SlideShare a Scribd company logo
1 of 16
Download to read offline
1 | P a g e
Gujarat Technological University, Ahmedabad
An Internship Report on
“ Over View Of Extrusion Process (Pipe Plant)”
Submitted in partial fulfillment for the award of degree of
Bachelor of Engineering
in
Plastic Technology
Submitted By,
Shravan Kumar Pathak
(180520123045)
Internship carried out at
AA VASANI POLY PIPE LLP,
GIDC,TALOD
Internal Guide External Guide
Dr. Neelmani Srivastava Mr.Amit Tripathi
Assistant Professor HOD, QC
Dept. of Plastic Technology GIDC ,Talod
CIPET,Ahmedabad
Department of Plastic Technology
Central Institute of Petrochemicals Engineering & Technology,Ahmedabad
2021-2022
2 | P a g e
Gujarat Technological University
Central Institute of Petrochemicals Engineering &
Technology,Ahmedabad
Department of Plastic Technology
Certificate
Certified that the internship work entitled “Over View Of Extrusion
Process (Pipe Plant)” is a bonafide work carried out by Shravan Kumar
Pathak (180520123045) of CIPET,Ahmedabad ,and this report is
submitted in partial fulfillment for the award of Bachelor of engineering
in Plastic Technology Of Gujarat Technological University,during the
year 2021-2022.
Signature of Internal Guide Signature of External Guide
Dr. Neelmani Srivastva Mr.Amit Tripathi
Assistant Professor HOD, QC
Dept. of Plastic Technology GIDC ,Talod
CIPET,Ahmedabad
Signature of HOD Signature of Principal
Dr.Anshuman Barman Mr. Ratan kumar
Prof.& HOD Principal
Dept.of Plastic Technology CIPET,Ahmedabad
CIPET,Ahmedabad
EXTERNAL VIVA
Name of the examiner; Signature
3 | P a g e
4 | P a g e
Acknowledgement
I am very thankful to AA VASANI POLY PIPE LLP Company for giving me the
opportunity to undertake my summer internship program at their prestigious
company. It was a very good learning experience for me to have worked at this
site.
I would like to convey my heartiest thanks to Mr. Raj Kapoor ,HR Manager ,who
heartily welcomed me for the internship, Mr.Amit Tripathi HOD of QC/QA who
guided and encouraged me all through the summer training and imparted in-
depth knowledge of the programme. I would like to thank all the staff of AA
VASANI POLY PIPE LLP for giving their precious time and valuable guidance
during my internship programme.
I am extremely thankful to Dr. Anshuman Barman,Head of Department of
Plastic Technology,CIPET,Ahmedabad for providing me facilities to work
in,without which this work would not have been possible.
5 | P a g e
Preface
Every student of Bachelor of Engineering in Plastic Technology, has an essential
requirement to do Two weeks time of internship in any of the well reputed
organization. The purpose of this programme is to acquaint the students with
practical applications of theoretical concepts taught to them during conduct of
their course.
Really, it was a nice opportunity to have a close comparison of theoretical
concept in practical field.This report may depict deficiencies on my part but still
it is an output of a student's efforts, for which I beg pardon.
The output of my analysis is summarized in a shape of internship the contents of
the report shows the detail of sequence of these.
6 | P a g e
Abstract
The report covers the following aspects of internship;
 Table of content.
 Introduction of AA VASANI POLY PIPE LLP.
 Departments of AA VASANI POLY PIPE LLP.
 Description of processing techniques.
 Schedule of Internship.
 Skills learned
 My role as an trainee
 conclusion
7 | P a g e
Table of Contents
Acknowledgement ......................................................................................04
Preface ........................................................................................................05
Abstract… .....................................................................................................06
Introduction of Company.............................................................................08
Departments In Company............................................................................09
 Marketing Department ...................................................................09
 Store...............................................................................................10
 Production Department ..................................................................10
 Testing Department( Laboratory) ....................................................13
o Density test.......................................................................13
o Ash content ......................................................................13
o Reversion test ..................................................................13
o VST test ...........................................................................13
o Hydrostatic Pressure test................................................13
o Impact test .....................................................................14
o MFI test..........................................................................14
 Quality Assurance/Quality Control… ..................................................14
