SlideShare a Scribd company logo
1 of 3
AJAY KUMAR UIKEY
Mobile: +91-9329444803 • +91-9644987502 • Email: ajayuikey18@gmail.com • ajay_uikey@rediffmail.com
Managerial assignments in Power Plant Operations with an organization of repute
EXECUTIVE SUMMARY
 Electrical Engineer with around 12 years of experience in Power Plant& utilities Operations.
 Deft at maintenance and overhauling of Generator, Transformers up to 315 MVA,MCCs, 415 V,3.3KV,6.6 KV,11KV SWGR &
Breakers, LT & HT Motors, and MOV Actuators.
 Worked as the Internal Auditor for IMS (ISO 9001,ISO 14001 & OHSAS 18001), ISO 50001 (EnMS) and 5S.
 Adept at erection & commissioningof LT/ HT Switchgear & Motors, Transformers,TravellingTripper & Stacker/Re-claimer.
 Adroit at performing documentation and auditing of IMS (ISO 9001:2008, ISO 14001,OHSAS 18001,ISO 50001 (EnMS) and
5S.
 Sound knowledge of Programmable Logic Control (PLC) & HMI, installation &Commissioning, Programming in STL, Software
programming of S7 300 PLC.
 Adept at inventory control, budget planning, maintenance planning, spare parts management, contracts management &
vendor development.
CAREER HIGHLIGHTS
 Successfully received:
o Excellence Award given by the 4X250 MW HTPS CSEB Korba (West) C.G. on Republic day of 2007.
o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic
Day of 2009.
o Spot Award given by (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on 18th January 2010.
o Excellence Award given by the 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on
Republic Day of 2010.
o Received award by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic Day of
2010 under suggestion scheme AapkaMantavya.
o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on
Independence Day of 2010.
o Three Nos. Award given by the 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on 29th
December 2010 under suggestion scheme AapkaMantavya.
o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic
Day of 2011.
o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh for SAP Implementation
Project Ekeekaran as a Core Team Member on Republic Day of 2011.
o Appreciation letter given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh for improving reliability of
equipment in Dec’2014.
o Maximum thank you card receiver award given by OPJSTPP (Jindal Power Limited) Tamnar, Raigarh on
Independence Day of 2015.
o Excellence Award given by OPJSTPP (Jindal Power Limited) Tamnar, Raigarh for SAP Implementation in 4X600 MW
plantas a Core Team Member on Republic Day of 2015.
 Worked IMS & EnMS Internal auditor CertificateGiven by Foour D.
CAREER CONTOUR
Jindal Power Limited Tamnar, Raigarh Manager Since Mar’08
Chhattisgarh State Electricity Board, Korba Junior Engineer Jun’04 - Feb’08
Key Deliverables:
Project Management:
 Performing erection, commissioning,operation & maintenance and/or project management of allocated project.
 Planning, executing, monitoring all erection works to ensure completion of project in accordance with contract
specifications,quality standards,safety requirements, cost targets and schedulingtargets.
 Planningand forecastingthe manpower requirements and ensuringsuitabledeployment of manpower.
 Handlingthe up-gradation of relay logic control systemof Coal Handlingplantto PLC.
 Ensuringthe modification of CoolingWater System PLC UPS Power supply to avoid breakdowns.
 Modifyingpaddlefeeder slip ringsystem,travellingtrippers & Flap Gate actuators to avoid frequent faults.
Operations & Maintenance:
 Overseeing the Operation &maintenance activities through executives and coordinating Mechanical, Electrical and
Instrument sub-functions.
 Preparing maintenance schedules of the equipments along with executing the preventive, predictive, breakdown
maintenance & overhaulingof various equipments includingbreakdown analysisand reporting.
 Reviewing the spares, consumables availability and consumption, prepare records, necessary management reports and
optimization of spares/consumables to reduce inventory.
 Commissioningof Siemens make redundant PLC system has been completed in the month of May-07.
 Completing renovation of Stacker/ Reclaimed electrical control System has been carried outin my supervision & guidance.
 Dealing with the modification of ash handling plant, coal handling plant, chiller plant, DM Plant & CW System to avoid
breakdowns & Generation Loss.
 Involving in modification of wall & shoot blower control circuit and cooling tower riser valve MOV actuators to avoid
breakdowns & minimizemaintenance costand to increaseavailability of equipments.
 Managing the Data Preparation for SAP (PM, MM & SM Module), EnMS, IMS & 5S implementation at Jindal Power Limited
Tamnar Raigarh (Chhattisgarh).
 Dealingwith internal auditfor IMS (ISO 9001,ISO 14001 & OHSAS 18001),EnMS (ISO 50001:2011) & 5S.
PROJECT HANDLED
Title: Transformer Design on Visual Basic
Details: Designs transformers of various ratings and has required some small data and gives the design of transformer
within minutes. Itis very useful in various industries which maketransformers.
VOCATIONAL TRAINING
Organization: Tata Sponge Iron Ltd., Orissa
Duration: 25 Days
Details: Observed and analyzed Water Treatment, conveyor belts system; Observed and analyzed the working of the
Kiln;Function of ESP.
TRAININGS ATTENDED
 VVVF Drives at Jindal Steel and Power Limited by Indian Institutefor Production Management
 Auma Actuators at Auma India,Bangalore
 Power Management organized by BEE at PMI, Noida
 Internal Auditor Trainingfor IMS (ISO 9001,ISO 14001 & OHSAS 18001) and ISO 50001 (EnMS)
 Business ExcellenceatESCI, Hyderabad
 Energy Efficiency organized by FICCI at Raipur
 VariableFrequency Drives atBHEL EDN Bangalore
 Train the Trainer
 FirstAid.
 Business writing& Presentation Skill
ACADEMIC CREDENTIALS
MBA (Operations Management); 2012
Sikkim Manipal University
B.E. (Electrical); 2004
Pt. Ravishankar Shukla University, Raipur
IT SKILLS
MS Office, Programming in Visual basic, MS-Business Solution-Navision & SAP
EXTRAMURAL ENGAGEMENTS
 Successfully qualified GATE with 90.37 percentile scorein 2003 and CG PSC Preliminary Twice.
 Actively participated in National Seminars,Teachingin JIPT.
PERSONAL DOSSIER
Date of Birth: 18th October 1979
Current Address: Qr. No. D - 22, Urja Nagar, Colony Jindal Power Limited Tamnar, Raigarh-496108,Chhattisgarh
Permanent Address: Bonga, Govindpur, Pratappur,Surajpur-497223,Chhattisgarh

