This is to certify that the vocational inplant training in “LAXMI
HYDRAULICS PVT. LTD. SOLAPUR,” has been completed successfully
and the report of the same has been submitted by ‘ Mr. CHIKHALE
UMESH MADHUKAR’ of B.E.(MECHANICAL) class (A) in the
partial fulfillment of the curriculum laid by Solapur University, Solapur
during the academic year 2017-2018.
T & P Head
Co-ordinator Dept.of Mech. Engg.
PRINCIPAL
CERTIFICATE
3
4
ACKNOWLEDGEMENT
It is with great sence of gratitude that I acknowledge the supportgiven to me by
number of individuals in the preparation of this report.
I thank to the staff of the company for their kind supportand help which proved to
be a source of knowledge and addition to the learning of engineering in a better
way.
I would like to thank to Prof. .Dr. P. S. KACHARE, Head, Department of
mechanical Engineering and the other teachers whose unending effort, advise,
motivation and encouragement at every step made this work possible.
I take this opportunity to also thank Principal of the college for being a source of
inspiration for students.
Lastely I thank my all friends who have helped directlyor indirectly to bring this
report to stage of completion.
Mr. CHIKHALE UMESH MADHUKAR
B.E.(MECH) (DIV-A)
5
INDEX
Sr.No. Contents Page no.
1 Introduction 7
1.1 Background 7
1.2 The Future 8
1.3 Location 9
1.4 General Information of Industry 9
1.5 LHP at a glance 10
1.6 Achievements 10
2 Plant Layout 11
3 Motors Manufactiring Photo Galary 12
4 Products 13
5 Specification of Motors 15
5.1 Roller Motors 15
5.1.1 Features 15
5.1.2 Applications 15
5.1.3 Application Standards 16
5.2 Openwell Submersible Pump 16
` 5.2.1 Features 16
5.2.2 Horizontal openwell Submersible pump set 17
5.2.3 Multistage vertical openwell Submersible pump set 17
5.3 Naval / Marine Duty Motor 17
5.3.1 Features 17
5.3.2 Applications 18
5.3.3 Application Standards 18
6
6 Product Ranges 19
6.1 The LHP product Portfolio 19
6.1.1 Motors 19
6.1.2 Gear Drives 20
6.1.3 Pumps 20
7 Testing Procedure of the Motor 21
8 Causes and Remedies 23
8.1 Pump does not deliver water 23
8.2 Discharge less than speed 23
8.3 Motor starts and gets trips (star delta starter) 23
8.4 Motor connected but does not picks up full speed 24
8.5 Noise 24
8.6 Starting speed less or Motors does not start(Single Phase Motor) 25
9 Conclusion 26
7
1.INTRODUCTION
1.1 BACKGROUND:-
LHP laid its foundation in 1981 as a motor and pump manufacturer at Solapur in India.
During the 80s - the first decade of its operations, the company invested its time and
resources to be future-ready by researching the needs of various industry verticals, developing
and establishing proper manufacturing methods, inducting and training a team of like-minded
engineers and technicians, and by developing a committed vendor base.
Once equipped, in the 90s the company expanded its product range, taking the tally to
more than 2500. LHP focused on reaching out and winning confidence of several companies
in India from various industry segments. The ever-growing client list included major
corporates, PSUs and OEMs.
After gaining a firm footing in the market, the first decade of the 21st century was the
time to consolidate position and be ready for a quantum leap. The company established a new
world-class, environmentally-friendly plant possessing the capacity of manufacturing nearly
240,000 motors per annum. The plant employs state-of-the-art manufacturing technology and
system and, ensuring economical production. Our competency in providing solutions to
specific customer requirement has helped us to develop the product basket of more than 6000
product variants including advanced technology energy-efficient motors, flame-proof motors
and gear motors.
Today, we take pride in associating with more than 4000 prestigious clients . Our International
Business Division is growing rapidly with recognition from the Europe, Middle East and
Africa.
8
1.2 THE FUTURE:-
With these credentials and commitment, now LHP is poised to cross new
frontiers. Our products are reaching every corner of the country and several parts
of the world and are preferred because of the assurance of quality, reliability,
safety, quicker deliveries and efficient service.
Considering the ever-growing demand from across the globe, we are
investing in technology, expanding our manufacturing capacity, widening
product offerings and strengthening reach.
While adhering to international standards and marketing our products
globally, we are aiming to achieve business excellence for a single reason -
Customer Delight.
9
1.3 Location:-
Laxmi Hydraulics Pvt.Ltd.
B-11, MIDC, Chincholi,
Solapur-413 255 INDIA
Tel:- +91- 217- 2357001(5 Lines)
Fax: +91-217-2357006.
1.4 General Information of Industry:-
 Establishment :- 1981
 Plant Area :- 15700 square meters
 Manufacturing Area :- 5200 square meters
 Office area :- 600 square meters
 Average annual compounded
Growth rate :- 18%
 Export (Direct and Indirect) :- 25%
 Installed capacity :- 20,000 motors and
Pumps per month
 Manpower :- 500 (180 technical)
 Certification :- ISO 9001:2008
 Standard product range :- 6000+
 Regular clients :- 4000+
10
1.5 LHP at a glance
Unit I Unit II Total
Establishment 1981
Plant area 16,000 square
meters
20000 square
meters
36000 square meters
Manufacturing
area
10000 square
meters
5000 square
meters
15000 square meters
Exports 25%