 Mixer Department… ...........................................................................14
Internship Rotational Plane.............................................................................14
Skills & Techniques learned during internship .................................................15
Role of internee During Internship ..................................................................15
Conclusion ........................................................................................................16
References…....................................................................................................16
8 | P a g e
Introduction
AA VASANI POLY PIPE LLP
This is a largest HDPE, PVC and DWC Pipe Manufacturer company , Started in
1996. This is Located in Special Economic Zone in Gujarat ,India. Being the
industry leader Vasani has the daily production capacity of 100 metric tons to
fulfil industry demand. The manufacturing plants of Vasani are spread across a
43000 square metre large infrastructre in GIDC Talod. To fulfill the ever
increasing demands of top quality PVC,HDPE pipes in market ,Vasani has more
than 1000 across india. Government organization such as SSNL,GIRDA are also
customer of Vasani.
Vasani is to provide integrated solutions and services to the polymers industry of
Vibrant Gujarat, designed to redefine the peasants' satisfaction, rationalize cost
and a bridge the gap between the Indian requirement and International practice
& farmers standard availing neck to neck support to agriculture and irrigation
industries of our beloved nation.
Vasani is enormously trying to achieve complete customer satisfaction by
continuously improving its quality. Vasani determined to be an innovative and
responsive manufacturer and supplier of best quality products through:
 Improvement of quality control system by giving proper training to our staff and
trainees.
 Conducting internal auditing for better result in the whole system.
 Delivering best quality products to the customer with an affordable price.
 Continuously updating and implementing products and process innovation to
reach towarda best quality with optimum sustainability.
 Keep researching product development to fulfill customer satisfaction.
 Smooth up gradation in our operation and processing system.
9 | P a g e
Products:
 RRJ pipes
 Selfit pipes
 Upvc plumbing pipe
 Casing pipes
 HDPE pipes
 SWR pipes
 DWC pipes
 UGDS pipes
 Sprinklers
Departments In Company
o Marketing Departments
o Store
o Training Departments
o Production Departments
o Testing Departments (Laboratory)
o Quality Assurance/Quality Control
o Mixer Department
Marketing Department
Marketing departments fulfill the marketing needs and work to ensure the
progress-
 Market research
 Product development
 Sales support
10 | P a g e
Store
Major functions :
 Receipt of Incoming goods
 Inspection of all receipts
 Storage and preservation
 Identification of all materials stored
 Material handling
 Packaging
 Issue & Dispatch
 Maintenance of stock records
 Stores accounting
 Inventory control
 Stock taking
Production Department
Extrusion process
The process itself is highly technical. However, it can be summed up in just five
steps.
Step 1: Raw plastic materials like granules, pellets, or powder are loaded into a
hopper and then fed into a long heated cylindrical chamber called an extruder. It
is moved through this chamber by a revolving screw. Some extruders can have
either one or two revolving screws.
Step 2: The raw materials flow from the hopper down through the feed throat
and onto a large spinning screw operating within a horizontal barrel.
Step 3: Not all materials have the same properties, so the raw material is
processed by a heating temperature specific to the type of raw material being
passed through. At the end of the heated chamber, the molten plastic is forced
through a small opening called a die to form the shape of the finished product.
Step 4: As the plastic is extruded from the die, it is fed onto a conveyor belt for
cooling. Cooling can happen by air or water. The process is similar to the
injection moulding process except that the melted plastic is forced through a die
instead of into a mould.
11 | P a g e
Step 5: The die for an individual plastic profile is designed so that the plastic
flows smoothly and evenly from the cylindrical profile of the extruder into the
final profile shape. Consistency in this flow is critical to achieving an end product
with integrity
Pipe Plant
We move toward production section ,where various machine fitted with
different outputs-
Hasmukh Engineering Extruder - 350-500 kg/hour
Kabra - 150 kg/hour
Panchveer-250kg/hour
Rolepal- 800kg/hour
12 | P a g e
These machines are specially use for production of pipes from ranging 40mm-
400mm.They were consist of extruder,cooling section,haul off unit and cutter
section. During the production of pipes contol the various troubleshooting which
occurs on the pipes.
 Extruded pipe cooled in cooling section.
