1. House No: B302, Kushi Residency, GE Road,
Telebandha, Labandhi,NH-6,RAIPUR – 492 010
Phone: 91-9589052501, email: avskrishna@hotmail.com
Adusumilli Venkata Siva Krishna
Job Objective
• To acquire a challenging position in the field of Mechanical Engineering, where I can
effectively contribute to the growth of the organization by utilizing my experience and
knowledge.
Professional Experience
• Having more than 23 years of experience in Design & Development of heavy
machinery, equipment and Plant Layouts for Cement Plants & Sugar plants.
• Well versed in independent Detail engineering of all type of indigenous machinery,
vessels & preparation of Plant layouts for Process plants
• Standardization of equipments and bought out items based on system requirements
to improve system performance
• Design and Detail engineering of high & low speed rotating indigenous machines.
• Sizing of equipment for material handling systems Lime Stone, Additives, Sugar,
and Coal etc.
• Detailed engineering with complete Process Flow diagrams & PI diagrams.
• Standardization of Layouts implementing Concept & modules and improving system
performance.
• Exposure to ISO 9001 procedure for Engineering.
Career Path
Details of Work Experience
(Sep 2015 to till date)
• June 1993 to Feb 1994 - Trainee (Engineering company)
• Mar 1994 to Aug1996 - Graduate Trainee(The KCP Ltd, Central workshop ,Chennai)
• Sep 1996 to May 1999 - Engineer - Designs(FCB-KCP Ltd, Chennai)
• June 1999 to July 2002 - Senior Engineer- Designs(FCB-KCP Ltd, Chennai)
• Aug 2002 to Oct. 2003 - Asst. Manager – Designs(FCB-KCP Ltd, Chennai)
• Nov 2003 to Dec 2006 - Deputy Manager – Designs(FCB-KCP Ltd, Chennai)
• Jan 2007 to Mar 2008 - Manager – Designs(Fives Cail -KCP Ltd, Chennai)
• April 2008 toDec 2008 - Senior Manager – Designs(Fives Cail –KCP Ltd, Chennai)
• Dec 2008 to Aug 2010 - Manager – Plant Layout (FLSmidth Pvt Ltd, Chennai)
• Sep 2010 to Sep 2015 - Chief Manager–Engineering(KHD Humboldt Wedag, Delhi)
• Sep 2015 to till date – GM Head of Engg (Jindal Steel & Power Ltd, Raipur)
• Organization - JINDAL STEEL & POWER LTD; Machinery Division,
Raipur.
• Company Profile - JINDAL STEEL & POWER LTD is the leading supplier
of equipment and services for EOT & Gantry Cranes, steel plant
equipment, Material Handling, & Pressure vessels and established in 1992
at Raipur, Chhattisgarh.
• Tenure - September 2015 to present
• Current Designation - General Manager (Head of Engineering)
Page 1 of 6
2. • Reporting to - Business Unit Head
Chief Tasks Handling
• Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage for steel plant (viz. Rubber
Belt conveyors, Stacker & Reclaimers etc.)
• Preparation & Freezing of Equipment Layout for Pipe conveyor, Cement
grinding unit & FGD of different plant departments as per plant Layout.
• Engineering head for doing projects of all the product equipment like EOT &
Gantry cranes, Pipe conveyor, Belt conveyors, Stacker & Reclaimers, Steel
plant equipment’s, Pressure vessels etc. Projects handling JPL Tamnar, JSPL
Angul, JSW, EIL, UOP, Dangote etc.
• Checking and approving of GA Drawings of different Plant departments.
• Preparation of Technical specifications of services related bought out items.
• Clarifications to the queries received from Civil consultants / Customer
• Layout Coordination with customer and consultants (Tendering projects).
• Currently working on an EPC Project, 20.3 KM pipe conveyor from Bilaimund to
JPL Tamnar.
• Lead the team of size 55 to 70 members while working for the different projects.
Details of Work Experience
(Previous Sep 2010 to Sep 2015)
• Organization - KHD HUMBOLDT WEDAG India Pvt Ltd; DELHI.
• Company Profile - KHD HUMBOLDT WEDAG is the leading supplier of
equipment and services to the global Cement and Minerals industries.
• Tenure - September 2010 to present
• Current Designation - Chief Manger (Plant Application Engineering & Services)
• Reporting to - AVP / Head of Engineering Dept
Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage (viz. Rubber Belt conveyors,
Stacker & Reclaimers, Bucket Elevators, Screw Conveyors etc.)
• Preparation & Freezing of Equipment Layout for different plant departments in
Cement Plant as per plant Layout.
