SlideShare a Scribd company logo
1 of 2
Download to read offline
Introduction
Every organization, however small, needs to know how long jobs take in order to carry out its
business. The small retailer, the provider of a local service, the larger factory or farm, even
public sector and other nonprofit making organizations cannot plan their work effectively
without this information.
In a small or simple organization, the data may not be collected in a formal manner, or even
recorded at all, for the person who plans the work will probably just carry it out. But as firms
grow larger or more complex it becomes desirable to make a specialist function of the setting of
time standards, and the building up of data which can be used by people in the organization who
are responsible for planning, costing, scheduling and payments.
In the past, there is no doubt that Work Measurement, and especially its main technique, Time
Study, gained a bad reputation due mainly to its misuse by certain firms and individuals.
Specifically, this resulted from two main causes; firstly the confusing of Work Measurement
with schemes, particularly 'Payment By Results Incentive Schemes', which use the data, and
secondly the failure of management to realize that Work Measurement often highlights
inefficiency in the organization rather than that being attributed to the worker.
Work measurement consists of a series of techniques the purpose of which is to define tasks,
measure them, and finally issue time standards to the people and departments who either use, or
are affected by, the information.
The five main techniques used in measuring work are Time
Study, Synthesis, Analytical Estimation, Pre-Determined Motion Time Systems
and Activity Sampling.
Time Study
Time study is a technique for recording the times and rates of working for the elements of a
specified job, carried out under specified conditions; the data is analyzed so as to obtain the time
necessary to carry out the work at a defined level of performance (BS 31001).
Before commencing a Time Study it is necessary to break down the job into elements, an
element being a distinctive part of the job, selected for the convenience of observation. The
period from the beginning of the first element of the operation to the same point in a repetition of
the operation is known as the Work Cycle. The instant at which one element in a work cycle
ends and another begins is called the Break Point. It is necessary to break down work into
elements for at least the following reasons:
1. To ensure that effective time is separated from ineffective time.
2. To permit the rate of performance to be assessed accurately.
3. To enable the correct relaxation allowance to be given to each element.
4. To enable time standards to be checked or modified in the light of future changes.
5. To enable a Work Specification to be drawn up.
6. To facilitate the compilation of Synthetic Times.
Timing Methods
Historical ways at arriving at job times include reference to past records, timing a complete batch
and estimation. These give accurate results and time study was developed in the interests both of
accuracy and objectivity. Elements are usually timed with a stop-watch in three main ways; fly-
back, cumulative and differential timing.
 Flyback Timing - uses a watch on which the hand, having recorded the length of an
element, can be made to return to zero and immediately begin timing the next element.
 Cumulative Timing - here the hand of the watch moves continuously throughout the
study. Reading of element times are taken as they occur, the time for each element being
subsequently obtained by subtraction - some Trade Union Agreements were drawn up in
the 1960's specifying only the use of continuous timing, since a view was held that time
was lost to the operator in the flyback technique.
 Differential Timing - this is a method of obtaining the time for a very small element.
Elements are timed in groups first including and then excluding the small element, the
time for which is subsequently obtained by subtraction.
Advantages and Disadvantages
1. With the flyback method, no further calculations are needed to obtain elemental times.
The subtraction needed with the continuous method can be a time consuming task on a
long activity.
2. The continuous method gives a total time for the study, but with the flyback method an
independent check is needed.
3. With the flyback method, a slight loss of time is experienced over a long study, but this
should be negligible in the case of a trained and experienced Time Study Practitioner.

More Related Content

Similar to cumulative and flyback timing.pdf

Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
Rajeev Sharan
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 

Similar to cumulative and flyback timing.pdf (20)

137 work study
137 work study137 work study
137 work study
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Work measurement
Work measurementWork measurement
Work measurement
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Production and material management
Production and material managementProduction and material management
Production and material management
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Work sampling
Work samplingWork sampling
Work sampling
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
Work study
Work studyWork study
Work study
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Time study
Time studyTime study
Time study
 
Work Measurment
Work Measurment Work Measurment
Work Measurment
 
Unit 2 work measurement.pdf
Unit 2 work measurement.pdfUnit 2 work measurement.pdf
Unit 2 work measurement.pdf
 
Work measurement
Work measurementWork measurement
Work measurement
 
Unit 3 iem part 2
Unit 3  iem part  2Unit 3  iem part  2
Unit 3 iem part 2
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 

More from Atmiya Institute of Technology and Science, Rajkot

More from Atmiya Institute of Technology and Science, Rajkot (16)

ind engg and mgmt O P KHANNA.pdf
ind engg and mgmt  O P KHANNA.pdfind engg and mgmt  O P KHANNA.pdf
ind engg and mgmt O P KHANNA.pdf
 
