SlideShare a Scribd company logo
1 of 4
1 | P a g e
Vikas Dhondiba Shinde MO: +91–9890024550
B.E. (Mechanical) E-Mail:vikas_shinde22@yahoo.com
Objective
 Seekingapositiontoutilizemyskillsandabilitiesinthe Industrythatoffers professionalgrowthwhile
beingresourceful,innovative andflexible.Soasto achieve self-realizationandaccomplishmentof
organizational goals.
 AssignmentsinProjectmanagement&ProductdevelopmentwithagrowthorientedOrganization.
Proficiency& Experience
 BachelorsinMechanical Engineeringhaving more than7 Years of technical experience in
ManufacturingEngineering.
 Adaptability willingness to learn and Team facilitator.
Organization Experience:
(A) Mahindra & Mahindra Ltd. (M&M) Pune
M&M is an Indianmultinational automobile manufacturingcorporationheadquarteredinMumbai,
Maharashtra, India.Itis one of the largestvehicle manufacturersbyproductioninIndiaandthe largestsellerof
tractors across the world.It isa part of Mahindra Group,an Indianconglomerate.Itwasrankedasthe 10th
mosttrustedbrand inIndia,byThe Brand Trust Report,IndiaStudy2014.
Department: Central Manufacturing Engineering (CME) - Powertrain division (PTD)
Designation:Deputy Manager
Duration – 11/02/2013 to till date
Job responsibilities(Projects) atM&M:
1. S101 : Transaxle Housings,Gears&Pinions machiningsetupfornew vehiclesplannedinM&MAuto sector
across India
 ManufacturingFeasibilitystudyof design withR&D
 Productdevelopment - Planning,Scheduling,Execution&Reviewaspertimeline.
 Budgetpreparation&monitoringfornew projects.
 Capacity calculationforequipmentplanningasperprojectvolume.
 Processdesign –PFC, PFMEA,Control Plan& Processsheetpreparation
 Preparationof OperationDrawingsforGears& Shaftsas perprocess.
 Selection,ordering,erection&commissioningof equipment’srequiredfornew projects –
 HMC, Washingmachine, Leaktestingmachine,Tool presetter,shrinkfitmachine,etc –
 Preparationof Scope of supply(SOS) asperproduct requirement&inputsfromlaunchteam
 Preparationof Accuracyrequirementchart
 SendingRFQto varioussuppliers,SOS&Accuracy chart discussion&signoff.
 Technical & commercial comparisonof offersfromsupplier
 Preparationof supplierevaluationmatrix forfinalizationof supplier
 Discussionwithsupplieralongwithcapital purchase teamforequipmentordering.
 Justificationtotopmanagementfordecisionof equipmentsupplierselection.
 DAPfor fixture &tooling.
 ConductingPre dispatchtrialsatsupplierend
 Confirmingthe equipmentadherence asperSOS
 Cuttingtrials – SPC,Cycle time,accuracy requirementprove out
 Installation&commissioningof equipment’satfactory,trials& prove outas per product
requirement
2 | P a g e
 Selection&orderingof peripheral equipment’srequiredfornew machineslike Transformer,Coolant
chiller,panel A/c,Chiptrolley,etc.
 Selection&orderingof accessoriesrequiredformachiningsetuplike Tool trolleys,Operatorplatform,
Liftingtackles,cuttingoil,Gauge table,peripheral stands,Airgun,etc
 Selection,ordering &prove outof Standard & special gaugesrequiredforcheckingof machined
components(Online SPCstation,BMD,ODGauges,Groove gauges,MandrelsforGear, DOP measurement,
CMM fixture,Lineargauges,TPG,etc.)
 Mechanical Fixture designing,manufacturingfromvendor&prove out.
 Cuttingtool selection,ordering&prove out for existingproject.
 Layout planningasperprocessflow.
 Supportto R&D & CDMM to developthe prototypepartsatsupplier.
(B) KIRLOSKAR PNEUMATICS CO.LTD (KPCL) (ISO14001) Hadapsar,IndustrialestatePune.
Kirloskar Pneumatics Co. Limited is largest Compressor as well as Transmission parts Manufacturer Company,
with revenues of Rs. 500 crores. KPCL is the leader in industrial compressor & refrigeration segment, and the