Installed
Capacity
20,000 Motors per month + 1000 Nos of
Gear Motors and Gear boxes per month
Manpower 390 ( 180
Technical)
277 ( 95
Technical)
667
Certification ISO 9001-2008
Product range 6000 +
Regular clients 4000 +
1.6 Achievements:-
 Outstanding Productivity Performance Award
by the State Government-for Maharashtra.
 ISO 9001: 2008 by Bureau Veritas
 Rajiv Gandhi National Quality Award
 National Award for Quality Products
By Government of India
11
2. PLANT LAYOUT
VARNISH &
BACKING OF
LARGE SIZED
MOTORS
MACHINE
SHOP
FOR SMALL
AND
MEDIUM
MOTORS
RECEIVING
INSPECTION
VARNISH &
BACKING
OF
SMALL
SIZED
MOTORS
FETTLING
CASTING
AREA
WELDING
SHOP
WINDING
WELDING
MACHINE
SHOP
FOR
SMALL
AND
MEDIUM
MOTORS
STORAGE
FOR
CASTING
STORAGE FOR METAL BARS
PACKING PRODUCT
STORAGE
STORAGE FOR
CORRUGATED PACKING
MATERIAL
STORAGE FOR WOODEN
PACKING MATERIAL
STORAGE FOR
WOODEN PACKING
MATERIAL
STORAGE FOR
FINISHED GOOD
MATERIAL
PRODUCT DEVELOPMENT
STORAGE
FOR
COMPONE-
NTS
STORAGE
FOR
COMPONE-
NTS
STORAGE FOR FINISHED
GOODS
ASSEMBLY
LINE FOR
SMALL
MOTORS
ASSEMBLY
LINE FOR
MEDIUM
MOTORS
ASSEMBLY
LINE FOR
LARGE
MOTORS
COOLING
TOWER
HOT
WELL
R & D
DEPARTMENT
ENTRY
MACHINE SHOP
FOR LARGE
MOTORS
12
3. MOTOR MANUFACTURING PHOTO GALARY
13
4. PRODUCTS
4.1 PRODUCTS:-
IE 3 MOTOR ROLLER TABLE MOTOR
Flame-proofMotor (IE1, IE2 & IE3) ENCODER MOTOR
PROCESS PUMP SPECIAL GEAR MOTOR
14
STANDARD MOTOR OPENWELL SUBMERSIBLE PUMP
MONOBLOCK PUMP LHP EURA AC DRIVES
SOFT STARTER Naval / Marine Duty Motor
15
5. SPECIFICATION OF MOTORS
5.1 Roller Table Motor:-
5.1.1 Features:-
Established in 1981, LHP is a reputed manufacturer of a wide range of high-quality motors up
to 355 L Frame (315 kW). The range includes various types of motors such as Standard Induction,
Geared, Brake, Dual Speed, Non- Sparking, Crane & Hoist Duty and Special Purpose Motors to name
only a few. The range has been proving its worth for different applications in various industries. LHP
Motor is the preferred choice of major corporates, MNCs & OEMs due to the product quality,
performance, timely deliveries and competitive prices.
The ISO 9001-2008 certification, CE mark, 3 BIS licences and National Awards for Quality Products
have made LHP Motors the customer's 'First Choice'.
LHP Roller Table Motors are designed taking into consideration the experience of users in steel
plants over the years.
5.1.2 APPLICATION:-
1. In steel plants for conveying steel billets for processing through roller mills.
2. Suitable for Geared Motors operating with VVVF Power Source
Range 355LFrame
Pole 4/6/8
Mounting Standard / Special asperIPSS
specifications
Frame Upto355L
Voltage 415VACor(upto660V)
16
Frequency 50Hz
Stalledrotorwithstandtime up to 15 minutesmax or as percustormer
requirement
Insulation HClass
Duty S3,S4,S1,S5,S6&S7
5.1.3 APPLICATION STANDARDS:-
IPSS- 1-03-007 Interplant standard for steel industries
IS- 325 (IEC 34-1) Specificationsfor 3 phase induction motors
IS- 4691 (IEC 34-5) Degrees of protection provided by enclosure for
rotating electrical machinery
5.2 Openwell Submersible Pumps
5.2.1 FEATURES:-
1. Models with wide range of discharge & head combinations.
2. Wet type winding wIth polyester wrapped winding wire
3. Copper rotor
4. Carbon / Stainless Still Thrust bearing
5. Bronze bush bearings with special alloy for wear resistance
6. Stainless steel shaft to preven! rusting
7. Stainless steel shaft sleeve
8. Can withstand voltage fluctuations from 300V to 440V
9. Anti-corrosive paint for external surface
10. Foundation and foot vaIve not required when installed under water
11. Buill meticulously for meeting the growing domand of customers
12. Compact in size and easy to installin an open will, river and on a surface as well.
17
5.2.2 HORIZONTAL OPENWELL SUBMERSIBLE PUMP SET:-
Type Head Range Discharge
0.5 HP to 30 HP Up to 78m 3.25 m3/h (2100 lpm)
5.2.3 MULTISTAGE VERTICAL OPENWELL SUBMERSIBLE PUPMP SET:-
5.3 Naval / Marine Duty Motor:-
5.3.1 FEATURES:-
Established in 1981, LHP is a reputed manufacturer of a wide range of high-quality motors up to 355 L
Frame (315 kW).The range includes various types of motors such as Standard Induction, Geared, Brake,
Dual Speed, Non- Sparking, Crane & Hoist Duty and Special Purpose Motors to name only a few. The
range has been proving its worth for different applications in various industries. LHP Motor is the
preferred choice of major corporates, MNCs & OEMs due to the product quality, performance, timely
deliveries and competitive prices.
The ISO 9001-2000 certification, CE mark, 3 BIS licences and National Awards for Quality Products
have made LHP Motors the customer's 'First Choice'.
Motors are suitable for
(a) Continuous duty (S1) Short time duty (S2)
(b) Periodic duty (S3)
Type Head Range Discharge
3 HP to 20 HP Up to 105m Up to 54 m3/h (1600 lpm)
18
5.3.2 APPLICATIONS:-
Cranes, Hoists, Lifts, Material handling equipment, Machine tools, Cement industries, Paper & Steel
plants
Range Up to 315 kW
RPM 3000, 1500, 1000, 750 (sychronous)
Mounting Foot (B-3), Flange (B-5), Face (B-14) and
combinations
Frame 63 to 355 L
Protection IP 55
Insulation F Class
Voltage 415 V, 380 V or as per requirement
Frequency 50 HZ / 60 HZ or as per requirement
Duty S2, S3, S4, S5, S7, & S
5.3.3 Applicable Standards:-
IS:4722 Specificationsfor rotating electrical machine.
IS:325 (IEC 34 - 1) Specificationsfor 3 phase induction motors.