 Haul – off unit is used to pulling the pipe from extruder.
 Cutter section is used to cut the pipe on required dimensions.
Troubleshooting:
S.N. PROBLEM CAUSES REMEDIES
1. Water mark  Excess water level in
cooling channel
 Increases water
temperature
 Reduce water level
 Decreases water
temperature
2. Rough surface  Improper compounding of
material
 Improper melting of
material in barrel
 Proper
compounding of
material
 Increase the
temperature of
barrel
3. Pin hole  Improper compounding of
material
 Improper melting of
material in barrel
 Proper
compounding of
material
 Increase the
temperature of
barrel
4. Cut mark  High haul-off speed
 Less dosing
 Reduce the amount
of dosing
13 | P a g e
Testing Department
Performed various test in testing departments;
 Density test
 Ash content
 Reversion test
 VST test
 Hydrostatic Pressure test
 Impact test
 MFI test
 Density test
Find out the density of PVC and HDPE material by following the IS standard,and
find the amount of filler in the material.
 Ash content
An Ash test is used to determine if a material is filled. The test will identify the
total filler content.
 Reversion test
Reversion Test is a method of determining the level of internal stresses in
pipes,and to know the percentage of shrinkage.
 VST test
To find out the softening temperature of the material by applying the load.
 Hydraustatic pressure test
The vessel is filled with a nearly incompressible liquid-usually water or oil-
pressurised to test pressure, and examined for leaks or permanent changes in
pipe.
14 | P a g e
 Impact test
In the impact test use a swinging pendulum to strike a notched bar; heights before
and after impact are used to compute the energy required to fracture the bar.
 Melt Flow Index
Determines the melt flow properties of a material at a specific shear stress and
temperature.
Quality Assurance/Quality Control
Production of pipes requires high end quality assurance which is a part and parcel of
the activity.We got exposed to a well defined quality system,consisting of in process
and in final inspection which ensure 100% inspection for the entire die & mould parts
and also sampling inspection for pipes to meet the customer requirements.
In this section we got basic knowledge of measuring equipments like Digital
Micrometer & Vernier calipers,Pie tape,Ultra frequency thickness gauge.
Mixer Department
In this department material compounded with various additives like
Caco3,Tio2,carbon,One pack stabilizer,Stearic& wax etc in mixer to enhance the
property of the pipes.
Internship Rotational Plane
Production section 1 Week 3 /06/ 21……….9/06/ 21
Testing section 1 Week 10/06/21……...16/06/21
Quality Assurance section 1Day 17/06/21………18/06/21
Mixer section 2 Day 18/06/21……….19/06/21
15 | P a g e
Skills & Techniques learned during internship
An Internship assists with career development by providing real work
experiences that provide students with opportunities to explore their
interests and develop professional skills and competencies. During
internship ,We are provided with opportunities to apply what we
learned in classes to actual practice.It is expected that we will also be
challenged to examine how our attitudes beliefs and values influence
the process
It was valuable time here in AA VASANI POLY PIPE LLP and we learn
unlimited here are a few point I have summarized.
 We learned about the leadership & teamwork to do an effective work.
 We learned about tactics to maintain discipline & How to deal with
workers.
 We learned How to control quality problems,defects in
material,Laboratory Tests.
 We have learnt how to make a powerfull team and achieve goal.
 We learned How to operate extruder machines and testing machine.
Role Of Internee during Internship
I learned how to adjust myself in the work environment,how to deal with
people at work from the boss to the janitors. It’s a good quality
experience.The necessary kind of experience as it helps you realize what you
want in future,also got the opportunity to evaluate myself under these stressful
conditions.
16 | P a g e
Conclusion
It was a wonderful learning experience at AA VASANI POLY PIPE LLP for two
weeks in Talod. I gained a lot of insight regarding almost every aspect of
plant. I was given exposure in almost all the departments at the plant. The
friendly welcome from all the employees is appreciating,sharing their
experiences and giving their peace of wisdom which they have gained in
long journey of work. I am very thankful for the wonderful facility from
VASANI. I hope this experience will help me in my future and also in
shaping my career.
I am preety sure that this facility has ability to achieve its goal as stated in
vision statement by following their quality statement.
We are commited to comply with customer requirements and Quality
Management System requirements and shall strive to continually improve
the effectiveness of our Quality Management System to exceed customer
expectations.
References
 http://vasanipolymers/about us.html
 http://www.slideshare.net
 www.google.com

