1. Position Applied: SENIOR CIVIL ENGINEER (Site)
VICENTE V. CARIÑO
E-Mail Add: yohvic2003@yahoo.com
C.P. #: +97433439863
+639294927551, +639208464794
QUALIFICATIONS: Career Highlight
BS in Civil Engineering
• Over 21 years of various fields of Engineering
Construction in the Middle East & Asia, Assigned
In Project Management & Construction Supervision
Of Multi Storey Buildings, Model Bank Branches,
Development of Industrial & Residential Subdivision,
Mass Housing Projects, Townhouses, Warehouses,
Airport Terminal, Schools, NGL Plant & Refinery, etc.
• Computer Proficient in MS Excel, MS Word &
Drafting ,knowledge in Auto Cadd
EDUCATIONAL ATTAINMENT:
TERTIARY : Bachelor of Science in Civil Engineering
Saint Louis University
Baguio City
Class 1991
PERSONAL QUALIFICATION:
Licensed Civil Engineer- PRC REG. No. 0069146
ORGANIZATIONAL AFFILIATION:
Philippine Institute of Civil Engineer (PICE)
Member, National Chapter
TRAINING AND SIMINARS:
Business Continuity Management Awareness at Arab National Bank
Various Philippine Institute of Civil Engineers – PICE seminars 1994 to present
Earth quake seminars and reinforce concrete at manila midtown hotels
Rail Tunnels –Introduction to construction of operational fire and life safety issues.
Certificate of Appreciation for completion of EC/Least Tardiness/Code of Ethics
2. DETAILED EXPERIENCE:
SENIOR CIVIL ENGINEER (site)
Louis Berger Group
Doha, Qatar
09/2012 - Present
Project: QF-12 Storey Headquarters and Strategic Studies Center (Education City)
& 4- Storey National Library Projects (Education City)
• Check/RFIT daily inspection of requested items and verification of approval such as
SD/MT/MS/ITP/MDS/CS/IFC via ACONEX system prior to proceed inspection
• Discuss noted activities without approval to QA/QC and SM for issuance of
SDR/NCR/SSR
• Discuss encounter problem in the site thru site manager and coordinate to other
disciplines
• Update project measurements based on actual accomplishment and submit to SM &
planning
• Update daily activities for external modification of underground utilities such as
removal and re-installation of affected firewater pipes/ Q-tel pipes/electrical cables
/trust blocks/backfilling /hauling/chipping of floor slab/ warning tape /removal of
limestone/shuttering fabrication & installation/total manpower/ photos and submit to
SM
• Mark up in the drawings for issued SSR/SDR/NCR and completed inspection for
records
• Overall work supervision and to verify/ ensure/implement project specs and QCS
• Submit daily allocated sheet (DAS) and daily log (DL) for inspected items to SM.
• Monitor actual activities in the site such as erection of structural steel and verify specs
for FPBW, UTS, MPI, NDT, white and colored concrete, normal concrete,check
slump and temperature, Water proofing membrane, plastering, blockworks and
facade,marble,tiles,studs/drywall,painting etc.
• Coordinate with MEP requirements prior to casting and closure of
formworks/ceiling,etc.
• Check/Verify/Redline mark-up submitted shop drawing as per actual on site.
• In-charge of infrastructure works for CR2
• Assigned to conduct newly applicant for interview and screening
CIVIL ENGINEER
ZUHAIR FAYEZ PARTNERSHIP CONSULTANTS
P.O.Box.5445, Jeddah 21422
October 01, 2011 to Sept 2012
Project: Construction of King Abdullah Immigrant Housing Dedicated to His/Her
Parents-Two Storey Residential House-Kharesh Site, Jizan City
3. JOB DESCRIPTION:
• Check/Verify shop drawing submitted by contractor base on approved construction
layout
• Assign in road infrastructure to monitor daily activities and check requested area for
inspection such as kerbstone, sewerage and water line, telecom and electrical including
paving tiles,etc.