IS:4889 (IEC 34 - 2) Methodof determination of efficiency of
rotating electrical machines.
IS:4691 (IEC 34 - 5) Degrees of protection provided by enclosure
for rotating electrical machinery.
IS:12824 Typeof duty & class of rating assigned to
rotating assigned to rotating electrical
machines.
19
6. PRODUCT RANGE
6.1 The LHP Product Portfolio:-
6.1.1 Motors
Product/Description Frame Size Range
Three Phase Sq. Cage Induction
Motors Up to 355L Up to 425HP/315KW
Single Phase Motors (CSR,CSIR &
CSCIR) Up to100L Up to 2HP/1.5KW
Brake Motors Up to 250M Up to 75HP/55 KW
Roller Table Motor 112 to 355L
1.1 to 45 KW( with 15 min. stall
time)
Flame-Proof Motors(Ex'd') Up to 315L
0.25HP/0.19KW to 270
HP/200KW
Increased Safety Motors(Ex'e') Up to 315L
0.75HP/0.55KW to
270HP/200KW
Non-sparking Motors(Ex'e') Up to 355L
0.16HP/0.12KW to 425HP/355
KW
Energy Efficient Motors Up to 355L Up to 425HP/315KW
(Standard And Flame Proof)
Helical Gearmotors Up to 225 0.16HP/0.12KW to 40HP/30 KW
0.3 TO 560 RPM
WVF Motors Up to 355L Up to 425HP/315KW
Crane and Hoist Duty Motors Up to 355L
Up to 425HP/315KW for VFD
duty
Up to 25HP/18KW DOL Starting
Lift Duty Motor Up to 315L Up to 215HP/160KW
Cooling Tower Motor Up to 315L Up to 215HP/200KW
20
6.1.2 GEAR DRIVE
TYPE RATING OUTPUT
EnergyefficientHelical GearMotorand 0.16 HP to 40HP
0.35 to 560 RPMand 15000
N-M
Gear Boxes 0.12KW to 30 KW Torque
Helical GearMotor and Gearboxes 0.16HP/40HP
0.35 to 560 RPMand 15000
N-M
0.12KW to 30 KW Torque
6.1.3 PUMP
Product/Description Range Head Range
Single Phase DomesticPump 2HP/1.5KW 48m to 50 m
MonoblockPumps up 40 HP/30KW 78 m
Openwell Pumps(VerticalandHorinzontal
Pumps) Up 20HP/15KW Up to 105m
MonoblockProcessPumps Up to 20HP/15KW 78m
Single Stage Horizontal Centrifugal Self
Priming, 14 HP to 10 KW 25 to 30 m
non-colgpumps(MudPumps)
21
HIGH VOLTAGE TEST
RESISTANCE MEASUREMENT
TEST
REDUCED VOLTAGE RUNNING TEST
NO LOAD RUNNING TEST
LOCKED ROTOR TEST
SAMPLING TYPE TEST
PAINTING
7. TESTING PROCEDURE OF THE MOTOR
ROUTINE TEST BLOCK
MEGGER TEST
OK
OK
OK
OK
OK
OK
OK
22
23
8. CAUSES AND REMIDIES
8.1 PUMP DOES NOT DELIVER WATER:-
Causes Remedies
a) No water in pump a) Fill water in pump
b) Foot valve is not emerged in water. b) Ensure that foot value is emerged in water.
c) Too many bends to suction pipe. c) Reduce the bends.
d) Leakage in suction Pipe. d) Ensure that there is no leakage in suction pipe.
e) Suction lift more than 6 mtr. e) Keep suction lift less than 6 mtr.
8.2 DISCHARGE LESS THAN SPEED:-
Causes Remedies
a) Suction lift more than 6 mtr. a) Keep suction lift less than 6 mtr.
b) Suction/delivery pipe line blocked. b) Clean the pipe line.
c) Strainer of foot value is blocked. c) Clean the strainer.
d) Pipe size used are smaller than
recommended.
d) Keep the pipe size as recommended.
8.3 Motor starts and gets trips (star delta starter):-
Causes Remedies
a) Timer setting on lowest step a) Set timer on proper setting.
b) Relay setting on lower reading than
rated current.
b) Set overload relay at 110% of rated full load
current punched on Nameplate.
24
c) Terminal voltage is low. c) Ensure rated voltage OR increase realy setting
slightly.
d) Backup fuse blowing. d) Correct rating of back-up fuse to be used.
e) Starting current is high due to
heavy inertia.
e) Start stop the relay continuously till motor, pick up
full speed.
If problem persist, Contact LHP and inform Gd2 of
load.
f) Misalignment. f) Ensure proper alignment.
8.4 MOTOR CONNECTED BUT DOES NOT PICKS UP FULL SPEED:-
Causes Remedies
a) No supply of voltage a) Check voltage between each two phases.
b) Motor jam b) Check freeness of motor without coupling it to load.
c) Motor may be overloaded c) Reduce load.
d) Loose connection. d)Tight connection properly.
8.5 NOISE:
Causes Remedies
a) Too high delivery head. a) Ensure total head is within specified range.
b) Too high suction lift. b) Keep suction lift less than 6 mtr.
c) Suction line or impeller block. c) Trace the blockage & clean.
d) Air entrapped in water. d) Ensure that all joints are airtight.
e) Bearings worn out. e) Replace bearing.
25
8.6 STARTING SPEED LESS O R MOTOR DOES NOT START. (SINGLE PHASE
MOTOR):-
Causes Remedies
a) Loose connection of capacitor in
Terminal Box.
a) Ensure the tight connection of capacitor in circuit as
per connection diagram.
b) Centrifugal switch open. b) Check contact of centrifugal switch.
26
9. CONCLUSION
Undergoing vocational training in esteemed good organization like Laxmi
Hydraulics Ltd. Solapur was very in distinguished period in my educational
life. The manufacturing of stator,rotor, pressing of rotor into the stator,etc. Also
various test performed on motor such as Megger test, high voltage test,
resistance measurement test,locked rotor test, etc. and to obtain final quality
product is having immence potential & very skilled and experienced manpower.
I observed various process like coil making,winding,heat treatmenton on
rotor pressing of rotor into the stator,all motor assembly and various test
performed on motors.
It is a good company with many versatile machines and various motors.
Also learned how to maintain good relationship between workers & supervisors,
which results in increasing the productivity It was excellent experience working
here. The training has encouraged me and gives guidance how to behave in
industry and work as part of it.