More Related Content

What's hot

Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltdabhishekgawande
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&TUmed Paliwal
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training ReportPrateek Dubey
 
Report on Cement manufacturing process
Report on Cement manufacturing process Report on Cement manufacturing process
Report on Cement manufacturing process Rohan Sharma
 
Portable pipe system (cipet)
Portable pipe system (cipet)Portable pipe system (cipet)
Portable pipe system (cipet)ArvIND Kumar
 
PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes.
PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes. PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes.
PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes. Ajjay Kumar Gupta
 
TRAINING REPORT ON CASTING
TRAINING REPORT ON CASTINGTRAINING REPORT ON CASTING
TRAINING REPORT ON CASTINGPawan Kumar
 
Project on plastic industry
Project on plastic industry Project on plastic industry
Project on plastic industry JainamMehta42
 
Project report on Bharat forge
Project report on Bharat forgeProject report on Bharat forge
Project report on Bharat forgeEshan Rastogi
 
PLM STRATEGY IN MANUFACTURING INDUSTRY
PLM STRATEGY IN MANUFACTURING INDUSTRYPLM STRATEGY IN MANUFACTURING INDUSTRY
PLM STRATEGY IN MANUFACTURING INDUSTRYDeepak Bal
 
Summer Internship project presentation
Summer Internship project presentationSummer Internship project presentation
Summer Internship project presentationShri Theja
 
Anna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-formatAnna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-formatVeera Victory
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
An Introduction to Lohia Corp Ltd, India
An Introduction to Lohia Corp Ltd, IndiaAn Introduction to Lohia Corp Ltd, India
An Introduction to Lohia Corp Ltd, IndiaDeven Mehta
 

What's hot (20)

Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltd
 
DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Report
 
Report on Cement manufacturing process
Report on Cement manufacturing process Report on Cement manufacturing process
Report on Cement manufacturing process
 
Portable pipe system (cipet)
Portable pipe system (cipet)Portable pipe system (cipet)
Portable pipe system (cipet)
 
PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes.
PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes. PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes.
PVC Pipes Manufacturing Project. Production of Polyvinyl Chloride (PVC) Pipes.
 
TRAINING REPORT ON CASTING
TRAINING REPORT ON CASTINGTRAINING REPORT ON CASTING
TRAINING REPORT ON CASTING
 
Project on plastic industry
Project on plastic industry Project on plastic industry
Project on plastic industry
 
glass industry
glass industryglass industry
glass industry
 
Project report on Bharat forge
Project report on Bharat forgeProject report on Bharat forge
Project report on Bharat forge
 
Plant visit report
Plant visit reportPlant visit report
Plant visit report
 
A project report on TQM
A project report on TQMA project report on TQM
A project report on TQM
 
PLM STRATEGY IN MANUFACTURING INDUSTRY
PLM STRATEGY IN MANUFACTURING INDUSTRYPLM STRATEGY IN MANUFACTURING INDUSTRY
PLM STRATEGY IN MANUFACTURING INDUSTRY
 
Summer Internship project presentation
Summer Internship project presentationSummer Internship project presentation
Summer Internship project presentation
 
QFD
QFDQFD
QFD
 
Anna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-formatAnna university-ug-pg-ppt-presentation-format
Anna university-ug-pg-ppt-presentation-format
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
Plastic processing
Plastic processingPlastic processing
Plastic processing
 