• Conduct FDT test for sub-base materials prior for prime coat and asphalt paving
• Verrify design mix for asphalt such as wearing & binder course
• Supervise asphalt paving and coring sample for the required thickness and laboratory
testing
• Assist concrete pouring in the site and monitor slump, temperature for the required
design mixture and general notes.
• Prepare daily and weekly report and submit to Infra manager and client
• Review submitted materials sample base on approved supplier/vendors and conform to
technical specifications
• Evaluate progress billing base on actual performance in the site and compare in
approved contract BOQ
• Grand Summary of Project Total Cost SR. 1.20 billion +V.O.
• Prepare SDR, SOR and NCR if the work does not comply to the requirements
• For Health centre ,check submitted RFI as per location and verify in the approved
construction drawings.
• Check setting out of plastering,alignment of column/beam and reinforcement as per
attached request.
• Coordinate with MEP requirements prior to next activities.
• Review submitted material samples and check in the specs and discuss to architecture
and site manager.
• Update actual accomplishment as per submitted time table & review submitted shop
drawing
• Inspection of RFIT for surface preparation prior to next application,such as primer,
painting,membrane,etc
PROJECT MANAGER/COORDINATOR
ARAB NATIONAL BANK
Riyadh/Jeddah/Abha/Al-Mansak/Al-Rass,Taif
July 14, 2008 to April 9, 2011
• Construction of 9-Storey Regional Management Office /Two Storey Model New
Branches & Tele-Money Center & Renovation branches –Jeddah
JOB DESCRIPTION:
• Prepare project proposal as requested by management; budget of the project & design
requirement for bank respective branches; bid invitation to consultant and contractor
• Represent premises dept. for bid opening of both consultant and contractor; prepare bid
analysis for the lowest bidders and negotiate the prices.
4. • Award consultancy work (design and supervision) and contractors works
• Overseas and approved consultants project design base on the bank standard requirements
• Monitor and control construction phase of the project,negoitiate,deal,coordinate with project
construction documents, project proceedings in all its stages, project construction & reports,
request furnitures,ITG,Overseas branch maintenance works until final handing over.
• Review construction contract both consultant and contractor, technical Specifications; check
bill of quantities and unit rate base on the BOQ; check IFC & SHOP Drawings, Material
submittals
• Monitor actual installation of finishing works base on approved submitted materials, check
proper installation, setting out and layout
• Send quotation to ANB Approved supplier base on the required supplied items.
• Prepare user approval and confirmation letter
• Attained weekly meeting @ site together with consultant, contractor, and sub-con. And
discuss status and progress of the project base on the approved schedule and materials
samples.
• Evaluate progress billing recommended by the consultant base in the contracts, tender
drawings and BOQ.
SENIOR CIVIL ENGINEER
CANSULT MAUN SELL CONSULTANCY SERVICES LIMITED/AECOM
P.O.Box 6650
Doha, State of Qatar
June 26, 2007 to June 26, 2008
• CONSTRUCTION OF TWO STORY HOUSING PROJECTS &
SCHOOLS,BANKS,HOSPITALS, RESTAURANTS,CAFES & COMMERCIAL
COMPLEX & SHOPS
JOB DESCRIPTION:
• Review submitted shop drawings base on the approved construction
• Prepare letter of approved drawings, revised and re-submit
• Monitor actual site activities base on submitted time table, check proper installation of work s
as per approved material submittal.
• To strictly enforce the provision amended in the building code & structural code for standard
practice.
• To support the project in-charge to fully implement the project as per plans & design
specification.
• Assigned in the project overall site supervision.
• Check material submittals base on approved vendors; classification of materials & reflect in
the QCS specs and BSI Code.
PROJECT MANAGER
ARAB NATIONAL BANK
Head Office, Murabba, Main Branch
Riyadh K.S.A.
