SlideShare a Scribd company logo
1 of 3
RIZWAN KHAN
House No. 43, block F, Defence view
Phase 2, Karachi South
Skype: rizwan-khan170
Contact no. +966 58 336 7446
Date of Birth: 12/12/1991
PEC Reg No: MECH/27287
rizwankhan170@gmail.com
Current location: Khobar, Saudi Arabia
OBJECTIVE
By the utilization of available resources, acquired skills, proper planning, and hard work to achieve the goal
within desired time frame and prove myself one of the best Mechanical Engineer of an organization.
EDUCATION
YEAR INSTITUTE DEGREE PROGRAM PERCENTAGE
/ GPA/GRADE
Jan-2010-Dec-
2013
NEDUET BE Mechanical
Engineering
3.4
2007-2009 Govt. Nabi Bagh Z.M
Science College
HSC Certificate Pre-Engineering 80%
2007 F.G.Public School
Karachi Cant
SSC Certificate Matric Science 65%
EXPERIENCE/TRAININGS/SHORT COURSES
Current
• Working as Mechanical Engineer(in Planning) in Enterprise future construction, Saudi
Arabia
Responsibilities:
o Preparing master schedule (WBS) on Primavera P6 of different milestones based on
given contract
o Identifying project deliverables, milestones or necessary tasks in order to allocate
available resources to them.
o Monitoring critical path activities in master schedule so that the project should be
within scope (Time, cost and quality)
o Monitoring day to day activities and presenting weekly and monthly progress report
against plan.
o Tracking, monitoring and forecast of all activities and deliverables.
o Reporting to Project manager about current work progress and comparing actual
work against plan work to show progress of the work (Also on network diagrams)
o Incorporating earn value cost so that difference of actual cost and earn value cost is
highlighted.
o Modifying master schedule on request of scope change.
o Developing and monitoring resource( manpower and equipment) histogram.
o Participating in different meetings.
o Prepared work method of statement in the initial phase of project.
o Study of All tender documents received from Client such as Drawings, BOQ &
Specifications specially of Fabrication & erection of structural steel.
o Estimating whatever possible based on given drawings
Past:
• Worked as Trainee Engineer in Unilever 3P, Futehally Chemicals Pvt. Ltd, in an
Engineering Department from Dec 16, 2013 to Feb 3, 2016
Responsibilities:
Projects:
o Involved in Planning, Estimating, managing and controlling of different small and
large Projects, including successful commissioning of New Plant.
o Tracking Project activities against Project plan (Primavera p6)
o Making brief and summarized Project Progress Reports
o Making and maintaining Project Key Performance Indicators
o Updating some of Project Plans to include changes
o Attending Daily Project Meetings
o Analyzing the comparative Sheets of final Bills so that most important and urgent
work to be done in that Purchase Order (PO) without making of new PO.
o Responsible for Identifying, Analyzing, Measuring and Controlling Project Risks
o Involve in Feasibility studies, Development of P&ID's, PFD'S and layouts of
Proposed Projects which include relocation of Rework system, Dust collection
system, Designing and installation of Deaerator System etc.
o Keeping an eye on the issuance of “Permit to work” to contractors Also making and
keeping a record of a punch list of different works from contractors.
o Location of rework System is reviewed by me and changed the current layout of it;
the purpose of doing so was to minimize the load on pump/motor (by reducing large
discharge pipeline and thus bends), reduction in electricity consumption and
Effective use of Rework.
o Some of the Projects are Pumps fitting and associated piping, Fabrication, and
Installation of conical SS 316L tanks and associated piping. Design and Installation
of Ventilation Hoppers, Cap, and Bottle Stand, Design of Ventilation Duct lines for
Dust and Fumes Extraction System, Design and installation of Dust collection
System, Installation of Enclosures, platforms, Shifting and installation of Machines,
Installation of Cargo lift Motors
Maintenance:
o Monitoring Planned Maintenance Activities (using TPM) of existing Plant including
Boiler, Compressors, Dust Collectors, Conveyor Belts, Cargo lifts, Bone mixers,
Centrifugal, and Positive displacement Pumps, Vibrating sieve, pipelines/Ducting,
Blower fans etc.
o Managing Key Performance Indicator (KPI’s) to optimize MTTR and MTBF.
o Monitoring Energy Management system of the whole factory.
o Modifying and maintaining the annual maintenance plan of Plant by dividing the
equipment for maintenance on weekly/monthly/quarterly/annual basis. Also
preparing (if required), modifying (if required) and maintaining the check sheets
against the maintenance plan.
o Maintaining the Overall Plant Effectiveness to World Class Manufacturing (WCM)
level.
o Doing RCA of different incidents including of Breakdowns and also making a WAO
stories.
o Planning, Monitoring and implementing annual maintenance of Boiler. Up till now
conducted two annual maintenance activity. Also doing its preventive maintenance
as of critical Part of the company.
o Preparing a record of particular preventive/planned maintenance activities and thus
minimizing the faults which occur again and again.
o Monitoring preventive and predictive maintenance of compressors, generators, Fork
lifters. Preparing their maintenance according to weekly, monthly and annual
maintenance plan.
• Certified Course on Project Management Framework and Tools from Ned University with
4.0/4.0 GPA.
• Attended Two days Training on Risk Assessment in Unilever Site, FCL by Mr. Naeem
Sadiq.
• Did Primavera (P6) Software Course from MS logics.
• Did Course Fundamentals of Project Planning and Management from the University of
Virginia.
• Did 5 days course on Lean Manufacturing in Ned University.
•
FINAL YEAR PROJECT
Title: Design of a heat exchanger based on Nano fluid.
• Mathematical modeling of heat exchanger
• Using latest correlations of alumina Nano fluid, measure its heat transfer with different diameters.
• Compare it with a conventional heat exchanger using water as a base fluid keeping other factors into
an account.
SKILLS
Technical Softwares:
• Primavera P6, MS Project, Microsoft Office (Word, Excel, PowerPoint), AutoCAD
REFERENCES
Will be furnished upon request