An Introduction to Lohia Corp Ltd, India
An Introduction to Lohia Corp Ltd, IndiaAn Introduction to Lohia Corp Ltd, India
An Introduction to Lohia Corp Ltd, India
 

Similar to project report

HMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training ReportHMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training ReportSiddharth Bhatnagar
 
CV of Shafiul Alam (Syngenta Bangladesh Ltd)
CV of Shafiul Alam (Syngenta Bangladesh Ltd)CV of Shafiul Alam (Syngenta Bangladesh Ltd)
CV of Shafiul Alam (Syngenta Bangladesh Ltd)SHAFIUL ALAM
 
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIAEME Publication
 
Industrial Training Report: Box Printing Industries
Industrial Training Report: Box Printing IndustriesIndustrial Training Report: Box Printing Industries
Industrial Training Report: Box Printing IndustriesSisubalan Selvan
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxvrickens
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments productionMd.Abdur Rahim Al Bahar
 
Presentation1 work study.pptx
Presentation1 work study.pptxPresentation1 work study.pptx
Presentation1 work study.pptxmesfin88
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringIJECSJournal
 
Operations Research & Methodology project report
Operations Research & Methodology  project reportOperations Research & Methodology  project report
Operations Research & Methodology project reportPankaj Kumar Dwivedi
 
Building effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportBuilding effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportMilind Gokhale
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816Shanmu S
 
Wioska moldings private limited
Wioska moldings private limitedWioska moldings private limited
Wioska moldings private limitedAkhilendra Shukla
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016Yatheesh J R
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016Yatheesh J R
 
Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)shi weihua
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
Amul PET Industries for Global Operation Management
Amul PET Industries for Global Operation ManagementAmul PET Industries for Global Operation Management
Amul PET Industries for Global Operation ManagementPranav Veerani
 

Similar to project report (20)

HMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training ReportHMT Machine Tools Ltd Ajmer Practical Summer Training Report
HMT Machine Tools Ltd Ajmer Practical Summer Training Report
 
CV of Shafiul Alam (Syngenta Bangladesh Ltd)
CV of Shafiul Alam (Syngenta Bangladesh Ltd)CV of Shafiul Alam (Syngenta Bangladesh Ltd)
CV of Shafiul Alam (Syngenta Bangladesh Ltd)
 
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
 
Industrial Training Report: Box Printing Industries
Industrial Training Report: Box Printing IndustriesIndustrial Training Report: Box Printing Industries
Industrial Training Report: Box Printing Industries
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
 
Application of industrial engineering techniques in garments production
Application of industrial engineering techniques      in garments productionApplication of industrial engineering techniques      in garments production
Application of industrial engineering techniques in garments production
 
Presentation1 work study.pptx
Presentation1 work study.pptxPresentation1 work study.pptx
Presentation1 work study.pptx
 
Cipet
CipetCipet
Cipet
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Start pages of report FOT TPM TRACKING
Start pages of report FOT TPM TRACKINGStart pages of report FOT TPM TRACKING
Start pages of report FOT TPM TRACKING
 
Operations Research & Methodology project report
Operations Research & Methodology  project reportOperations Research & Methodology  project report
Operations Research & Methodology project report
 
Building effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportBuilding effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project report
 
Automatic bottle filling Machine
Automatic bottle filling Machine  Automatic bottle filling Machine
Automatic bottle filling Machine
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
 
Wioska moldings private limited
Wioska moldings private limitedWioska moldings private limited
Wioska moldings private limited
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
 
updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016updated resume yathesh 18.09.2016
updated resume yathesh 18.09.2016
 
Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)Resume-Johnson Shi.docx(1)
Resume-Johnson Shi.docx(1)
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
Amul PET Industries for Global Operation Management
Amul PET Industries for Global Operation ManagementAmul PET Industries for Global Operation Management
Amul PET Industries for Global Operation Management
 

Recently uploaded

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 

Recently uploaded (20)