largest manufacturer of naval gearboxes, windmill gearboxes & traction gears.
Department: Manufacturing & Industrial Engineering
Designation:Assistant Manager
Duration – 01/08/2007 to 11/02/2013
Job responsibilitiesatKPCL:
 Erection& Commissioningactivitiesfornew machines.
 New& existingmachineprove outs.
 SettingproductionnormsfornewMachines/Products.
 Cuttingtool selection,procurement&trials.
 PlantLayout- Design& Implementation.
 Designing&Manufacturingof Jigsand Fixtures.
 Designingof Material HandlingSystems.
 Incentive schemesdesign,programming&Calculation.
 Compilation&Analysisof ProductiondataforMIS reports.
 OEE – Design, Implementation,Lossanalysis&Corrective actions.
 Cost estimation.
 VendorDevelopment.
 Time Studyand Methodstudy.
 5 S teamleader.
 TPM – JH Pillarmember
Area of Excellence
 Hands onexperienceof workingwithdepartmentslike CNCmachining,EngineeringResearch,Quality
Assurance,etc.
 Trouble shootingof technical problemsbyimplementingthe solutionandmakingmodification
wheneverrequired.
Qualification
DEGREE INSTITUTE BOARD/UNIVERSITY YEAR OF
PASSING
PERCENTAGE
(%)
B.E.(MECH) SRESCOE PUNE 2007 68.86
H.S.C. RJC PUNE 2003 76.33
S.S.C SAVK PUNE 2001 81.6
3 | P a g e
Major Projects
A) Mahindra & Mahindra Ltd –
B) Kirloskar PneumaticCompany Ltd -
C) EngineeringProject(SponsoredbyKirloskarPneumaticCo.LTD)
1. Project NAME: Design of Drill Jig for L.P. inner cover.
College S.R.E.S. College of Engg. Kopargaon - Pune University
Duration 1 year Team Size 4
Industrial Training
S.No. Description Duration
1 ‘BasicSkill Orientation’atTATA MOTORS, Pune 15 days
2 ‘ManagementDevelopment’ProgramatKIAMS,Harihar,Karnataka. 15 days
3
‘CertifiedCNCProductivitySupervisorCourse’byIndianMachine Tool
ManufacturersAssociation. 2 days
4 MOST 2 days
5 TEAMCENTER 2 days
6 UNIGRAPHIX(NX) 6 days
7 MetallurgistforNon-metallurgistbyASMIndia 3 days
1. Project NAME: S101 Transaxle (Aluminium Housing machining setup)
Duration 18 Months Team Size 1
Status Trials at supplier end completed successfully, installation at
plant in progress
1. Project NAME: U321 Transaxle (Aluminium Housing, Gear & Shafts machining
setup)
Duration 18 Months Team Size 2
Status Design review completed, discussion with supplier is in
progress
1. Project NAME: Plant Layout for Transmission Division New plant.
Duration 4 Months Team Size 4
2. Project NAME: Cutting Tools selection, trials & procurement for new windmill
project
Duration 2 Months Team Size 2
3. Project NAME: Design & Mfg. of Hobbing fixtures.
Duration 21 days Team Size 1
4 | P a g e
Industrial Visits
Study Missionon ‘Sharing Best Practicesfor World ClassManufacturing’, Bangalore:
The missionincludesvisitstocompaniesthathave done commendable workinthisarea
 ABB Ltd  L & T Komatsu Ltd
 Bosch Ltd  Toyota Kirloskar Motor Pvt Ltd
 Taegu Tec India P Ltd
Achievements
1. Runnerup in‘IMTMA-SIEMENS PRODUCTIVITYCHAMPIONSHIPAWARDS2010’
2. Two timesSpontaneousAwardwinnerin KIRLOSKARPNEUMATICCO.LTD.
3. Won the “PAREXCELLENT” trophy at NCQC-2011, HyderabadinKAIZEN Category
4. SpontaneousawardwinneratMVML
Software Proficiency
1. DesignSoftware : AutoCAD,UG
2. MicrosoftOffice : 2000, 2007, Office 365
3. ORACLE : 11i
4. SAP
5. OperatingSystems: Windows 98, 2000, XP,Vista,Seven.
Personal Information
Name : VikasDhondibaShinde
Date of Birth : 13th
Feb1986
Gender : Male
Nationality : Indian
Language : Marathi, Hindi,English.
Address : S/R No.47,
PratikApartment.
Chavan Nagar,Kharadi road,
ChandanNagar
Pune – 411014.
I herebydeclare thatthe detailsfurnishedabove are true tothe bestof my knowledgeandbelief.
Vikas Dhondiba Shinde

