SlideShare a Scribd company logo
1 of 7
House No: B302, Kushi Residency, GE Road,
Telebandha, Labandhi,NH-6,RAIPUR – 492 010
Phone: 91-9589052501, email: avskrishna@hotmail.com
Adusumilli Venkata Siva Krishna
Job Objective
• To acquire a challenging position in the field of Mechanical Engineering, where I can
effectively contribute to the growth of the organization by utilizing my experience and
knowledge.
Professional Experience
• Having more than 23 years of experience in Design & Development of heavy
machinery, equipment and Plant Layouts for Cement Plants & Sugar plants.
• Well versed in independent Detail engineering of all type of indigenous machinery,
vessels & preparation of Plant layouts for Process plants
• Standardization of equipments and bought out items based on system requirements
to improve system performance
• Design and Detail engineering of high & low speed rotating indigenous machines.
• Sizing of equipment for material handling systems Lime Stone, Additives, Sugar,
and Coal etc.
• Detailed engineering with complete Process Flow diagrams & PI diagrams.
• Standardization of Layouts implementing Concept & modules and improving system
performance.
• Exposure to ISO 9001 procedure for Engineering.
Career Path
Details of Work Experience
(Sep 2015 to till date)
• June 1993 to Feb 1994 - Trainee (Engineering company)
• Mar 1994 to Aug1996 - Graduate Trainee(The KCP Ltd, Central workshop ,Chennai)
• Sep 1996 to May 1999 - Engineer - Designs(FCB-KCP Ltd, Chennai)
• June 1999 to July 2002 - Senior Engineer- Designs(FCB-KCP Ltd, Chennai)
• Aug 2002 to Oct. 2003 - Asst. Manager – Designs(FCB-KCP Ltd, Chennai)
• Nov 2003 to Dec 2006 - Deputy Manager – Designs(FCB-KCP Ltd, Chennai)
• Jan 2007 to Mar 2008 - Manager – Designs(Fives Cail -KCP Ltd, Chennai)
• April 2008 toDec 2008 - Senior Manager – Designs(Fives Cail –KCP Ltd, Chennai)
• Dec 2008 to Aug 2010 - Manager – Plant Layout (FLSmidth Pvt Ltd, Chennai)
• Sep 2010 to Sep 2015 - Chief Manager–Engineering(KHD Humboldt Wedag, Delhi)
• Sep 2015 to till date – GM Head of Engg (Jindal Steel & Power Ltd, Raipur)
• Organization - JINDAL STEEL & POWER LTD; Machinery Division,
Raipur.
• Company Profile - JINDAL STEEL & POWER LTD is the leading supplier
of equipment and services for EOT & Gantry Cranes, steel plant
equipment, Material Handling, & Pressure vessels and established in 1992
at Raipur, Chhattisgarh.
• Tenure - September 2015 to present
• Current Designation - General Manager (Head of Engineering)
Page 1 of 6
• Reporting to - Business Unit Head
Chief Tasks Handling
• Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage for steel plant (viz. Rubber
Belt conveyors, Stacker & Reclaimers etc.)
• Preparation & Freezing of Equipment Layout for Pipe conveyor, Cement
grinding unit & FGD of different plant departments as per plant Layout.
• Engineering head for doing projects of all the product equipment like EOT &
Gantry cranes, Pipe conveyor, Belt conveyors, Stacker & Reclaimers, Steel
plant equipment’s, Pressure vessels etc. Projects handling JPL Tamnar, JSPL
Angul, JSW, EIL, UOP, Dangote etc.
• Checking and approving of GA Drawings of different Plant departments.
• Preparation of Technical specifications of services related bought out items.
• Clarifications to the queries received from Civil consultants / Customer
• Layout Coordination with customer and consultants (Tendering projects).
• Currently working on an EPC Project, 20.3 KM pipe conveyor from Bilaimund to
JPL Tamnar.
• Lead the team of size 55 to 70 members while working for the different projects.
Details of Work Experience
(Previous Sep 2010 to Sep 2015)
• Organization - KHD HUMBOLDT WEDAG India Pvt Ltd; DELHI.
• Company Profile - KHD HUMBOLDT WEDAG is the leading supplier of
equipment and services to the global Cement and Minerals industries.
• Tenure - September 2010 to present
• Current Designation - Chief Manger (Plant Application Engineering & Services)
• Reporting to - AVP / Head of Engineering Dept
Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage (viz. Rubber Belt conveyors,
Stacker & Reclaimers, Bucket Elevators, Screw Conveyors etc.)
• Preparation & Freezing of Equipment Layout for different plant departments in
Cement Plant as per plant Layout.
• Technical head for projects like Ultratech 10,000 tpd clinkerisation plant, Dalmia
Cement for their 4500 tpd clinker capacity integrated cement plant in Belgaum,
ACC for 9000 tpd clinker capacity integrated cement plant in Jamul etc. These
projects includes various product departments having equipment like Roller
Press, Separators, Preheater, Kiln, Cooler, VRM, Ball Mills, material handling
equipments etc..