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 

project report

  • 1. 1 | P a g e Gujarat Technological University, Ahmedabad An Internship Report on “ Over View Of Extrusion Process (Pipe Plant)” Submitted in partial fulfillment for the award of degree of Bachelor of Engineering in Plastic Technology Submitted By, Shravan Kumar Pathak (180520123045) Internship carried out at AA VASANI POLY PIPE LLP, GIDC,TALOD Internal Guide External Guide Dr. Neelmani Srivastava Mr.Amit Tripathi Assistant Professor HOD, QC Dept. of Plastic Technology GIDC ,Talod CIPET,Ahmedabad Department of Plastic Technology Central Institute of Petrochemicals Engineering & Technology,Ahmedabad 2021-2022
  • 2. 2 | P a g e Gujarat Technological University Central Institute of Petrochemicals Engineering & Technology,Ahmedabad Department of Plastic Technology Certificate Certified that the internship work entitled “Over View Of Extrusion Process (Pipe Plant)” is a bonafide work carried out by Shravan Kumar Pathak (180520123045) of CIPET,Ahmedabad ,and this report is submitted in partial fulfillment for the award of Bachelor of engineering in Plastic Technology Of Gujarat Technological University,during the year 2021-2022. Signature of Internal Guide Signature of External Guide Dr. Neelmani Srivastva Mr.Amit Tripathi Assistant Professor HOD, QC Dept. of Plastic Technology GIDC ,Talod CIPET,Ahmedabad Signature of HOD Signature of Principal Dr.Anshuman Barman Mr. Ratan kumar Prof.& HOD Principal Dept.of Plastic Technology CIPET,Ahmedabad CIPET,Ahmedabad EXTERNAL VIVA Name of the examiner; Signature
  • 3. 3 | P a g e
  • 4. 4 | P a g e Acknowledgement I am very thankful to AA VASANI POLY PIPE LLP Company for giving me the opportunity to undertake my summer internship program at their prestigious company. It was a very good learning experience for me to have worked at this site. I would like to convey my heartiest thanks to Mr. Raj Kapoor ,HR Manager ,who heartily welcomed me for the internship, Mr.Amit Tripathi HOD of QC/QA who guided and encouraged me all through the summer training and imparted in- depth knowledge of the programme. I would like to thank all the staff of AA VASANI POLY PIPE LLP for giving their precious time and valuable guidance during my internship programme. I am extremely thankful to Dr. Anshuman Barman,Head of Department of Plastic Technology,CIPET,Ahmedabad for providing me facilities to work in,without which this work would not have been possible.
  • 5. 5 | P a g e Preface Every student of Bachelor of Engineering in Plastic Technology, has an essential requirement to do Two weeks time of internship in any of the well reputed organization. The purpose of this programme is to acquaint the students with practical applications of theoretical concepts taught to them during conduct of their course. Really, it was a nice opportunity to have a close comparison of theoretical concept in practical field.This report may depict deficiencies on my part but still it is an output of a student's efforts, for which I beg pardon. The output of my analysis is summarized in a shape of internship the contents of the report shows the detail of sequence of these.
  • 6. 6 | P a g e Abstract The report covers the following aspects of internship;  Table of content.  Introduction of AA VASANI POLY PIPE LLP.  Departments of AA VASANI POLY PIPE LLP.  Description of processing techniques.  Schedule of Internship.  Skills learned  My role as an trainee  conclusion
  • 7. 7 | P a g e Table of Contents Acknowledgement ......................................................................................04 Preface ........................................................................................................05 Abstract… .....................................................................................................06 Introduction of Company.............................................................................08 Departments In Company............................................................................09  Marketing Department ...................................................................09  Store...............................................................................................10  Production Department ..................................................................10  Testing Department( Laboratory) ....................................................13 o Density test.......................................................................13 o Ash content ......................................................................13 o Reversion test ..................................................................13 o VST test ...........................................................................13 o Hydrostatic Pressure test................................................13 o Impact test .....................................................................14 o MFI test..........................................................................14  Quality Assurance/Quality Control… ..................................................14  Mixer Department… ...........................................................................14 Internship Rotational Plane.............................................................................14 Skills & Techniques learned during internship .................................................15 Role of internee During Internship ..................................................................15 Conclusion ........................................................................................................16 References…....................................................................................................16