More Related Content

What's hot (19)

Prashant Satpute
Prashant SatputePrashant Satpute
Prashant Satpute
 
SHYAMjaiswal_(2)--1
SHYAMjaiswal_(2)--1SHYAMjaiswal_(2)--1
SHYAMjaiswal_(2)--1
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
Galaxy Transmissions Pvt Ltd_Conductor Manufacturer
Galaxy Transmissions Pvt Ltd_Conductor ManufacturerGalaxy Transmissions Pvt Ltd_Conductor Manufacturer
Galaxy Transmissions Pvt Ltd_Conductor Manufacturer
 
AnshumanResume1pdf
AnshumanResume1pdfAnshumanResume1pdf
AnshumanResume1pdf
 
electrical maintenace (2)
electrical maintenace  (2)electrical maintenace  (2)
electrical maintenace (2)
 
Galaxybrochure
GalaxybrochureGalaxybrochure
Galaxybrochure
 
Etricals - Profile
Etricals - ProfileEtricals - Profile
Etricals - Profile
 
sujit resume (1)
sujit resume (1)sujit resume (1)
sujit resume (1)
 
Resume
ResumeResume
Resume
 
rakesh ranjan das_inst
rakesh ranjan das_instrakesh ranjan das_inst
rakesh ranjan das_inst
 
navroon2
navroon2navroon2
navroon2
 
Dhiru singh
Dhiru singhDhiru singh
Dhiru singh
 
shoaib CV
shoaib CVshoaib CV
shoaib CV
 
Infinity Engineering Co., Pune, Electrical Products
Infinity Engineering Co., Pune, Electrical ProductsInfinity Engineering Co., Pune, Electrical Products
Infinity Engineering Co., Pune, Electrical Products
 
Resume Kallol Chatterjee
Resume Kallol ChatterjeeResume Kallol Chatterjee
Resume Kallol Chatterjee
 
Amrit Resume
Amrit ResumeAmrit Resume
Amrit Resume
 
Alvin latest cv 2015
Alvin latest cv 2015Alvin latest cv 2015
Alvin latest cv 2015
 

Viewers also liked

Coal Handling System
Coal Handling SystemCoal Handling System
Coal Handling Systemshaikhsaif
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling PlantAshrant Dass
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARARajat Verma
 
coal handling
coal handling coal handling
coal handling ssoniii
 
Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...Amit Bansal
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentationrajkumar_sm
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plantRohit Khatri
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systemsArnab Chakraborty
 
Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....Vipul Sinha
 
Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )SHRIKANT KHATING
 

Viewers also liked (13)

Coal Handling System
Coal Handling SystemCoal Handling System
Coal Handling System
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARA
 
coal handling
coal handling coal handling
coal handling
 
Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...Summer training presentation on thermal plant in jindal steel and power limit...
Summer training presentation on thermal plant in jindal steel and power limit...
 