• Checking and approving of GA Drawings of different Plant departments in
compass Documentum (Common Database)
• Preparation of Technical specifications of services related bought out items.
• Clarifications to the queries received from Civil consultants / Customer
Page 2 of 6
• Layout Coordination with customer and consultants ( Dalmia cement, ACC
Jamul & Tendering projects).
• Currently working on an EPC Project, ACC Jamul 9000tpd integrated cement
plant.
• Lead the virtual team of size 20 to 25 members while working for the different
projects.
Details of Work Experience
(Previous Dec 2008 to Aug 2010)
• Organization - FLSmidth Pvt Ltd; CHENNAI.
• Company Profile - FLSmidth is the leading supplier of equipment
and services to the global Cement and Minerals
industries.
• Tenure - December 2008 to Sept 2010
• Current Designation - Manager (Plant Layout)
• Reporting to - Head of Plant Layout Engineering
Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage (viz. Rubber Belt conveyors,
Stacker & Reclaimers, Bucket Elevators, Screw Conveyors etc.)
• Basic Design of equipment for Coal material handling systems from raw coal
dumping hoppers to coal mill and coal mill to fine coal bins(Rubber Belt
Conveyors, Screw Conveyors etc.) and Cement grinding.
• Preparation & Freezing of Equipment Layout for different plant departments in
Cement Plant and Sizing of Bins as per plant Layout.
• Preparation of Outline & Load drawings for different equipment (viz. Rubber
Belt conveyors, Bucket Elevators, Screw Conveyors, Bins etc.)
• Checking and approving of GA Drawings of different Plant departments in
Documentum (Common Database)
• Preparation and submission of transmittals for different plant departments and
Preparation of Foundation Bolts list.
• Clarifications to the queries received from Civil consultants / Customer
• Preparation of piping layout for compressed air and water for different Plant
departments.
• Leading a team of 2 Engineers and 14 Designers.
Details of Work Experience (Other
Previous)
• Organization - Fives Cail - KCP Ltd. (Formerly FCB-KCP Ltd.)
• Company Profile - Design, Manufacture, Supply, Installation & Commissioning
of
Machinery & Equipment on Turnkey basis for Sugar,
Minerals,
Distillery & various Process Plants
• Tenure - September 1996 to Dec 2008.
• Current Designation- Senior Manager (Designs)
• Reporting to - GM (Engineering & Purchase) / Managing Director
Page 3 of 6
Chief Tasks Handled
• Leading the Engineering team from Design Stage for developing the Preliminary
Plant layouts to design and detail engineering of equipment/machinery/material
handling equipments.
• Sizing & Finalization of Material Handling equipment connecting different Plant
departments and Raw material handling & storage (viz. Rubber Belt conveyors,
Bucket Elevators, Screw Conveyors etc.)
• Modification of existing layouts to accommodate equipment / Machinery with
conveying system for expansion projects.
• Design and detail engineering of material handling equipments, rotary driers,
fluidized bed driers.
• Design and detail engineering of high speed centrifugal machines and shredders etc
• Converted French drawings and materials standards to suit Indian standards.
• Detailed Engineering with complete Process Flow diagram & PI diagram, Piping
layouts & detailing.
• Continuous development and replacement of imported components with indigenous
items to suit Indian Customers and easy procurement.
• Erection, commissioning and performance guarantees of the new product
launching.
• Attending technical negotiations with customers and freezing the concepts.
• Finalizing the layouts to suit customer requirements and site conditions.
• Preparation of Estimates for a Plant of particular capacity.
• Freezing of Equipment for a plant of particular capacity.
• Finalization of Technical Specifications, order processing and execution including
proving of performance trials.
• Design of Molasses Storage Tanks using IS: 5521and storage bins.
• Preparation of feasibility report and providing consultancy services for various
Customers.
• Selection of vendors, attending technical discussions for finalization of bought-out
items.
• Trouble shooting and advising remedial measures during erection & commissioning.
• Preparation & submission of operation and maintenance manual for various
machinery & equipment.
• Meeting the target of project completion (domestic & exports) within scheduled
time.
• Leading a team of 4 Engineers and 14 Designers including 2 trainees.
Some of the Achievements during the above tenure
 Improved the Equipments design :-
• Improved design of new equipments of our collaborator and made detail
engineering, involved in the manufacturing, erection & commissioned the