• Technical head for projects like Ultratech 10,000 tpd clinkerisation plant, Dalmia
Cement for their 4500 tpd clinker capacity integrated cement plant in Belgaum,
ACC for 9000 tpd clinker capacity integrated cement plant in Jamul etc. These
projects includes various product departments having equipment like Roller
Press, Separators, Preheater, Kiln, Cooler, VRM, Ball Mills, material handling
equipments etc..
• Checking and approving of GA Drawings of different Plant departments in
compass Documentum (Common Database)
• Preparation of Technical specifications of services related bought out items.
• Clarifications to the queries received from Civil consultants / Customer
Page 2 of 6
3. • Layout Coordination with customer and consultants ( Dalmia cement, ACC
Jamul & Tendering projects).
• Currently working on an EPC Project, ACC Jamul 9000tpd integrated cement
plant.
• Lead the virtual team of size 20 to 25 members while working for the different
projects.
Details of Work Experience
(Previous Dec 2008 to Aug 2010)
• Organization - FLSmidth Pvt Ltd; CHENNAI.
• Company Profile - FLSmidth is the leading supplier of equipment
and services to the global Cement and Minerals
industries.
• Tenure - December 2008 to Sept 2010
• Current Designation - Manager (Plant Layout)
• Reporting to - Head of Plant Layout Engineering
Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage (viz. Rubber Belt conveyors,
Stacker & Reclaimers, Bucket Elevators, Screw Conveyors etc.)
• Basic Design of equipment for Coal material handling systems from raw coal
dumping hoppers to coal mill and coal mill to fine coal bins(Rubber Belt
Conveyors, Screw Conveyors etc.) and Cement grinding.
• Preparation & Freezing of Equipment Layout for different plant departments in
Cement Plant and Sizing of Bins as per plant Layout.
• Preparation of Outline & Load drawings for different equipment (viz. Rubber
Belt conveyors, Bucket Elevators, Screw Conveyors, Bins etc.)
• Checking and approving of GA Drawings of different Plant departments in
Documentum (Common Database)
• Preparation and submission of transmittals for different plant departments and
Preparation of Foundation Bolts list.
• Clarifications to the queries received from Civil consultants / Customer
• Preparation of piping layout for compressed air and water for different Plant
departments.
• Leading a team of 2 Engineers and 14 Designers.
Details of Work Experience (Other
Previous)
• Organization - Fives Cail - KCP Ltd. (Formerly FCB-KCP Ltd.)
• Company Profile - Design, Manufacture, Supply, Installation & Commissioning
of
Machinery & Equipment on Turnkey basis for Sugar,
Minerals,
Distillery & various Process Plants
• Tenure - September 1996 to Dec 2008.
• Current Designation- Senior Manager (Designs)
• Reporting to - GM (Engineering & Purchase) / Managing Director
Page 3 of 6
4. Chief Tasks Handled
• Leading the Engineering team from Design Stage for developing the Preliminary
Plant layouts to design and detail engineering of equipment/machinery/material
handling equipments.
• Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage (viz. Rubber Belt conveyors,
Bucket Elevators, Screw Conveyors etc.)
• Modification of existing layouts to accommodate equipment / Machinery with
conveying system for expansion projects.
• Design and detail engineering of material handling equipments, rotary driers,
fluidized bed driers.
• Design and detail engineering of high speed centrifugal machines and shredders etc
• Converted French drawings and materials standards to suit Indian standards.
• Detailed Engineering with complete Process Flow diagram & PI diagram, Piping
layouts & detailing.
• Continuous development and replacement of imported components with indigenous
items to suit Indian Customers and easy procurement.
• Erection, commissioning and performance guarantees of the new product
launching.
• Attending technical negotiations with customers and freezing the concepts.
• Finalizing the layouts to suit customer requirements and site conditions.
• Preparation of Estimates for a Plant of particular capacity.
• Freezing of Equipment for a plant of particular capacity.
• Finalization of Technical Specifications, order processing and execution including
proving of performance trials.
• Design of Molasses Storage Tanks using IS: 5521and storage bins.
• Preparation of feasibility report and providing consultancy services for various
Customers.
• Selection of vendors, attending technical discussions for finalization of bought-out
items.
• Trouble shooting and advising remedial measures during erection & commissioning.
• Preparation & submission of operation and maintenance manual for various
machinery & equipment.
• Meeting the target of project completion (domestic & exports) within scheduled
time.
• Leading a team of 4 Engineers and 14 Designers including 2 trainees.