C chart.pdf
C chart.pdfC chart.pdf
C chart.pdf
 
FPC.pdf
FPC.pdfFPC.pdf
FPC.pdf
 
howto_histogram.pdf
howto_histogram.pdfhowto_histogram.pdf
howto_histogram.pdf
 
Acceptance sampling.pdf
Acceptance sampling.pdfAcceptance sampling.pdf
Acceptance sampling.pdf
 
22657 - Industrial Engineering and Quality Control-syllabus.pdf
22657 - Industrial Engineering and Quality Control-syllabus.pdf22657 - Industrial Engineering and Quality Control-syllabus.pdf
22657 - Industrial Engineering and Quality Control-syllabus.pdf
 
3351904.pdf
3351904.pdf3351904.pdf
3351904.pdf
 
calculation of process capability.pdf
calculation of process capability.pdfcalculation of process capability.pdf
calculation of process capability.pdf
 
Howto histogram
Howto histogramHowto histogram
Howto histogram
 
Fpc
FpcFpc
Fpc
 
Cumulative and flyback timing
Cumulative and flyback timingCumulative and flyback timing
Cumulative and flyback timing
 
Calculation of process capability
Calculation of process capabilityCalculation of process capability
Calculation of process capability
 
C chart
C chartC chart
C chart
 
Acceptance sampling
Acceptance samplingAcceptance sampling
Acceptance sampling
 
3351904
33519043351904
3351904
 
22657 industrial engineering and quality control-syllabus
22657   industrial engineering and quality control-syllabus22657   industrial engineering and quality control-syllabus
22657 industrial engineering and quality control-syllabus
 

Recently uploaded

Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 

cumulative and flyback timing.pdf

  • 1. Introduction Every organization, however small, needs to know how long jobs take in order to carry out its business. The small retailer, the provider of a local service, the larger factory or farm, even public sector and other nonprofit making organizations cannot plan their work effectively without this information. In a small or simple organization, the data may not be collected in a formal manner, or even recorded at all, for the person who plans the work will probably just carry it out. But as firms grow larger or more complex it becomes desirable to make a specialist function of the setting of time standards, and the building up of data which can be used by people in the organization who are responsible for planning, costing, scheduling and payments. In the past, there is no doubt that Work Measurement, and especially its main technique, Time Study, gained a bad reputation due mainly to its misuse by certain firms and individuals. Specifically, this resulted from two main causes; firstly the confusing of Work Measurement with schemes, particularly 'Payment By Results Incentive Schemes', which use the data, and secondly the failure of management to realize that Work Measurement often highlights inefficiency in the organization rather than that being attributed to the worker. Work measurement consists of a series of techniques the purpose of which is to define tasks, measure them, and finally issue time standards to the people and departments who either use, or are affected by, the information. The five main techniques used in measuring work are Time Study, Synthesis, Analytical Estimation, Pre-Determined Motion Time Systems and Activity Sampling. Time Study Time study is a technique for recording the times and rates of working for the elements of a specified job, carried out under specified conditions; the data is analyzed so as to obtain the time necessary to carry out the work at a defined level of performance (BS 31001). Before commencing a Time Study it is necessary to break down the job into elements, an element being a distinctive part of the job, selected for the convenience of observation. The period from the beginning of the first element of the operation to the same point in a repetition of the operation is known as the Work Cycle. The instant at which one element in a work cycle ends and another begins is called the Break Point. It is necessary to break down work into elements for at least the following reasons: 1. To ensure that effective time is separated from ineffective time. 2. To permit the rate of performance to be assessed accurately. 3. To enable the correct relaxation allowance to be given to each element.
  • 2. 4. To enable time standards to be checked or modified in the light of future changes. 5. To enable a Work Specification to be drawn up. 6. To facilitate the compilation of Synthetic Times. Timing Methods Historical ways at arriving at job times include reference to past records, timing a complete batch and estimation. These give accurate results and time study was developed in the interests both of accuracy and objectivity. Elements are usually timed with a stop-watch in three main ways; fly- back, cumulative and differential timing.  Flyback Timing - uses a watch on which the hand, having recorded the length of an element, can be made to return to zero and immediately begin timing the next element.  Cumulative Timing - here the hand of the watch moves continuously throughout the study. Reading of element times are taken as they occur, the time for each element being subsequently obtained by subtraction - some Trade Union Agreements were drawn up in the 1960's specifying only the use of continuous timing, since a view was held that time was lost to the operator in the flyback technique.  Differential Timing - this is a method of obtaining the time for a very small element. Elements are timed in groups first including and then excluding the small element, the time for which is subsequently obtained by subtraction. Advantages and Disadvantages 1. With the flyback method, no further calculations are needed to obtain elemental times. The subtraction needed with the continuous method can be a time consuming task on a long activity. 2. The continuous method gives a total time for the study, but with the flyback method an independent check is needed. 3. With the flyback method, a slight loss of time is experienced over a long study, but this should be negligible in the case of a trained and experienced Time Study Practitioner.