More Related Content

What's hot (20)

Resume_caterpillar
Resume_caterpillarResume_caterpillar
Resume_caterpillar
 
bapan cv
bapan cvbapan cv
bapan cv
 
training report on airconditioning
training report on airconditioningtraining report on airconditioning
training report on airconditioning
 
Dinkar
DinkarDinkar
Dinkar
 
saketjoshi Resume
saketjoshi Resumesaketjoshi Resume
saketjoshi Resume
 
0601043 feasibility study for diversification & market survey
0601043 feasibility study for diversification & market survey0601043 feasibility study for diversification & market survey
0601043 feasibility study for diversification & market survey
 
Airtech performance affraisal project airtec
Airtech performance affraisal project airtecAirtech performance affraisal project airtec
Airtech performance affraisal project airtec
 
Sharad srivastava resume (1)
Sharad srivastava resume (1)Sharad srivastava resume (1)
Sharad srivastava resume (1)
 
presentation on ABC bearings
presentation on ABC  bearingspresentation on ABC  bearings
presentation on ABC bearings
 
S.Nayak_
S.Nayak_S.Nayak_
S.Nayak_
 
ravindra_resume
ravindra_resumeravindra_resume
ravindra_resume
 
Resume
ResumeResume
Resume
 
Contribution in Different sectors
Contribution in Different sectorsContribution in Different sectors
Contribution in Different sectors
 
shahid-updated resume(1)
shahid-updated resume(1)shahid-updated resume(1)
shahid-updated resume(1)
 
Abdul Moiz Ahmed CV
Abdul Moiz Ahmed CVAbdul Moiz Ahmed CV
Abdul Moiz Ahmed CV
 
SIDDAPPA JIRANKALAGI
SIDDAPPA JIRANKALAGISIDDAPPA JIRANKALAGI
SIDDAPPA JIRANKALAGI
 
Sudhir Prajapati_CV
Sudhir Prajapati_CVSudhir Prajapati_CV
Sudhir Prajapati_CV
 
project report
 project report  project report
project report
 
resume
resumeresume
resume
 
LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING
LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERINGLEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING
LEAN ENTERPRISE AND CONTINUOUS IMPROVEMENT ENGINEERING
 

Similar to Resume_vikas

Professional Details
Professional DetailsProfessional Details
Professional DetailsUMAR SHAIKH
 
Mohsin_Moin_CV_-_Updated Bus. (1)
Mohsin_Moin_CV_-_Updated Bus. (1)Mohsin_Moin_CV_-_Updated Bus. (1)
Mohsin_Moin_CV_-_Updated Bus. (1)Mohsin Moin
 
Training report lakshay tvs 2015
Training report lakshay tvs 2015Training report lakshay tvs 2015
Training report lakshay tvs 2015Lakshay Sharma
 
Sanjay V Deshpande-Resume-030515
Sanjay V  Deshpande-Resume-030515Sanjay V  Deshpande-Resume-030515
Sanjay V Deshpande-Resume-030515Sanjay Deshpande
 
SBC 16+ L Kach May15
SBC 16+ L Kach May15SBC 16+ L Kach May15
SBC 16+ L Kach May15SB Chauhan
 
Resume Production
Resume ProductionResume Production
Resume ProductionKeyur Modi
 
A Datta -Resume
A Datta -ResumeA Datta -Resume
A Datta -Resumedatta313
 
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)Neelu Yadav
 

Similar to Resume_vikas (20)

Resume 20th August Aug 15
Resume 20th August Aug 15Resume 20th August Aug 15
Resume 20th August Aug 15
 
Professional Details
Professional DetailsProfessional Details
Professional Details
 
Mohsin_Moin_CV_-_Updated Bus. (1)
Mohsin_Moin_CV_-_Updated Bus. (1)Mohsin_Moin_CV_-_Updated Bus. (1)
Mohsin_Moin_CV_-_Updated Bus. (1)
 
Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
Training report lakshay tvs 2015
Training report lakshay tvs 2015Training report lakshay tvs 2015
Training report lakshay tvs 2015
 
Resume_VSR
Resume_VSRResume_VSR
Resume_VSR
 
Resume
ResumeResume
Resume
 
Sanjay V Deshpande-Resume-030515
Sanjay V  Deshpande-Resume-030515Sanjay V  Deshpande-Resume-030515
Sanjay V Deshpande-Resume-030515
 
Aipl peb presentation
Aipl peb presentationAipl peb presentation
Aipl peb presentation
 
SBC 16+ L Kach May15
SBC 16+ L Kach May15SBC 16+ L Kach May15
SBC 16+ L Kach May15
 
Resume Production
Resume ProductionResume Production
Resume Production
 
Venugopala Rao resume
Venugopala Rao resumeVenugopala Rao resume
Venugopala Rao resume
 
sunil kumar
sunil kumarsunil kumar
sunil kumar
 
nits_resume
nits_resumenits_resume
nits_resume
 
cv_kuldip[1](1)
cv_kuldip[1](1)cv_kuldip[1](1)
cv_kuldip[1](1)
 
