PROCEDURE
NO. KONTRAK :
00200.PO/SNBP/PGAS/V
III/2022
NOMOR DOKUMEN:
SNBP-CV-CPM-PRO-QC-ITP-001
4 Halaman
PENGADAAN CONTROL VALVE PACKAGE
SENIPAH – BALIKPAPAN
INSPECTION AND TEST PLAN
D 09 Jan 23 Re-Issued For Approval PRB WIN VIC
ASW
EFC
C 01 Dec 22 Re-Issued For Approval PRB WIN VIC
ASW
EFC
B 18 Oct 22 Issued For Approval PRB WIN VIC
ASW
EFC
A 14 Sep 22 Issued For Review PRB WIN VIC ASW EFC
REV TANGGAL DESKRIPSI
DISIAPKAN DIPERIKSA DISETUJUI DISETUJUI
PT. CONTROMATIC PRIMA MANDIRI PT PGAS SOLUTION
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 1 dari 4
TABEL REVISI
HAL
REVISI
HAL
REVISI
HAL
REVISI
A B C D 0 1 2 A B C D 0 1 2 A B C D 0 1 2
1 X X X X
2 X X X X
3 X X X X
4 X X X X
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 2 dari 4
CATATAN PERUBAHAN DOKUMEN
No.
Alasan
Perubahan
Item yang
diubah
Tgl.
Perubahan
Revisi
Ke
Diubah
Oleh
Diketahui
Oleh
1
Apakah hydro akan dilakukan
setelah Actuator di
Assembly.Actuator di Assembly?
Iya,
- 18 Oct 22 B PRB WIN
2
Only FAT/ Function Test?
FAT Factory will apply to all test
as mentioned in 6.2.
(we recommended 10% of total
item orrepresent of each model
and size)
- 18 Oct 22 B PRB WIN
3
FAT/Function 100%
Hydrotest dan Leak Test pada point
6.2 dihapus karena sudah
dilakukan di hydrotest Valve
Ok
- 09 Jan 23 C PRB WIN
4
Ok
Ok
- 09 Jan 23 C PRB WIN
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 3 dari 4
TABLE OF CONTENTS
COVER ...........................................................................................................................................
1. TABEL REVISI.............................................................................................................................. 1
2. CATATAN PERUBAHAN.............................................................................................................. 2
3. DAFTAR ISI .................................................................................................................................. 3
4. LAMPIRAN ................................................................................................................................... 4
- LAMPIRAN : INSPECTION AND TEST PLAN .......................................................................... 4
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 4 dari 4
Lampiran
INSPECTION AND TEST PLAN
Quality Plan
1 / 3
INSPECTION AND TEST PLAN
Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc.
Manufacturing
Neles Korea Co., Ltd.
#235 Cheomdansaneop 1-ro Daesowon-myeon,
Chungju-si, Chungbuk-do,
Korea #27466
Products location
Control Vlave
Tag
-
Customer reference
Quotation number
-
Order number -
-
RESTRICTED
Info:
M - Implementation
R - Review
W - Witness
H - Hold Point
Nel - Neles Korea Co.Ltd
Met - metso
ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY
General Nel/Met CPM PGSOL/PERTAGAS
A. Quality System Control of
quality related
processes
Flow Control HSEQ Guideline
FC-HSEQ-973-En and
procedures. Pressure
Equipment Directive (PED)
2014/68/EU Module H. Metso
Quality System is certified to
ISO 9001.
M - R
B. Contract review Order is
compared with
quotation
Customer requirements
defined and can be complied
with
Order Ackn
M - R
C. Inspection of design and
manufacturing documents
Design
documents for
ASME B16.34
and proprietary
design valves
ASME B16.34 latest rev,
Design documents, Quality
plan M - R
Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon
Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
Quality Plan
2 / 3
INSPECTION AND TEST PLAN
Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc.
ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY
1.0 Quality Control of Materials by Neles Nel/Met CPM PGSOL/PERTAGAS
1.1 Chemical analysis and mechanical
tests
Control of ladle analysis taken during
pouring, and mechanical properties
Pressure
retaining parts
Procedures M-144-En / M-
148-En and material
specification
10204 3.1
M - R
1.2 Visual examination
Visual inspection of surfaces/marking
prior to delivery
Pressure
retaining parts
MSS SP-55 standard and
relevant drawing
M - -
1.3 Liquid Penetrant Test
Examination of surface defects on
component surfaces.
Pressure
retaining parts
Neles Standard Test report M - R
2.0 Quality Control of Materials at Metso Nel/Met CPM PGSOL/PERTAGAS
2.1
Receiving of materials and
certificates
Comparing of dispatch list with
purchasing documents
Verification of
identification
marking and
visual condition
Purchase order Test report M - R
2.2 Incoming inspection
Control of dimensions, surface quality,
markings and certificates
Applicable
parts
Drawings, MSS SP-55
standard and procedures M-
264-En, M-176-En, M-144-En
/ M-148-En / M-147-En
M - -
2.3 Visual and dimensional inspection
Main dimensions, 3D measuring
machine used on a sample basis,
markings
In house
machined parts
Drawings, standards and
procedure M - -
3.0 Quality control during Valve Assembly at Metso Nel/Met CPM PGSOL/PERTAGAS
3.1 Assembly
Control of visual appearance,
cleanliness and markings
All parts
Procedures M-230-En, SOP-
2195-EN and internal
procedures
M - -
3.2 Valve final testing
- Shell PressureTest
- High Pressure Test
- Low Pressure Test
Valve
No visible leakage in shell test
acc. to M-906-Ko.
Seat leakage according to
procedure M-907-Ko and
international standards
Test record
M - W
4.0 Quality control during Actuator Assembly at NELES
Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon
Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
Quality Plan
3 / 3
INSPECTION AND TEST PLAN
Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc.
ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY
4.1 Actuator final inspection
Tightness test (air)
Breakaway test
Actuator
Test Record M - -
5.0 Quality control during Surface Treatment at Metso Nel/Met CPM PGSOL/PERTAGAS
5.1 Surface treatment
Valve painted and dried for corrosion
protection and surface finish
Note! Stainless steel valves blast
cleaned and pickled in cast condition.
Valve
Actuator
Accessory
Test Record Painting Report M M R
6.0 Quality control during Final Assembly (Topworks) at Metso Nel/Met CPM PGSOL/PERTAGAS
6.1 Actuator/Valve assembly
Topworks assembly; mounting of
actuator
Complete valve
actuator unit
Internal SOP procedures and
drawings
(3)
Report
M M R
6.2 Topworks testing
Functional test and Final inspection Complete valve
actuator unit
Procedure M-360-En and M-
905-Ko
FAT Report
M M W
7.0 Quality Control after Manufacturing at Metso Nel/Met CPM PGSOL/PERTAGAS
7.1 Preservation and Packaging
Ensure integrity and preservation of
goods
Valve or
complete
Topwork
M M R
7.2 Manufacturing Data Record (MDR) All Document and
Report
Contract Dossier
M M R
NOTES
1)
Standard document package consists of a Certificate of Compliance, 3.1 material certs for pressure retaining components and Declaration of Conformity and NDT/PT Report shall be
compiled into MDR
2)
Neles Flow control valve manufacturing and sub-suppliers in supply chain
Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon
Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo

More Related Content

What's hot

Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
pipe stress analysis for piping engineering
pipe stress analysis for piping engineeringpipe stress analysis for piping engineering
pipe stress analysis for piping engineeringYoga Sathish
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineeringMobinVarghese8
 
Tutorial caesars II
Tutorial caesars IITutorial caesars II
Tutorial caesars IImanuedlf
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Varun Patel
 
419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdfmoumo1
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Madhur Mahajan
 
Heat Exchanger
Heat ExchangerHeat Exchanger
Heat ExchangerNathan
 
piping design engineering by hamed motlagh
piping design engineering by hamed motlaghpiping design engineering by hamed motlagh
piping design engineering by hamed motlaghHamed Motlagh
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceAbhishek Srivastav
 
Pipe & its wall thickness calculation
Pipe & its wall thickness calculationPipe & its wall thickness calculation
Pipe & its wall thickness calculationsandeepkrish2712
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
 

What's hot (20)

Piping ppt1
Piping ppt1Piping ppt1
Piping ppt1
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
Pipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & MaintenancePipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & Maintenance
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
pipe stress analysis for piping engineering
pipe stress analysis for piping engineeringpipe stress analysis for piping engineering
pipe stress analysis for piping engineering
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineering
 
Tutorial caesars II
Tutorial caesars IITutorial caesars II
Tutorial caesars II
 
pressure vessel, its types and uses
pressure vessel, its types and usespressure vessel, its types and uses
pressure vessel, its types and uses
 
Shell rolling procedure
Shell rolling procedureShell rolling procedure
Shell rolling procedure
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf
 
Piping Material Specification
Piping Material Specification Piping Material Specification
Piping Material Specification
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...
 