  • 8. 8 | P a g e Introduction AA VASANI POLY PIPE LLP This is a largest HDPE, PVC and DWC Pipe Manufacturer company , Started in 1996. This is Located in Special Economic Zone in Gujarat ,India. Being the industry leader Vasani has the daily production capacity of 100 metric tons to fulfil industry demand. The manufacturing plants of Vasani are spread across a 43000 square metre large infrastructre in GIDC Talod. To fulfill the ever increasing demands of top quality PVC,HDPE pipes in market ,Vasani has more than 1000 across india. Government organization such as SSNL,GIRDA are also customer of Vasani. Vasani is to provide integrated solutions and services to the polymers industry of Vibrant Gujarat, designed to redefine the peasants' satisfaction, rationalize cost and a bridge the gap between the Indian requirement and International practice & farmers standard availing neck to neck support to agriculture and irrigation industries of our beloved nation. Vasani is enormously trying to achieve complete customer satisfaction by continuously improving its quality. Vasani determined to be an innovative and responsive manufacturer and supplier of best quality products through:  Improvement of quality control system by giving proper training to our staff and trainees.  Conducting internal auditing for better result in the whole system.  Delivering best quality products to the customer with an affordable price.  Continuously updating and implementing products and process innovation to reach towarda best quality with optimum sustainability.  Keep researching product development to fulfill customer satisfaction.  Smooth up gradation in our operation and processing system.
  • 9. 9 | P a g e Products:  RRJ pipes  Selfit pipes  Upvc plumbing pipe  Casing pipes  HDPE pipes  SWR pipes  DWC pipes  UGDS pipes  Sprinklers Departments In Company o Marketing Departments o Store o Training Departments o Production Departments o Testing Departments (Laboratory) o Quality Assurance/Quality Control o Mixer Department Marketing Department Marketing departments fulfill the marketing needs and work to ensure the progress-  Market research  Product development  Sales support
  • 10. 10 | P a g e Store Major functions :  Receipt of Incoming goods  Inspection of all receipts  Storage and preservation  Identification of all materials stored  Material handling  Packaging  Issue & Dispatch  Maintenance of stock records  Stores accounting  Inventory control  Stock taking Production Department Extrusion process The process itself is highly technical. However, it can be summed up in just five steps. Step 1: Raw plastic materials like granules, pellets, or powder are loaded into a hopper and then fed into a long heated cylindrical chamber called an extruder. It is moved through this chamber by a revolving screw. Some extruders can have either one or two revolving screws. Step 2: The raw materials flow from the hopper down through the feed throat and onto a large spinning screw operating within a horizontal barrel. Step 3: Not all materials have the same properties, so the raw material is processed by a heating temperature specific to the type of raw material being passed through. At the end of the heated chamber, the molten plastic is forced through a small opening called a die to form the shape of the finished product. Step 4: As the plastic is extruded from the die, it is fed onto a conveyor belt for cooling. Cooling can happen by air or water. The process is similar to the injection moulding process except that the melted plastic is forced through a die instead of into a mould.
  • 11. 11 | P a g e Step 5: The die for an individual plastic profile is designed so that the plastic flows smoothly and evenly from the cylindrical profile of the extruder into the final profile shape. Consistency in this flow is critical to achieving an end product with integrity Pipe Plant We move toward production section ,where various machine fitted with different outputs- Hasmukh Engineering Extruder - 350-500 kg/hour Kabra - 150 kg/hour Panchveer-250kg/hour Rolepal- 800kg/hour