equipments (high speed rotating machinery) and proved the performance.
 Deputed to France :- Oct’2004
• For discussions with our Collaborator for development and launching of New
Product.
• Analyzed the problems/ drawbacks in existing design.
• Defined the technical specification for the new product with feasibility for
diversification to non – sugar industry.
Page 4 of 6
• Selection and finalization of raw materials & manufacturing methods.
• Development of prototype and testing.
• Reduced the cost of centrifugal machine by 15% and increased the market share of
Centrifugal Machine from 25% to 40%
 Deputed to Bangladesh:- Oct’2006
• Trouble shooting of some of the conveyors/equipments/machinery and achieved the
performance.
• For clarification of various points in laying the pipelines for 1000 TPD Sugar
Refinery
 Visited Vietnam :- Jun’2007
• For studying an existing factory equipments/machinery/conveyors and design the
equipments and layout for expansion
• Completed the expansion work successfully with in stipulated time
 Attended an International Seminar in South Africa :- Aug’2007
• For marketing and to explain the international customers about the advantages of
our equipments.
 Visited Vietnam :- Apr’2008
• For identifying the suitability of equipments of an existing plant for purchasing and
shifting the plant to new location & expanding the plant.
Details of Experience with Previous Employers
1) • Organization - The KCP Ltd. Chennai
• Company Profile - Design, Manufacture, Supply, Installation & Commissioning of
Machinery & Equipment on Turnkey basis for Cement,
Steel,
Sugar, Chemical Plants & Special Projects for ISRO,
Defense etc.
• Tenure - March 1994 to April 1996
• Last Designation - Graduate Trainee
2) • Organization - Engineering & Constructions Ltd.
• Company Profile - Fabrication, Erection & Commissioning of Machinery &
Equipment on Turnkey basis for Different Industries
• Tenure - June 1993 to February 1994
• Last Designation - Trainee
Job Responsibilities include
• System Design, Detail Engineering and providing inputs for preparation of
manufacturing drawings for machinery & equipment
• Design/ Engineering of requisite structural for machinery & equipment
• Preparation of bought-out items and bill of materials for machinery & equipment.
• Negotiation and finalization of sub-contract orders for site fabrication, erection &
commissioning
• Receipt of raw materials and distribution to sub-contractors for site fabrication
• Stage wise inspection of the job and obtain customer clearance
• Checking of civil foundations before installation of the machinery & equipment
• Conducting trials of the installed machinery & equipment and handing over to
customer
Page 5 of 6
• Attending review meetings with customer
Some of the Achievements during the above tenure
• Suggested changes in design of structural arrangement with cost reduction of 20%
• Suggested change in material specification of liners, which was frequently getting
damaged.
• Handled independently the site fabrication installation & commissioning of
conveyors, machinery & equipment.
• Developed indigenous components, which were being imported from France
causing delay in delivery.
Educational Qualifications
• First Class Engineering Graduate in Mechanical Engineering from KBN College
of Engineering, Gulbarga, Karnataka
• Diploma in Mechanical Engineering from V. Ramakrishna Polytechnic, Chennai
Computer Skills
• Software: - Pro/E 20.0, Auto CAD Rel. 2008, NISA
• Operating System: - Windows XP and LAN
• Languages Known: - C++
Personal Details
• Date of Birth: 22nd
April 1969
Languages Known: English, Hindi, Telugu & Tamil
Present CTC
Notice Period
• …….Lacks.
• 2 to 3 months
Page 6 of 6
• Attending review meetings with customer
Some of the Achievements during the above tenure
• Suggested changes in design of structural arrangement with cost reduction of 20%
• Suggested change in material specification of liners, which was frequently getting
damaged.
• Handled independently the site fabrication installation & commissioning of
conveyors, machinery & equipment.
• Developed indigenous components, which were being imported from France
causing delay in delivery.
Educational Qualifications
• First Class Engineering Graduate in Mechanical Engineering from KBN College
of Engineering, Gulbarga, Karnataka
• Diploma in Mechanical Engineering from V. Ramakrishna Polytechnic, Chennai
Computer Skills
• Software: - Pro/E 20.0, Auto CAD Rel. 2008, NISA
• Operating System: - Windows XP and LAN
• Languages Known: - C++
Personal Details
• Date of Birth: 22nd
April 1969
Languages Known: English, Hindi, Telugu & Tamil
Present CTC
Notice Period
• …….Lacks.
• 2 to 3 months
Page 6 of 6