CORPORATE PRESENTATION 2013
CORPORATE PRESENTATION 2013CORPORATE PRESENTATION 2013
CORPORATE PRESENTATION 2013
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systems
 
Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....
 
Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )Coal Handling Plant ( CHP )
Coal Handling Plant ( CHP )
 
Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
 

Similar to Ajay Uikey

Similar to Ajay Uikey (20)

deo@dipankar.doc
deo@dipankar.docdeo@dipankar.doc
deo@dipankar.doc
 
SuryaMohan_Resume_2016
SuryaMohan_Resume_2016SuryaMohan_Resume_2016
SuryaMohan_Resume_2016
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016
 
social profile _sachin soni_220715
social profile _sachin soni_220715social profile _sachin soni_220715
social profile _sachin soni_220715
 
SuryaMohan_Resume_2015
SuryaMohan_Resume_2015SuryaMohan_Resume_2015
SuryaMohan_Resume_2015
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Resume ravindra
Resume ravindraResume ravindra
Resume ravindra
 
SUDIP DHAR Resume electrical Engineering
SUDIP DHAR  Resume electrical EngineeringSUDIP DHAR  Resume electrical Engineering
SUDIP DHAR Resume electrical Engineering
 
RUPAN GUHA RESUME
RUPAN GUHA  RESUMERUPAN GUHA  RESUME
RUPAN GUHA RESUME
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
C.V_Ali_Akhtar Anjum
C.V_Ali_Akhtar AnjumC.V_Ali_Akhtar Anjum
C.V_Ali_Akhtar Anjum
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Dhananjay_Kumar_Chaubey_2016
Dhananjay_Kumar_Chaubey_2016Dhananjay_Kumar_Chaubey_2016
Dhananjay_Kumar_Chaubey_2016
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Rajesh Patel Resume
Rajesh Patel ResumeRajesh Patel Resume
Rajesh Patel Resume
 