More Related Content

What's hot (20)

Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Resume
ResumeResume
Resume
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Mohammed vasil k.
Mohammed vasil k.Mohammed vasil k.
Mohammed vasil k.
 
Aker Experience
Aker ExperienceAker Experience
Aker Experience
 
Balamurugan CV Jan16
Balamurugan CV Jan16Balamurugan CV Jan16
Balamurugan CV Jan16
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
 
Resume pritam
Resume  pritamResume  pritam
Resume pritam
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
Deepak Kumar_Project
Deepak Kumar_ProjectDeepak Kumar_Project
Deepak Kumar_Project
 
sounder
soundersounder
sounder
 
arco.cv
arco.cvarco.cv
arco.cv
 

Viewers also liked (14)

35th bcs-question-solution
35th bcs-question-solution35th bcs-question-solution
35th bcs-question-solution
 
Masoneilan Control Valve Fundamental Cert
Masoneilan Control Valve Fundamental CertMasoneilan Control Valve Fundamental Cert
Masoneilan Control Valve Fundamental Cert
 
eCertificate
eCertificateeCertificate
eCertificate
 
Goddard_View_V11_I3_web
Goddard_View_V11_I3_webGoddard_View_V11_I3_web
Goddard_View_V11_I3_web
 
My Introduction
My IntroductionMy Introduction
My Introduction
 
AACP 2010 Poster
AACP 2010 PosterAACP 2010 Poster
AACP 2010 Poster
 
Graciela messina
Graciela messinaGraciela messina
Graciela messina
 
Fisheries&aquaculture
Fisheries&aquacultureFisheries&aquaculture
Fisheries&aquaculture
 
Theories of communication 2
Theories of communication 2Theories of communication 2
Theories of communication 2
 
Gayatri-resume_updated
Gayatri-resume_updatedGayatri-resume_updated
Gayatri-resume_updated
 
Brief history of bangladesh
Brief history of bangladeshBrief history of bangladesh
Brief history of bangladesh
 
Pakistan Pharma Overview
Pakistan Pharma OverviewPakistan Pharma Overview
Pakistan Pharma Overview
 
Pakistan Pharmaceutical Market Overview (2015)
Pakistan Pharmaceutical Market Overview (2015)Pakistan Pharmaceutical Market Overview (2015)
Pakistan Pharmaceutical Market Overview (2015)
 
5 barriers to effective communication
5 barriers to effective communication5 barriers to effective communication
5 barriers to effective communication
 

Similar to RizwanKhan CV (20)

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
 
CV
CVCV
CV
 
Vinoth
VinothVinoth
Vinoth
 
Resume
ResumeResume
Resume
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
 
Pradeep raja resume
Pradeep raja   resumePradeep raja   resume
Pradeep raja resume
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)CURRICULUM VITA Suramontri (Planning)
CURRICULUM VITA Suramontri (Planning)
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 