  • 12. 12 | P a g e These machines are specially use for production of pipes from ranging 40mm- 400mm.They were consist of extruder,cooling section,haul off unit and cutter section. During the production of pipes contol the various troubleshooting which occurs on the pipes.  Extruded pipe cooled in cooling section.  Haul – off unit is used to pulling the pipe from extruder.  Cutter section is used to cut the pipe on required dimensions. Troubleshooting: S.N. PROBLEM CAUSES REMEDIES 1. Water mark  Excess water level in cooling channel  Increases water temperature  Reduce water level  Decreases water temperature 2. Rough surface  Improper compounding of material  Improper melting of material in barrel  Proper compounding of material  Increase the temperature of barrel 3. Pin hole  Improper compounding of material  Improper melting of material in barrel  Proper compounding of material  Increase the temperature of barrel 4. Cut mark  High haul-off speed  Less dosing  Reduce the amount of dosing
  • 13. 13 | P a g e Testing Department Performed various test in testing departments;  Density test  Ash content  Reversion test  VST test  Hydrostatic Pressure test  Impact test  MFI test  Density test Find out the density of PVC and HDPE material by following the IS standard,and find the amount of filler in the material.  Ash content An Ash test is used to determine if a material is filled. The test will identify the total filler content.  Reversion test Reversion Test is a method of determining the level of internal stresses in pipes,and to know the percentage of shrinkage.  VST test To find out the softening temperature of the material by applying the load.  Hydraustatic pressure test The vessel is filled with a nearly incompressible liquid-usually water or oil- pressurised to test pressure, and examined for leaks or permanent changes in pipe.
  • 14. 14 | P a g e  Impact test In the impact test use a swinging pendulum to strike a notched bar; heights before and after impact are used to compute the energy required to fracture the bar.  Melt Flow Index Determines the melt flow properties of a material at a specific shear stress and temperature. Quality Assurance/Quality Control Production of pipes requires high end quality assurance which is a part and parcel of the activity.We got exposed to a well defined quality system,consisting of in process and in final inspection which ensure 100% inspection for the entire die & mould parts and also sampling inspection for pipes to meet the customer requirements. In this section we got basic knowledge of measuring equipments like Digital Micrometer & Vernier calipers,Pie tape,Ultra frequency thickness gauge. Mixer Department In this department material compounded with various additives like Caco3,Tio2,carbon,One pack stabilizer,Stearic& wax etc in mixer to enhance the property of the pipes. Internship Rotational Plane Production section 1 Week 3 /06/ 21……….9/06/ 21 Testing section 1 Week 10/06/21……...16/06/21 Quality Assurance section 1Day 17/06/21………18/06/21 Mixer section 2 Day 18/06/21……….19/06/21
  • 15. 15 | P a g e Skills & Techniques learned during internship An Internship assists with career development by providing real work experiences that provide students with opportunities to explore their interests and develop professional skills and competencies. During internship ,We are provided with opportunities to apply what we learned in classes to actual practice.It is expected that we will also be challenged to examine how our attitudes beliefs and values influence the process It was valuable time here in AA VASANI POLY PIPE LLP and we learn unlimited here are a few point I have summarized.  We learned about the leadership & teamwork to do an effective work.  We learned about tactics to maintain discipline & How to deal with workers.  We learned How to control quality problems,defects in material,Laboratory Tests.  We have learnt how to make a powerfull team and achieve goal.  We learned How to operate extruder machines and testing machine. Role Of Internee during Internship I learned how to adjust myself in the work environment,how to deal with people at work from the boss to the janitors. It’s a good quality experience.The necessary kind of experience as it helps you realize what you want in future,also got the opportunity to evaluate myself under these stressful conditions.
  • 16. 16 | P a g e Conclusion It was a wonderful learning experience at AA VASANI POLY PIPE LLP for two weeks in Talod. I gained a lot of insight regarding almost every aspect of plant. I was given exposure in almost all the departments at the plant. The friendly welcome from all the employees is appreciating,sharing their experiences and giving their peace of wisdom which they have gained in long journey of work. I am very thankful for the wonderful facility from VASANI. I hope this experience will help me in my future and also in shaping my career. I am preety sure that this facility has ability to achieve its goal as stated in vision statement by following their quality statement. We are commited to comply with customer requirements and Quality Management System requirements and shall strive to continually improve the effectiveness of our Quality Management System to exceed customer expectations. References  http://vasanipolymers/about us.html  http://www.slideshare.net  www.google.com