Resume_Dinkar.xls
Resume_Dinkar.xlsResume_Dinkar.xls
Resume_Dinkar.xls
 
A Datta -Resume
A Datta -ResumeA Datta -Resume
A Datta -Resume
 
Mithran j cv21316
Mithran j cv21316 Mithran j cv21316
Mithran j cv21316
 
Mithran J CV21316
Mithran J CV21316Mithran J CV21316
Mithran J CV21316
 
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
SEKISUI DLJM Molding Pvt. Ltd. Industrial Report(Plastic Injection Molding)
 

Resume_vikas

  • 1. 1 | P a g e Vikas Dhondiba Shinde MO: +91–9890024550 B.E. (Mechanical) E-Mail:vikas_shinde22@yahoo.com Objective  Seekingapositiontoutilizemyskillsandabilitiesinthe Industrythatoffers professionalgrowthwhile beingresourceful,innovative andflexible.Soasto achieve self-realizationandaccomplishmentof organizational goals.  AssignmentsinProjectmanagement&ProductdevelopmentwithagrowthorientedOrganization. Proficiency& Experience  BachelorsinMechanical Engineeringhaving more than7 Years of technical experience in ManufacturingEngineering.  Adaptability willingness to learn and Team facilitator. Organization Experience: (A) Mahindra & Mahindra Ltd. (M&M) Pune M&M is an Indianmultinational automobile manufacturingcorporationheadquarteredinMumbai, Maharashtra, India.Itis one of the largestvehicle manufacturersbyproductioninIndiaandthe largestsellerof tractors across the world.It isa part of Mahindra Group,an Indianconglomerate.Itwasrankedasthe 10th mosttrustedbrand inIndia,byThe Brand Trust Report,IndiaStudy2014. Department: Central Manufacturing Engineering (CME) - Powertrain division (PTD) Designation:Deputy Manager Duration – 11/02/2013 to till date Job responsibilities(Projects) atM&M: 1. S101 : Transaxle Housings,Gears&Pinions machiningsetupfornew vehiclesplannedinM&MAuto sector across India  ManufacturingFeasibilitystudyof design withR&D  Productdevelopment - Planning,Scheduling,Execution&Reviewaspertimeline.  Budgetpreparation&monitoringfornew projects.  Capacity calculationforequipmentplanningasperprojectvolume.  Processdesign –PFC, PFMEA,Control Plan& Processsheetpreparation  Preparationof OperationDrawingsforGears& Shaftsas perprocess.  Selection,ordering,erection&commissioningof equipment’srequiredfornew projects –  HMC, Washingmachine, Leaktestingmachine,Tool presetter,shrinkfitmachine,etc –  Preparationof Scope of supply(SOS) asperproduct requirement&inputsfromlaunchteam  Preparationof Accuracyrequirementchart  SendingRFQto varioussuppliers,SOS&Accuracy chart discussion&signoff.  Technical & commercial comparisonof offersfromsupplier  Preparationof supplierevaluationmatrix forfinalizationof supplier  Discussionwithsupplieralongwithcapital purchase teamforequipmentordering.  Justificationtotopmanagementfordecisionof equipmentsupplierselection.  DAPfor fixture &tooling.  ConductingPre dispatchtrialsatsupplierend  Confirmingthe equipmentadherence asperSOS  Cuttingtrials – SPC,Cycle time,accuracy requirementprove out  Installation&commissioningof equipment’satfactory,trials& prove outas per product requirement
  • 2. 2 | P a g e  Selection&orderingof peripheral equipment’srequiredfornew machineslike Transformer,Coolant chiller,panel A/c,Chiptrolley,etc.  Selection&orderingof accessoriesrequiredformachiningsetuplike Tool trolleys,Operatorplatform, Liftingtackles,cuttingoil,Gauge table,peripheral stands,Airgun,etc  Selection,ordering &prove outof Standard & special gaugesrequiredforcheckingof machined components(Online SPCstation,BMD,ODGauges,Groove gauges,MandrelsforGear, DOP measurement, CMM fixture,Lineargauges,TPG,etc.)  Mechanical Fixture designing,manufacturingfromvendor&prove out.  Cuttingtool selection,ordering&prove out for existingproject.  Layout planningasperprocessflow.  