RizwanKhan CV

  • 1. RIZWAN KHAN House No. 43, block F, Defence view Phase 2, Karachi South Skype: rizwan-khan170 Contact no. +966 58 336 7446 Date of Birth: 12/12/1991 PEC Reg No: MECH/27287 rizwankhan170@gmail.com Current location: Khobar, Saudi Arabia OBJECTIVE By the utilization of available resources, acquired skills, proper planning, and hard work to achieve the goal within desired time frame and prove myself one of the best Mechanical Engineer of an organization. EDUCATION YEAR INSTITUTE DEGREE PROGRAM PERCENTAGE / GPA/GRADE Jan-2010-Dec- 2013 NEDUET BE Mechanical Engineering 3.4 2007-2009 Govt. Nabi Bagh Z.M Science College HSC Certificate Pre-Engineering 80% 2007 F.G.Public School Karachi Cant SSC Certificate Matric Science 65% EXPERIENCE/TRAININGS/SHORT COURSES Current • Working as Mechanical Engineer(in Planning) in Enterprise future construction, Saudi Arabia Responsibilities: o Preparing master schedule (WBS) on Primavera P6 of different milestones based on given contract o Identifying project deliverables, milestones or necessary tasks in order to allocate available resources to them. o Monitoring critical path activities in master schedule so that the project should be within scope (Time, cost and quality) o Monitoring day to day activities and presenting weekly and monthly progress report against plan. o Tracking, monitoring and forecast of all activities and deliverables. o Reporting to Project manager about current work progress and comparing actual work against plan work to show progress of the work (Also on network diagrams) o Incorporating earn value cost so that difference of actual cost and earn value cost is highlighted. o Modifying master schedule on request of scope change. o Developing and monitoring resource( manpower and equipment) histogram. o Participating in different meetings. o Prepared work method of statement in the initial phase of project. o Study of All tender documents received from Client such as Drawings, BOQ & Specifications specially of Fabrication & erection of structural steel. o Estimating whatever possible based on given drawings
  • 2. Past: • Worked as Trainee Engineer in Unilever 3P, Futehally Chemicals Pvt. Ltd, in an Engineering Department from Dec 16, 2013 to Feb 3, 2016 Responsibilities: Projects: o Involved in Planning, Estimating, managing and controlling of different small and large Projects, including successful commissioning of New Plant. o Tracking Project activities against Project plan (Primavera p6) o Making brief and summarized Project Progress Reports o Making and maintaining Project Key Performance Indicators o Updating some of Project Plans to include changes o Attending Daily Project Meetings o Analyzing the comparative Sheets of final Bills so that most important and urgent work to be done in that Purchase Order (PO) without making of new PO. o Responsible for Identifying, Analyzing, Measuring and Controlling Project Risks o Involve in Feasibility studies, Development of P&ID's, PFD'S and layouts of Proposed Projects which include relocation of Rework system, Dust collection system, Designing and installation of Deaerator System etc. o Keeping an eye on the issuance of “Permit to work” to contractors Also making and keeping a record of a punch list of different works from contractors. o Location of rework System is reviewed by me and changed the current layout of it; the purpose of doing so was to minimize the load on pump/motor (by reducing large discharge pipeline and thus bends), reduction in electricity consumption and Effective use of Rework. o Some of the Projects are Pumps fitting and associated piping, Fabrication, and Installation of conical SS 316L tanks and associated piping. Design and Installation of Ventilation Hoppers, Cap, and Bottle Stand, Design of Ventilation Duct lines for Dust and Fumes Extraction System, Design and installation of Dust collection System, Installation of Enclosures, platforms, Shifting and installation of Machines, Installation of Cargo lift Motors Maintenance: o Monitoring Planned Maintenance Activities (using TPM) of existing Plant including Boiler, Compressors, Dust Collectors, Conveyor Belts, Cargo lifts, Bone mixers, Centrifugal, and Positive displacement Pumps, Vibrating sieve, pipelines/Ducting, Blower fans etc. o Managing Key Performance Indicator (KPI’s) to optimize MTTR and MTBF. o Monitoring Energy Management system of the whole factory. o Modifying and maintaining the annual maintenance plan of Plant by dividing the equipment for maintenance on weekly/monthly/quarterly/annual basis. Also preparing (if required), modifying (if required) and maintaining the check sheets against the maintenance plan. o Maintaining the Overall Plant Effectiveness to World Class Manufacturing (WCM) level. o Doing RCA of different incidents including of Breakdowns and also making a WAO stories. o Planning, Monitoring and implementing annual maintenance of Boiler. Up till now conducted two annual maintenance activity. Also doing its preventive maintenance as of critical Part of the company. o Preparing a record of particular preventive/planned maintenance activities and thus minimizing the faults which occur again and again.
  • 3. o Monitoring preventive and predictive maintenance of compressors, generators, Fork lifters. Preparing their maintenance according to weekly, monthly and annual maintenance plan. • Certified Course on Project Management Framework and Tools from Ned University with 4.0/4.0 GPA. • Attended Two days Training on Risk Assessment in Unilever Site, FCL by Mr. Naeem Sadiq. • Did Primavera (P6) Software Course from MS logics. • Did Course Fundamentals of Project Planning and Management from the University of Virginia. • Did 5 days course on Lean Manufacturing in Ned University. • FINAL YEAR PROJECT Title: Design of a heat exchanger based on Nano fluid. • Mathematical modeling of heat exchanger • Using latest correlations of alumina Nano fluid, measure its heat transfer with different diameters. • Compare it with a conventional heat exchanger using water as a base fluid keeping other factors into an account. SKILLS Technical Softwares: • Primavera P6, MS Project, Microsoft Office (Word, Excel, PowerPoint), AutoCAD REFERENCES Will be furnished upon request