Fpc
- 1. Flow Processchart
chart No.
Sheet
No.
Summary
Activity
Present Proposed Saving
Activity Operation 7
Method Present Proposed Transportation 3
Location
Degreasing
Shop
Delay 0
Operative Clock No. 1234571 Inspection 1
Charted
By: Storage
1
Approved
By
Distance 57
Date Time
Sr.
No.
Description Qty. Distance
(m)
Time
(min)
Symbol Remarks
1 Storedin Old Engine Store
2 Engine PickedUp
3 Transportedto next crane 24
ElectricCrane
4 Unloadedto floor
5 Pickedup
6 Transportedto Stripping Bay 30
ElectricCrane
7 Unloadedto Floor
8 Engine Stripped
9
Main components cleanedandlaid
out
10 Components inspectedfor wear
11 Inspectionreport written
12 Parts carriedto degreasing basket 3
ElectricCrane