More Related Content

What's hot (20)

Resume Aich 240916
Resume Aich 240916Resume Aich 240916
Resume Aich 240916
 
Resume of R N Chaudhuri
Resume of R N ChaudhuriResume of R N Chaudhuri
Resume of R N Chaudhuri
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
MSSRESUME 02-12-2016
MSSRESUME 02-12-2016 MSSRESUME 02-12-2016
MSSRESUME 02-12-2016
 
resume frfcf murgi
resume frfcf murgiresume frfcf murgi
resume frfcf murgi
 
cv
cvcv
cv
 
Copy of resume veera (2)
Copy of resume veera (2)Copy of resume veera (2)
Copy of resume veera (2)
 
Resume
ResumeResume
Resume
 
ANUPAM RESUME
ANUPAM RESUMEANUPAM RESUME
ANUPAM RESUME
 
Raghavendra Purohit - Ver.01
Raghavendra Purohit - Ver.01Raghavendra Purohit - Ver.01
Raghavendra Purohit - Ver.01
 
Resume
ResumeResume
Resume
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
David Urban Resume Updated Apr 2015
David Urban Resume Updated Apr 2015David Urban Resume Updated Apr 2015
David Urban Resume Updated Apr 2015
 
resume
resumeresume
resume
 
Anurag
AnuragAnurag
Anurag
 
GNS-Resume
GNS-ResumeGNS-Resume
GNS-Resume
 
Ravi Resume
Ravi ResumeRavi Resume
Ravi Resume
 
CV rajesh
CV rajeshCV rajesh
CV rajesh
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 

Viewers also liked

Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...
Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...
Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...Alberto Mantovani
 
Execution of a_cement_project_from_az[1]
Execution of a_cement_project_from_az[1]Execution of a_cement_project_from_az[1]
Execution of a_cement_project_from_az[1]manojrv
 
Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !F. Mattes
 
Trabajos robados en internet
Trabajos robados en internetTrabajos robados en internet
Trabajos robados en internetAngie Moreno
 
iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)Renson Mwenda
 

Viewers also liked (8)

Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...
Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...
Osteosintesi percutanea delle fratture dei metacarpi con fili di K. e Morsett...
 