Some of the Achievements during the above tenure
Improved the Equipments design :-
• Improved design of new equipments of our collaborator and made detail
engineering, involved in the manufacturing, erection & commissioned the
equipments (high speed rotating machinery) and proved the performance.
Deputed to France :- Oct’2004
• For discussions with our Collaborator for development and launching of New
Product.
• Analyzed the problems/ drawbacks in existing design.
• Defined the technical specification for the new product with feasibility for
diversification to non – sugar industry.
Page 4 of 6
5. • Selection and finalization of raw materials & manufacturing methods.
• Development of prototype and testing.
• Reduced the cost of centrifugal machine by 15% and increased the market share of
Centrifugal Machine from 25% to 40%
Deputed to Bangladesh:- Oct’2006
• Trouble shooting of some of the conveyors/equipments/machinery and achieved the
performance.
• For clarification of various points in laying the pipelines for 1000 TPD Sugar
Refinery
Visited Vietnam :- Jun’2007
• For studying an existing factory equipments/machinery/conveyors and design the
equipments and layout for expansion
• Completed the expansion work successfully with in stipulated time
Attended an International Seminar in South Africa :- Aug’2007
• For marketing and to explain the international customers about the advantages of
our equipments.
Visited Vietnam :- Apr’2008
• For identifying the suitability of equipments of an existing plant for purchasing and
shifting the plant to new location & expanding the plant.
Details of Experience with Previous Employers
1) • Organization - The KCP Ltd. Chennai
• Company Profile - Design, Manufacture, Supply, Installation & Commissioning of
Machinery & Equipment on Turnkey basis for Cement,
Steel,
Sugar, Chemical Plants & Special Projects for ISRO,
Defense etc.
• Tenure - March 1994 to April 1996
• Last Designation - Graduate Trainee
2) • Organization - Engineering & Constructions Ltd.
• Company Profile - Fabrication, Erection & Commissioning of Machinery &
Equipment on Turnkey basis for Different Industries
• Tenure - June 1993 to February 1994
• Last Designation - Trainee
Job Responsibilities include
• System Design, Detail Engineering and providing inputs for preparation of
manufacturing drawings for machinery & equipment
• Design/ Engineering of requisite structural for machinery & equipment
• Preparation of bought-out items and bill of materials for machinery & equipment.
• Negotiation and finalization of sub-contract orders for site fabrication, erection &
commissioning
• Receipt of raw materials and distribution to sub-contractors for site fabrication
• Stage wise inspection of the job and obtain customer clearance
• Checking of civil foundations before installation of the machinery & equipment
• Conducting trials of the installed machinery & equipment and handing over to
customer
Page 5 of 6
6. • Attending review meetings with customer
Some of the Achievements during the above tenure
• Suggested changes in design of structural arrangement with cost reduction of 20%
• Suggested change in material specification of liners, which was frequently getting
damaged.
• Handled independently the site fabrication installation & commissioning of
conveyors, machinery & equipment.
• Developed indigenous components, which were being imported from France
causing delay in delivery.
Educational Qualifications
• First Class Engineering Graduate in Mechanical Engineering from KBN College
of Engineering, Gulbarga, Karnataka
• Diploma in Mechanical Engineering from V. Ramakrishna Polytechnic, Chennai
Computer Skills
• Software: - Pro/E 20.0, Auto CAD Rel. 2008, NISA
• Operating System: - Windows XP and LAN
• Languages Known: - C++
Personal Details
• Date of Birth: 22nd
April 1969
Languages Known: English, Hindi, Telugu & Tamil
Present CTC
Notice Period
• …….Lacks.
• 2 to 3 months
Page 6 of 6
7. • Attending review meetings with customer
Some of the Achievements during the above tenure
• Suggested changes in design of structural arrangement with cost reduction of 20%
• Suggested change in material specification of liners, which was frequently getting
damaged.
• Handled independently the site fabrication installation & commissioning of
conveyors, machinery & equipment.
• Developed indigenous components, which were being imported from France
causing delay in delivery.
Educational Qualifications
• First Class Engineering Graduate in Mechanical Engineering from KBN College
of Engineering, Gulbarga, Karnataka
• Diploma in Mechanical Engineering from V. Ramakrishna Polytechnic, Chennai
Computer Skills
• Software: - Pro/E 20.0, Auto CAD Rel. 2008, NISA
• Operating System: - Windows XP and LAN
• Languages Known: - C++
Personal Details
• Date of Birth: 22nd
April 1969
Languages Known: English, Hindi, Telugu & Tamil
Present CTC
Notice Period
• …….Lacks.
• 2 to 3 months
Page 6 of 6