Heat Exchanger
Heat ExchangerHeat Exchanger
Heat Exchanger
 
Pressure vessel
Pressure vesselPressure vessel
Pressure vessel
 
piping design engineering by hamed motlagh
piping design engineering by hamed motlaghpiping design engineering by hamed motlagh
piping design engineering by hamed motlagh
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - Maintainance
 
Pipe & its wall thickness calculation
Pipe & its wall thickness calculationPipe & its wall thickness calculation
Pipe & its wall thickness calculation
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 

Similar to Control Valve Inspection Plan

Similar to Control Valve Inspection Plan (20)

18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
testing formats
testing formatstesting formats
testing formats
 
Nes 362
Nes 362Nes 362
Nes 362
 
Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validation
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
18rf 31170-ts-001 (seal ring)
18rf 31170-ts-001 (seal ring)18rf 31170-ts-001 (seal ring)
18rf 31170-ts-001 (seal ring)
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
18rf 31170-ts-003 (screws)
18rf 31170-ts-003 (screws)18rf 31170-ts-003 (screws)
18rf 31170-ts-003 (screws)
 
51410-55S00.pdf
51410-55S00.pdf51410-55S00.pdf
51410-55S00.pdf
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdf
 
NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
96326047 process-description-og-lpg-train-4
96326047 process-description-og-lpg-train-496326047 process-description-og-lpg-train-4
96326047 process-description-og-lpg-train-4
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 

More from Multidisciplinary consulting and engineering firm (10)

Main distribution board (mdb) testing and commissioning field instrumentati...
Main distribution board (mdb) testing and commissioning   field instrumentati...Main distribution board (mdb) testing and commissioning   field instrumentati...
Main distribution board (mdb) testing and commissioning field instrumentati...
 
Procedure cable testing
Procedure cable testingProcedure cable testing
Procedure cable testing
 
Panel check-list
Panel check-listPanel check-list
Panel check-list
 
Scada foft & hardware
Scada foft & hardwareScada foft & hardware
Scada foft & hardware
 
Tac xenta 300 specification sheet
Tac xenta 300 specification sheetTac xenta 300 specification sheet
Tac xenta 300 specification sheet
 
4.1.1 royston handycap
4.1.1 royston handycap4.1.1 royston handycap
4.1.1 royston handycap
 
Cathodic isolator
Cathodic isolatorCathodic isolator
Cathodic isolator
 
Pub059 007-00 0904
Pub059 007-00 0904Pub059 007-00 0904
Pub059 007-00 0904
 
Slickline co pei
Slickline co peiSlickline co pei
Slickline co pei
 
Basic Instrument PID
Basic Instrument PID Basic Instrument PID
Basic Instrument PID
 

Recently uploaded

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Control Valve Inspection Plan