Execution of a_cement_project_from_az[1]
Execution of a_cement_project_from_az[1]Execution of a_cement_project_from_az[1]
Execution of a_cement_project_from_az[1]
 
YH Media Kit 2016
YH Media Kit 2016YH Media Kit 2016
YH Media Kit 2016
 
Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !Christiane Taubira, la femme debout !
Christiane Taubira, la femme debout !
 
Trabajos robados en internet
Trabajos robados en internetTrabajos robados en internet
Trabajos robados en internet
 
iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)iKonsult PPT Presentation (Final)
iKonsult PPT Presentation (Final)
 
Pacific case
Pacific casePacific case
Pacific case
 
Shroff A - AIMRADIAL 2014 - Same-day discharge
Shroff A - AIMRADIAL 2014 - Same-day dischargeShroff A - AIMRADIAL 2014 - Same-day discharge
Shroff A - AIMRADIAL 2014 - Same-day discharge
 

Similar to AVS Krishna Resume

Similar to AVS Krishna Resume (20)

Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
RESUME-MOHAN MUKUND
RESUME-MOHAN MUKUNDRESUME-MOHAN MUKUND
RESUME-MOHAN MUKUND
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Construction Engineer Piping ,Tower crane - Anoop
Construction Engineer Piping ,Tower crane - AnoopConstruction Engineer Piping ,Tower crane - Anoop
Construction Engineer Piping ,Tower crane - Anoop
 
Abhishek
AbhishekAbhishek
Abhishek
 
Resume Nikhil Sudan
Resume Nikhil SudanResume Nikhil Sudan
Resume Nikhil Sudan
 
Alzagon engineering solutions
Alzagon engineering solutionsAlzagon engineering solutions
Alzagon engineering solutions
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
CV_Pratip_Dutta_Design_Mechanical_03.10.2016
CV_Pratip_Dutta_Design_Mechanical_03.10.2016CV_Pratip_Dutta_Design_Mechanical_03.10.2016
CV_Pratip_Dutta_Design_Mechanical_03.10.2016
 
vijay cv
vijay cvvijay cv
vijay cv
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Venkata Chandra Sekhar Sure
Venkata Chandra Sekhar SureVenkata Chandra Sekhar Sure
Venkata Chandra Sekhar Sure
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
CV Max KM
CV Max KMCV Max KM
CV Max KM
 