More Related Content

What's hot

power generation through speed breaker
power generation through speed breaker power generation through speed breaker
power generation through speed breaker Ranjan Kumar Thakur
 
Industrial Training report at Adani Power Limited Mundra
Industrial Training report at Adani Power Limited MundraIndustrial Training report at Adani Power Limited Mundra
Industrial Training report at Adani Power Limited MundraSaikat Bhandari
 
UNDERWATER WINDMILL
UNDERWATER WINDMILLUNDERWATER WINDMILL
UNDERWATER WINDMILLShyam sivan
 
OTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationOTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationJoydeep Paul
 
Presentation on starter
Presentation on starterPresentation on starter
Presentation on starteraftab alam
 
Power Generation Using Speed Breakers
Power Generation Using Speed BreakersPower Generation Using Speed Breakers
Power Generation Using Speed BreakersPrachurya Sarma
 
Footstep power generation system Final year be project
Footstep power generation system   Final year be project Footstep power generation system   Final year be project
Footstep power generation system Final year be project silveroak engineering collage
 
Oro551 res- unit 1 - environmental impact of solar energy
Oro551   res- unit 1 - environmental impact of solar energyOro551   res- unit 1 - environmental impact of solar energy
Oro551 res- unit 1 - environmental impact of solar energykarthi keyan
 
Starter of an induction motor
Starter of an induction motor Starter of an induction motor
Starter of an induction motor sbpatel199688
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
Summer internship report of DCCPP
Summer internship report of DCCPPSummer internship report of DCCPP
Summer internship report of DCCPPDurgSingh
 
Solar-biomass hybrid power plant
Solar-biomass hybrid power plantSolar-biomass hybrid power plant
Solar-biomass hybrid power plantprajeesh pv
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 

What's hot (20)

power generation through speed breaker
power generation through speed breaker power generation through speed breaker
power generation through speed breaker
 
training report
training reporttraining report
training report
 
Industrial Training report at Adani Power Limited Mundra
Industrial Training report at Adani Power Limited MundraIndustrial Training report at Adani Power Limited Mundra
Industrial Training report at Adani Power Limited Mundra
 
UNDERWATER WINDMILL
UNDERWATER WINDMILLUNDERWATER WINDMILL
UNDERWATER WINDMILL
 
OTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generationOTPC-Palatana 726.6MW combined cycle power generation
OTPC-Palatana 726.6MW combined cycle power generation
 
gopi chandra sahu, Resume
gopi  chandra sahu,  Resumegopi  chandra sahu,  Resume
gopi chandra sahu, Resume
 
Presentation on starter
Presentation on starterPresentation on starter
Presentation on starter
 
Power Generation Using Speed Breakers
Power Generation Using Speed BreakersPower Generation Using Speed Breakers
Power Generation Using Speed Breakers
 
Wind Energy
Wind EnergyWind Energy
Wind Energy
 
Footstep power generation system Final year be project
Footstep power generation system   Final year be project Footstep power generation system   Final year be project
Footstep power generation system Final year be project
 
Wind turbine
Wind turbineWind turbine
Wind turbine
 
Micro hydro power plant
Micro hydro power plantMicro hydro power plant
Micro hydro power plant
 
Wind power plant
Wind power plantWind power plant
Wind power plant
 
Oro551 res- unit 1 - environmental impact of solar energy
Oro551   res- unit 1 - environmental impact of solar energyOro551   res- unit 1 - environmental impact of solar energy
Oro551 res- unit 1 - environmental impact of solar energy
 
Starter of an induction motor
Starter of an induction motor Starter of an induction motor
Starter of an induction motor
 
DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report DLW Electrical Engineering industrial training Report
DLW Electrical Engineering industrial training Report
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Summer internship report of DCCPP
Summer internship report of DCCPPSummer internship report of DCCPP
Summer internship report of DCCPP
 
Solar-biomass hybrid power plant
Solar-biomass hybrid power plantSolar-biomass hybrid power plant
Solar-biomass hybrid power plant
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 

Similar to Lhp training report

Keruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos EléctricosKeruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos EléctricosHerbert L Romero
 
Aceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updatedAceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updatedbeanmatrix
 
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...ABHINAV KUMAR
 
Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014aceyengindia
 
Beta Blowers Catalogue
Beta Blowers CatalogueBeta Blowers Catalogue
Beta Blowers CatalogueBetaBlowers1
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSHAILESH SHUKLA
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training reportPrashantSharma897
 

