2. JAYPEE BINA THEMAL POWER
PLANT PROFILE
Jaiprakash Power Ventures Limited is setting up 2x 250 MW
Coal based Jaypee Bina Thermal Power Plant at Bina
Tehsil, Sagar District, Madhya Pradesh.
1. Location : Bina (M.P)
2. Installed capacity : 2 x 250 MW
3. Future capacity : 650 MW
4. Total area of the Plant : 693.783 hectare
5. Cost of project : 3240 Cr.
6. Coal Required : 2.65 MTPA
7. Water source : Betwa
3. INTRODUCTION
• What is CHP?
• Coal Handling Plant (CHP) is a plant which
handles the coal from its receipt to
transporting it to Boiler and store in Bunkers.
It also processes the raw coal to make it
suitable for Boiler Operation.
4. AVAILABILITY OF COAL IN INDIA
• Mostly E and F grade coal used in India.
• Blending Is Done To get Average D Grade.
CV(K Cal/Kg) Grade
>6200 A
5601-6200 B
4941-5600 C
4201-5940 D
3361-4200 E
2401-3360 F
5.
6. TRANSPORTATION OF COAL
Coal is brought to the power station by three
modes of transportation :
1.Roadways
2.Railways