AVS Krishna Resume

  • 1. House No: B302, Kushi Residency, GE Road, Telebandha, Labandhi,NH-6,RAIPUR – 492 010 Phone: 91-9589052501, email: avskrishna@hotmail.com Adusumilli Venkata Siva Krishna Job Objective • To acquire a challenging position in the field of Mechanical Engineering, where I can effectively contribute to the growth of the organization by utilizing my experience and knowledge. Professional Experience • Having more than 23 years of experience in Design & Development of heavy machinery, equipment and Plant Layouts for Cement Plants & Sugar plants. • Well versed in independent Detail engineering of all type of indigenous machinery, vessels & preparation of Plant layouts for Process plants • Standardization of equipments and bought out items based on system requirements to improve system performance • Design and Detail engineering of high & low speed rotating indigenous machines. • Sizing of equipment for material handling systems Lime Stone, Additives, Sugar, and Coal etc. • Detailed engineering with complete Process Flow diagrams & PI diagrams. • Standardization of Layouts implementing Concept & modules and improving system performance. • Exposure to ISO 9001 procedure for Engineering. Career Path Details of Work Experience (Sep 2015 to till date) • June 1993 to Feb 1994 - Trainee (Engineering company) • Mar 1994 to Aug1996 - Graduate Trainee(The KCP Ltd, Central workshop ,Chennai) • Sep 1996 to May 1999 - Engineer - Designs(FCB-KCP Ltd, Chennai) • June 1999 to July 2002 - Senior Engineer- Designs(FCB-KCP Ltd, Chennai) • Aug 2002 to Oct. 2003 - Asst. Manager – Designs(FCB-KCP Ltd, Chennai) • Nov 2003 to Dec 2006 - Deputy Manager – Designs(FCB-KCP Ltd, Chennai) • Jan 2007 to Mar 2008 - Manager – Designs(Fives Cail -KCP Ltd, Chennai) • April 2008 toDec 2008 - Senior Manager – Designs(Fives Cail –KCP Ltd, Chennai) • Dec 2008 to Aug 2010 - Manager – Plant Layout (FLSmidth Pvt Ltd, Chennai) • Sep 2010 to Sep 2015 - Chief Manager–Engineering(KHD Humboldt Wedag, Delhi) • Sep 2015 to till date – GM Head of Engg (Jindal Steel & Power Ltd, Raipur) • Organization - JINDAL STEEL & POWER LTD; Machinery Division, Raipur. • Company Profile - JINDAL STEEL & POWER LTD is the leading supplier of equipment and services for EOT & Gantry Cranes, steel plant equipment, Material Handling, & Pressure vessels and established in 1992 at Raipur, Chhattisgarh. • Tenure - September 2015 to present • Current Designation - General Manager (Head of Engineering) Page 1 of 6
  • 2. • Reporting to - Business Unit Head Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant departments and Raw material handling & storage for steel plant (viz. Rubber Belt conveyors, Stacker & Reclaimers etc.) • Preparation & Freezing of Equipment Layout for Pipe conveyor, Cement grinding unit & FGD of different plant departments as per plant Layout. • Engineering head for doing projects of all the product equipment like EOT & Gantry cranes, Pipe conveyor, Belt conveyors, Stacker & Reclaimers, Steel plant equipment’s, Pressure vessels etc. Projects handling JPL Tamnar, JSPL Angul, JSW, EIL, UOP, Dangote etc. • Checking and approving of GA Drawings of different Plant departments. • Preparation of Technical specifications of services related bought out items. • Clarifications to the queries received from Civil consultants / Customer • Layout Coordination with customer and consultants (Tendering projects). • Currently working on an EPC Project, 20.3 KM pipe conveyor from Bilaimund to JPL Tamnar. • Lead the team of size 55 to 70 members while working for the different projects. Details of Work Experience (Previous Sep 2010 to Sep 2015) • Organization - KHD HUMBOLDT WEDAG India Pvt Ltd; DELHI. • Company Profile - KHD HUMBOLDT WEDAG is the leading supplier of equipment and services to the global Cement and Minerals industries. • Tenure - September 2010 to present • Current Designation - Chief Manger (Plant Application Engineering & Services) • Reporting to - AVP / Head of Engineering Dept Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant departments and Raw material handling & storage (viz. Rubber Belt conveyors, Stacker & Reclaimers, Bucket Elevators, Screw Conveyors etc.) • Preparation & Freezing of Equipment Layout for different plant departments in Cement Plant as per plant Layout. • Technical head for projects like Ultratech 10,000 tpd clinkerisation plant, Dalmia Cement for their 4500 tpd clinker capacity integrated cement plant in Belgaum, ACC for 9000 tpd clinker capacity integrated cement plant in Jamul etc. These projects includes various product departments having equipment like Roller Press, Separators, Preheater, Kiln, Cooler, VRM, Ball Mills, material handling equipments etc.. • Checking and approving of GA Drawings of different Plant departments in compass Documentum (Common Database) • Preparation of Technical specifications of services related bought out items. • Clarifications to the queries received from Civil consultants / Customer Page 2 of 6