October 20, 2004 – to June 01, 2007
5. • CONSTRUCTION AND RENOVATIONS OF BANK BRANCHES (JIZAN/MAHAEL
ASEER/SABIA/Khamis Mushy at Military and New Model Branch / Al-Baha,/Tai’f Al-
Shouhada & Najran )
JOB DESCRIPTION:
• Prepare project proposal as requested by management, budget of the project & design
requirement for bank respective branches; bid invitation to consultant and contractor
• Represent premises dept for bid opening of both consultant and contractor; prepare bid
analysis for the lowest bidders and negotiate the prices.
• Award consultancy work (design and supervision) and contractors works
• Overseas and approved consultants project design base on the bank standard requirements
• Monitor and control construction phase of the project,negoitiate,deal,coordinate with project
construction documents, project proceedings in all its stages, project construction & reports,
request furnitures,ITG,Overseas branch maintenance works until final handing over
• Review construction contract both consultant and contractor, technical Specifications; check
bill of quantities and unit rate base on the BOQ; check IFC & SHOP Drawings, Material
submittals.
• Monitor actual installation of finishing works base on approved submitted materials, check
proper installation, setting out and layout
• Send quotation to ANB Approved supplier base on the required supplied items.
• Prepare user approval and confirmation letter
• Attained weekly meeting @ site together with consultant, contractor, and sub-con. And
discuss status and progress of the project base on the approved schedule and materials
samples.
• Evaluate progress billing recommended by the consultant base in the contracts, tender
drawings and BOQ.
SENIOR CIVIL ENGINEER
AL- ABBAS TRADING & CONT.EST.
P.O.Box.101
Rahima 31941
K.S.A.
January 22, 2001 - March 12, 2004
• UPGRADE A/C UNITS @ COMM. BLDG. # 1401 YANBU REFINERIES & BLDG. #
12 NGL PLANT, SAUDI ARAMCO, K.S.A.
• UPGRADE EMERGENCY CONTROL CENTER AND ROOM RENOVATION @
ABQAIQ CENTRAL ADMIN. BLDG.RM.3105. SAUDI ARAMCO, K.S.A.
• EXPANSION OF NEW COMM. BLDG. @ RABEGH & CONSTRUCTION OF NEW
COMM.BLDG. SHEDGUM, SAUDI ARAMCO, K.S.A.
JOB DESCRIPTION:
• Attend pre-qualification of bid @ SAUDI ARAMCO PROJECT & site actual visit.
• Quantity takeoff base on given drawing and send quotation to the manufacturer for their
prices. Evaluate given unit prices and compute total amount then submit to project manager
for final approval and submission of bid.
• Coordinate to SAUDI ARAMCO proponent, project engineer, inspector regarding work
activities and accomplishment. Supervised installation of HVAC UNITS as per plan including
piping and electrical layout.
6. • Submit RFI & joint inspection together with the project inspector prior to concrete casting &
final closure. Discuss not specified in the approved plan and changes.
• Coordinate with loss prevention before commencing work especially in the restricted areas
for the issuance of required permits.
• As built plan for final location and re-routing.
SENIOR CIVIL ENGINEER
SAUDI OGER LTD.
P.O.Box.1449
Riyadh 11431
K.S.A
November 12, 1998-December 14, 1999
• EQUESTRIAN CLUB & 7th
STORY Building
JOB DESCRIPTION:
• Quantity takeoff base on given contract agreement, IFC Drawing and approved
construction plan, shop drawing and compare in BOQ.
• To be aware of the schedule given by the project manager & coordinate with foreman/ lead
man of civil work.
• Coordinate with structural designer regarding detail of plan and supervise actual
implementation of structural and architectural work.
• Prepare for inspection of rebar, formwork before closing & coordinate with inspector.
• Coordinate with surveyor regarding gridlines & elevation.
• Supervised and quantify volume of concrete required & coordinate to QA/QC inspector
regarding samples o test cubes & slump test. Coordinate to supplier regarding volume of
concrete & casting notice.