  • 1. PROCEDURE NO. KONTRAK : 00200.PO/SNBP/PGAS/V III/2022 NOMOR DOKUMEN: SNBP-CV-CPM-PRO-QC-ITP-001 4 Halaman PENGADAAN CONTROL VALVE PACKAGE SENIPAH – BALIKPAPAN INSPECTION AND TEST PLAN D 09 Jan 23 Re-Issued For Approval PRB WIN VIC ASW EFC C 01 Dec 22 Re-Issued For Approval PRB WIN VIC ASW EFC B 18 Oct 22 Issued For Approval PRB WIN VIC ASW EFC A 14 Sep 22 Issued For Review PRB WIN VIC ASW EFC REV TANGGAL DESKRIPSI DISIAPKAN DIPERIKSA DISETUJUI DISETUJUI PT. CONTROMATIC PRIMA MANDIRI PT PGAS SOLUTION
  • 2. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 1 dari 4 TABEL REVISI HAL REVISI HAL REVISI HAL REVISI A B C D 0 1 2 A B C D 0 1 2 A B C D 0 1 2 1 X X X X 2 X X X X 3 X X X X 4 X X X X
  • 3. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 2 dari 4 CATATAN PERUBAHAN DOKUMEN No. Alasan Perubahan Item yang diubah Tgl. Perubahan Revisi Ke Diubah Oleh Diketahui Oleh 1 Apakah hydro akan dilakukan setelah Actuator di Assembly.Actuator di Assembly? Iya, - 18 Oct 22 B PRB WIN 2 Only FAT/ Function Test? FAT Factory will apply to all test as mentioned in 6.2. (we recommended 10% of total item orrepresent of each model and size) - 18 Oct 22 B PRB WIN 3 FAT/Function 100% Hydrotest dan Leak Test pada point 6.2 dihapus karena sudah dilakukan di hydrotest Valve Ok - 09 Jan 23 C PRB WIN 4 Ok Ok - 09 Jan 23 C PRB WIN
  • 4. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 3 dari 4 TABLE OF CONTENTS COVER ........................................................................................................................................... 1. TABEL REVISI.............................................................................................................................. 1 2. CATATAN PERUBAHAN.............................................................................................................. 2 3. DAFTAR ISI .................................................................................................................................. 3 4. LAMPIRAN ................................................................................................................................... 4 - LAMPIRAN : INSPECTION AND TEST PLAN .......................................................................... 4
  • 5. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 4 dari 4 Lampiran INSPECTION AND TEST PLAN
  • 6. Quality Plan 1 / 3 INSPECTION AND TEST PLAN Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc. Manufacturing Neles Korea Co., Ltd. #235 Cheomdansaneop 1-ro Daesowon-myeon, Chungju-si, Chungbuk-do, Korea #27466 Products location Control Vlave Tag - Customer reference Quotation number - Order number - - RESTRICTED Info: M - Implementation R - Review W - Witness H - Hold Point Nel - Neles Korea Co.Ltd Met - metso ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY General Nel/Met CPM PGSOL/PERTAGAS A. Quality System Control of quality related processes Flow Control HSEQ Guideline FC-HSEQ-973-En and procedures. Pressure Equipment Directive (PED) 2014/68/EU Module H. Metso Quality System is certified to ISO 9001. M - R B. Contract review Order is compared with quotation Customer requirements defined and can be complied with Order Ackn M - R C. Inspection of design and manufacturing documents Design documents for ASME B16.34 and proprietary design valves ASME B16.34 latest rev, Design documents, Quality plan M - R Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
  • 7. Quality Plan 2 / 3 INSPECTION AND TEST PLAN Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc. ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY 1.0 Quality Control of Materials by Neles Nel/Met CPM PGSOL/PERTAGAS 1.1 Chemical analysis and mechanical tests Control of ladle analysis taken during pouring, and mechanical properties Pressure retaining parts Procedures M-144-En / M- 148-En and material specification 10204 3.1 M - R 1.2 Visual examination Visual inspection of surfaces/marking prior to delivery Pressure retaining parts MSS SP-55 standard and relevant drawing M - - 1.3 Liquid Penetrant Test Examination of surface defects on component surfaces. Pressure retaining parts Neles Standard Test report M - R 2.0 Quality Control of Materials at Metso Nel/Met CPM PGSOL/PERTAGAS 2.1 Receiving of materials and certificates Comparing of dispatch list with purchasing documents Verification of identification marking and visual condition Purchase order Test report M - R 2.2 Incoming inspection Control of dimensions, surface quality, markings and certificates Applicable parts Drawings, MSS SP-55 standard and procedures M- 264-En, M-176-En, M-144-En / M-148-En / M-147-En M - - 2.3 Visual and dimensional inspection Main dimensions, 3D measuring machine used on a sample basis, markings In house machined parts Drawings, standards and procedure M - - 3.0 Quality control during Valve Assembly at Metso Nel/Met CPM PGSOL/PERTAGAS 3.1 Assembly Control of visual appearance, cleanliness and markings All parts Procedures M-230-En, SOP- 2195-EN and internal procedures M - - 3.2 Valve final testing - Shell PressureTest - High Pressure Test - Low Pressure Test Valve No visible leakage in shell test acc. to M-906-Ko. Seat leakage according to procedure M-907-Ko and international standards Test record M - W 4.0 Quality control during Actuator Assembly at NELES Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
  • 8. Quality Plan 3 / 3 INSPECTION AND TEST PLAN Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc. ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY 4.1 Actuator final inspection Tightness test (air) Breakaway test Actuator Test Record M - - 5.0 Quality control during Surface Treatment at Metso Nel/Met CPM PGSOL/PERTAGAS 5.1 Surface treatment Valve painted and dried for corrosion protection and surface finish Note! Stainless steel valves blast cleaned and pickled in cast condition. Valve Actuator Accessory Test Record Painting Report M M R 6.0 Quality control during Final Assembly (Topworks) at Metso Nel/Met CPM PGSOL/PERTAGAS 6.1 Actuator/Valve assembly Topworks assembly; mounting of actuator Complete valve actuator unit Internal SOP procedures and drawings (3) Report M M R 6.2 Topworks testing Functional test and Final inspection Complete valve actuator unit Procedure M-360-En and M- 905-Ko FAT Report M M W 7.0 Quality Control after Manufacturing at Metso Nel/Met CPM PGSOL/PERTAGAS 7.1 Preservation and Packaging Ensure integrity and preservation of goods Valve or complete Topwork M M R 7.2 Manufacturing Data Record (MDR) All Document and Report Contract Dossier M M R NOTES 1) Standard document package consists of a Certificate of Compliance, 3.1 material certs for pressure retaining components and Declaration of Conformity and NDT/PT Report shall be compiled into MDR 2) Neles Flow control valve manufacturing and sub-suppliers in supply chain Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo