benefits of Partial Discharge Testing

Partial Discharge testing WILL provide users a huge benefit in the form of one or
more of the following:

           It is truly a predictive test, indicating insulation degradation in advance of
      •

           the failure.

           It need not use any over-voltages, thereby not exposing the tested
      •

           equipment to higher voltage stresses than those encountered under
           normal operating conditions. Avoid unexpected in-service failures of the
           equipment and extend up-time between outages.

           Avoid unnecessary servicing and repairs of older equipment by
       •
           maximizing the operating hours.


           Find a problem and remedy it before it has a chance to fail the
       •
           equipment.


           Find problems on new equipments which may still be under warranty.
       •


           Assess the quality of maintenance repairs and/or rewinds with before and
       •
           after testing.


           Compare results from similar equipment to focus maintenance on those
       •
           with higher levels of PD.


           Identify specific failure mechanisms in the equipment to allow for
       •
           corrective action prior to an outage.


           Improve the overall reliability of the equipment.
       •


           Accomplish all this while the machine remains in operation (On-Line).
       •
Why choose PD testing over Hipot testing?
         HI-POT (DC,AC)-Pressure Test                        Partial Discharge (PD) Test
      Destructive Test                                    Non Destructive Test
•                                                    •

     - Based on Pass/Fail criteria.                      - Does not test to fail equipment and
                                                     does not affect insulation at all.

    - Weaken insulation due to overvoltage applied
      thus unnecessarily reducing equipment life.
       Not recommended to be done on aged
      equipment

      Can hardly detect voids, cuts and                   Ability to detect voids, cuts and
•                                                    •
     workmanship induced defects which may               workmanship induced defects.
     develop into serious defects when put in
     service.

      Required de-energised state                         Can be carried out in energized and de-
•                                                    •
     - Potential of damage due to inappropriate          energized state.
        Switching.                                       -No loss of revenue.
     - Loss of revenue.

      Intrusive form of testing                      Non intrusive form of testing and very safe
 •
                                                     to carry out.
     -Some degree of safety risk.

       Bulk testing concept                                 Localized testing concept
 •                                                   •
  - Only tell there is a defect somewhere but           - Able to locate the source and location of
cannot locate the source of defect                   the defect.
 - Servicing time will be longer and higher              -Cut down on servicing cost.
     servicing cost incurred

         Degradation of insulation cannot be                 Degradation of insulation can be
 •                                                   •
         predicted                                           predicted by trending over time.
                                                         -Proactive maintenance can be carried out
      - Have to service equipment once defect is
        detected.
      - No flexibility in planning maintenance
         schedules.

      Results are less conclusive                           Results are more conclusive.
 •                                                   •
  -Testing is carried out in non operating             -Testing is carried out “live” and really
normal condition.                                        stimulates a true normal operating
                                                     condition.
Note:

It is not our usual practice to recommend PD testing with the intention to replace other
forms of electrical testing as most are good tests to perform when given the chance.
However, why take an operating equipment out of service or extend an outage to do these
tests when totally non destructive on-line Partial Discharge testing can do the same job
and with more detailed inferences while “Live”. Hoestar does recommend that PD testing
be used as the first line of testing to identify any possible insulation defects before
performing any off-line tests (Corona, hipot or megger test) as the benefits of PD testing
are much more worthwhile. Offline test can then be carried out to confirm the problem
existence if necessary.

Commonly asked questions:

1) Is Partial Discharge (PD) accurate? What standard does it conforms to?

   PD Testing is an internationally recognized testing technique used in more than 28
   countries for detecting insulation defects. According to IEEE 400, the only proven
   and effective way to establish an electrical preventative/ predictive maintenance
   program is using Partial Discharge Testing.

   Many grids are turning to this test as a first line test to check for early insulation
   defects as it is totally non destructive in nature compared to the usual hipot test.

2) If Partial Discharge testing is so good and highly rated, why is it not many people are
adopting
   this testing method?

   There are three reasons behind this:

            PD testing is a fairly new technology compared to the usual Hipot (Megger)
   •
        test. PD testing has matured over the years and today it has already been
        proven to be much more powerful indicator for insulation defects compared to
        offline test (like hipot, Megger etc).

           PD testing may be the most powerful indicator for detecting insulation defect
   •
        but it is also the most sophisticated test to be carried out. The interpretations of
        the results are extremely challenging and require very well trained personnel to
        do the analysis. Once results are correctly interpreted, PD testing will give the
        best detailed diagnosis of the insulation condition of equipment compared to any
        Hipot. Megger test etc.

           As PD testing is sophisticated, the cost of inspection is generally much higher
   •
        than usual       Hipot testing. However, the cost of PD testing is much lower
        nowadays.

More Related Content

Viewers also liked

Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
Donald Stephen
 
Insulation testing of power cable
Insulation testing of power cableInsulation testing of power cable
Insulation testing of power cable
Syed Atif Naseem
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
Shahab Khan
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
Shankar Singh
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
ajayknows
 

Viewers also liked (14)

Measurement of partial discharges
Measurement of partial dischargesMeasurement of partial discharges
Measurement of partial discharges
 
Touch1
Touch1Touch1
Touch1
 
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
A Frequency-based  RF Partial Discharge Detector  for Low-power Wireless Sens...A Frequency-based  RF Partial Discharge Detector  for Low-power Wireless Sens...
A Frequency-based RF Partial Discharge Detector for Low-power Wireless Sens...
 
Galvanic cp design
Galvanic cp designGalvanic cp design
Galvanic cp design
 
Insulation testing of power cable
Insulation testing of power cableInsulation testing of power cable
Insulation testing of power cable
 
Impulse test for power transformers
Impulse test for power transformersImpulse test for power transformers
Impulse test for power transformers
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
 
High voltage engineering
High voltage engineeringHigh voltage engineering
High voltage engineering
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Definition & Classification Of Power System Stability
Definition & Classification Of Power System StabilityDefinition & Classification Of Power System Stability
Definition & Classification Of Power System Stability
 
Radio communication presentation
Radio communication presentationRadio communication presentation
Radio communication presentation
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 

Recently uploaded

Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...
AnaBeatriz125525
 

Recently uploaded (20)

PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Engagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed GuideEngagement Rings vs Promise Rings | Detailed Guide
Engagement Rings vs Promise Rings | Detailed Guide
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Aptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdfAptar Closures segment - Corporate Overview-India.pdf
Aptar Closures segment - Corporate Overview-India.pdf
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Unveiling Gemini: Traits and Personality of the Twins
Unveiling Gemini: Traits and Personality of the TwinsUnveiling Gemini: Traits and Personality of the Twins
Unveiling Gemini: Traits and Personality of the Twins
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...What is social media.pdf Social media refers to digital platforms and applica...
What is social media.pdf Social media refers to digital platforms and applica...
 

Introduction To Partial Discharge Testing

  • 1. Introduction Discharge (PD), as it's name would suggest, is an electrical discharge that occurs across a portion of the insulation between two conducting electrodes, without completely bridging the gap. Partial Discharges can occur in voids in solid insulation (paper, polymer etc), gas bubbles in liquid insulation or around an electrode in a gas (corona). Once PD occurs, insulation will degrade and eventually lead to equipment breakdown. Partial Discharge testing is a predictive maintenance tool for any high voltage equipment. It is the only on-line electrical test recommended by IEEE that correctly identifies and warns of insulation defects such as contamination, thermal deterioration, poor manufacture, and more! Why test for Partial Discharge? Failure of High Voltage insulation is the No. 1 cause of High voltage system failures with IEEE statistics indicating that electrical insulation deterioration causes up to 90% of electrical failures of certain high voltage equipment. On-line PD testing of HV plant gives advance warning of pending insulation failure thus allowing the plant owner to take remedial action during planned outages. Unlike off-line testing, on- line PD testing and monitoring gives an accurate picture of the plants health and performance under service conditions.
  • 2. Benefits of Partial Discharge Testing Partial Discharge testing WILL provide users a huge benefit in the form of one or more of the following: It is truly a predictive test, indicating insulation degradation in advance of • the failure. It need not use any over-voltages, thereby not exposing the tested • equipment to higher voltage stresses than those encountered under normal operating conditions. Avoid unexpected in-service failures of the equipment and extend up-time between outages. Avoid unnecessary servicing and repairs of older equipment by • maximizing the operating hours. Find a problem and remedy it before it has a chance to fail the • equipment. Find problems on new equipments which may still be under warranty. • Assess the quality of maintenance repairs and/or rewinds with before and • after testing. Compare results from similar equipment to focus maintenance on those • with higher levels of PD. Identify specific failure mechanisms in the equipment to allow for • corrective action prior to an outage. Improve the overall reliability of the equipment. • Accomplish all this while the machine remains in operation (On-Line). •
  • 3. Why choose PD testing over Hipot testing? HI-POT (DC,AC)-Pressure Test Partial Discharge (PD) Test Destructive Test Non Destructive Test • • - Based on Pass/Fail criteria. - Does not test to fail equipment and does not affect insulation at all. - Weaken insulation due to overvoltage applied thus unnecessarily reducing equipment life. Not recommended to be done on aged equipment Can hardly detect voids, cuts and Ability to detect voids, cuts and • • workmanship induced defects which may workmanship induced defects. develop into serious defects when put in service. Required de-energised state Can be carried out in energized and de- • • - Potential of damage due to inappropriate energized state. Switching. -No loss of revenue. - Loss of revenue. Intrusive form of testing Non intrusive form of testing and very safe • to carry out. -Some degree of safety risk. Bulk testing concept Localized testing concept • • - Only tell there is a defect somewhere but - Able to locate the source and location of cannot locate the source of defect the defect. - Servicing time will be longer and higher -Cut down on servicing cost. servicing cost incurred Degradation of insulation cannot be Degradation of insulation can be • • predicted predicted by trending over time. -Proactive maintenance can be carried out - Have to service equipment once defect is detected. - No flexibility in planning maintenance schedules. Results are less conclusive Results are more conclusive. • • -Testing is carried out in non operating -Testing is carried out “live” and really normal condition. stimulates a true normal operating condition.
  • 4. Note: It is not our usual practice to recommend PD testing with the intention to replace other forms of electrical testing as most are good tests to perform when given the chance. However, why take an operating equipment out of service or extend an outage to do these tests when totally non destructive on-line Partial Discharge testing can do the same job and with more detailed inferences while “Live”. Hoestar does recommend that PD testing be used as the first line of testing to identify any possible insulation defects before performing any off-line tests (Corona, hipot or megger test) as the benefits of PD testing are much more worthwhile. Offline test can then be carried out to confirm the problem existence if necessary. Commonly asked questions: 1) Is Partial Discharge (PD) accurate? What standard does it conforms to? PD Testing is an internationally recognized testing technique used in more than 28 countries for detecting insulation defects. According to IEEE 400, the only proven and effective way to establish an electrical preventative/ predictive maintenance program is using Partial Discharge Testing. Many grids are turning to this test as a first line test to check for early insulation defects as it is totally non destructive in nature compared to the usual hipot test. 2) If Partial Discharge testing is so good and highly rated, why is it not many people are adopting this testing method? There are three reasons behind this: PD testing is a fairly new technology compared to the usual Hipot (Megger) • test. PD testing has matured over the years and today it has already been proven to be much more powerful indicator for insulation defects compared to offline test (like hipot, Megger etc). PD testing may be the most powerful indicator for detecting insulation defect • but it is also the most sophisticated test to be carried out. The interpretations of the results are extremely challenging and require very well trained personnel to do the analysis. Once results are correctly interpreted, PD testing will give the best detailed diagnosis of the insulation condition of equipment compared to any Hipot. Megger test etc. As PD testing is sophisticated, the cost of inspection is generally much higher • than usual Hipot testing. However, the cost of PD testing is much lower nowadays.