Similar to Lhp training report (20)

Resume Kallol Chatterjee
Resume Kallol ChatterjeeResume Kallol Chatterjee
Resume Kallol Chatterjee
 
Keruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos EléctricosKeruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos Eléctricos
 
DLW training report
DLW  training reportDLW  training report
DLW training report
 
Aceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updatedAceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updated
 
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
 
MARATHON BATTERIES PRESENTATION
MARATHON BATTERIES PRESENTATIONMARATHON BATTERIES PRESENTATION
MARATHON BATTERIES PRESENTATION
 
Sei ppt
Sei pptSei ppt
Sei ppt
 
Sei ppt
Sei pptSei ppt
Sei ppt
 
SGI. PROFILE
SGI. PROFILESGI. PROFILE
SGI. PROFILE
 
Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014Acey Engineering India Private Limited corporate presentation 2014
Acey Engineering India Private Limited corporate presentation 2014
 
Taneko Company Profile
Taneko Company ProfileTaneko Company Profile
Taneko Company Profile
 
Ajay Uikey
Ajay UikeyAjay Uikey
Ajay Uikey
 
ajayuikey
ajayuikeyajayuikey
ajayuikey
 
Beta Blowers Catalogue
Beta Blowers CatalogueBeta Blowers Catalogue
Beta Blowers Catalogue
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
AKS
AKSAKS
AKS
 
Sadguruppt
SadgurupptSadguruppt
Sadguruppt
 
APM coprporate Profile 2014-new
APM coprporate Profile 2014-newAPM coprporate Profile 2014-new
APM coprporate Profile 2014-new
 
Kirloskar group
Kirloskar group Kirloskar group
Kirloskar group
 

More from umesh chikhale

Hydraulic and pneumatic control elements
Hydraulic and pneumatic control elementsHydraulic and pneumatic control elements
Hydraulic and pneumatic control elementsumesh chikhale
 
Opportunities after be
Opportunities after beOpportunities after be
Opportunities after beumesh chikhale
 
Opportunities after be
Opportunities after beOpportunities after be
Opportunities after beumesh chikhale
 
Ese 2017 time table-204
Ese 2017 time table-204Ese 2017 time table-204
Ese 2017 time table-204umesh chikhale
 
Assembly and Details machine drawing pdf
Assembly and Details  machine drawing pdfAssembly and Details  machine drawing pdf
Assembly and Details machine drawing pdfumesh chikhale
 
Trends in Advanced Manufacturing
Trends in Advanced ManufacturingTrends in Advanced Manufacturing
Trends in Advanced Manufacturingumesh chikhale
 
Trends in Advanced Manufacturing
Trends in Advanced ManufacturingTrends in Advanced Manufacturing
Trends in Advanced Manufacturingumesh chikhale
 

More from umesh chikhale (13)

Hydraulic and pneumatic control elements
Hydraulic and pneumatic control elementsHydraulic and pneumatic control elements
Hydraulic and pneumatic control elements
 
Opportunities after be
Opportunities after beOpportunities after be
Opportunities after be
 
Opportunities after be
Opportunities after beOpportunities after be
Opportunities after be
 
Gate 2017 Poster
Gate 2017 PosterGate 2017 Poster
Gate 2017 Poster
 
Ese 2017 time table-204
Ese 2017 time table-204Ese 2017 time table-204
Ese 2017 time table-204
 
Ese 2017 syllabi-110
Ese 2017 syllabi-110Ese 2017 syllabi-110
Ese 2017 syllabi-110
 
Gate cutoff 36
Gate cutoff 36Gate cutoff 36
Gate cutoff 36
 
Ese 2015-cut-off 31
Ese 2015-cut-off 31Ese 2015-cut-off 31
Ese 2015-cut-off 31
 
Assembly and Details
Assembly and Details  Assembly and Details
Assembly and Details
 
Assembly and Details machine drawing pdf
Assembly and Details  machine drawing pdfAssembly and Details  machine drawing pdf
Assembly and Details machine drawing pdf
 
Trends in Advanced Manufacturing
Trends in Advanced ManufacturingTrends in Advanced Manufacturing
Trends in Advanced Manufacturing
 
WELCOME
WELCOMEWELCOME
WELCOME
 
Trends in Advanced Manufacturing
Trends in Advanced ManufacturingTrends in Advanced Manufacturing
Trends in Advanced Manufacturing
 

Recently uploaded

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 

Recently uploaded (20)

Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 

Lhp training report

  • 1. 1 A VOCATIONAL INPLANT TRAINING REPORT ON “LAXMI HYDRAULICS PVT. LTD. SOLAPUR”. Submitted By:- Mr. CHIKHALE UMESH MADHUKAR B.E. (MECHANICAL ENGINEERING) (ROLL NO. A- ) DEPARTMENT OF MECHANICAL ENGINEERING COLLEGE OF ENGINEERING, PANDHARPUR. Academic Year:-2017-2018
  • 2. 2 College of Engineering, Pandharpur This is to certify that the vocational inplant training in “LAXMI HYDRAULICS PVT. LTD. SOLAPUR,” has been completed successfully and the report of the same has been submitted by ‘ Mr. CHIKHALE UMESH MADHUKAR’ of B.E.(MECHANICAL) class (A) in the partial fulfillment of the curriculum laid by Solapur University, Solapur during the academic year 2017-2018. T & P Head Co-ordinator Dept.of Mech. Engg. PRINCIPAL CERTIFICATE
  • 3. 3
  • 4. 4 ACKNOWLEDGEMENT It is with great sence of gratitude that I acknowledge the supportgiven to me by number of individuals in the preparation of this report. I thank to the staff of the company for their kind supportand help which proved to be a source of knowledge and addition to the learning of engineering in a better way. I would like to thank to Prof. .Dr. P. S. KACHARE, Head, Department of mechanical Engineering and the other teachers whose unending effort, advise, motivation and encouragement at every step made this work possible. I take this opportunity to also thank Principal of the college for being a source of inspiration for students. Lastely I thank my all friends who have helped directlyor indirectly to bring this report to stage of completion. Mr. CHIKHALE UMESH MADHUKAR B.E.(MECH) (DIV-A)
  • 5. 5 INDEX Sr.No. Contents Page no. 1 Introduction 7 1.1 Background 7 1.2 The Future 8 1.3 Location 9 1.4 General Information of Industry 9 1.5 LHP at a glance 10 1.6 Achievements 10 2 Plant Layout 11 3 Motors Manufactiring Photo Galary 12 4 Products 13 5 Specification of Motors 15 5.1 Roller Motors 15 5.1.1 Features 15 5.1.2 Applications 15 5.1.3 Application Standards 16 5.2 Openwell Submersible Pump 16 ` 5.2.1 Features 16 5.2.2 Horizontal openwell Submersible pump set 17 5.2.3 Multistage vertical openwell Submersible pump set 17 5.3 Naval / Marine Duty Motor 17 5.3.1 Features 17 5.3.2 Applications 18 5.3.3 Application Standards 18
  • 6. 6 6 Product Ranges 19 6.1 The LHP product Portfolio 19 6.1.1 Motors 19 6.1.2 Gear Drives 20 6.1.3 Pumps 20 7 Testing Procedure of the Motor 21 8 Causes and Remedies 23 8.1 Pump does not deliver water 23 8.2 Discharge less than speed 23 8.3 Motor starts and gets trips (star delta starter) 23 8.4 Motor connected but does not picks up full speed 24 8.5 Noise 24 8.6 Starting speed less or Motors does not start(Single Phase Motor) 25 9 Conclusion 26
  • 7. 7 1.INTRODUCTION 1.1 BACKGROUND:- LHP laid its foundation in 1981 as a motor and pump manufacturer at Solapur in India. During the 80s - the first decade of its operations, the company invested its time and resources to be future-ready by researching the needs of various industry verticals, developing and establishing proper manufacturing methods, inducting and training a team of like-minded engineers and technicians, and by developing a committed vendor base. Once equipped, in the 90s the company expanded its product range, taking the tally to more than 2500. LHP focused on reaching out and winning confidence of several companies in India from various industry segments. The ever-growing client list included major corporates, PSUs and OEMs. After gaining a firm footing in the market, the first decade of the 21st century was the time to consolidate position and be ready for a quantum leap. The company established a new world-class, environmentally-friendly plant possessing the capacity of manufacturing nearly 240,000 motors per annum. The plant employs state-of-the-art manufacturing technology and system and, ensuring economical production. Our competency in providing solutions to specific customer requirement has helped us to develop the product basket of more than 6000 product variants including advanced technology energy-efficient motors, flame-proof motors and gear motors. Today, we take pride in associating with more than 4000 prestigious clients . Our International Business Division is growing rapidly with recognition from the Europe, Middle East and Africa.
  • 8. 8 1.2 THE FUTURE:- With these credentials and commitment, now LHP is poised to cross new frontiers. Our products are reaching every corner of the country and several parts of the world and are preferred because of the assurance of quality, reliability, safety, quicker deliveries and efficient service. Considering the ever-growing demand from across the globe, we are investing in technology, expanding our manufacturing capacity, widening product offerings and strengthening reach. While adhering to international standards and marketing our products globally, we are aiming to achieve business excellence for a single reason - Customer Delight.
  • 9. 9 1.3 Location:- Laxmi Hydraulics Pvt.Ltd. B-11, MIDC, Chincholi, Solapur-413 255 INDIA Tel:- +91- 217- 2357001(5 Lines) Fax: +91-217-2357006. 1.4 General Information of Industry:-  Establishment :- 1981  Plant Area :- 15700 square meters  Manufacturing Area :- 5200 square meters  Office area :- 600 square meters  Average annual compounded Growth rate :- 18%  Export (Direct and Indirect) :- 25%  Installed capacity :- 20,000 motors and Pumps per month  Manpower :- 500 (180 technical)  Certification :- ISO 9001:2008  Standard product range :- 6000+  Regular clients :- 4000+