  • 3. • Layout Coordination with customer and consultants ( Dalmia cement, ACC Jamul & Tendering projects). • Currently working on an EPC Project, ACC Jamul 9000tpd integrated cement plant. • Lead the virtual team of size 20 to 25 members while working for the different projects. Details of Work Experience (Previous Dec 2008 to Aug 2010) • Organization - FLSmidth Pvt Ltd; CHENNAI. • Company Profile - FLSmidth is the leading supplier of equipment and services to the global Cement and Minerals industries. • Tenure - December 2008 to Sept 2010 • Current Designation - Manager (Plant Layout) • Reporting to - Head of Plant Layout Engineering Chief Tasks Handling • Sizing & Finalization of Material Handling equipment connecting different Plant departments and Raw material handling & storage (viz. Rubber Belt conveyors, Stacker & Reclaimers, Bucket Elevators, Screw Conveyors etc.) • Basic Design of equipment for Coal material handling systems from raw coal dumping hoppers to coal mill and coal mill to fine coal bins(Rubber Belt Conveyors, Screw Conveyors etc.) and Cement grinding. • Preparation & Freezing of Equipment Layout for different plant departments in Cement Plant and Sizing of Bins as per plant Layout. • Preparation of Outline & Load drawings for different equipment (viz. Rubber Belt conveyors, Bucket Elevators, Screw Conveyors, Bins etc.) • Checking and approving of GA Drawings of different Plant departments in Documentum (Common Database) • Preparation and submission of transmittals for different plant departments and Preparation of Foundation Bolts list. • Clarifications to the queries received from Civil consultants / Customer • Preparation of piping layout for compressed air and water for different Plant departments. • Leading a team of 2 Engineers and 14 Designers. Details of Work Experience (Other Previous) • Organization - Fives Cail - KCP Ltd. (Formerly FCB-KCP Ltd.) • Company Profile - Design, Manufacture, Supply, Installation & Commissioning of Machinery & Equipment on Turnkey basis for Sugar, Minerals, Distillery & various Process Plants • Tenure - September 1996 to Dec 2008. • Current Designation- Senior Manager (Designs) • Reporting to - GM (Engineering & Purchase) / Managing Director Page 3 of 6
  • 4. Chief Tasks Handled • Leading the Engineering team from Design Stage for developing the Preliminary Plant layouts to design and detail engineering of equipment/machinery/material handling equipments. • Sizing & Finalization of Material Handling equipment connecting different Plant departments and Raw material handling & storage (viz. Rubber Belt conveyors, Bucket Elevators, Screw Conveyors etc.) • Modification of existing layouts to accommodate equipment / Machinery with conveying system for expansion projects. • Design and detail engineering of material handling equipments, rotary driers, fluidized bed driers. • Design and detail engineering of high speed centrifugal machines and shredders etc • Converted French drawings and materials standards to suit Indian standards. • Detailed Engineering with complete Process Flow diagram & PI diagram, Piping layouts & detailing. • Continuous development and replacement of imported components with indigenous items to suit Indian Customers and easy procurement. • Erection, commissioning and performance guarantees of the new product launching. • Attending technical negotiations with customers and freezing the concepts. • Finalizing the layouts to suit customer requirements and site conditions. • Preparation of Estimates for a Plant of particular capacity. • Freezing of Equipment for a plant of particular capacity. • Finalization of Technical Specifications, order processing and execution including proving of performance trials. • Design of Molasses Storage Tanks using IS: 5521and storage bins. • Preparation of feasibility report and providing consultancy services for various Customers. • Selection of vendors, attending technical discussions for finalization of bought-out items. • Trouble shooting and advising remedial measures during erection & commissioning. • Preparation & submission of operation and maintenance manual for various machinery & equipment. • Meeting the target of project completion (domestic & exports) within scheduled time. • Leading a team of 4 Engineers and 14 Designers including 2 trainees. Some of the Achievements during the above tenure  Improved the Equipments design :- • Improved design of new equipments of our collaborator and made detail engineering, involved in the manufacturing, erection & commissioned the equipments (high speed rotating machinery) and proved the performance.  Deputed to France :- Oct’2004 • For discussions with our Collaborator for development and launching of New Product. • Analyzed the problems/ drawbacks in existing design. • Defined the technical specification for the new product with feasibility for diversification to non – sugar industry. Page 4 of 6