Supportto R&D & CDMM to developthe prototypepartsatsupplier. (B) KIRLOSKAR PNEUMATICS CO.LTD (KPCL) (ISO14001) Hadapsar,IndustrialestatePune. Kirloskar Pneumatics Co. Limited is largest Compressor as well as Transmission parts Manufacturer Company, with revenues of Rs. 500 crores. KPCL is the leader in industrial compressor & refrigeration segment, and the largest manufacturer of naval gearboxes, windmill gearboxes & traction gears. Department: Manufacturing & Industrial Engineering Designation:Assistant Manager Duration – 01/08/2007 to 11/02/2013 Job responsibilitiesatKPCL:  Erection& Commissioningactivitiesfornew machines.  New& existingmachineprove outs.  SettingproductionnormsfornewMachines/Products.  Cuttingtool selection,procurement&trials.  PlantLayout- Design& Implementation.  Designing&Manufacturingof Jigsand Fixtures.  Designingof Material HandlingSystems.  Incentive schemesdesign,programming&Calculation.  Compilation&Analysisof ProductiondataforMIS reports.  OEE – Design, Implementation,Lossanalysis&Corrective actions.  Cost estimation.  VendorDevelopment.  Time Studyand Methodstudy.  5 S teamleader.  TPM – JH Pillarmember Area of Excellence  Hands onexperienceof workingwithdepartmentslike CNCmachining,EngineeringResearch,Quality Assurance,etc.  Trouble shootingof technical problemsbyimplementingthe solutionandmakingmodification wheneverrequired. Qualification DEGREE INSTITUTE BOARD/UNIVERSITY YEAR OF PASSING PERCENTAGE (%) B.E.(MECH) SRESCOE PUNE 2007 68.86 H.S.C. RJC PUNE 2003 76.33 S.S.C SAVK PUNE 2001 81.6
  • 3. 3 | P a g e Major Projects A) Mahindra & Mahindra Ltd – B) Kirloskar PneumaticCompany Ltd - C) EngineeringProject(SponsoredbyKirloskarPneumaticCo.LTD) 1. Project NAME: Design of Drill Jig for L.P. inner cover. College S.R.E.S. College of Engg. Kopargaon - Pune University Duration 1 year Team Size 4 Industrial Training S.No. Description Duration 1 ‘BasicSkill Orientation’atTATA MOTORS, Pune 15 days 2 ‘ManagementDevelopment’ProgramatKIAMS,Harihar,Karnataka. 15 days 3 ‘CertifiedCNCProductivitySupervisorCourse’byIndianMachine Tool ManufacturersAssociation. 2 days 4 MOST 2 days 5 TEAMCENTER 2 days 6 UNIGRAPHIX(NX) 6 days 7 MetallurgistforNon-metallurgistbyASMIndia 3 days 1. Project NAME: S101 Transaxle (Aluminium Housing machining setup) Duration 18 Months Team Size 1 Status Trials at supplier end completed successfully, installation at plant in progress 1. Project NAME: U321 Transaxle (Aluminium Housing, Gear & Shafts machining setup) Duration 18 Months Team Size 2 Status Design review completed, discussion with supplier is in progress 1. Project NAME: Plant Layout for Transmission Division New plant. Duration 4 Months Team Size 4 2. Project NAME: Cutting Tools selection, trials & procurement for new windmill project Duration 2 Months Team Size 2 3. Project NAME: Design & Mfg. of Hobbing fixtures. Duration 21 days Team Size 1
  • 4. 4 | P a g e Industrial Visits Study Missionon ‘Sharing Best Practicesfor World ClassManufacturing’, Bangalore: The missionincludesvisitstocompaniesthathave done commendable workinthisarea  ABB Ltd  L & T Komatsu Ltd  Bosch Ltd  Toyota Kirloskar Motor Pvt Ltd  Taegu Tec India P Ltd Achievements 1. Runnerup in‘IMTMA-SIEMENS PRODUCTIVITYCHAMPIONSHIPAWARDS2010’ 2. Two timesSpontaneousAwardwinnerin KIRLOSKARPNEUMATICCO.LTD. 3. Won the “PAREXCELLENT” trophy at NCQC-2011, HyderabadinKAIZEN Category 4. SpontaneousawardwinneratMVML Software Proficiency 1. DesignSoftware : AutoCAD,UG 2. MicrosoftOffice : 2000, 2007, Office 365 3. ORACLE : 11i 4. SAP 5. OperatingSystems: Windows 98, 2000, XP,Vista,Seven. Personal Information Name : VikasDhondibaShinde Date of Birth : 13th Feb1986 Gender : Male Nationality : Indian Language : Marathi, Hindi,English. Address : S/R No.47, PratikApartment. Chavan Nagar,Kharadi road, ChandanNagar Pune – 411014. I herebydeclare thatthe detailsfurnishedabove are true tothe bestof my knowledgeandbelief. Vikas Dhondiba Shinde