  • 10. 10 1.5 LHP at a glance Unit I Unit II Total Establishment 1981 Plant area 16,000 square meters 20000 square meters 36000 square meters Manufacturing area 10000 square meters 5000 square meters 15000 square meters Exports 25% Installed Capacity 20,000 Motors per month + 1000 Nos of Gear Motors and Gear boxes per month Manpower 390 ( 180 Technical) 277 ( 95 Technical) 667 Certification ISO 9001-2008 Product range 6000 + Regular clients 4000 + 1.6 Achievements:-  Outstanding Productivity Performance Award by the State Government-for Maharashtra.  ISO 9001: 2008 by Bureau Veritas  Rajiv Gandhi National Quality Award  National Award for Quality Products By Government of India
  • 11. 11 2. PLANT LAYOUT VARNISH & BACKING OF LARGE SIZED MOTORS MACHINE SHOP FOR SMALL AND MEDIUM MOTORS RECEIVING INSPECTION VARNISH & BACKING OF SMALL SIZED MOTORS FETTLING CASTING AREA WELDING SHOP WINDING WELDING MACHINE SHOP FOR SMALL AND MEDIUM MOTORS STORAGE FOR CASTING STORAGE FOR METAL BARS PACKING PRODUCT STORAGE STORAGE FOR CORRUGATED PACKING MATERIAL STORAGE FOR WOODEN PACKING MATERIAL STORAGE FOR WOODEN PACKING MATERIAL STORAGE FOR FINISHED GOOD MATERIAL PRODUCT DEVELOPMENT STORAGE FOR COMPONE- NTS STORAGE FOR COMPONE- NTS STORAGE FOR FINISHED GOODS ASSEMBLY LINE FOR SMALL MOTORS ASSEMBLY LINE FOR MEDIUM MOTORS ASSEMBLY LINE FOR LARGE MOTORS COOLING TOWER HOT WELL R & D DEPARTMENT ENTRY MACHINE SHOP FOR LARGE MOTORS
  • 13. 13 4. PRODUCTS 4.1 PRODUCTS:- IE 3 MOTOR ROLLER TABLE MOTOR Flame-proofMotor (IE1, IE2 & IE3) ENCODER MOTOR PROCESS PUMP SPECIAL GEAR MOTOR
  • 14. 14 STANDARD MOTOR OPENWELL SUBMERSIBLE PUMP MONOBLOCK PUMP LHP EURA AC DRIVES SOFT STARTER Naval / Marine Duty Motor
  • 15. 15 5. SPECIFICATION OF MOTORS 5.1 Roller Table Motor:- 5.1.1 Features:- Established in 1981, LHP is a reputed manufacturer of a wide range of high-quality motors up to 355 L Frame (315 kW). The range includes various types of motors such as Standard Induction, Geared, Brake, Dual Speed, Non- Sparking, Crane & Hoist Duty and Special Purpose Motors to name only a few. The range has been proving its worth for different applications in various industries. LHP Motor is the preferred choice of major corporates, MNCs & OEMs due to the product quality, performance, timely deliveries and competitive prices. The ISO 9001-2008 certification, CE mark, 3 BIS licences and National Awards for Quality Products have made LHP Motors the customer's 'First Choice'. LHP Roller Table Motors are designed taking into consideration the experience of users in steel plants over the years. 5.1.2 APPLICATION:- 1. In steel plants for conveying steel billets for processing through roller mills. 2. Suitable for Geared Motors operating with VVVF Power Source Range 355LFrame Pole 4/6/8 Mounting Standard / Special asperIPSS specifications Frame Upto355L Voltage 415VACor(upto660V)
  • 16. 16 Frequency 50Hz Stalledrotorwithstandtime up to 15 minutesmax or as percustormer requirement Insulation HClass Duty S3,S4,S1,S5,S6&S7 5.1.3 APPLICATION STANDARDS:- IPSS- 1-03-007 Interplant standard for steel industries IS- 325 (IEC 34-1) Specificationsfor 3 phase induction motors IS- 4691 (IEC 34-5) Degrees of protection provided by enclosure for rotating electrical machinery 5.2 Openwell Submersible Pumps 5.2.1 FEATURES:- 1. Models with wide range of discharge & head combinations. 2. Wet type winding wIth polyester wrapped winding wire 3. Copper rotor 4. Carbon / Stainless Still Thrust bearing 5. Bronze bush bearings with special alloy for wear resistance 6. Stainless steel shaft to preven! rusting 7. Stainless steel shaft sleeve 8. Can withstand voltage fluctuations from 300V to 440V 9. Anti-corrosive paint for external surface 10. Foundation and foot vaIve not required when installed under water 11. Buill meticulously for meeting the growing domand of customers 12. Compact in size and easy to installin an open will, river and on a surface as well.
  • 17. 17 5.2.2 HORIZONTAL OPENWELL SUBMERSIBLE PUMP SET:- Type Head Range Discharge 0.5 HP to 30 HP Up to 78m 3.25 m3/h (2100 lpm) 5.2.3 MULTISTAGE VERTICAL OPENWELL SUBMERSIBLE PUPMP SET:- 5.3 Naval / Marine Duty Motor:- 5.3.1 FEATURES:- Established in 1981, LHP is a reputed manufacturer of a wide range of high-quality motors up to 355 L Frame (315 kW).The range includes various types of motors such as Standard Induction, Geared, Brake, Dual Speed, Non- Sparking, Crane & Hoist Duty and Special Purpose Motors to name only a few. The range has been proving its worth for different applications in various industries. LHP Motor is the preferred choice of major corporates, MNCs & OEMs due to the product quality, performance, timely deliveries and competitive prices. The ISO 9001-2000 certification, CE mark, 3 BIS licences and National Awards for Quality Products have made LHP Motors the customer's 'First Choice'. Motors are suitable for (a) Continuous duty (S1) Short time duty (S2) (b) Periodic duty (S3) Type Head Range Discharge 3 HP to 20 HP Up to 105m Up to 54 m3/h (1600 lpm)
  • 18. 18 5.3.2 APPLICATIONS:- Cranes, Hoists, Lifts, Material handling equipment, Machine tools, Cement industries, Paper & Steel plants Range Up to 315 kW RPM 3000, 1500, 1000, 750 (sychronous) Mounting Foot (B-3), Flange (B-5), Face (B-14) and combinations Frame 63 to 355 L Protection IP 55 Insulation F Class Voltage 415 V, 380 V or as per requirement Frequency 50 HZ / 60 HZ or as per requirement Duty S2, S3, S4, S5, S7, & S 5.3.3 Applicable Standards:- IS:4722 Specificationsfor rotating electrical machine. IS:325 (IEC 34 - 1) Specificationsfor 3 phase induction motors. IS:4889 (IEC 34 - 2) Methodof determination of efficiency of rotating electrical machines. IS:4691 (IEC 34 - 5) Degrees of protection provided by enclosure for rotating electrical machinery. IS:12824 Typeof duty & class of rating assigned to rotating assigned to rotating electrical machines.