Saroja patra@cv
Saroja patra@cvSaroja patra@cv
Saroja patra@cv
 

Ajay Uikey

  • 1. AJAY KUMAR UIKEY Mobile: +91-9329444803 • +91-9644987502 • Email: ajayuikey18@gmail.com • ajay_uikey@rediffmail.com Managerial assignments in Power Plant Operations with an organization of repute EXECUTIVE SUMMARY  Electrical Engineer with around 12 years of experience in Power Plant& utilities Operations.  Deft at maintenance and overhauling of Generator, Transformers up to 315 MVA,MCCs, 415 V,3.3KV,6.6 KV,11KV SWGR & Breakers, LT & HT Motors, and MOV Actuators.  Worked as the Internal Auditor for IMS (ISO 9001,ISO 14001 & OHSAS 18001), ISO 50001 (EnMS) and 5S.  Adept at erection & commissioningof LT/ HT Switchgear & Motors, Transformers,TravellingTripper & Stacker/Re-claimer.  Adroit at performing documentation and auditing of IMS (ISO 9001:2008, ISO 14001,OHSAS 18001,ISO 50001 (EnMS) and 5S.  Sound knowledge of Programmable Logic Control (PLC) & HMI, installation &Commissioning, Programming in STL, Software programming of S7 300 PLC.  Adept at inventory control, budget planning, maintenance planning, spare parts management, contracts management & vendor development. CAREER HIGHLIGHTS  Successfully received: o Excellence Award given by the 4X250 MW HTPS CSEB Korba (West) C.G. on Republic day of 2007. o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic Day of 2009. o Spot Award given by (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on 18th January 2010. o Excellence Award given by the 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic Day of 2010. o Received award by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic Day of 2010 under suggestion scheme AapkaMantavya. o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Independence Day of 2010. o Three Nos. Award given by the 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on 29th December 2010 under suggestion scheme AapkaMantavya. o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh (Chhattisgarh) on Republic Day of 2011. o Excellence Award given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh for SAP Implementation Project Ekeekaran as a Core Team Member on Republic Day of 2011. o Appreciation letter given by 4X250 MW OPJSTPP (Jindal Power Limited) Tamnar, Raigarh for improving reliability of equipment in Dec’2014. o Maximum thank you card receiver award given by OPJSTPP (Jindal Power Limited) Tamnar, Raigarh on Independence Day of 2015. o Excellence Award given by OPJSTPP (Jindal Power Limited) Tamnar, Raigarh for SAP Implementation in 4X600 MW plantas a Core Team Member on Republic Day of 2015.  Worked IMS & EnMS Internal auditor CertificateGiven by Foour D. CAREER CONTOUR Jindal Power Limited Tamnar, Raigarh Manager Since Mar’08 Chhattisgarh State Electricity Board, Korba Junior Engineer Jun’04 - Feb’08 Key Deliverables: Project Management:  Performing erection, commissioning,operation & maintenance and/or project management of allocated project.  Planning, executing, monitoring all erection works to ensure completion of project in accordance with contract specifications,quality standards,safety requirements, cost targets and schedulingtargets.  Planningand forecastingthe manpower requirements and ensuringsuitabledeployment of manpower.  Handlingthe up-gradation of relay logic control systemof Coal Handlingplantto PLC.  Ensuringthe modification of CoolingWater System PLC UPS Power supply to avoid breakdowns.  Modifyingpaddlefeeder slip ringsystem,travellingtrippers & Flap Gate actuators to avoid frequent faults.
  • 2. Operations & Maintenance:  Overseeing the Operation &maintenance activities through executives and coordinating Mechanical, Electrical and Instrument sub-functions.  Preparing maintenance schedules of the equipments along with executing the preventive, predictive, breakdown maintenance & overhaulingof various equipments includingbreakdown analysisand reporting.  Reviewing the spares, consumables availability and consumption, prepare records, necessary management reports and optimization of spares/consumables to reduce inventory.  Commissioningof Siemens make redundant PLC system has been completed in the month of May-07.  Completing renovation of Stacker/ Reclaimed electrical control System has been carried outin my supervision & guidance.  Dealing with the modification of ash handling plant, coal handling plant, chiller plant, DM Plant & CW System to avoid breakdowns & Generation Loss.  Involving in modification of wall & shoot blower control circuit and cooling tower riser valve MOV actuators to avoid breakdowns & minimizemaintenance costand to increaseavailability of equipments.  Managing the Data Preparation for SAP (PM, MM & SM Module), EnMS, IMS & 5S implementation at Jindal Power Limited Tamnar Raigarh (Chhattisgarh).  Dealingwith internal auditfor IMS (ISO 9001,ISO 14001 & OHSAS 18001),EnMS (ISO 50001:2011) & 5S. PROJECT HANDLED Title: Transformer Design on Visual Basic Details: Designs transformers of various ratings and has required some small data and gives the design of transformer within minutes. Itis very useful in various industries which maketransformers. VOCATIONAL TRAINING Organization: Tata Sponge Iron Ltd., Orissa Duration: 25 Days Details: Observed and analyzed Water Treatment, conveyor belts system; Observed and analyzed the working of the Kiln;Function of ESP. TRAININGS ATTENDED  VVVF Drives at Jindal Steel and Power Limited by Indian Institutefor Production Management  Auma Actuators at Auma India,Bangalore  Power Management organized by BEE at PMI, Noida  Internal Auditor Trainingfor IMS (ISO 9001,ISO 14001 & OHSAS 18001) and ISO 50001 (EnMS)  Business ExcellenceatESCI, Hyderabad  Energy Efficiency organized by FICCI at Raipur  VariableFrequency Drives atBHEL EDN Bangalore  Train the Trainer  FirstAid.  Business writing& Presentation Skill ACADEMIC CREDENTIALS MBA (Operations Management); 2012 Sikkim Manipal University B.E. (Electrical); 2004 Pt. Ravishankar Shukla University, Raipur IT SKILLS MS Office, Programming in Visual basic, MS-Business Solution-Navision & SAP EXTRAMURAL ENGAGEMENTS  Successfully qualified GATE with 90.37 percentile scorein 2003 and CG PSC Preliminary Twice.  Actively participated in National Seminars,Teachingin JIPT.
  • 3. PERSONAL DOSSIER Date of Birth: 18th October 1979 Current Address: Qr. No. D - 22, Urja Nagar, Colony Jindal Power Limited Tamnar, Raigarh-496108,Chhattisgarh Permanent Address: Bonga, Govindpur, Pratappur,Surajpur-497223,Chhattisgarh