• Review submitted shop drawings
CIVIL SITE SUPERVISOR
DAEWOO CORPORATION
Bandar Wawasan / Vision City project
Lot.PT.372 Section 41
Jalan Sultan Ismail 50300
Kuala Lumpur, Malaysia
August 01, 1997- August 01, 1998
• 35 STOREY TWIN TOWER OFFICE BLDG. & RETAIL CENTER WITH 4
BASEMENT
JOB DESCRIPTION:
• Assigned in the project overall site supervision.
• Supervised work activities of sub-contractors base on the actual activities and reflect in the
approved construction drawings; prepare construction reports
• Prepare for inspection of rebar, formwork before closing & coordinate with inspectors.
• Coordinate with surveyor regarding gridlines & elevation.
7. • Supervised and quantify volume of concrete required & coordinate to QA/QC inspector
regarding samples o test cubes & slump test. Coordinate to supplier regarding volume of
concrete & casting notice.
• Checking of layout such as bricklaying, plastering alignment with level surface & corner bead
including ex-met and final paintings. Check brick classifications base in required
specification.
• Inspection of door frame, plastering, bricklaying & coordinate to consultant
• Coordinate to M & E department regarding opening of duct & pipe sleeves.
FORMWORKS SUPERVISOR-1
FF CRUZ JR / FILSYSTEMS INC.
April 1995 - July 31, 1997
• 50-STORY FORBES TOWER/QUEEN’S GARDEN WITH 7 CARPARK
LEVEL/Valero St. Salcedo,Village, Makati City
• 45-STORY TWIN TOWER CONDOMINUM with 4 basement / Salcedo Village,
Makati City
JOB DESCRIPTION:
• Assigned in the project overall work site supervision
• Quantify formwork requirements & monitor materials needed @ jobsite & Coordinate to
formworks head.
• Design formworks used especially table form & conventional method. Monitor actual
accomplishment & supervise installation of formworks, stripping of forms and concrete
pouring.
• Coordinate with quantity surveyor to provide grind lines and elevation of areas to perform
and advise concrete engineer, M & E for the work activities.
PROJECT FIELD ENGINEER
J. STA. MARIA CONSTRUCTION
T. M. Kalaw St. Ermita, Manila
June 1993 - Feb.1995
• 16-STORY OFFICE BUILDING WITH 2 BASEMENT LEVEL
JOB DESCRIPTION:
• Supervise pile driving & record penetration. Check required splice & monitor pile-splicing
epoxy with setting time in the accordance with design & specification.
• Supervise cutting of rebar in accordance with design & specification and concrete pouring.
• Purchase construction materials.
• Prepare weekly reports, coordinate with project inspector and submit to R.E.& Project
Manager
• Quantify formwork requirements & monitor materials needed @ jobsite & Coordinate to
formworks head.
8. PROJECT ENGINEER
RESIDENTIAL HOUSES
(Self-employed)
April 1991- May 30, 1993
JOB DESCRIPTION:
• Assigned in the project as overall site supervision.
• To strictly enforce the provision amended in the building code & structural code for standard
practice.
• To support the project in-charge to fully implement the project as per plans & design
specification.
• Quantity takeoff base on given approved drawings.
• Coordinate with supplier regarding volume of concrete & casting notice.
• Check setting out such CMU walls, vertical and horizontal alignment, level pick such ex-met
and corner bed; Inspection of door frame, plastering and final painting.
• Check lot area preparation for butter board and layout setting.
REFERENCES:
Mr.Michael Donkin Mr.Nicolas Ruiz
SCM,Louis Berger Group SCM,Louis Berger Group
EC-Project Doha EC-Project,Doha
Mr.David Rouback Engr. Joel T.Madriaga
Chief Construction Manager Commissioning Manager
Louis Berger Group- China Harbor,Doha
EC-Project -Doha,Qatar
I hereby certify that the above information is true and correct to the best of my knowledge
and belief.
VICENTE V. CARINO
CIVIL ENGINEER
PRC REG.NO.0069146