  • 5. • Selection and finalization of raw materials & manufacturing methods. • Development of prototype and testing. • Reduced the cost of centrifugal machine by 15% and increased the market share of Centrifugal Machine from 25% to 40%  Deputed to Bangladesh:- Oct’2006 • Trouble shooting of some of the conveyors/equipments/machinery and achieved the performance. • For clarification of various points in laying the pipelines for 1000 TPD Sugar Refinery  Visited Vietnam :- Jun’2007 • For studying an existing factory equipments/machinery/conveyors and design the equipments and layout for expansion • Completed the expansion work successfully with in stipulated time  Attended an International Seminar in South Africa :- Aug’2007 • For marketing and to explain the international customers about the advantages of our equipments.  Visited Vietnam :- Apr’2008 • For identifying the suitability of equipments of an existing plant for purchasing and shifting the plant to new location & expanding the plant. Details of Experience with Previous Employers 1) • Organization - The KCP Ltd. Chennai • Company Profile - Design, Manufacture, Supply, Installation & Commissioning of Machinery & Equipment on Turnkey basis for Cement, Steel, Sugar, Chemical Plants & Special Projects for ISRO, Defense etc. • Tenure - March 1994 to April 1996 • Last Designation - Graduate Trainee 2) • Organization - Engineering & Constructions Ltd. • Company Profile - Fabrication, Erection & Commissioning of Machinery & Equipment on Turnkey basis for Different Industries • Tenure - June 1993 to February 1994 • Last Designation - Trainee Job Responsibilities include • System Design, Detail Engineering and providing inputs for preparation of manufacturing drawings for machinery & equipment • Design/ Engineering of requisite structural for machinery & equipment • Preparation of bought-out items and bill of materials for machinery & equipment. • Negotiation and finalization of sub-contract orders for site fabrication, erection & commissioning • Receipt of raw materials and distribution to sub-contractors for site fabrication • Stage wise inspection of the job and obtain customer clearance • Checking of civil foundations before installation of the machinery & equipment • Conducting trials of the installed machinery & equipment and handing over to customer Page 5 of 6
  • 6. • Attending review meetings with customer Some of the Achievements during the above tenure • Suggested changes in design of structural arrangement with cost reduction of 20% • Suggested change in material specification of liners, which was frequently getting damaged. • Handled independently the site fabrication installation & commissioning of conveyors, machinery & equipment. • Developed indigenous components, which were being imported from France causing delay in delivery. Educational Qualifications • First Class Engineering Graduate in Mechanical Engineering from KBN College of Engineering, Gulbarga, Karnataka • Diploma in Mechanical Engineering from V. Ramakrishna Polytechnic, Chennai Computer Skills • Software: - Pro/E 20.0, Auto CAD Rel. 2008, NISA • Operating System: - Windows XP and LAN • Languages Known: - C++ Personal Details • Date of Birth: 22nd April 1969 Languages Known: English, Hindi, Telugu & Tamil Present CTC Notice Period • …….Lacks. • 2 to 3 months Page 6 of 6
  • 7. • Attending review meetings with customer Some of the Achievements during the above tenure • Suggested changes in design of structural arrangement with cost reduction of 20% • Suggested change in material specification of liners, which was frequently getting damaged. • Handled independently the site fabrication installation & commissioning of conveyors, machinery & equipment. • Developed indigenous components, which were being imported from France causing delay in delivery. Educational Qualifications • First Class Engineering Graduate in Mechanical Engineering from KBN College of Engineering, Gulbarga, Karnataka • Diploma in Mechanical Engineering from V. Ramakrishna Polytechnic, Chennai Computer Skills • Software: - Pro/E 20.0, Auto CAD Rel. 2008, NISA • Operating System: - Windows XP and LAN • Languages Known: - C++ Personal Details • Date of Birth: 22nd April 1969 Languages Known: English, Hindi, Telugu & Tamil Present CTC Notice Period • …….Lacks. • 2 to 3 months Page 6 of 6