  • 19. 19 6. PRODUCT RANGE 6.1 The LHP Product Portfolio:- 6.1.1 Motors Product/Description Frame Size Range Three Phase Sq. Cage Induction Motors Up to 355L Up to 425HP/315KW Single Phase Motors (CSR,CSIR & CSCIR) Up to100L Up to 2HP/1.5KW Brake Motors Up to 250M Up to 75HP/55 KW Roller Table Motor 112 to 355L 1.1 to 45 KW( with 15 min. stall time) Flame-Proof Motors(Ex'd') Up to 315L 0.25HP/0.19KW to 270 HP/200KW Increased Safety Motors(Ex'e') Up to 315L 0.75HP/0.55KW to 270HP/200KW Non-sparking Motors(Ex'e') Up to 355L 0.16HP/0.12KW to 425HP/355 KW Energy Efficient Motors Up to 355L Up to 425HP/315KW (Standard And Flame Proof) Helical Gearmotors Up to 225 0.16HP/0.12KW to 40HP/30 KW 0.3 TO 560 RPM WVF Motors Up to 355L Up to 425HP/315KW Crane and Hoist Duty Motors Up to 355L Up to 425HP/315KW for VFD duty Up to 25HP/18KW DOL Starting Lift Duty Motor Up to 315L Up to 215HP/160KW Cooling Tower Motor Up to 315L Up to 215HP/200KW
  • 20. 20 6.1.2 GEAR DRIVE TYPE RATING OUTPUT EnergyefficientHelical GearMotorand 0.16 HP to 40HP 0.35 to 560 RPMand 15000 N-M Gear Boxes 0.12KW to 30 KW Torque Helical GearMotor and Gearboxes 0.16HP/40HP 0.35 to 560 RPMand 15000 N-M 0.12KW to 30 KW Torque 6.1.3 PUMP Product/Description Range Head Range Single Phase DomesticPump 2HP/1.5KW 48m to 50 m MonoblockPumps up 40 HP/30KW 78 m Openwell Pumps(VerticalandHorinzontal Pumps) Up 20HP/15KW Up to 105m MonoblockProcessPumps Up to 20HP/15KW 78m Single Stage Horizontal Centrifugal Self Priming, 14 HP to 10 KW 25 to 30 m non-colgpumps(MudPumps)
  • 21. 21 HIGH VOLTAGE TEST RESISTANCE MEASUREMENT TEST REDUCED VOLTAGE RUNNING TEST NO LOAD RUNNING TEST LOCKED ROTOR TEST SAMPLING TYPE TEST PAINTING 7. TESTING PROCEDURE OF THE MOTOR ROUTINE TEST BLOCK MEGGER TEST OK OK OK OK OK OK OK
  • 22. 22
  • 23. 23 8. CAUSES AND REMIDIES 8.1 PUMP DOES NOT DELIVER WATER:- Causes Remedies a) No water in pump a) Fill water in pump b) Foot valve is not emerged in water. b) Ensure that foot value is emerged in water. c) Too many bends to suction pipe. c) Reduce the bends. d) Leakage in suction Pipe. d) Ensure that there is no leakage in suction pipe. e) Suction lift more than 6 mtr. e) Keep suction lift less than 6 mtr. 8.2 DISCHARGE LESS THAN SPEED:- Causes Remedies a) Suction lift more than 6 mtr. a) Keep suction lift less than 6 mtr. b) Suction/delivery pipe line blocked. b) Clean the pipe line. c) Strainer of foot value is blocked. c) Clean the strainer. d) Pipe size used are smaller than recommended. d) Keep the pipe size as recommended. 8.3 Motor starts and gets trips (star delta starter):- Causes Remedies a) Timer setting on lowest step a) Set timer on proper setting. b) Relay setting on lower reading than rated current. b) Set overload relay at 110% of rated full load current punched on Nameplate.
  • 24. 24 c) Terminal voltage is low. c) Ensure rated voltage OR increase realy setting slightly. d) Backup fuse blowing. d) Correct rating of back-up fuse to be used. e) Starting current is high due to heavy inertia. e) Start stop the relay continuously till motor, pick up full speed. If problem persist, Contact LHP and inform Gd2 of load. f) Misalignment. f) Ensure proper alignment. 8.4 MOTOR CONNECTED BUT DOES NOT PICKS UP FULL SPEED:- Causes Remedies a) No supply of voltage a) Check voltage between each two phases. b) Motor jam b) Check freeness of motor without coupling it to load. c) Motor may be overloaded c) Reduce load. d) Loose connection. d)Tight connection properly. 8.5 NOISE: Causes Remedies a) Too high delivery head. a) Ensure total head is within specified range. b) Too high suction lift. b) Keep suction lift less than 6 mtr. c) Suction line or impeller block. c) Trace the blockage & clean. d) Air entrapped in water. d) Ensure that all joints are airtight. e) Bearings worn out. e) Replace bearing.
  • 25. 25 8.6 STARTING SPEED LESS O R MOTOR DOES NOT START. (SINGLE PHASE MOTOR):- Causes Remedies a) Loose connection of capacitor in Terminal Box. a) Ensure the tight connection of capacitor in circuit as per connection diagram. b) Centrifugal switch open. b) Check contact of centrifugal switch.
  • 26. 26 9. CONCLUSION Undergoing vocational training in esteemed good organization like Laxmi Hydraulics Ltd. Solapur was very in distinguished period in my educational life. The manufacturing of stator,rotor, pressing of rotor into the stator,etc. Also various test performed on motor such as Megger test, high voltage test, resistance measurement test,locked rotor test, etc. and to obtain final quality product is having immence potential & very skilled and experienced manpower. I observed various process like coil making,winding,heat treatmenton on rotor pressing of rotor into the stator,all motor assembly and various test performed on motors. It is a good company with many versatile machines and various motors. Also learned how to maintain good relationship between workers & supervisors, which results in increasing the productivity It was excellent experience working here. The training has encouraged me and gives guidance how to behave in industry and work as part of it.